SlideShare a Scribd company logo
1 of 11
Download to read offline
PRESENTED BY-
AKASH SINGH, ROHIT DABAS I M.U.R.P.-1st YEAR I I.I.T. ROORKEE
NOIDA
LOCATION OF NOIDA ON
U.P. & N.C.R MAP
 CITY INTRODUCTION-Gold
mine of Uttar Pradesh
• Came into administrative existence
on 17 April 1976 and celebrates 17
April as "Noida Day".
• Set up as part of an urbanization
thrust during the
controversial Emergency period.
• As per Census India, population of
Noida in 2011 is 642,381; of which
male and female are 352,577 and
289,804 respectively.
• Total area - 203 km2 (78 sq mi)
• The city has the highest per capita income in the whole National Capital Region
• The Noida Authority is the richest civic body in the country
• Famous for excellent roads and considered Country's greenest city. Hot spot for IT and IT-enabled services industry
CHAPTER 1
PRELIMINARY
CHAPTER 2
BUILDING PERMIT AND OCCUPANCY
CHAPTER 3
GENERAL SITE REQUIREMENTS
CHAPTER 4
STRUCTURAL SAFETY, FIRE SAFETY AND
SERVICES
CHAPTER 5
CONSTRUCTION OF FARM HOUSE BUILDING
IN AGRICULTURAL USE ZONE
CHAPTER 6
CONSTRUCTION ON PLOTS ALLOTTED TO
THE FARMERS AGAINST LAND ACQUISITION
CHAPTER 7
PURCHASABLE FAR
CHAPTER 8
PROVISIONS OF PARKING, LOADING AND
UNLOADING SPACES
 Short title, Commencement and Application
• These regulations and directions may be called the New Okhla Industrial
Development Area Building Regulations and Directions, dated 30 November, 2010
 Definitions
• Definitions of 97 various building related terms used in byelaw
Eg. - Air conditioning, Applicant, Area, Barsati, Basement, Building, Building line ,
FAR, FSI etc.
• Refuge Area – for all buildings exceeding 24 m height, 15 m refuge area is required
i. The floors above 24 metres and up to 39 metres- one refuge area on the floor
immediately above 24 metres
ii. For floors above 39 metres - one refuge area on the floor immediately above 39
metres and so on after every 15mtrs
CHAPTER 1
PRELIMINARY
CHAPTER 2
BUILDING PERMIT AND OCCUPANCY
CHAPTER 3
GENERAL SITE REQUIREMENTS
CHAPTER 4
STRUCTURAL SAFETY, FIRE SAFETY AND
SERVICES
CHAPTER 5
CONSTRUCTION OF FARM HOUSE BUILDING
IN AGRICULTURAL USE ZONE
CHAPTER 6
CONSTRUCTION ON PLOTS ALLOTTED TO
THE FARMERS AGAINST LAND ACQUISITION
CHAPTER 7
PURCHASABLE FAR
CHAPTER 8
PROVISIONS OF PARKING, LOADING AND
UNLOADING SPACES
 Layout / Building Permit and Occupancy
• No person can construct any building, boundary wall or even fencing without taking
permission from the appropriate officer
 Application for building permit –
• Every person who intends to erect a building within the Industrial Development Area
shall give application in the Form given at Appendix – 1
• Documents should be submitted as per the Appendix-1
• Fees should be paid as per regulation no. 10
• No permission required for –
i. Whitewashing and painting;
ii. Plastering, patch work, flooring;
iii. Renewal of roof at the same height;
iv. Reconstruction of portions of building damaged by any natural calamity to the
same extent as previously approved;
v. Internal additions / alterations within the building envelop certified and
supervised by a Technical Person ;
vi. Digging or filling of earth;
CHAPTER 1
PRELIMINARY
CHAPTER 2
BUILDING PERMIT AND OCCUPANCY
CHAPTER 3
GENERAL SITE REQUIREMENTS
CHAPTER 4
STRUCTURAL SAFETY, FIRE SAFETY AND
SERVICES
CHAPTER 5
CONSTRUCTION OF FARM HOUSE BUILDING
IN AGRICULTURAL USE ZONE
CHAPTER 6
CONSTRUCTION ON PLOTS ALLOTTED TO
THE FARMERS AGAINST LAND ACQUISITION
CHAPTER 7
PURCHASABLE FAR
CHAPTER 8
PROVISIONS OF PARKING, LOADING AND
UNLOADING SPACES
 Submission drawings must have all details about the building which is
developed
• Proper mention of signatory
and his/her qualifications
• Fees - Rs. 15.00 per square
metre covered area on all
floors.,
• For layout plan – Re. 1/- per
square metre plot area upto for
first 4.0ha and Rs. 0.50 per
square metre for balance area.
• Clause for withdrawal.
• Sanction or refusal of
building permit – within 60
days.
• Appeal against refusal or
sanction with modification of a
