Challenges
The DCS I/Os and hardware are fine, but the outdated computers had become a huge burden to plant safety and
performance. It also had caused a high maintenance cost due to obsolescence of spare parts. In addition, our customers
wanted to develop useful applications for operation and engineering, and they needed to increase capacity of their
computers for supporting various information of their plants.
Solutions
For high performances and reliable system, ARIDES improved TCS performance and communication with Mark V DCS.
Especially, by redundancy of ARCNET networks and ARIDES servers, the system can provide data from <C> core and <D>
core without any loss. In addition, ARIDES reinforced various types of trend charts, system status overview for checking
processing status and networks, point and group setting function. Also, it supported powerful historian with back up system
and various types of reports.
Performances and Functions Upgrade
 DCS HMI solution based on Windows platform
 Reinforcing the performance of Historian
- On-line retrieval of more than 5 years historical
data with high performance
Upgrading GE Mark V DCS HMI to ARIDES
<R> <S> <T>
<C> <D>
Mark V Control Cabinet
DENET
ARIDES(Advanced Real-time Information DEployment Solution) is a specialized HMI solution for process plants and offers
sophisticated features for real-time process monitoring and control. ARIDES provides communication with various types of
DCS(communication with MHI MIDAS 8000, ABB Procontrol P13/42, SIEMENS Teleperm XP, GE Mark-V).
User Interface of ARIDES is designed in accordance with process plants’ standard, so users can manage and operate all
functions easily. In addition, it improves a whole control system performance by upgrading old HMI software solutions for
legacy DCS.
References
Tel. +82-42-939-9114 / +82-42-939-9018 E-mail. gbm@bnftech.com Web. www.bnftech.com
data with high performance
- Storing 9 years data in case of storing 10,000
points per sec
 System stability
- <C> core, <D> core / Redundant System : Fault
Tolerant System
- Improving system availability
- Replacing old < I> station with the newest system
 Improving functions by considering usability
- Providing various types of trend chart
- Historian backup and reporting functions
- Providing on-line checking of system
status(networks, servers, clients and etc)
- Reinforcing point search, builder and setting
functions
 Supporting various external interfaces
<C> <D>
ARIDES-
Server/Client
ARIDES-OIS
ARIDES-HistorianColor Laser Printer Laser Printer
Historian Historian
ARCNET Hub
DENET
ARCNET
ETHERNET
Backup
Line Redundancy
<System Configuration>
References
 In Saudi Arabia,
- Q power plants, 3 Units (Only G/T) - 81MW
- A power plants, 3 Units (Only G/T) - 110MW
 In Korea,
- HU Nuclear Power Plant Unit 1 x 1000MW
- DJ Thermal Power Plant Unit 3 x 500MW
- DH Thermal Power Plant Unit 2 x 200MW
- TA Thermal Power Plant Unit 3 x 500MW
ARIDES-
Server/Client
Challenges
The DCS I/Os and hardware are fine but the outdated computers had become a huge burden to plant safety and had
caused a high maintenance cost due to obsolescence of spare parts. It is desirable to replace the computers and the
software used. However, since the ABB Procontrol DCS is a closed system, it is difficult to establish a high-speed, 2-way,
and large-scale data communication between the DCS and a modern computer system.
Solutions
To overcome the obstacles, a high-speed network bride board was developed to interface ABB Procontrol bus with Ethernet.
A special interface driver was developed to establish a direct communication between the ABB Procontrol DCS and ARIDES
real-time database.
Upgrading ABB Procontrol P13/P42 DCS HMI to ARIDES References
ARIDES(Advanced Real-time Information Deployment Solution) is specialized HMI solution for process plants and offers
sophisticated features for real-time process monitoring and control. ARIDES provides communication with various types of
DCS(communication with MHI MIDAS 8000, ABB Procontrol P13/42, SIEMENS Teleperm XP, GE Mark-V).
User Interface of ARIDES is designed in accordance with process plants’ standard, so users can manage and operate all
functions easily. In addition, it improves a whole control system performance by upgrading old HMI software solutions for
legacy DCS to the latest one.
Project Requirements
 Down time of the plant during
installation of the new system
- 2 days down for each S/T and
G/T
 Direct P13/P42 bus interface
- P42 IPB interface
- P13 Local bus interface
 Reliability
UNIT #1
SYSTEM
SERVER#2
SYSTEM
SERVER#1
G3
Interface #1
G3
Interface #2
OPS#1 OPS#2 OPS#3 OPS#4 OPS#5 OPS#6 OPS#7
Tel. +82-42-939-9104 / +82-42-939-9018 E-mail. gbm@bnftech.com Web. www.bnftech.com
 Reliability
- Redundancy of server, operator
stations, networks and P42
interface
 Expandability and Flexibility
- Industrial standard network
protocol
- OPC available for external
systems
 Supporting multiple window
displays
 Minimizing changes of process
displays and controls
Performance and Functions Upgrade
 Replacement of the PRAUT and Operator Station
 Replacement of the PMS and Operator Station
 Replacement of the G/T Local MMI computer and panel
 Providing all function of G/T Local MMI within the MCR
 GPS Time synchronization
 Remote control of vibration monitoring equipment
 Sharing of the monitoring/control functions between block #1 and #2
 Consistency of the MMI design between block #1 and #2
References
BR Combined Cycle Power Plant, GT 150MW x 8
BD Combined Cycle Power Plant, GT 75MW x 8 / ST 115MW x 1, ST 115MW x 1 / HRSG x 4
AY Combined Cycle Power Plant, GT 85MW x 4 / ST 160MW x 1 / HRSG x 4
UNIT #2
SYSTEM
SERVER#2
SYSTEM
SERVER#1
G3
Interface #1
G3
Interface #2
GT#1
GT#2
ST#1
BOP
ST#2
GT#4
GT#3
BLOCK#2
OPS#1 OPS#2 OPS#3 OPS#4 OPS#5 OPS#6 OPS#7
<System Configuration>
Upgrading MHI MIDAS 8000 DCS HMI to ARIDES References
Challenges
The DCS I/Os and hardware are fine but the outdated computers had become a huge burden to plant safety and had caused
a high maintenance cost due to obsolescence of spare parts. It is desirable to replace the computers and the software used.
However, since the MHI DCS is a closed system, it is difficult to establish a high-speed, 2-way, and large-scale data
communication between the DCS and a modern computer system.
Solutions
To overcome the obstacles, a high-speed network bride board was developed to interface MIDAS bus with Ethernet.
A special interface driver was developed to establish a direct communication between the DCS and ARIDES real-time
database.
OPS1 OPS2 OPS3 OPS4 OPS5 OPS
6
OPS7 OPS N EWS…
…
ARIDES
Project Requirements
 Directly connecting server system
to MIDAS System Highway
 Providing united function of the
engineer station and 7 OPSs
 Reliability
- Redundancy of server, and using
latest OS(Linux Kernel 2.6) for
real-time response
ARIDES(Advanced Real-time Information Deployment Solution) is specialized HMI solution for process plants and offers
sophisticated features for real-time process monitoring and control. ARIDES provides communication with various types of
DCS(communication with MHI MIDAS 8000, ABB Procontrol P13/42, SIEMENS Teleperm XP, GE Mark-V).
User Interface of ARIDES is designed in accordance with process plants’ standard, so users can manage and operate all
functions easily. In addition, it improves a whole control system performance by upgrading old HMI software solutions for
legacy DCS to the latest one.
Tel. +82-42-939-9104 / +82-42-939-9018 E-mail. gbm@bnftech.com Web. www.bnftech.com
DEHC BOP1 BOP2 HRSG1 HRSG2 HRSG3 RPIO Event
Recorder
VAX A VAX B
P-Line
Q-Line
Serve
r #1
Server #2
GPS Time
Sync
Device
IDOL
Maintenance
Tool
Gateway
PCS
Additional
I/F
- Separating between MIDAS DCS
networks and OPS networks
 Maintenance & scalability
- Installation of state-of-art
standard system(Intel) for easy
maintenance
- Using industry standard protocol
- I/O data process & connectivity
from external networks
 Minimum 1 year data storage and
search of whole power generation.
 Minimizing changes of process
displays and controls
Performance and Functions Upgrade
 Communication driver development and installation
 Development and installation of Server applications
 Development and installation of OPS and ES applications
 Installation of the standard OS (Redhat Linux)
 GPS Time synchronization
 Improvement of operation environment
 Installation of high-speed networks
 Developing customized MMI system adopting customers’ requirements
 Replacing Server, OPS and ES system to the latest version
Reference
BC Combined Cycle Power Plant, GT 100MW x 3 / ST 150MW x 1 / HRSG x 3
<System Configuration>
Challenges
The DCS I/Os and hardware are fine, but the outdated computers had become a huge burden to plant safety and
performance. It also had caused a high maintenance cost due to obsolescence of spare parts. In addition, our customers
wanted to develop useful applications for operation and engineering, and they needed to increase capacity of their
computers for supporting various information of their plants.
Solutions
For high performances and reliable system, ARIDES improved Teleperm XP performance and communication with APs.
In addition, ARIDES reinforced various types of trend charts, system status overview for checking processing status and
networks, point and group setting function, Logic viewer. Also, it supported powerful historian with back up system and
various types of reports.
Performances and Functions Upgrade
 DCS HMI solution based on Windows platform
 Reinforcing Historian performance
- On-line retrieval of more than 5 years historical
data with high performance
Upgrading SIEMENS Teleperm XP HMI to ARIDES
ARIDES(Advanced Real-time Information DEployment Solution) is a specialized HMI solution for process plants and offers
sophisticated features for real-time process monitoring and control. ARIDES provides communication with various types of
DCS(communication with MHI MIDAS 8000, ABB Procontrol P13/42, SIEMENS Teleperm XP, GE Mark-V).
User Interface of ARIDES is designed in accordance with process plants’ standard, so users can manage and operate all
functions easily. In addition, it improves a whole control system performance by upgrading old HMI software solutions for
legacy DCS.
References
Tel. +82-42-939-9114 / +82-42-939-9018 E-mail. gbm@bnftech.com Web. www.bnftech.com
data with high performance
- Unlimited data storing(Depends on storage size)
 Improving the system stability
- Redundant System : Fault Tolerant System
- Improving system availability
- Replacing old OT station to the newest system
 Improving user-friendly functions
- Various types of trend chart
- Historian backup and reporting functions
- On-line checking of system status(networks,
servers, clients and etc)
- Reinforcing point search, builder and setting
functions
- Logic viewer that looks like ES650
 Supporting various external interfaces (OPC)
References
BG Combine Cycle Power Plant Unit1 x 538MW
IC Combine Cycle Power Plant Unit1 x 503MW

