THE DYNAMICS OF
BUILDING
PERMITTING
CONSTRUCTION
DEFINITIONS
- OWNER
- BUILDING OFFICIAL
- INSPECTOR/IN-CHARGE
- DESIGN PROFESSIONAL
- STAFF
- BUILDING PERMIT
- OTHER GOV’T AGENCIES
- PROJECT
- CONSTRUCTOR
THE
NATIONAL
BUILDING
CODE
ADMINISTRATIVE
SANCTION
AND
PROCEDURES
• THE DYNAMICS OF BUILDING PERMIT / CONSTRUCTION
– The clearances from other gov’t agencies / Sect 302 IRR2005 (PD1096
- DPWH/ Nat Road Widening & Improvements
- AIR TRANS. OFFICE (CAAP)/ Height
- HLURB / Housing
- DEPT OF HEALTH/ Hospital
- Dept Ed/ Schools
- PHIL PORT AUTHO/ Pier & Harbor
- DILG/ BFP-Fire Clearance
- DOTC/ Stations
- DENR/ Environment
- DEPT OF TOURISM/ Resorts
- LGU / Zoning &
- PHIL INST OF VOLC/ Faults
- LAGUNA LAKE DEVT/ Discharge
- MWSS/ Water Supply & Sewerage
- NAT WATER RES BRD/ UG-Water Use
- DEPT OF AGRIC/ Dairy & Agricultural Bldg.
- DOLE/ Workers Safety
- OTHERS/ MMDA/ Traffic & Drainage
- NAT COUNCIL For The WDPs (Access)
- NAT HOUSING AUTHO/ Re-settlements
THE
NATIONAL
BUILDING
CODE
ADMINISTRATIVE
SANCTION
AND
PROCEDURES
• THE DYNAMICS OF BUILDING PERMITTING FOR
CONSTRUCTION - BUILDING OFFICIAL-
THE BO- (SECT 207, PD 1096) RESPONSIBLE
FOR CARRYING OUT THE PROVISION OF THE
BUILDING CODE IN THE FIELD AS WELL AS THE
ENFORCEMENTS OF ORDERS AND DECISIONS
MADE PURSUANT THERETO.
DUTIES: (GIVEN IN SECT 207 OF THE BUILDING
CODE) , AMONG THOSE DUTIES IS;
- UPON COMPLAINT OR MOTO PROPIO
AND AFTER THE DUE NOTICE/S AND HEARING
INITIATE (ACTION ) TOWARDS ADMINISTRATIVE
PROCEDINGS.
- OWNER/ PERSON
THE OWNER- REFER TO ANY INDIVIDUAL,
PARTNERSHIP, CORPORATION, ASSOCIATION
AND PUBLIC OR PRIVATE ORGANIZAQTION OF
ANY CHARACTER WITH INTENT TO PUT UP A
PROJECT.
INSPECTOR & SUPV- WHO IS THE IN-CHARGE OF
CONST’N COMMISSION BY THE OWNER TO
PREPARE RECORD & SUPERVISION OF THE
PROJECT IMPLEMENTATION.
DESIGN PROFESSIONALS- COMMISSION BY THE
OWNER TO PREPARE TECHNICAL
DOCUMENTATIONS OF THE PROJECT FOR
PERMITTING AND CONSTRUCTION
CONSTRUCTOR/AMO- COMMISSIONED BY THE
OWNER TO PERFORM THE IMPLEMENTATION OF
THE PROJECT ACCORDING TO THE ISSUED
PERMITS, PLANS AND SPECIFICATIONS.
• THE DYNAMICS OF BUILDING PERMITTING FOR
CONSTRUCTION
THE
NATIONAL
BUILDING
CODE
ADMINISTRATIVE
SANCTION
AND
PROCEDURES
- BUILDING OFFICIAL-
THE BO- RESPONSIBLE FOR CARRYING OUT
THE PROVISION OF THE BUILDING CODE IN THE
FIELD; OFFICIAL CHARGED WITH THE DUTIES OF
ISSUING BUILDING PERMITS.
OFFICE & STAFFS- ASSIST THE BUILDING
OFFICIAL IN HANDLING THE PROCESSING OF
APPLICATION FORM AND THE ISSUANCE OF, ALL
KINDS OF PERMIT PERTAINING TO BUILDINGS
BOTH PUBLIC AND PRIVATE, AND ALL OTHER
APPURTENANCES THERETO.
THE BUILDING PERMIT- SHALL MEAN THE
PRINCIPAL (BUILDING) PERMIT AND ALL THE
ANCILLARY OR ACCESSORY PERMITS
PERTAINING TO A BUILDING AND ITS
APPURTENANCES, SUCH AS MECHANICAL AND
ELECTRICAL PERMITS, SANITARY/PLUMBING
PERMITS, AND FENCING, SIDEWALKS, TOWERS,
SIGNBOARDS, ETC.
• THE DYNAMICS OF BUILDING PERMITTING FOR
CONSTRUCTION
• THE DYNAMICS OF BUILDING
PERMITTING CONSTRUCTION
Section 305 – Validity of Building Permits
“ whenever the issuance of a permit is based on
approved plans and specification which are
subsequently found defective, the BO
- order to correct plans & specifications
- order to stop any or all building
operation
• Section 306- Non-Issuance, Suspension or
Revocation of Building Permits
- Errors found in the plans and
specifications
- Incorrect or inaccurate info supplied
- non compliance with the provision of the
Code
• THE DYNAMICS OF BUILDING PERMITTING FOR
CONSTRUCTION
Project,
Project
Project,
Project
THE NATIONAL BUILDING CODE
ADMINISTRATIVE SANCTION AND PROCEDURES
SECTION 103. Scope and Application
(a) The provisions of this Code shall apply to the design,
location, siting, construction, alteration, repair, conversion, use,
occupancy, maintenance, moving, demolition of, and addition to
public and private buildings and structures, except traditional
indigenous family dwellings as defined herein.
13
Indigenous
dwelling
Building any structure, . . As principal use of the lot from which it is
situated.
THE NATIONAL BUILDING CODE
ADMINISTRATIVE SANCTION AND PROCEDURES
Socialized
housing
project
THE NATIONAL BUILDING CODE
ADMINISTRATIVE SANCTION AND PROCEDURES
Administration and Enforcement
15
BP
220
THE NATIONAL BUILDING CODE
ADMINISTRATIVE SANCTION AND PROCEDURES
Administration and Enforcement 16
BP 220
THE NATIONAL BUILDING CODE
ADMINISTRATIVE SANCTION AND PROCEDURES
THE NATIONAL BUILDING
CODE
ADMINISTRATIVE SANCTION AND
PROCEDURES
Project,
Project
Infrastructure Project
THE NATIONAL BUILDING CODE
ADMINISTRATIVE SANCTION AND PROCEDURES
Regulations
Department of Building Official
Office Of The Building Official
Tanggapan Ng Punong Panggusali
Kagawaran Ng Punong Panggusali
Regulations
BUILDING PERMIT
Sizes of:
Rooms
Windows
Doors
Stair
Strength/Stability of
Foundations
Walls
Columns
Flooring Sys
Roofing Sys
Beams and
Integrity of;
Painting
Sealant
Lighting
Odor
Safety in Construction
Office Of The
Building Official
National Building Code
PD 1096
Building
Permit
• What is a Building Permit?
– (By definition) A document issued by the
Building Official (BO) to an owner/applicant to
proceed with the construction, installation,
addition, alteration, renovation, conversion,
repair, moving, demolition or other work
activity of a specific project/building/structure
or portions thereof after the accompanying
principal plans, specification and other
pertinent documents with the duly notarized
application are found satisfactory and
substantially conforming with the National
Building Code of the Philippines and its
implementing Rules and Regulations.(IRR).
The Building Permit –