building permit – within 30
days
CHAPTER 1
PRELIMINARY
CHAPTER 2
BUILDING PERMIT AND OCCUPANCY
CHAPTER 3
GENERAL SITE REQUIREMENTS
CHAPTER 4
STRUCTURAL SAFETY, FIRE SAFETY AND
SERVICES
CHAPTER 5
CONSTRUCTION OF FARM HOUSE BUILDING
IN AGRICULTURAL USE ZONE
CHAPTER 6
CONSTRUCTION ON PLOTS ALLOTTED TO
THE FARMERS AGAINST LAND ACQUISITION
CHAPTER 7
PURCHASABLE FAR
CHAPTER 8
PROVISIONS OF PARKING, LOADING AND
UNLOADING SPACES
• Duration of validity of a building permit- only for 5 years
• Additions or alterations during construction
• Cancellation of permit for building activity – technical person blacklisted and debarred
for 5 years
• Work to be carried out in full accordance of Zoning Regulations, Building
Regulations and Directions
• Notice for issue of occupancy certificate – as per Appendix 9
• Occupancy certificate necessary for occupation
CHAPTER 1
PRELIMINARY
CHAPTER 2
BUILDING PERMIT AND OCCUPANCY
CHAPTER 3
GENERAL SITE REQUIREMENTS
CHAPTER 4
STRUCTURAL SAFETY, FIRE SAFETY AND
SERVICES
CHAPTER 5
CONSTRUCTION OF FARM HOUSE BUILDING
IN AGRICULTURAL USE ZONE
CHAPTER 6
CONSTRUCTION ON PLOTS ALLOTTED TO
THE FARMERS AGAINST LAND ACQUISITION
CHAPTER 7
PURCHASABLE FAR
CHAPTER 8
PROVISIONS OF PARKING, LOADING AND
UNLOADING SPACES
1. General Site Requirements –
• Distance from electric lines
• Site and land use pattern
• Means of Access
• Ground coverage, Floor Area Ratio, Height and Setbacks
2. Built Forms are sub – divided into 8 categories –
• RESIDENTIAL BUILDINGS ON PLOTS (other than flatted group housing)
• GROUP HOUSING (Flatted and cluster type)
• INDUSTRIAL BUILDINGS
• COMMERCIAL BUILDINGS
• INSTITUTIONAL
• GREEN AREAS
• TRANSPORTATION
• INFORMAL SECTOR
CHAPTER 1
PRELIMINARY
CHAPTER 2
BUILDING PERMIT AND OCCUPANCY
CHAPTER 3
GENERAL SITE REQUIREMENTS
CHAPTER 4
STRUCTURAL SAFETY, FIRE SAFETY AND
SERVICES
CHAPTER 5
CONSTRUCTION OF FARM HOUSE BUILDING
IN AGRICULTURAL USE ZONE
CHAPTER 6
CONSTRUCTION ON PLOTS ALLOTTED TO
THE FARMERS AGAINST LAND ACQUISITION
CHAPTER 7
PURCHASABLE FAR
CHAPTER 8
PROVISIONS OF PARKING, LOADING AND
UNLOADING SPACES
3. Various provisions of each built form is given in detail such as –
• Minimum Plot size
• Maximum Permissible – Ground Coverage, FAR, Height, Density
• Other Provisions – Watchman Shelter, Chajjas, Canopies, UG tanks etc.
• Things included in FAR
• Things excluded from FAR
• Common facilities were included in FAR – 15 % FAR towards common areas
• Distance between two adjacent building blocks
• Minimum requirement for sanction/completion
• Provision of following item in building shall be mandatory for issue of completion
certificate such as – parking, landscaping, flooring, plumbing, internal & external
finishing etc.
4. These above mentioned items varies according to the use of
buildings.
CHAPTER 1
PRELIMINARY
CHAPTER 2
BUILDING PERMIT AND OCCUPANCY
CHAPTER 3
GENERAL SITE REQUIREMENTS
CHAPTER 4
STRUCTURAL SAFETY, FIRE SAFETY AND
SERVICES
CHAPTER 5
CONSTRUCTION OF FARM HOUSE BUILDING
IN AGRICULTURAL USE ZONE
CHAPTER 6
CONSTRUCTION ON PLOTS ALLOTTED TO
THE FARMERS AGAINST LAND ACQUISITION
CHAPTER 7
PURCHASABLE FAR
CHAPTER 8
PROVISIONS OF PARKING, LOADING AND
UNLOADING SPACES
1. Fire Safety Requirements – as per part 4 of NBC, 2005; provisions of Uttar
Pradesh Agni Nivaran aur Agni Suraksha Adhinium.
2. Structural Design- as per part 6 of NBC, 2005.
3. Quality of Material and Workmanship – good quality conforming to standards
of Public Work Department of Uttar Pradesh, Indian Standards Specifications and
Codes as included in Part V Building Materials and Part VII Constructional Practices
and Safety of National Building Code of India 2005.
4. Plumbing – as per part 9 of NBC, 2005.
5. Water supply requirements – as per NBC, 2005.
6. Sanitary Fitting - as per NBC, 2005.
7. Building Services – as per part 8 of NBC, 2005.
8. Structural Safety for natural Hazard Protection.
9. Provision for Physically Handicapped – as per Part III, Annex D of NBC,
2005.
fdocuments.in_noida-building-bye-laws.pdf