More Related Content

What's hot

Fieldbus Presentation
Fieldbus PresentationFieldbus Presentation
Fieldbus PresentationSachin Rasane
 
CHARMED Upgrading the UT Pickle Separations to DeltaV v11
CHARMED Upgrading the UT Pickle Separations to DeltaV v11CHARMED Upgrading the UT Pickle Separations to DeltaV v11
CHARMED Upgrading the UT Pickle Separations to DeltaV v11Emerson Exchange
 
DeltaV Safety Instrumented System Overview
DeltaV Safety Instrumented System OverviewDeltaV Safety Instrumented System Overview
DeltaV Safety Instrumented System OverviewSumeet Goel
 
Design of Industrial Automation Functional Specifications for PLCs, DCs and S...
Design of Industrial Automation Functional Specifications for PLCs, DCs and S...Design of Industrial Automation Functional Specifications for PLCs, DCs and S...
Design of Industrial Automation Functional Specifications for PLCs, DCs and S...Living Online
 
[White Paper] Europe’s Window of Opportunity for Terminal Operators
[White Paper] Europe’s Window of Opportunity for Terminal Operators[White Paper] Europe’s Window of Opportunity for Terminal Operators
[White Paper] Europe’s Window of Opportunity for Terminal OperatorsSchneider Electric
 
NI Compact RIO Platform
NI Compact RIO PlatformNI Compact RIO Platform
NI Compact RIO Platformjlai
 