 Front Side – indicated
entries from the
applicant to be
filled up by appropriate
concerns.
Box 1 for detail, scope
of application
Box 2 for full-time
inspector of the const’n
Box 3 for applicant
Box 4 for lot owner
Box 5 for the Notary
NBC FORM NO. B - 01
Republic of the Philippines
City/Municipality of __________________
Province of __________________________
OFFICE OF THE BUILDING OFFICIAL
APPLICATION FOR BUILDING PERMIT
BOX 1 (TO BE ACCOMPLISHED IN PRINT BY THE APPLICANT)
USE OR CHARACTER OF OCCUPANCY
GROUP A : RESIDENTIAL, DWELLINGS
GROUP B : RESIDENTIAL HOTEL, APARTMENT
GROUP C : EDUCATIONAL, RECREATIONAL
GROUP D : INSTITUTIONAL
GROUP E : BUSINESS AND MERCANTILE
GROUP F : INDUSTRIAL
GROUP G : INDUSTRIAL STORAGE AND HAZARDOUS
GROUP H : RECREATIONAL, ASSEMBLY OCCUPANT LOAD LESS THAN 1000
GROUP I : RECREATIONAL, ASSEMBLY OCCUPANT LOAD 1000 OR MORE
GROUP J : AGRICULTURAL, ACCESSORY
SCOPE OF WORK
ALTERATION
NEW CONSTRUCTION
ERECTION
ADDITION
MOVING
RENOVATION
CONVERSION
REPAIR
ACCESSORY BUILDING/STRUCTURE
OTHERS (Specify)
OCCUPANCY CLASSIFIED _________________________________________
NUMBER OF UNITS_______________________________________________
TOTAL FLOOR AREA ______________________________ SQUARE METERS
TOTAL ESTIMATED COST P __________________________________
PROPOSED DATE OF CONSTRUCTION _________________________
EXPECTED DATE OF COMPLETION____________________________
_______________________________________________
OTHERS (Specify) ________________
(Signature Over Printed Name) (Signature Over Printed Name)
WITH MY CONSENT: LOT OWNER
Address
CTC No Date Issued Place Issued
Address
CTC No Date Issued Place Issued
APPLICANT:
BOX 3
BOX 2
BOX 5
REPUBLIC OF THE PHILIPPINES )
CITY/MUNICIPALITY OF __________________________________________)
BEFORE ME, at the City/Municipality of _____________________________________________________ , on _________________________ personally appeared
the following:
______________________________________________________ _______________ ______________ ___________________________________________
______________________________________________________ _______________ ______________ ___________________________________________
whose signatures appear hereinabove, known to me to be the same persons who executed this standard prescribed form and acknowledged to me that the same is their free and
voluntary act and deed.
WITNESS MY HAND AND SEAL on the date and place above written.
Doc. No. ________
Page No. ________ ________________________________________________________
Book No. ________ NOTARY PUBLIC (Until December _____________ )
Series of ________
APPLICANT C.T.C. No. Date Issued Place Issued
LICENSED ARCHITECT OR CIVIL ENGINEER
(Full-Time Inspector and Supervisor of Construction Works)
S.S
C.T.C. No. Date Issued Place Issued
APPLICATION NO. AREA NO
OWNER/APPLICANT LAST NAME FIRST NAME M.I. TIN
FOR CONSTRUCTION OWNED FORM OF OWNERSHIP
BY AN ENTERPRISE
ADDRESS: NO., STREET, BARANGAY, CITY/MUNICIPALITY ZIP CODE TELEPHONE NO.
LOCATION OF CONSTRUCTION: LOT NO. ______ BLK NO. ________ TCT NO. ______________ TAX DEC. NO. ____________________
STREET_____________________ BARANGAY __________________________ CITY/ MUNICIPALITY OF_______________________________
FULL-TIME INSPECTOR AND SUPERVISOR OF CONSTRUCTION WORKS (REPRESENTING THE OWNER)
ARCHITECT OR CIVIL ENGINEER
(Signed and Sealed Over Printed Name)
Date_____________________________
PRC No.
Issued at TIN
Date Issued
PTR No.
Validity
BOX 4
Address
DO NOT FILL-UP (NSO USE ONLY)
Date______________ Date______________
NEW RENEWAL AMENDATORY
RAISING
OTHERS(specify)________________
OCCUPANCY CLASSIFIED__________________________ TOTALESTIMATEDCOSTP___________________________
NUMBEROFUNITS_______________________________ PROPOSEDDATEOFCONSTRUCTION__________________
TOTALFLOORAREA __________________SQUAREMETERS EXPECTEDDATEOFCOMPLETION_____________________
GROUPA:RESIDENTIALDWELLINGS
APPLICATIONNO.
OWNER/APPLICANT LASTNAME FIRSTNAME M.I. TIN
FORCONSTRUCTIONOWNEDBY ANENTERPRSE FORMOFOWNERSHIP
ADDRESSNO STREET BARANGAY CITY/MUNICIPALITY ZIPCODE TELEPHONENO.
LOCATIONOFCONSTRUCTION LOTNO._________ BLKNO________ TCTNO________ TAXDECNO________
STREET_______________ BARANGAY _______________CITY /MUNICIPALITY OF_______________________
SCOPEOFWORK
GROUPC:EDUCATIONAL,RECREATIONAL
GROUPB:RESIDENTIALHOTELAPARTMENT
NEWCONSTRUCTION
ERECTION______________
ADDITION______________
ALTERATION___________
GROUPD:INSTITUTIONAL
GROUPG:INDUSTRIALSTORAGEANDHAZARDOUS