More Related Content

Similar to fdocuments.in_noida-building-bye-laws.pdf

A Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingA Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingIRJET Journal
 
Construction site management
Construction site managementConstruction site management
Construction site managementrajlaxmipardeshi
 
Introduction to bye laws
Introduction to bye lawsIntroduction to bye laws
Introduction to bye lawsNitin Thakral
 
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptxHiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptxmayas43
 
RESEARCH WORK NO 1 PPT PRESENTATION.ppt
RESEARCH WORK NO 1 PPT PRESENTATION.pptRESEARCH WORK NO 1 PPT PRESENTATION.ppt
RESEARCH WORK NO 1 PPT PRESENTATION.pptCRISTELLEJOYMANALO
 
National building codes
National building codesNational building codes
National building codesSelf employed
 
Elam Pricing Full Set 4.3.15
Elam Pricing Full Set 4.3.15Elam Pricing Full Set 4.3.15
Elam Pricing Full Set 4.3.15Sean Roper
 
Topic 9b - UBBL.ppt
Topic 9b - UBBL.pptTopic 9b - UBBL.ppt
Topic 9b - UBBL.pptAizuddin9
 
Building Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERINGBuilding Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERINGCESatvirSingh1
 
MINI TEST- MARIETTE ROSE 201109044.pptx
MINI TEST- MARIETTE ROSE 201109044.pptxMINI TEST- MARIETTE ROSE 201109044.pptx
MINI TEST- MARIETTE ROSE 201109044.pptxMarietteGeorge2
 
GDCR Planning Regulations
GDCR Planning Regulations GDCR Planning Regulations
GDCR Planning Regulations GeetShah8
 
New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103Safe Rise
 
Summary of NBC 2016
Summary of NBC 2016Summary of NBC 2016
Summary of NBC 2016ssuserfa2cfd
 
New York City Department of Buildings Filing rep course_202
New York City Department of Buildings Filing rep course_202New York City Department of Buildings Filing rep course_202
New York City Department of Buildings Filing rep course_202Safe Rise
 

Similar to fdocuments.in_noida-building-bye-laws.pdf (20)

A Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment BuildingA Descriptive Study on Construction Progress Involved in Apartment Building
A Descriptive Study on Construction Progress Involved in Apartment Building
 
Construction site management
Construction site managementConstruction site management
Construction site management
 
Introduction to bye laws
Introduction to bye lawsIntroduction to bye laws
Introduction to bye laws
 
Provisions of NBC.pptx
Provisions of NBC.pptxProvisions of NBC.pptx
Provisions of NBC.pptx
 
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptxHiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptx
 
RESEARCH WORK NO 1 PPT PRESENTATION.ppt
RESEARCH WORK NO 1 PPT PRESENTATION.pptRESEARCH WORK NO 1 PPT PRESENTATION.ppt
RESEARCH WORK NO 1 PPT PRESENTATION.ppt
 
National building codes
National building codesNational building codes
National building codes
 