CV2015_06_30 -NG van Zyl
CV2015_06_30 -NG van ZylCV2015_06_30 -NG van Zyl
CV2015_06_30 -NG van ZylGerhard van Zyl
 
Curtiss-Wright Controls Avionics & Electronics Corporate Overview
Curtiss-Wright Controls Avionics & Electronics Corporate OverviewCurtiss-Wright Controls Avionics & Electronics Corporate Overview
Curtiss-Wright Controls Avionics & Electronics Corporate OverviewCurtiss-Wright Defense Solutions
 
Why rthplc v2
Why rthplc v2Why rthplc v2
Why rthplc v2tanima123
 
Visio arquitectura dcs petrocedeño
Visio arquitectura dcs petrocedeñoVisio arquitectura dcs petrocedeño
Visio arquitectura dcs petrocedeñoJesusLopez715693
 
S57 Optimacs processor - S5 to S7 PLC upgrades
S57 Optimacs processor - S5 to S7 PLC upgradesS57 Optimacs processor - S5 to S7 PLC upgrades
S57 Optimacs processor - S5 to S7 PLC upgradesOptima Control Solutions
 
Foxboro Evo DCS - Εκδήλωση Explore Innovation - Αθήνα, Ιούνιος 2016
Foxboro Evo DCS - Εκδήλωση Explore Innovation - Αθήνα, Ιούνιος 2016Foxboro Evo DCS - Εκδήλωση Explore Innovation - Αθήνα, Ιούνιος 2016
Foxboro Evo DCS - Εκδήλωση Explore Innovation - Αθήνα, Ιούνιος 2016Schneider Electric
 
Fieldbus Tutorial Part 2 - Justifying Fieldbus
Fieldbus Tutorial Part 2 - Justifying FieldbusFieldbus Tutorial Part 2 - Justifying Fieldbus
Fieldbus Tutorial Part 2 - Justifying FieldbusEmerson Exchange
 
Driving Forces and Key Benefits of Control System Migrations
Driving Forces and Key Benefits of Control System MigrationsDriving Forces and Key Benefits of Control System Migrations
Driving Forces and Key Benefits of Control System MigrationsOptima Control Solutions
 
L1 PLC SCADA Orientation
L1 PLC SCADA OrientationL1 PLC SCADA Orientation
L1 PLC SCADA OrientationRAJESH KUMAR
 
Fieldbus Tutorial Part 10 - Fieldbus EDDL
Fieldbus Tutorial Part 10 - Fieldbus EDDLFieldbus Tutorial Part 10 - Fieldbus EDDL
Fieldbus Tutorial Part 10 - Fieldbus EDDLEmerson Exchange
 

What's hot (17)

Fieldbus Presentation
Fieldbus PresentationFieldbus Presentation
Fieldbus Presentation
 
CHARMED Upgrading the UT Pickle Separations to DeltaV v11
CHARMED Upgrading the UT Pickle Separations to DeltaV v11CHARMED Upgrading the UT Pickle Separations to DeltaV v11
CHARMED Upgrading the UT Pickle Separations to DeltaV v11
 
DeltaV Safety Instrumented System Overview
DeltaV Safety Instrumented System OverviewDeltaV Safety Instrumented System Overview
DeltaV Safety Instrumented System Overview
 
Design of Industrial Automation Functional Specifications for PLCs, DCs and S...
Design of Industrial Automation Functional Specifications for PLCs, DCs and S...Design of Industrial Automation Functional Specifications for PLCs, DCs and S...
Design of Industrial Automation Functional Specifications for PLCs, DCs and S...
 
[White Paper] Europe’s Window of Opportunity for Terminal Operators
[White Paper] Europe’s Window of Opportunity for Terminal Operators[White Paper] Europe’s Window of Opportunity for Terminal Operators
[White Paper] Europe’s Window of Opportunity for Terminal Operators
 
NI Compact RIO Platform
NI Compact RIO PlatformNI Compact RIO Platform
NI Compact RIO Platform
 
What is field bus
What is field busWhat is field bus
What is field bus
 
CV2015_06_30 -NG van Zyl
CV2015_06_30 -NG van ZylCV2015_06_30 -NG van Zyl
CV2015_06_30 -NG van Zyl
 
Curtiss-Wright Controls Avionics & Electronics Corporate Overview
Curtiss-Wright Controls Avionics & Electronics Corporate OverviewCurtiss-Wright Controls Avionics & Electronics Corporate Overview
Curtiss-Wright Controls Avionics & Electronics Corporate Overview
 
Why rthplc v2
Why rthplc v2Why rthplc v2
Why rthplc v2
 
Visio arquitectura dcs petrocedeño
Visio arquitectura dcs petrocedeñoVisio arquitectura dcs petrocedeño
Visio arquitectura dcs petrocedeño
 
S57 Optimacs processor - S5 to S7 PLC upgrades
S57 Optimacs processor - S5 to S7 PLC upgradesS57 Optimacs processor - S5 to S7 PLC upgrades
S57 Optimacs processor - S5 to S7 PLC upgrades
 
Foxboro Evo DCS - Εκδήλωση Explore Innovation - Αθήνα, Ιούνιος 2016
Foxboro Evo DCS - Εκδήλωση Explore Innovation - Αθήνα, Ιούνιος 2016Foxboro Evo DCS - Εκδήλωση Explore Innovation - Αθήνα, Ιούνιος 2016
Foxboro Evo DCS - Εκδήλωση Explore Innovation - Αθήνα, Ιούνιος 2016
 
Fieldbus Tutorial Part 2 - Justifying Fieldbus
Fieldbus Tutorial Part 2 - Justifying FieldbusFieldbus Tutorial Part 2 - Justifying Fieldbus
Fieldbus Tutorial Part 2 - Justifying Fieldbus
 
Driving Forces and Key Benefits of Control System Migrations
Driving Forces and Key Benefits of Control System MigrationsDriving Forces and Key Benefits of Control System Migrations
Driving Forces and Key Benefits of Control System Migrations
 