GROUPH:RECREATIONALASSEMBLY OCCUPANTLOADLESSTHAN1000
GROUPI:RECREATIONALASSEMBLY OCCUPANTLOAD1000ORMORE
GROUPF:INDUSTRIAL
USEOFCHARACTEROFOCCUPANCY
GROUPE:BUSINESSANDMERCANTILE GROUPJ:AGRICULTURALACCESSORY
MOVING_____________________
RAISING_____________________________
ACCESORY BUILDINGSTRUCTURE_______
OTHERS(specify)_____________________
____________________________________
RENOVATION________________
CONVERSION________________
REPAIR_____________________
NBC FORM NO. B - 01
Republic of the Philippines
City/Municipality of __________________
Province of __________________________
OFFICE OF THE BUILDING OFFICIAL
APPLICATION FOR BUILDING PERMIT
BOX 1 (TO BE ACCOMPLISHED IN PRINT BY THE APPLICANT)
USE OR CHARACTER OF OCCUPANCY
GROUP A : RESIDENTIAL, DWELLINGS
GROUP B : RESIDENTIAL HOTEL, APARTMENT
GROUP C : EDUCATIONAL, RECREATIONAL
GROUP D : INSTITUTIONAL
GROUP E : BUSINESS AND MERCANTILE
GROUP F : INDUSTRIAL
GROUP G : INDUSTRIAL STORAGE AND HAZARDOUS
GROUP H : RECREATIONAL, ASSEMBLY OCCUPANT LOAD LESS THAN 1000
GROUP I : RECREATIONAL, ASSEMBLY OCCUPANT LOAD 1000 OR MORE
GROUP J : AGRICULTURAL, ACCESSORY
SCOPE OF WORK
ALTERATION
NEW CONSTRUCTION
ERECTION
ADDITION
MOVING
RENOVATION
CONVERSION
REPAIR
ACCESSORY BUILDING/STRUCTURE
OTHERS (Specify)
OCCUPANCY CLASSIFIED _________________________________________
NUMBER OF UNITS_______________________________________________
TOTAL FLOOR AREA ______________________________ SQUARE METERS
TOTAL ESTIMATED COST P __________________________________
PROPOSED DATE OF CONSTRUCTION _________________________
EXPECTED DATE OF COMPLETION____________________________
_______________________________________________
OTHERS (Specify) ________________
(Signature Over Printed Name) (Signature Over Printed Name)
WITH MY CONSENT: LOT OWNER
Address
CTC No Date Issued Place Issued
Address
CTC No Date Issued Place Issued
APPLICANT:
BOX 3
BOX 2
BOX 5
REPUBLIC OF THE PHILIPPINES )
CITY/MUNICIPALITY OF __________________________________________)
BEFORE ME, at the City/Municipality of _____________________________________________________ , on _________________________ personally appeared
the following:
______________________________________________________ _______________ ______________ ___________________________________________
______________________________________________________ _______________ ______________ ___________________________________________
whose signatures appear hereinabove, known to me to be the same persons who executed this standard prescribed form and acknowledged to me that the same is their free and
voluntary act and deed.
WITNESS MY HAND AND SEAL on the date and place above written.
Doc. No. ________
Page No. ________ ________________________________________________________
Book No. ________ NOTARY PUBLIC (Until December _____________ )
Series of ________
APPLICANT C.T.C. No. Date Issued Place Issued
LICENSED ARCHITECT OR CIVIL ENGINEER
(Full-Time Inspector and Supervisor of Construction Works)
S.S
C.T.C. No. Date Issued Place Issued
APPLICATION NO. AREA NO
OWNER/APPLICANT LAST NAME FIRST NAME M.I. TIN
FOR CONSTRUCTION OWNED FORM OF OWNERSHIP
BY AN ENTERPRISE
ADDRESS: NO., STREET, BARANGAY, CITY/MUNICIPALITY ZIP CODE TELEPHONE NO.
LOCATION OF CONSTRUCTION: LOT NO. ______ BLK NO. ________ TCT NO. ______________ TAX DEC. NO. ____________________
STREET_____________________ BARANGAY __________________________ CITY/ MUNICIPALITY OF_______________________________
FULL-TIME INSPECTOR AND SUPERVISOR OF CONSTRUCTION WORKS (REPRESENTING THE OWNER)
ARCHITECT OR CIVIL ENGINEER
(Signed and Sealed Over Printed Name)
Date_____________________________
PRC No.
Issued at TIN
Date Issued
PTR No.
Validity
BOX 4
Address
DO NOT FILL-UP (NSO USE ONLY)
Date______________ Date______________
NEW RENEWAL AMENDATORY
RAISING
Use Or Type of Occupancy
Residential/Dwelling Grp A
Res/Hotel or Apartment Grp B
Educational/Recreational Grp C
Institutional Grp D
Business/Mercantile Grp E
Industrial Building Grp F
Storage/Hazard Bldg Grp G
Assembly Building Grp H & I
Accessory Building Grp J
Scope of Work;
New Construction
Renovation
Erection
Addition
Alteration
Conversion
Repair
Demolition
Raising
The Building Permit –
Dorsal side is the
Building Permit itself and the
terms and condition of the
permit, appearing also the
processing fees for each
sectional evaluation.
1. That under Article 1723 of the Civil Code of the Philippines, the engineer or architect who drew up the plans and specifications for a building/structure is liable for