Elam Pricing Full Set 4.3.15
Elam Pricing Full Set 4.3.15Elam Pricing Full Set 4.3.15
Elam Pricing Full Set 4.3.15
 
Topic 9b - UBBL.ppt
Topic 9b - UBBL.pptTopic 9b - UBBL.ppt
Topic 9b - UBBL.ppt
 
Building Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERINGBuilding Industrial Training report for CIVIL ENGINEERING
Building Industrial Training report for CIVIL ENGINEERING
 
Trendset Winz Hyderabad
Trendset Winz HyderabadTrendset Winz Hyderabad
Trendset Winz Hyderabad
 
Saha amadeus noida expressway
Saha amadeus   noida expresswaySaha amadeus   noida expressway
Saha amadeus noida expressway
 
building byelaws
building byelawsbuilding byelaws
building byelaws
 
MINI TEST- MARIETTE ROSE 201109044.pptx
MINI TEST- MARIETTE ROSE 201109044.pptxMINI TEST- MARIETTE ROSE 201109044.pptx
MINI TEST- MARIETTE ROSE 201109044.pptx
 
Redevelopment
RedevelopmentRedevelopment
Redevelopment
 
A2005.2 BLDG 3&4 1F PLAN
A2005.2 BLDG 3&4 1F PLANA2005.2 BLDG 3&4 1F PLAN
A2005.2 BLDG 3&4 1F PLAN
 
GDCR Planning Regulations
GDCR Planning Regulations GDCR Planning Regulations
GDCR Planning Regulations
 
New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103New York City Department of Buildings Filing rep course_103
New York City Department of Buildings Filing rep course_103
 
Summary of NBC 2016
Summary of NBC 2016Summary of NBC 2016
Summary of NBC 2016
 
New York City Department of Buildings Filing rep course_202
New York City Department of Buildings Filing rep course_202New York City Department of Buildings Filing rep course_202
New York City Department of Buildings Filing rep course_202
 

Recently uploaded

ORane M Cornish affidavit statement for New Britain court proving Wentworth'...
ORane M Cornish affidavit statement  for New Britain court proving Wentworth'...ORane M Cornish affidavit statement  for New Britain court proving Wentworth'...
ORane M Cornish affidavit statement for New Britain court proving Wentworth'...Oranecornish
 
Embed-2-2.pdf[[app[r[prf[-rk;lme;[ed[prp[
Embed-2-2.pdf[[app[r[prf[-rk;lme;[ed[prp[Embed-2-2.pdf[[app[r[prf[-rk;lme;[ed[prp[
Embed-2-2.pdf[[app[r[prf[-rk;lme;[ed[prp[bhavenpr
 
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样mefyqyn
 
HOW LAW FIRMS CAN SUPPORT MILITARY DIVORCE CASES
HOW LAW FIRMS CAN SUPPORT MILITARY DIVORCE CASESHOW LAW FIRMS CAN SUPPORT MILITARY DIVORCE CASES
HOW LAW FIRMS CAN SUPPORT MILITARY DIVORCE CASESMesnik Law Group,Inc.
 
Petitioner Moot Memorial including Charges and Argument Advanced.docx
Petitioner Moot Memorial including Charges and Argument Advanced.docxPetitioner Moot Memorial including Charges and Argument Advanced.docx
Petitioner Moot Memorial including Charges and Argument Advanced.docxRumantSharma
 
一比一原版(TUOS毕业证书)谢菲尔德大学毕业证成绩单原件一模一样
一比一原版(TUOS毕业证书)谢菲尔德大学毕业证成绩单原件一模一样一比一原版(TUOS毕业证书)谢菲尔德大学毕业证成绩单原件一模一样
一比一原版(TUOS毕业证书)谢菲尔德大学毕业证成绩单原件一模一样mefyqyn
 
Termination of Employees under the Labor Code.pptx
Termination of Employees under the Labor Code.pptxTermination of Employees under the Labor Code.pptx
Termination of Employees under the Labor Code.pptxBrV
 
Skill Development in Law, Para Legal & other Fields and Export of Trained Man...
Skill Development in Law, Para Legal & other Fields and Export of Trained Man...Skill Development in Law, Para Legal & other Fields and Export of Trained Man...
Skill Development in Law, Para Legal & other Fields and Export of Trained Man...Nilendra Kumar
 