L1 PLC SCADA Orientation
L1 PLC SCADA OrientationL1 PLC SCADA Orientation
L1 PLC SCADA Orientation
 
Fieldbus Tutorial Part 10 - Fieldbus EDDL
Fieldbus Tutorial Part 10 - Fieldbus EDDLFieldbus Tutorial Part 10 - Fieldbus EDDL
Fieldbus Tutorial Part 10 - Fieldbus EDDL
 

Viewers also liked

Plaque rupture relationship to plaque composition in coronary arteries. A 320...
Plaque rupture relationship to plaque composition in coronary arteries. A 320...Plaque rupture relationship to plaque composition in coronary arteries. A 320...
Plaque rupture relationship to plaque composition in coronary arteries. A 320...Apollo Hospitals
 
Presentación LCN Paraguay para arquitectos
Presentación  LCN  Paraguay para arquitectosPresentación  LCN  Paraguay para arquitectos
Presentación LCN Paraguay para arquitectosAna Lewkowitz
 
Programme du l'archipel
Programme du l'archipelProgramme du l'archipel
Programme du l'archipelEGM16081984
 
Nt207 a fr 1 protocole jbus minisonic600
Nt207 a fr 1 protocole jbus minisonic600Nt207 a fr 1 protocole jbus minisonic600
Nt207 a fr 1 protocole jbus minisonic600arkad4848
 
Dresdner Impressionen 2010
Dresdner Impressionen 2010Dresdner Impressionen 2010
Dresdner Impressionen 2010Volker Mölle
 
Towed Trailer Becomes Detached
Towed Trailer Becomes DetachedTowed Trailer Becomes Detached
Towed Trailer Becomes DetachedBianca Kemp
 
Libro 2 do trimestre paguina 89-hasta-la-94
Libro 2 do trimestre paguina 89-hasta-la-94Libro 2 do trimestre paguina 89-hasta-la-94
Libro 2 do trimestre paguina 89-hasta-la-94stefanny ochoa
 
2 guia integrada_de_actividades_academicas_2015-16-02
2 guia integrada_de_actividades_academicas_2015-16-022 guia integrada_de_actividades_academicas_2015-16-02
2 guia integrada_de_actividades_academicas_2015-16-02marta paredes
 
GDF SUEZ International - BEI facts and figures - march 2015
GDF SUEZ International - BEI facts and figures - march 2015 GDF SUEZ International - BEI facts and figures - march 2015
GDF SUEZ International - BEI facts and figures - march 2015 GDFSUEZLA
 
Smart Cities, Gender, Inclusion - Flavia Marzano - Vilnius ICT2013 - WISTER
Smart Cities, Gender, Inclusion - Flavia Marzano - Vilnius ICT2013 - WISTERSmart Cities, Gender, Inclusion - Flavia Marzano - Vilnius ICT2013 - WISTER
Smart Cities, Gender, Inclusion - Flavia Marzano - Vilnius ICT2013 - WISTERFlavia Marzano
 
Dossier empresa Agencia Creativa Comunicación Multimedia
Dossier empresa Agencia Creativa Comunicación MultimediaDossier empresa Agencia Creativa Comunicación Multimedia
Dossier empresa Agencia Creativa Comunicación MultimediaAgencia Creativa
 
Apostila teoria-musical-solfejo
Apostila teoria-musical-solfejoApostila teoria-musical-solfejo
Apostila teoria-musical-solfejoWagner Matos
 
Linee guida internazionalizzazione Sistema Produttivo Regione Lazio 2016 2017
Linee guida internazionalizzazione  Sistema Produttivo Regione Lazio 2016 2017 Linee guida internazionalizzazione  Sistema Produttivo Regione Lazio 2016 2017
Linee guida internazionalizzazione Sistema Produttivo Regione Lazio 2016 2017 Daniele De Felice
 

Viewers also liked (20)

Dossier empresa karicia cosmetica
Dossier empresa karicia cosmeticaDossier empresa karicia cosmetica
Dossier empresa karicia cosmetica
 
Plaque rupture relationship to plaque composition in coronary arteries. A 320...
Plaque rupture relationship to plaque composition in coronary arteries. A 320...Plaque rupture relationship to plaque composition in coronary arteries. A 320...
Plaque rupture relationship to plaque composition in coronary arteries. A 320...
 
Presentación LCN Paraguay para arquitectos
Presentación  LCN  Paraguay para arquitectosPresentación  LCN  Paraguay para arquitectos
Presentación LCN Paraguay para arquitectos
 
Programme du l'archipel
Programme du l'archipelProgramme du l'archipel
Programme du l'archipel
 
Nt207 a fr 1 protocole jbus minisonic600
Nt207 a fr 1 protocole jbus minisonic600Nt207 a fr 1 protocole jbus minisonic600
Nt207 a fr 1 protocole jbus minisonic600
 
PROCESO DE TRANSPORTE
PROCESO DE TRANSPORTEPROCESO DE TRANSPORTE
PROCESO DE TRANSPORTE
 
Lakhvir singh 30 oct
Lakhvir singh 30 octLakhvir singh 30 oct
Lakhvir singh 30 oct
 
Dresdner Impressionen 2010
Dresdner Impressionen 2010Dresdner Impressionen 2010
Dresdner Impressionen 2010
 
school2.@
school2.@school2.@
school2.@
 
Towed Trailer Becomes Detached
Towed Trailer Becomes DetachedTowed Trailer Becomes Detached
Towed Trailer Becomes Detached
 
Libro 2 do trimestre paguina 89-hasta-la-94
Libro 2 do trimestre paguina 89-hasta-la-94Libro 2 do trimestre paguina 89-hasta-la-94
Libro 2 do trimestre paguina 89-hasta-la-94
 
Porque Yo Lo Valgo!
Porque Yo Lo Valgo!Porque Yo Lo Valgo!
Porque Yo Lo Valgo!
 