damages if within fifteen (15) years from the completion of the building/structure, the same should collapse due to defect in the plans or specifications or defects in
the ground. The engineer or architect who supervises the construction shall be solidarily liable with the contractor should the edifice collapse due to defect in the
construction or the use of inferior materials.
2. This permit shall be accompanied by the various applicable ancillary and accessory permits, plans and specifications signed and sealed by the corresponding design
professionals who shall be responsible for the comprehensive and correctness of the plans in compliance to the Code and its IRR and to all applicable referral codes
and professional regulatory laws.
3. That the proposed construction/erection/addition/alteration/renovation/conversion/repair/moving/demolition, etc. shall be in conformity with the provisions of the
National Building Code, and its IRR.
a. That prior to commencement of the proposed projects and construction an actual relocation survey shall be conducted by a duly licensed Geodetic Engineer.
b. That before commencing the excavation the person making or causing the excavation to be made shall notify in writing the owner of adjoining property not less
than ten (10) days before such excavation is to be made and show how the adjoining property should be protected.
c. That no person shall use or occupy a street, alley or public sidewalk for the performance of work covered by a building permit.
d. That no person shall perform any work on any building or structure adjacent to a public way in general use for pedestrian travel, unless the pedestrians are
protected.
e. That the supervising Architect/Civil Engineer shall keep at the jobsite at all times a logbook of daily construction activities wherein the actual daily progress of
construction including tests conducted, weather condition and other pertinent data are to be recorded, same shall be made available for scrutiny and
comments by the OBO representative during the conduct of his/her inspection pursuant to Section 207 of the National Building Code.
f. That upon completion of the construction, the said licensed supervising Architect/Civil Engineer shall submit to the Building Official duly signed and sealed
logbook, as-built plans and other documents and shall also prepare and submit a Certificate of Completion of the project stating that the construction of the
building/structure conform to the provision of the Code, its IRR as well as the plans and specifications.
g. All such changes, modifications and alterations shall likewise be submitted to the Building Official and the subsequent amendatory permit therefor issued
before any work on said changes, modifications and alterations shall be started. The as-built plans and specifications maybe just an orderly and
comprehensive compilation of all documents which include the originally submitted plans and specifications of all amendments thereto as actually built or they
may be an entirely new set of plans and specifications accurately describing and/or reflecting therein the building as actually built.
4. That no building/structure shall be used until the Building Official has issued a Certificate of Occupancy therefor as provided in the Code. However, a partial
Certificate of Occupancy may be issued for the Use/Occupancy of a portion or portions of a building/structure prior to the completion of the entire building/structure.
5. That this permit shall not serve as an exemption from securing written clearances from various government authorities exercising regulatory function affecting
buildings/structures.
6. When the construction is undertaken by contract, the work shall be done by a duly licensed and registered contractor pursuant to the provisions of the Contractor’s
License Law (RA 4566).
7. The Owner/Permittee shall submit a duly accomplished prescribed “Notice of Construction” to the Office of the Building Official prior to any construction activity.
8. The Owner/Permittee shall put a Building Permit sign which complies with the prescribed dimensions and information, which shall remain posted on the construction
site for the duration of the construction.
BUILDING OFFICIAL
(Signature Over Printed Name)
Date _________________
PERMIT ISSUED BY:
BUILDING PERMIT
BUILDING PERMIT NO.
Permit is issued to__________________________for the proposed _________________________________