2024 Managing Labor + Employee Relations Seminar
2024 Managing Labor + Employee Relations Seminar2024 Managing Labor + Employee Relations Seminar
2024 Managing Labor + Employee Relations SeminarKegler Brown Hill + Ritter
 
一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样
一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样
一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样mefyqyn
 
How Can an Attorney Help With My Car Accident Claim?
How Can an Attorney Help With My Car Accident Claim?How Can an Attorney Help With My Car Accident Claim?
How Can an Attorney Help With My Car Accident Claim?Paisley Law LLC
 
Embed-1-1.pdfohediooieoiehohoiefoloeohefoi
Embed-1-1.pdfohediooieoiehohoiefoloeohefoiEmbed-1-1.pdfohediooieoiehohoiefoloeohefoi
Embed-1-1.pdfohediooieoiehohoiefoloeohefoibhavenpr
 
Does Apple Neurotechnology Patents Go To Far?
Does Apple  Neurotechnology Patents Go To Far?Does Apple  Neurotechnology Patents Go To Far?
Does Apple Neurotechnology Patents Go To Far?Graham Ware
 
Streamline Legal Operations: A Guide to Paralegal Services
Streamline Legal Operations: A Guide to Paralegal ServicesStreamline Legal Operations: A Guide to Paralegal Services
Streamline Legal Operations: A Guide to Paralegal ServicesEternity Paralegal Services
 
Embed-6 (1).pdfc p;p;kdk[odk[drskpokpopo
Embed-6 (1).pdfc p;p;kdk[odk[drskpokpopoEmbed-6 (1).pdfc p;p;kdk[odk[drskpokpopo
Embed-6 (1).pdfc p;p;kdk[odk[drskpokpopobhavenpr
 
Essential Components of an Effective HIPAA Safeguard Program
Essential Components of an Effective HIPAA Safeguard ProgramEssential Components of an Effective HIPAA Safeguard Program
Essential Components of an Effective HIPAA Safeguard ProgramColington Consulting
 
Bad Spaniel's Consumer Survey on the Use of Disclaimers
Bad Spaniel's Consumer Survey on the Use of DisclaimersBad Spaniel's Consumer Survey on the Use of Disclaimers
Bad Spaniel's Consumer Survey on the Use of DisclaimersMike Keyes
 
posts-harmful-to-secular-structure-of-the-country-539103-1.pdf
posts-harmful-to-secular-structure-of-the-country-539103-1.pdfposts-harmful-to-secular-structure-of-the-country-539103-1.pdf
posts-harmful-to-secular-structure-of-the-country-539103-1.pdfbhavenpr
 
一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样
一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样
一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样mefyqyn
 

Recently uploaded (20)

ORane M Cornish affidavit statement for New Britain court proving Wentworth'...
ORane M Cornish affidavit statement  for New Britain court proving Wentworth'...ORane M Cornish affidavit statement  for New Britain court proving Wentworth'...
ORane M Cornish affidavit statement for New Britain court proving Wentworth'...
 
Embed-2-2.pdf[[app[r[prf[-rk;lme;[ed[prp[
Embed-2-2.pdf[[app[r[prf[-rk;lme;[ed[prp[Embed-2-2.pdf[[app[r[prf[-rk;lme;[ed[prp[
Embed-2-2.pdf[[app[r[prf[-rk;lme;[ed[prp[
 
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
一比一原版(BCU毕业证书)伯明翰城市大学毕业证成绩单原件一模一样
 
HOW LAW FIRMS CAN SUPPORT MILITARY DIVORCE CASES
HOW LAW FIRMS CAN SUPPORT MILITARY DIVORCE CASESHOW LAW FIRMS CAN SUPPORT MILITARY DIVORCE CASES
HOW LAW FIRMS CAN SUPPORT MILITARY DIVORCE CASES
 
Petitioner Moot Memorial including Charges and Argument Advanced.docx
Petitioner Moot Memorial including Charges and Argument Advanced.docxPetitioner Moot Memorial including Charges and Argument Advanced.docx
Petitioner Moot Memorial including Charges and Argument Advanced.docx
 
一比一原版(TUOS毕业证书)谢菲尔德大学毕业证成绩单原件一模一样
一比一原版(TUOS毕业证书)谢菲尔德大学毕业证成绩单原件一模一样一比一原版(TUOS毕业证书)谢菲尔德大学毕业证成绩单原件一模一样
一比一原版(TUOS毕业证书)谢菲尔德大学毕业证成绩单原件一模一样
 
Termination of Employees under the Labor Code.pptx
Termination of Employees under the Labor Code.pptxTermination of Employees under the Labor Code.pptx
Termination of Employees under the Labor Code.pptx
 
Skill Development in Law, Para Legal & other Fields and Export of Trained Man...
Skill Development in Law, Para Legal & other Fields and Export of Trained Man...Skill Development in Law, Para Legal & other Fields and Export of Trained Man...
Skill Development in Law, Para Legal & other Fields and Export of Trained Man...
 