2 guia integrada_de_actividades_academicas_2015-16-02
2 guia integrada_de_actividades_academicas_2015-16-022 guia integrada_de_actividades_academicas_2015-16-02
2 guia integrada_de_actividades_academicas_2015-16-02
 
GDF SUEZ International - BEI facts and figures - march 2015
GDF SUEZ International - BEI facts and figures - march 2015 GDF SUEZ International - BEI facts and figures - march 2015
GDF SUEZ International - BEI facts and figures - march 2015
 
CoA from HDEC
CoA from HDECCoA from HDEC
CoA from HDEC
 
Smart Cities, Gender, Inclusion - Flavia Marzano - Vilnius ICT2013 - WISTER
Smart Cities, Gender, Inclusion - Flavia Marzano - Vilnius ICT2013 - WISTERSmart Cities, Gender, Inclusion - Flavia Marzano - Vilnius ICT2013 - WISTER
Smart Cities, Gender, Inclusion - Flavia Marzano - Vilnius ICT2013 - WISTER
 
Maksumuudatused 2014
Maksumuudatused 2014Maksumuudatused 2014
Maksumuudatused 2014
 
Dossier empresa Agencia Creativa Comunicación Multimedia
Dossier empresa Agencia Creativa Comunicación MultimediaDossier empresa Agencia Creativa Comunicación Multimedia
Dossier empresa Agencia Creativa Comunicación Multimedia
 
Apostila teoria-musical-solfejo
Apostila teoria-musical-solfejoApostila teoria-musical-solfejo
Apostila teoria-musical-solfejo
 
Linee guida internazionalizzazione Sistema Produttivo Regione Lazio 2016 2017
Linee guida internazionalizzazione  Sistema Produttivo Regione Lazio 2016 2017 Linee guida internazionalizzazione  Sistema Produttivo Regione Lazio 2016 2017
Linee guida internazionalizzazione Sistema Produttivo Regione Lazio 2016 2017
 

Similar to HMI Replacement_GE MARK V, ABB Procontrol 13, MHI MIDAS 8000, SIEMEN TXP

Distributed Control System (DCS) Notes
Distributed Control System (DCS) NotesDistributed Control System (DCS) Notes
Distributed Control System (DCS) NotesRaj Nayak
 
Distributed control system
Distributed control systemDistributed control system
Distributed control systemTilahun Shibru
 
Ls catalog thiet bi tu dong master p 5000-e_dienhathe.vn
Ls catalog thiet bi tu dong master p 5000-e_dienhathe.vnLs catalog thiet bi tu dong master p 5000-e_dienhathe.vn
Ls catalog thiet bi tu dong master p 5000-e_dienhathe.vnDien Ha The
 
Ls catalog thiet bi tu dong master p 5000-e
Ls catalog thiet bi tu dong master p 5000-eLs catalog thiet bi tu dong master p 5000-e
Ls catalog thiet bi tu dong master p 5000-eDien Ha The
 
InSource 2017 IIoT Roadshow: Collecting and Moving Data
InSource 2017 IIoT Roadshow: Collecting and Moving DataInSource 2017 IIoT Roadshow: Collecting and Moving Data
InSource 2017 IIoT Roadshow: Collecting and Moving DataInSource Solutions
 
IRJET-Design of ARM Based Data Acquisition and Control System for Engine Asse...
IRJET-Design of ARM Based Data Acquisition and Control System for Engine Asse...IRJET-Design of ARM Based Data Acquisition and Control System for Engine Asse...
IRJET-Design of ARM Based Data Acquisition and Control System for Engine Asse...IRJET Journal
 
LVTS - Remote CDSEM concept for Fab Metrology
LVTS  - Remote CDSEM concept for Fab MetrologyLVTS  - Remote CDSEM concept for Fab Metrology
LVTS - Remote CDSEM concept for Fab MetrologyVladislav Kaplan
 
DCiM Evaluation Checklist
DCiM Evaluation ChecklistDCiM Evaluation Checklist
DCiM Evaluation ChecklistTREDS
 
Genesys System - 8dec2010
Genesys System - 8dec2010Genesys System - 8dec2010
Genesys System - 8dec2010Agora Group
 
Custom Modular Extrusion
Custom Modular ExtrusionCustom Modular Extrusion
Custom Modular ExtrusionJeff West
 
SICAM PAS Software (6MD90)
SICAM PAS Software (6MD90)SICAM PAS Software (6MD90)
SICAM PAS Software (6MD90)ashwini reliserv
 
Case Study At91RM9200 Data Hub Controller
Case Study At91RM9200 Data Hub ControllerCase Study At91RM9200 Data Hub Controller
Case Study At91RM9200 Data Hub ControllerPromwad
 
Advanced motion controls servo drive catalog
Advanced motion controls servo drive catalogAdvanced motion controls servo drive catalog
Advanced motion controls servo drive catalogElectromate
 
Introduction to IBM Shared Memory Communications Version 2 (SMCv2) and SMC-Dv2
Introduction to IBM Shared Memory Communications Version 2 (SMCv2) and SMC-Dv2Introduction to IBM Shared Memory Communications Version 2 (SMCv2) and SMC-Dv2
Introduction to IBM Shared Memory Communications Version 2 (SMCv2) and SMC-Dv2zOSCommserver
 

Similar to HMI Replacement_GE MARK V, ABB Procontrol 13, MHI MIDAS 8000, SIEMEN TXP (20)

ATS @SCADA+
ATS @SCADA+ATS @SCADA+
ATS @SCADA+
 
Distributed Control System (DCS) Notes
Distributed Control System (DCS) NotesDistributed Control System (DCS) Notes
Distributed Control System (DCS) Notes
 
gesa_sol.ppt
gesa_sol.pptgesa_sol.ppt
gesa_sol.ppt
 
Distributed control system
Distributed control systemDistributed control system
Distributed control system
 
Ls catalog thiet bi tu dong master p 5000-e_dienhathe.vn
Ls catalog thiet bi tu dong master p 5000-e_dienhathe.vnLs catalog thiet bi tu dong master p 5000-e_dienhathe.vn
Ls catalog thiet bi tu dong master p 5000-e_dienhathe.vn
 
Ls catalog thiet bi tu dong master p 5000-e
Ls catalog thiet bi tu dong master p 5000-eLs catalog thiet bi tu dong master p 5000-e
Ls catalog thiet bi tu dong master p 5000-e
 
InSource 2017 IIoT Roadshow: Collecting and Moving Data
InSource 2017 IIoT Roadshow: Collecting and Moving DataInSource 2017 IIoT Roadshow: Collecting and Moving Data
InSource 2017 IIoT Roadshow: Collecting and Moving Data
 
IRJET-Design of ARM Based Data Acquisition and Control System for Engine Asse...
IRJET-Design of ARM Based Data Acquisition and Control System for Engine Asse...IRJET-Design of ARM Based Data Acquisition and Control System for Engine Asse...
IRJET-Design of ARM Based Data Acquisition and Control System for Engine Asse...
 