under____________________, of Group_____, located at Lot No._____Block No.______OCT/TCT No. ______,
_______________Street, Barangay_________________, City/Municipality of_______________________ subject to
the following:
(Owner/Applicant) (Type of Project)
NOTE : THIS PERMIT MAY BE CANCELLED OR REVOKED PURSUANT TO SECTIONS 305 AND 306 OF THE “NATIONAL BUILDING CODE”
DATE ISSUED
OFFICIAL RECEIPT NO.
DATE PAID
(Use or Character of Occupancy)
M M D D Y Y M M D D Y Y
BOX 6 (TO BE ACCOMPLISHED BY THE PROCESSING AND EVALUATION DIVISION)
AMOUNT DUE
ASSESSED BY
TOTAL
LINE AND GRADE (Geodetic)
FENCING
ARCHITECTURAL
ELECTRICAL
MECHANICAL
PLUMBING
SANITARY
LOCATIONAL/ZONING OF LAND USE
ELECTRONICS
PROCESSING FEE
FILING FEE
CIVIL/STRUCTURAL
ONE HALF (½) OF FIRE SERVICE FUND (FSF)
ASSESSED FEES O.R. NUMBER
DATE PAID
INTERIOR
BOX 7 (TO BE ACCOMPLISHED BY THE BUILDING OFFICIAL)
NSO
 Dorsal side – indicated
entries from the OBO
Box 6 for processing &
evaluation division
Box 7 for the Building Official
which is the
Building Permit itself.
Section 304 – IRR 2005 PD1096
On issuance of building permit in item 5
terms and condition of permit
When the construction is undertaken by
contract, the work shall be done by a duly
licensed and registered contractor
pursuant to the provisions of the
Contractor’s License Law (RA 4566)
Item 6 on condition of Building Permit
Issuance
When the construction is undertaken by
contract, the work shall be done by a duly
licensed and registered contractor
pursuant to the provisions Contractor’s
License Law (RA 4566)
List
of
Requirements
ADMINISTRATION AND ENFORCEMENT
ORGANIZATION OF DOCUMENTATION
Organization of the Forms
Building
Permit
Ancillary
Permits
Accessory
Permits
Bldg Permit, Form No. B-01
Architectural Permit, Form No. A-01
Civil/Structural Permit, Form No. A-02
Electrical Permit, Form No. A-03
Mechanical Permit, Form No. A-04
Sanitary Permit, Form No. A-05
Plumbing Permit, Form No. A-06
Electronic Permit, Form No. A-07
Sidewalk Constn. Permit, Form No. B-04
Sidewalk enclosure Permit, Form No. B-05
Scaffolding Permit, Form No. B-06
GP & Excavation Permit, Form No. B-02
5 copies/set
5 copies/set
5 copies/set
5 copies/set
5 copies/set
5 copies/set
5 copies/set
5 copies/set
5 copies/set
5 copies/set
5 copies/set
5 copies/set
(Notarized)
(Not Notarize)
(Not Notarize)
60 copies
ADMINISTRATION AND ENFORCEMENT
Organization of the Forms
Clearances
(applicable)
Support
Documents
Special
Requirements
Zoning / Local LGU
Proponent Agency (institutions)
Agency jurisdiction (widening, etc)
5 sets Constn Plan (min 12 copies/set)
Geodetic Relocation Survey
True Copies of TCT/OCT
Tax Dec + Current Tax Receipt
Specifications (min 12 copies/set
Struct. Analysis/comp. (min 12 copies/set)
Authorization, Secretary’s Cert., Soil
Classification Report, Barangay,
Homeowner’s,
3 copies
3 copies
3 copies
60 copies
5 copies
3 copies
6 copies
60 copies
60 copies
60 copies
5 copies
(Owner)
(Technical)
(BO options)
Bill of Materials. (min 12 copies/set)
Technical/Professional ID (3 copies/tech 24 copies
60 copies (+)
Total - - - 352 copies
292 copies
NBC - IRR/ Administration & Enforcement 28
NBC – (NR)IRR BP Processing Flow
Administrative & Enforcement
REQUIRED
CLEARANCES
MUN/CITY
TREASURER
VERIFICATION
OF ZONING
& OTHER
CLEARNCES FINAL
EVALUATION
AND
RECOMMENDATION
LINE AND
GRADE
(GEODETIC)
ARCHITECTURAL
INTERIOR/
ACCESSIBILITY
PLUMBING
SANITARY
ELECTRICAL
ELECTRONICS &
COMMUNICATION
MECHANICAL
OTHERS
(SPECIFY, REPAIR)
CIVIL/
STRUCTURAL
LAND USE
AND
ZONING
BUILDING
OFFICIAL
APPLICATION
REALEASE
TRUE COPY TCT
TAXDEC & RCPT
(LEASE CNTRCT)
SETS OF PLANS
& SPECIFICATN
(A/S, S/P, E & M)
GOV’T & EXEMP
PROCESSINGOF BUILDING PERMIT APPLICATION
PAYMENT OF
FEES
1 2 3
4
5
6
7
8
9
11 12
10
13
Endorsed one set of plans
Bureau of Fire Protection
Valid for five days
Hierarchy of Building Development / Building Code Requirement
1- Planning 2- Permitting
3- Construction 4- Completion
Processing of completed construction covered by Building Permit
Completed Construction
Certificate of Occupancy
Certificate of Occupancy – shall be issued by the Local Building
Official after final inspection and submittal of a Certificate of
Completion and found that the building or structure complies
with the provisions of the National Building Code
NBC FORM NO. B - 01
Republic of the Philippines
City/Municipality of __________________
Province of __________________________
OFFICE OF THE BUILDING OFFICIAL
APPLICATION FOR BUILDING PERMIT
BOX 1 (TO BE ACCOMPLISHED IN PRINT BY THE APPLICANT)