2024 Managing Labor + Employee Relations Seminar
2024 Managing Labor + Employee Relations Seminar2024 Managing Labor + Employee Relations Seminar
2024 Managing Labor + Employee Relations Seminar
 
一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样
一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样
一比一原版(ASU毕业证书)亚利桑那州立大学毕业证成绩单原件一模一样
 
How Can an Attorney Help With My Car Accident Claim?
How Can an Attorney Help With My Car Accident Claim?How Can an Attorney Help With My Car Accident Claim?
How Can an Attorney Help With My Car Accident Claim?
 
Embed-1-1.pdfohediooieoiehohoiefoloeohefoi
Embed-1-1.pdfohediooieoiehohoiefoloeohefoiEmbed-1-1.pdfohediooieoiehohoiefoloeohefoi
Embed-1-1.pdfohediooieoiehohoiefoloeohefoi
 
Does Apple Neurotechnology Patents Go To Far?
Does Apple  Neurotechnology Patents Go To Far?Does Apple  Neurotechnology Patents Go To Far?
Does Apple Neurotechnology Patents Go To Far?
 
Streamline Legal Operations: A Guide to Paralegal Services
Streamline Legal Operations: A Guide to Paralegal ServicesStreamline Legal Operations: A Guide to Paralegal Services
Streamline Legal Operations: A Guide to Paralegal Services
 
Embed-6 (1).pdfc p;p;kdk[odk[drskpokpopo
Embed-6 (1).pdfc p;p;kdk[odk[drskpokpopoEmbed-6 (1).pdfc p;p;kdk[odk[drskpokpopo
Embed-6 (1).pdfc p;p;kdk[odk[drskpokpopo
 
Essential Components of an Effective HIPAA Safeguard Program
Essential Components of an Effective HIPAA Safeguard ProgramEssential Components of an Effective HIPAA Safeguard Program
Essential Components of an Effective HIPAA Safeguard Program
 
Trending Topics in ITC Litigation with Knobbe Martens
Trending Topics in ITC Litigation with Knobbe MartensTrending Topics in ITC Litigation with Knobbe Martens
Trending Topics in ITC Litigation with Knobbe Martens
 
Bad Spaniel's Consumer Survey on the Use of Disclaimers
Bad Spaniel's Consumer Survey on the Use of DisclaimersBad Spaniel's Consumer Survey on the Use of Disclaimers
Bad Spaniel's Consumer Survey on the Use of Disclaimers
 
posts-harmful-to-secular-structure-of-the-country-539103-1.pdf
posts-harmful-to-secular-structure-of-the-country-539103-1.pdfposts-harmful-to-secular-structure-of-the-country-539103-1.pdf
posts-harmful-to-secular-structure-of-the-country-539103-1.pdf
 
一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样
一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样
一比一原版(UBC毕业证书)不列颠哥伦比亚大学毕业证成绩单原件一模一样
 