LVTS - Remote CDSEM concept for Fab Metrology
LVTS  - Remote CDSEM concept for Fab MetrologyLVTS  - Remote CDSEM concept for Fab Metrology
LVTS - Remote CDSEM concept for Fab Metrology
 
DCiM Evaluation Checklist
DCiM Evaluation ChecklistDCiM Evaluation Checklist
DCiM Evaluation Checklist
 
Genesys System - 8dec2010
Genesys System - 8dec2010Genesys System - 8dec2010
Genesys System - 8dec2010
 
Custom Modular Extrusion
Custom Modular ExtrusionCustom Modular Extrusion
Custom Modular Extrusion
 
SICAM PAS Software (6MD90)
SICAM PAS Software (6MD90)SICAM PAS Software (6MD90)
SICAM PAS Software (6MD90)
 
Parimal Resume
Parimal ResumeParimal Resume
Parimal Resume
 
Case Study At91RM9200 Data Hub Controller
Case Study At91RM9200 Data Hub ControllerCase Study At91RM9200 Data Hub Controller
Case Study At91RM9200 Data Hub Controller
 
InTouch Machine Edition Advantages and Features
InTouch Machine Edition Advantages and FeaturesInTouch Machine Edition Advantages and Features
InTouch Machine Edition Advantages and Features
 
Beagle board
Beagle boardBeagle board
Beagle board
 
Effective Plant Management
Effective Plant ManagementEffective Plant Management
Effective Plant Management
 
Advanced motion controls servo drive catalog
Advanced motion controls servo drive catalogAdvanced motion controls servo drive catalog
Advanced motion controls servo drive catalog
 
Introduction to IBM Shared Memory Communications Version 2 (SMCv2) and SMC-Dv2
Introduction to IBM Shared Memory Communications Version 2 (SMCv2) and SMC-Dv2Introduction to IBM Shared Memory Communications Version 2 (SMCv2) and SMC-Dv2
Introduction to IBM Shared Memory Communications Version 2 (SMCv2) and SMC-Dv2
 

Recently uploaded

chapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptchapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptkotipi9215
 
Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)OPEN KNOWLEDGE GmbH
 
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...soniya singh
 
What are the features of Vehicle Tracking System?
What are the features of Vehicle Tracking System?What are the features of Vehicle Tracking System?
What are the features of Vehicle Tracking System?Watsoo Telematics
 
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer DataAdobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer DataBradBedford3
 
The Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdfThe Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdfPower Karaoke
 
What is Binary Language? Computer Number Systems
What is Binary Language?  Computer Number SystemsWhat is Binary Language?  Computer Number Systems
What is Binary Language? Computer Number SystemsJheuzeDellosa
 
Professional Resume Template for Software Developers
Professional Resume Template for Software DevelopersProfessional Resume Template for Software Developers
Professional Resume Template for Software DevelopersVinodh Ram
 
Implementing Zero Trust strategy with Azure
Implementing Zero Trust strategy with AzureImplementing Zero Trust strategy with Azure
Implementing Zero Trust strategy with AzureDinusha Kumarasiri
 
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...kellynguyen01
 
Engage Usergroup 2024 - The Good The Bad_The Ugly
Engage Usergroup 2024 - The Good The Bad_The UglyEngage Usergroup 2024 - The Good The Bad_The Ugly
Engage Usergroup 2024 - The Good The Bad_The UglyFrank van der Linden
 
XpertSolvers: Your Partner in Building Innovative Software Solutions
XpertSolvers: Your Partner in Building Innovative Software SolutionsXpertSolvers: Your Partner in Building Innovative Software Solutions
XpertSolvers: Your Partner in Building Innovative Software SolutionsMehedi Hasan Shohan
 
Salesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantSalesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantAxelRicardoTrocheRiq
 
Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
Cloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackCloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackVICTOR MAESTRE RAMIREZ
 
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...stazi3110
 
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio, Inc.
 
buds n tech IT solutions
buds n  tech IT                solutionsbuds n  tech IT                solutions
buds n tech IT solutionsmonugehlot87
 
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...MyIntelliSource, Inc.
 

Recently uploaded (20)

chapter--4-software-project-planning.ppt
chapter--4-software-project-planning.pptchapter--4-software-project-planning.ppt
chapter--4-software-project-planning.ppt
 
Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)Der Spagat zwischen BIAS und FAIRNESS (2024)
Der Spagat zwischen BIAS und FAIRNESS (2024)
 
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
Russian Call Girls in Karol Bagh Aasnvi ➡️ 8264348440 💋📞 Independent Escort S...
 
What are the features of Vehicle Tracking System?
What are the features of Vehicle Tracking System?What are the features of Vehicle Tracking System?
What are the features of Vehicle Tracking System?
 
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer DataAdobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
Adobe Marketo Engage Deep Dives: Using Webhooks to Transfer Data
 
The Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdfThe Evolution of Karaoke From Analog to App.pdf
The Evolution of Karaoke From Analog to App.pdf
 
What is Binary Language? Computer Number Systems
What is Binary Language?  Computer Number SystemsWhat is Binary Language?  Computer Number Systems
What is Binary Language? Computer Number Systems
 
Professional Resume Template for Software Developers
Professional Resume Template for Software DevelopersProfessional Resume Template for Software Developers
Professional Resume Template for Software Developers
 
Implementing Zero Trust strategy with Azure
Implementing Zero Trust strategy with AzureImplementing Zero Trust strategy with Azure
Implementing Zero Trust strategy with Azure
 
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
Short Story: Unveiling the Reasoning Abilities of Large Language Models by Ke...
 