USE OR CHARACTER OF OCCUPANCY
GROUP A : RESIDENTIAL, DWELLINGS
GROUP B : RESIDENTIAL HOTEL, APARTMENT
GROUP C : EDUCATIONAL, RECREATIONAL
GROUP D : INSTITUTIONAL
GROUP E : BUSINESS AND MERCANTILE
GROUP F : INDUSTRIAL
GROUP G : INDUSTRIAL STORAGE AND HAZARDOUS
GROUP H : RECREATIONAL, ASSEMBLY OCCUPANT LOAD LESS THAN 1000
GROUP I : RECREATIONAL, ASSEMBLY OCCUPANT LOAD 1000 OR MORE
GROUP J : AGRICULTURAL, ACCESSORY
SCOPE OF WORK
ALTERATION
NEW CONSTRUCTION
ERECTION
ADDITION
MOVING
RENOVATION
CONVERSION
REPAIR
ACCESSORY BUILDING/STRUCTURE
OTHERS (Specify)
OCCUPANCY CLASSIFIED _________________________________________
NUMBER OF UNITS_______________________________________________
TOTAL FLOOR AREA ______________________________ SQUARE METERS
TOTAL ESTIMATED COST P __________________________________
PROPOSED DATE OF CONSTRUCTION _________________________
EXPECTED DATE OF COMPLETION____________________________
_______________________________________________
OTHERS (Specify) ________________
(Signature Over Printed Name) (Signature Over Printed Name)
WITH MY CONSENT: LOT OWNER
Address
CTC No Date Issued Place Issued
Address
CTC No Date Issued Place Issued
APPLICANT:
BOX 3
BOX 2
BOX 5
REPUBLIC OF THE PHILIPPINES )
CITY/MUNICIPALITY OF __________________________________________)
BEFORE ME, at the City/Municipality of _____________________________________________________ , on _________________________ personally appeared
the following:
______________________________________________________ _______________ ______________ ___________________________________________
______________________________________________________ _______________ ______________ ___________________________________________
whose signatures appear hereinabove, known to me to be the same persons who executed this standard prescribed form and acknowledged to me that the same is their free and
voluntary act and deed.
WITNESS MY HAND AND SEAL on the date and place above written.
Doc. No. ________
Page No. ________ ________________________________________________________
Book No. ________ NOTARY PUBLIC (Until December _____________ )
Series of ________
APPLICANT C.T.C. No. Date Issued Place Issued
LICENSED ARCHITECT OR CIVIL ENGINEER
(Full-Time Inspector and Supervisor of Construction Works)
S.S
C.T.C. No. Date Issued Place Issued
APPLICATION NO. AREA NO
OWNER/APPLICANT LAST NAME FIRST NAME M.I. TIN
FOR CONSTRUCTION OWNED FORM OF OWNERSHIP
BY AN ENTERPRISE
ADDRESS: NO., STREET, BARANGAY, CITY/MUNICIPALITY ZIP CODE TELEPHONE NO.
LOCATION OF CONSTRUCTION: LOT NO. ______ BLK NO. ________ TCT NO. ______________ TAX DEC. NO. ____________________
STREET_____________________ BARANGAY __________________________ CITY/ MUNICIPALITY OF_______________________________
FULL-TIME INSPECTOR AND SUPERVISOR OF CONSTRUCTION WORKS (REPRESENTING THE OWNER)
ARCHITECT OR CIVIL ENGINEER
(Signed and Sealed Over Printed Name)
Date_____________________________
PRC No.
Issued at TIN
Date Issued
PTR No.
Validity
BOX 4
Address
DO NOT FILL-UP (NSO USE ONLY)
Date______________ Date______________
NEW RENEWAL AMENDATORY
RAISING
3) Light and ventilation (NBC IRR-8)
Office of the Building
Official NBCDO-DPWH
SECTION 309- CERTIFICATE OF OCCUPANCY
Q. Steps in Securing Certificate or Occupancy
Step 1- The owner/applicant from his/her inquiry shall be provided with information as well as forms and checklist of requirements to be
accomplished and submitted for application of Certificate of Occupancy.
Step 2- Owner/Applicant shall fill-up with appropriate information all required application forms and submit together with the
requirements stated in the checklist;
a) Certificate of Completion (signed and sealed by In-charge of Construction and Authorized Managing Officer (AMO))
b) Logbook (signed and sealed by In-charge of Construction)
c) As-built plan and specifications jointly signed and sealed by the designing Architect or Civil Engineer and the Architect or Civil
Engineer In-charge of Construction (shall also be signed by contractor if the construction is done by contract) and confirmed
by the owner. Said plans and specifications shall reflect faithfully all changes, modifications and alterations made on the
originally approved plans and specifications which are the basis of issuance of the original building permit.
Note: All changes, modifications and alterations shall be covered by subsequent amandatory permit therefore issued by the Building