fdocuments.in_noida-building-bye-laws.pdf

  • 1. PRESENTED BY- AKASH SINGH, ROHIT DABAS I M.U.R.P.-1st YEAR I I.I.T. ROORKEE
  • 2. NOIDA LOCATION OF NOIDA ON U.P. & N.C.R MAP  CITY INTRODUCTION-Gold mine of Uttar Pradesh • Came into administrative existence on 17 April 1976 and celebrates 17 April as "Noida Day". • Set up as part of an urbanization thrust during the controversial Emergency period. • As per Census India, population of Noida in 2011 is 642,381; of which male and female are 352,577 and 289,804 respectively. • Total area - 203 km2 (78 sq mi) • The city has the highest per capita income in the whole National Capital Region • The Noida Authority is the richest civic body in the country • Famous for excellent roads and considered Country's greenest city. Hot spot for IT and IT-enabled services industry
  • 3.
  • 4. CHAPTER 1 PRELIMINARY CHAPTER 2 BUILDING PERMIT AND OCCUPANCY CHAPTER 3 GENERAL SITE REQUIREMENTS CHAPTER 4 STRUCTURAL SAFETY, FIRE SAFETY AND SERVICES CHAPTER 5 CONSTRUCTION OF FARM HOUSE BUILDING IN AGRICULTURAL USE ZONE CHAPTER 6 CONSTRUCTION ON PLOTS ALLOTTED TO THE FARMERS AGAINST LAND ACQUISITION CHAPTER 7 PURCHASABLE FAR CHAPTER 8 PROVISIONS OF PARKING, LOADING AND UNLOADING SPACES  Short title, Commencement and Application • These regulations and directions may be called the New Okhla Industrial Development Area Building Regulations and Directions, dated 30 November, 2010  Definitions • Definitions of 97 various building related terms used in byelaw Eg. - Air conditioning, Applicant, Area, Barsati, Basement, Building, Building line , FAR, FSI etc. • Refuge Area – for all buildings exceeding 24 m height, 15 m refuge area is required i. The floors above 24 metres and up to 39 metres- one refuge area on the floor immediately above 24 metres ii. For floors above 39 metres - one refuge area on the floor immediately above 39 metres and so on after every 15mtrs
  • 5. CHAPTER 1 PRELIMINARY CHAPTER 2 BUILDING PERMIT AND OCCUPANCY CHAPTER 3 GENERAL SITE REQUIREMENTS CHAPTER 4 STRUCTURAL SAFETY, FIRE SAFETY AND SERVICES CHAPTER 5 CONSTRUCTION OF FARM HOUSE BUILDING IN AGRICULTURAL USE ZONE CHAPTER 6 CONSTRUCTION ON PLOTS ALLOTTED TO THE FARMERS AGAINST LAND ACQUISITION CHAPTER 7 PURCHASABLE FAR CHAPTER 8 PROVISIONS OF PARKING, LOADING AND UNLOADING SPACES  Layout / Building Permit and Occupancy • No person can construct any building, boundary wall or even fencing without taking permission from the appropriate officer  Application for building permit – • Every person who intends to erect a building within the Industrial Development Area shall give application in the Form given at Appendix – 1 • Documents should be submitted as per the Appendix-1 • Fees should be paid as per regulation no. 10 • No permission required for – i. Whitewashing and painting; ii. Plastering, patch work, flooring; iii. Renewal of roof at the same height; iv. Reconstruction of portions of building damaged by any natural calamity to the same extent as previously approved; v. Internal additions / alterations within the building envelop certified and supervised by a Technical Person ; vi. Digging or filling of earth;
  • 6. CHAPTER 1 PRELIMINARY CHAPTER 2 BUILDING PERMIT AND OCCUPANCY CHAPTER 3 GENERAL SITE REQUIREMENTS CHAPTER 4 STRUCTURAL SAFETY, FIRE SAFETY AND SERVICES CHAPTER 5 CONSTRUCTION OF FARM HOUSE BUILDING IN AGRICULTURAL USE ZONE CHAPTER 6 CONSTRUCTION ON PLOTS ALLOTTED TO THE FARMERS AGAINST LAND ACQUISITION CHAPTER 7 PURCHASABLE FAR CHAPTER 8 PROVISIONS OF PARKING, LOADING AND UNLOADING SPACES  Submission drawings must have all details about the building which is developed • Proper mention of signatory and his/her qualifications • Fees - Rs. 15.00 per square metre covered area on all floors., • For layout plan – Re. 1/- per square metre plot area upto for first 4.0ha and Rs. 0.50 per square metre for balance area. • Clause for withdrawal. • Sanction or refusal of building permit – within 60 days. • Appeal against refusal or sanction with modification of a building permit – within 30 days