Engage Usergroup 2024 - The Good The Bad_The Ugly
Engage Usergroup 2024 - The Good The Bad_The UglyEngage Usergroup 2024 - The Good The Bad_The Ugly
Engage Usergroup 2024 - The Good The Bad_The Ugly
 
XpertSolvers: Your Partner in Building Innovative Software Solutions
XpertSolvers: Your Partner in Building Innovative Software SolutionsXpertSolvers: Your Partner in Building Innovative Software Solutions
XpertSolvers: Your Partner in Building Innovative Software Solutions
 
Salesforce Certified Field Service Consultant
Salesforce Certified Field Service ConsultantSalesforce Certified Field Service Consultant
Salesforce Certified Field Service Consultant
 
Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Naraina Delhi 💯Call Us 🔝8264348440🔝
 
Call Girls In Mukherjee Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Mukherjee Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...Call Girls In Mukherjee Nagar 📱  9999965857  🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
Call Girls In Mukherjee Nagar 📱 9999965857 🤩 Delhi 🫦 HOT AND SEXY VVIP 🍎 SE...
 
Cloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStackCloud Management Software Platforms: OpenStack
Cloud Management Software Platforms: OpenStack
 
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
Building a General PDE Solving Framework with Symbolic-Numeric Scientific Mac...
 
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed DataAlluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
Alluxio Monthly Webinar | Cloud-Native Model Training on Distributed Data
 
buds n tech IT solutions
buds n  tech IT                solutionsbuds n  tech IT                solutions
buds n tech IT solutions
 
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
Try MyIntelliAccount Cloud Accounting Software As A Service Solution Risk Fre...
 