Official before any work on said changes, modifications and alterations shall be started.
d) Originally issued plans and specifications
e) And all as required and stated in the checklist provided
Step 3- Received complete required documents , stamped (OBO Logo and date), generate number and enter information details to
computer filing.
Step 4- Distribute documents to different processing group and make review of the building based on the Certificate of Completion,
logbook, plans, as-built plans as the case maybe, and specification.
1. Architectural and Fire Safety-
1) Types of Construction (NBC IRR-4)
2) Requirements of Fire Zones (NBC IRR-5) / Fire Safety Inspection Certificate is required for all
buildings/structures, if non-available per MOA dated Aug 1, 1978 between MPW & MOND, the Building
Official may issue the Certificate of Occupancy with the condition that the fire safety requirement shall
be complied with the prescribed period set forth in the Fire Code of the Philippines.
OFFICE OF THE BUILDING
OFFICIAL / NBCDO
Section
301
PD
1096
• SECTION 301- Building Permits
No person, firm or corporation, including
any agency or instrumentally of the
government shall construct, alter, repair,
convert, use, occupy,, move, demolish,
and add any building/structure or any
portion thereof or cause the same to be
done, without first obtaining a building
permit therefore from the Building Official
assigned in the place where the subject
building/structure is located or to be done.
NBC - IRR/ Administration &
Enforcement
40
The Sy Building
Dangerous Building – Sy Building Collapses
NBC - IRR/ Administration &
Enforcement
41
Deep excavation besides an existing high rise building requires
soil exploration
NBC - IRR/ Administration &
Enforcement
42
Sign(1) Structure Collapses
Dangerous Structure – SB (Mandaluyong
Collapses
NBC - IRR/ Administration &
Enforcement
Sign(2) Structures Collapses
The Millenyo Challenges the Billboards
THE OZONE DISCO
a) Architectural Failure
b) Electrical Failure
c) Structural Failure
The Ozone Disco
The Ozone Disco
FEB. 25, 1983 OCT. 3, 1984
IRR /EFFECT
PRES MARCOS
SIGNED THIS ACT
SCOPE
ALL BLDG &
STRUCT
PERMIT
-IRR 1: SCOPE & APP
-IRR 2: MIN REQ’MENTS
-IRR 3: SPECIFIC REQ.
-IRR 4: TRANSPORT REQ
-IRR 5: ADM & ENF
APPLICATION
-CONSTRUCTN
-REPAIR
-RENOVATION
-CHANGE OCCUP
INCORPORATED
IN DESIGN &
FACILITIES
INSTALLATION
NEW PROPOSED
EXISTING
a) PRIMARY FUNCTION
b) 10% OF TOTAL
NUMBER
c) INGRESS/EGRESS
d) PARKING AREAS
a) WORK TO BE DONE
AT PRIMARY
FUNCTION
b) USE OF
ELEVATOR/LEVEL
c) 10% LIMIT ON
FUNCTION ROOM
d) NOT EFFECT
STRUCTURAL
e) COST NOT MORE
THAN 20% /BLDG
f) NO LEGAL EFFECT
BOTH
PRIVATE PUBLIC
NON-
ISSUANCE
WHEN
NOT
TO ISSUE
VIOLATION BY
CONSTITUTE
-OWNER
-CONTRACTOR
-ARCHITECT
-ENGINEER
-BLDG OFF’L
NON-COMPLIANCE
-STAIRS
-WALKWAYS
-CORRIDORS
-DOORS/ENTR
-WASH/REST RM
-LIFTS/ELEV
-RAMP
-PARKING
-SWITCHES/
-HANDRAILS
-THRESHOLDS
-FLOOR FINISHES
-DRINKING FOUN
-PUB TELEPHONE
-SEATING CAPACITY
EDUC INST
AIRPORTS
SHOPS/EST
SPORT CX
RECREA CX
PARKING
PUB TRANS
STREETS
HIGHWAY
PED XING
B
P
34
4
–
Hi
sto
gr
a
m
BATAS
PAMBANSA
344
BATAS
PAMBANSA
344
Permitting
Summary
LRA
BRGY
CPDO
BFP
OBO
CHO
MAYNILAD
TELCO
ASSESOR
AGENCY
C
o
n
s
t
r
u
c
t
i
o
n
1/7 2/3
3/2
4/1 5/1 6/1 7/5
8/7 10/1
9/12 11/1
Transactions 11/38
12/1 13/1 14/5
15/1 16/1 17/5
18/1 19/1 20/1
21/1 22/1 23/18
24/1 25/1 26/21
27/5
29. Receive inspection from the
Appraiser of CAO
1Day
no
charge
28. Apply for the tax declaration of
improvement at the City
Assessor's Office (CAO)
1Day
no
charge
30. Obtain the tax declaration of
improvement from the CAO
Company should request the
technical conditions for making the
necessary utility connections. At this
point, the company also starts
negotiations on conditions for the
supply of these utilities.
3
Days
no
charge
28/1 29/1 30/3
Pre-Cons. /BP Post-Cons / CO.
LRA
BRGY
CPDO
BFP
OBO
CHO
MAYNILAD
TELCO
ASSESOR
AGENCY
C
o
n
s
t
r
u
c
t
i
o
n
1/7 2/3
3/2
4/1 5/1 6/1 7/5
8/7 10/1
9/12 11/1
Transactions 11/38
12/1 13/1 14/5
15/1 16/1 17/5
18/1 19/1 20/1
21/1 22/1 23/18
24/1 25/1 26/21
27/5
28/1 29/1 30/3
Transaction 19/65
Pre-Cons. /BP Post-Cons / CO.
LRA
BRGY
CPDO
BFP
OBO
CHO
MAYNILAD
TELCO
ASSESOR
AGENCY
C
o
n
s
t
r
u
c
t
i
o
n
1/7 2/3
3/2
4/1 5/1 6/1 7/5
8/7 10/1
9/12 11/1
Transactions 11/38
12/1 13/1 14/5
15/1 16/1 17/5
18/1 19/1 20/1
21/1 22/1 23/18
24/1 25/1 26/21
27/5
28/1 29/1 30/3
Transactions 19/65
Completed Transaction 30/103
Pre-Cons. /BP
Bldg Permit
Post-Cons / CO
Cert of Occupancy.
Permitting
Summary
REF
PIC
THANK YOU