  • 7. CHAPTER 1 PRELIMINARY CHAPTER 2 BUILDING PERMIT AND OCCUPANCY CHAPTER 3 GENERAL SITE REQUIREMENTS CHAPTER 4 STRUCTURAL SAFETY, FIRE SAFETY AND SERVICES CHAPTER 5 CONSTRUCTION OF FARM HOUSE BUILDING IN AGRICULTURAL USE ZONE CHAPTER 6 CONSTRUCTION ON PLOTS ALLOTTED TO THE FARMERS AGAINST LAND ACQUISITION CHAPTER 7 PURCHASABLE FAR CHAPTER 8 PROVISIONS OF PARKING, LOADING AND UNLOADING SPACES • Duration of validity of a building permit- only for 5 years • Additions or alterations during construction • Cancellation of permit for building activity – technical person blacklisted and debarred for 5 years • Work to be carried out in full accordance of Zoning Regulations, Building Regulations and Directions • Notice for issue of occupancy certificate – as per Appendix 9 • Occupancy certificate necessary for occupation
  • 8. CHAPTER 1 PRELIMINARY CHAPTER 2 BUILDING PERMIT AND OCCUPANCY CHAPTER 3 GENERAL SITE REQUIREMENTS CHAPTER 4 STRUCTURAL SAFETY, FIRE SAFETY AND SERVICES CHAPTER 5 CONSTRUCTION OF FARM HOUSE BUILDING IN AGRICULTURAL USE ZONE CHAPTER 6 CONSTRUCTION ON PLOTS ALLOTTED TO THE FARMERS AGAINST LAND ACQUISITION CHAPTER 7 PURCHASABLE FAR CHAPTER 8 PROVISIONS OF PARKING, LOADING AND UNLOADING SPACES 1. General Site Requirements – • Distance from electric lines • Site and land use pattern • Means of Access • Ground coverage, Floor Area Ratio, Height and Setbacks 2. Built Forms are sub – divided into 8 categories – • RESIDENTIAL BUILDINGS ON PLOTS (other than flatted group housing) • GROUP HOUSING (Flatted and cluster type) • INDUSTRIAL BUILDINGS • COMMERCIAL BUILDINGS • INSTITUTIONAL • GREEN AREAS • TRANSPORTATION • INFORMAL SECTOR
  • 9. CHAPTER 1 PRELIMINARY CHAPTER 2 BUILDING PERMIT AND OCCUPANCY CHAPTER 3 GENERAL SITE REQUIREMENTS CHAPTER 4 STRUCTURAL SAFETY, FIRE SAFETY AND SERVICES CHAPTER 5 CONSTRUCTION OF FARM HOUSE BUILDING IN AGRICULTURAL USE ZONE CHAPTER 6 CONSTRUCTION ON PLOTS ALLOTTED TO THE FARMERS AGAINST LAND ACQUISITION CHAPTER 7 PURCHASABLE FAR CHAPTER 8 PROVISIONS OF PARKING, LOADING AND UNLOADING SPACES 3. Various provisions of each built form is given in detail such as – • Minimum Plot size • Maximum Permissible – Ground Coverage, FAR, Height, Density • Other Provisions – Watchman Shelter, Chajjas, Canopies, UG tanks etc. • Things included in FAR • Things excluded from FAR • Common facilities were included in FAR – 15 % FAR towards common areas • Distance between two adjacent building blocks • Minimum requirement for sanction/completion • Provision of following item in building shall be mandatory for issue of completion certificate such as – parking, landscaping, flooring, plumbing, internal & external finishing etc. 4. These above mentioned items varies according to the use of buildings.
  • 10. CHAPTER 1 PRELIMINARY CHAPTER 2 BUILDING PERMIT AND OCCUPANCY CHAPTER 3 GENERAL SITE REQUIREMENTS CHAPTER 4 STRUCTURAL SAFETY, FIRE SAFETY AND SERVICES CHAPTER 5 CONSTRUCTION OF FARM HOUSE BUILDING IN AGRICULTURAL USE ZONE CHAPTER 6 CONSTRUCTION ON PLOTS ALLOTTED TO THE FARMERS AGAINST LAND ACQUISITION CHAPTER 7 PURCHASABLE FAR CHAPTER 8 PROVISIONS OF PARKING, LOADING AND UNLOADING SPACES 1. Fire Safety Requirements – as per part 4 of NBC, 2005; provisions of Uttar Pradesh Agni Nivaran aur Agni Suraksha Adhinium. 2. Structural Design- as per part 6 of NBC, 2005. 3. Quality of Material and Workmanship – good quality conforming to standards of Public Work Department of Uttar Pradesh, Indian Standards Specifications and Codes as included in Part V Building Materials and Part VII Constructional Practices and Safety of National Building Code of India 2005. 4. Plumbing – as per part 9 of NBC, 2005. 5. Water supply requirements – as per NBC, 2005. 6. Sanitary Fitting - as per NBC, 2005. 7. Building Services – as per part 8 of NBC, 2005. 8. Structural Safety for natural Hazard Protection. 9. Provision for Physically Handicapped – as per Part III, Annex D of NBC, 2005.