HMI Replacement_GE MARK V, ABB Procontrol 13, MHI MIDAS 8000, SIEMEN TXP

  • 1. Challenges The DCS I/Os and hardware are fine, but the outdated computers had become a huge burden to plant safety and performance. It also had caused a high maintenance cost due to obsolescence of spare parts. In addition, our customers wanted to develop useful applications for operation and engineering, and they needed to increase capacity of their computers for supporting various information of their plants. Solutions For high performances and reliable system, ARIDES improved TCS performance and communication with Mark V DCS. Especially, by redundancy of ARCNET networks and ARIDES servers, the system can provide data from <C> core and <D> core without any loss. In addition, ARIDES reinforced various types of trend charts, system status overview for checking processing status and networks, point and group setting function. Also, it supported powerful historian with back up system and various types of reports. Performances and Functions Upgrade  DCS HMI solution based on Windows platform  Reinforcing the performance of Historian - On-line retrieval of more than 5 years historical data with high performance Upgrading GE Mark V DCS HMI to ARIDES <R> <S> <T> <C> <D> Mark V Control Cabinet DENET ARIDES(Advanced Real-time Information DEployment Solution) is a specialized HMI solution for process plants and offers sophisticated features for real-time process monitoring and control. ARIDES provides communication with various types of DCS(communication with MHI MIDAS 8000, ABB Procontrol P13/42, SIEMENS Teleperm XP, GE Mark-V). User Interface of ARIDES is designed in accordance with process plants’ standard, so users can manage and operate all functions easily. In addition, it improves a whole control system performance by upgrading old HMI software solutions for legacy DCS. References Tel. +82-42-939-9114 / +82-42-939-9018 E-mail. gbm@bnftech.com Web. www.bnftech.com data with high performance - Storing 9 years data in case of storing 10,000 points per sec  System stability - <C> core, <D> core / Redundant System : Fault Tolerant System - Improving system availability - Replacing old < I> station with the newest system  Improving functions by considering usability - Providing various types of trend chart - Historian backup and reporting functions - Providing on-line checking of system status(networks, servers, clients and etc) - Reinforcing point search, builder and setting functions  Supporting various external interfaces <C> <D> ARIDES- Server/Client ARIDES-OIS ARIDES-HistorianColor Laser Printer Laser Printer Historian Historian ARCNET Hub DENET ARCNET ETHERNET Backup Line Redundancy <System Configuration> References  In Saudi Arabia, - Q power plants, 3 Units (Only G/T) - 81MW - A power plants, 3 Units (Only G/T) - 110MW  In Korea, - HU Nuclear Power Plant Unit 1 x 1000MW - DJ Thermal Power Plant Unit 3 x 500MW - DH Thermal Power Plant Unit 2 x 200MW - TA Thermal Power Plant Unit 3 x 500MW ARIDES- Server/Client
  • 2. Challenges The DCS I/Os and hardware are fine but the outdated computers had become a huge burden to plant safety and had caused a high maintenance cost due to obsolescence of spare parts. It is desirable to replace the computers and the software used. However, since the ABB Procontrol DCS is a closed system, it is difficult to establish a high-speed, 2-way, and large-scale data communication between the DCS and a modern computer system. Solutions To overcome the obstacles, a high-speed network bride board was developed to interface ABB Procontrol bus with Ethernet. A special interface driver was developed to establish a direct communication between the ABB Procontrol DCS and ARIDES real-time database. Upgrading ABB Procontrol P13/P42 DCS HMI to ARIDES References ARIDES(Advanced Real-time Information Deployment Solution) is specialized HMI solution for process plants and offers sophisticated features for real-time process monitoring and control. ARIDES provides communication with various types of DCS(communication with MHI MIDAS 8000, ABB Procontrol P13/42, SIEMENS Teleperm XP, GE Mark-V). User Interface of ARIDES is designed in accordance with process plants’ standard, so users can manage and operate all functions easily. In addition, it improves a whole control system performance by upgrading old HMI software solutions for legacy DCS to the latest one. Project Requirements  Down time of the plant during installation of the new system - 2 days down for each S/T and G/T  Direct P13/P42 bus interface - P42 IPB interface - P13 Local bus interface  Reliability UNIT #1 SYSTEM SERVER#2 SYSTEM SERVER#1 G3 Interface #1 G3 Interface #2 OPS#1 OPS#2 OPS#3 OPS#4 OPS#5 OPS#6 OPS#7 Tel. +82-42-939-9104 / +82-42-939-9018 E-mail. gbm@bnftech.com Web. www.bnftech.com  Reliability - Redundancy of server, operator stations, networks and P42 interface  Expandability and Flexibility - Industrial standard network protocol - OPC available for external systems  Supporting multiple window displays  Minimizing changes of process displays and controls Performance and Functions Upgrade  Replacement of the PRAUT and Operator Station  Replacement of the PMS and Operator Station  Replacement of the G/T Local MMI computer and panel  Providing all function of G/T Local MMI within the MCR  GPS Time synchronization  Remote control of vibration monitoring equipment  Sharing of the monitoring/control functions between block #1 and #2  Consistency of the MMI design between block #1 and #2 References BR Combined Cycle Power Plant, GT 150MW x 8 BD Combined Cycle Power Plant, GT 75MW x 8 / ST 115MW x 1, ST 115MW x 1 / HRSG x 4 AY Combined Cycle Power Plant, GT 85MW x 4 / ST 160MW x 1 / HRSG x 4 UNIT #2 SYSTEM SERVER#2 SYSTEM SERVER#1 G3 Interface #1 G3 Interface #2 GT#1 GT#2 ST#1 BOP ST#2 GT#4 GT#3 BLOCK#2 OPS#1 OPS#2 OPS#3 OPS#4 OPS#5 OPS#6 OPS#7 <System Configuration>
  • 3. Upgrading MHI MIDAS 8000 DCS HMI to ARIDES References Challenges The DCS I/Os and hardware are fine but the outdated computers had become a huge burden to plant safety and had caused a high maintenance cost due to obsolescence of spare parts. It is desirable to replace the computers and the software used. However, since the MHI DCS is a closed system, it is difficult to establish a high-speed, 2-way, and large-scale data communication between the DCS and a modern computer system. Solutions To overcome the obstacles, a high-speed network bride board was developed to interface MIDAS bus with Ethernet. A special interface driver was developed to establish a direct communication between the DCS and ARIDES real-time database. OPS1 OPS2 OPS3 OPS4 OPS5 OPS 6 OPS7 OPS N EWS… … ARIDES Project Requirements  Directly connecting server system to MIDAS System Highway  Providing united function of the engineer station and 7 OPSs  Reliability - Redundancy of server, and using latest OS(Linux Kernel 2.6) for real-time response ARIDES(Advanced Real-time Information Deployment Solution) is specialized HMI solution for process plants and offers sophisticated features for real-time process monitoring and control. ARIDES provides communication with various types of DCS(communication with MHI MIDAS 8000, ABB Procontrol P13/42, SIEMENS Teleperm XP, GE Mark-V). User Interface of ARIDES is designed in accordance with process plants’ standard, so users can manage and operate all functions easily. In addition, it improves a whole control system performance by upgrading old HMI software solutions for legacy DCS to the latest one. Tel. +82-42-939-9104 / +82-42-939-9018 E-mail. gbm@bnftech.com Web. www.bnftech.com DEHC BOP1 BOP2 HRSG1 HRSG2 HRSG3 RPIO Event Recorder VAX A VAX B P-Line Q-Line Serve r #1 Server #2 GPS Time Sync Device IDOL Maintenance Tool Gateway PCS Additional I/F - Separating between MIDAS DCS networks and OPS networks  Maintenance & scalability - Installation of state-of-art standard system(Intel) for easy maintenance - Using industry standard protocol - I/O data process & connectivity from external networks  Minimum 1 year data storage and search of whole power generation.  Minimizing changes of process displays and controls Performance and Functions Upgrade  Communication driver development and installation  Development and installation of Server applications  Development and installation of OPS and ES applications  Installation of the standard OS (Redhat Linux)  GPS Time synchronization  Improvement of operation environment  Installation of high-speed networks  Developing customized MMI system adopting customers’ requirements  Replacing Server, OPS and ES system to the latest version Reference BC Combined Cycle Power Plant, GT 100MW x 3 / ST 150MW x 1 / HRSG x 3 <System Configuration>
  • 4. Challenges The DCS I/Os and hardware are fine, but the outdated computers had become a huge burden to plant safety and performance. It also had caused a high maintenance cost due to obsolescence of spare parts. In addition, our customers wanted to develop useful applications for operation and engineering, and they needed to increase capacity of their computers for supporting various information of their plants. Solutions For high performances and reliable system, ARIDES improved Teleperm XP performance and communication with APs. In addition, ARIDES reinforced various types of trend charts, system status overview for checking processing status and networks, point and group setting function, Logic viewer. Also, it supported powerful historian with back up system and various types of reports. Performances and Functions Upgrade  DCS HMI solution based on Windows platform  Reinforcing Historian performance - On-line retrieval of more than 5 years historical data with high performance Upgrading SIEMENS Teleperm XP HMI to ARIDES ARIDES(Advanced Real-time Information DEployment Solution) is a specialized HMI solution for process plants and offers sophisticated features for real-time process monitoring and control. ARIDES provides communication with various types of DCS(communication with MHI MIDAS 8000, ABB Procontrol P13/42, SIEMENS Teleperm XP, GE Mark-V). User Interface of ARIDES is designed in accordance with process plants’ standard, so users can manage and operate all functions easily. In addition, it improves a whole control system performance by upgrading old HMI software solutions for legacy DCS. References Tel. +82-42-939-9114 / +82-42-939-9018 E-mail. gbm@bnftech.com Web. www.bnftech.com data with high performance - Unlimited data storing(Depends on storage size)  Improving the system stability - Redundant System : Fault Tolerant System - Improving system availability - Replacing old OT station to the newest system  Improving user-friendly functions - Various types of trend chart - Historian backup and reporting functions - On-line checking of system status(networks, servers, clients and etc) - Reinforcing point search, builder and setting functions - Logic viewer that looks like ES650  Supporting various external interfaces (OPC) References BG Combine Cycle Power Plant Unit1 x 538MW IC Combine Cycle Power Plant Unit1 x 503MW