More Related Content

Similar to Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptx

CEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectCEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectAllen Green
 
Capital Needs Assessment Example
Capital Needs Assessment ExampleCapital Needs Assessment Example
Capital Needs Assessment ExampleAdam Hoeksema
 
Lec-10 Model Building Bye Laws & Disaster Preparedness Govt of India.pptx
Lec-10 Model Building Bye Laws & Disaster Preparedness Govt of India.pptxLec-10 Model Building Bye Laws & Disaster Preparedness Govt of India.pptx
Lec-10 Model Building Bye Laws & Disaster Preparedness Govt of India.pptxSamirsinh Parmar
 
updated habeeb cv
updated habeeb cvupdated habeeb cv
updated habeeb cvhabeeb ishaq
 
Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
Ibrahim_Abdelkhalig_Curriculum_vitae_(2) Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
Ibrahim_Abdelkhalig_Curriculum_vitae_(2) Ibraim Mohamed
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviromentjuwes
 
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATIONRESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATIONMaypray Guimbarda
 
Cost Estimator and Consultant
Cost Estimator and ConsultantCost Estimator and Consultant
Cost Estimator and ConsultantRalph Abagis
 
Site analysis and documentation
Site analysis and documentation Site analysis and documentation
Site analysis and documentation Lawin Langat
 
Estimation (power Point).ppt
Estimation (power Point).pptEstimation (power Point).ppt
Estimation (power Point).pptNaumanIjaz12
 
Mohammad Hassan -CV
Mohammad Hassan -CVMohammad Hassan -CV
Mohammad Hassan -CVMohammed Hassan
 
Designing of an airport
Designing of an airportDesigning of an airport
Designing of an airportNilanjana Pal
 
Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16tyeeseeker
 
Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Shabaz Khan
 
Building ssr 2013-14
Building ssr 2013-14Building ssr 2013-14
Building ssr 2013-14Rajkumar Kamarsu
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.pptBALAMURUGANR53
 
Eng. tarek ali cv - 29 oct 2015
Eng. tarek ali   cv - 29 oct 2015Eng. tarek ali   cv - 29 oct 2015
Eng. tarek ali cv - 29 oct 2015Tarek Ali
 
Construction site management
Construction site managementConstruction site management
Construction site managementrajlaxmipardeshi
 

Similar to Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptx (20)

CEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final ProjectCEM455 CONSTRUCTION Final Project
CEM455 CONSTRUCTION Final Project
 
Capital Needs Assessment Example
Capital Needs Assessment ExampleCapital Needs Assessment Example
Capital Needs Assessment Example
 
Lec-10 Model Building Bye Laws & Disaster Preparedness Govt of India.pptx
Lec-10 Model Building Bye Laws & Disaster Preparedness Govt of India.pptxLec-10 Model Building Bye Laws & Disaster Preparedness Govt of India.pptx
Lec-10 Model Building Bye Laws & Disaster Preparedness Govt of India.pptx
 
updated habeeb cv
updated habeeb cvupdated habeeb cv
updated habeeb cv
 
Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
Ibrahim_Abdelkhalig_Curriculum_vitae_(2) Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
Ibrahim_Abdelkhalig_Curriculum_vitae_(2)
 
CV@JOMY NEW
CV@JOMY NEWCV@JOMY NEW
CV@JOMY NEW
 
Sxsw 2011 construction enviroment
Sxsw 2011 construction enviromentSxsw 2011 construction enviroment
Sxsw 2011 construction enviroment
 
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATIONRESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
 
Cost Estimator and Consultant
Cost Estimator and ConsultantCost Estimator and Consultant
Cost Estimator and Consultant
 
Site analysis and documentation
Site analysis and documentation Site analysis and documentation
Site analysis and documentation
 
Estimation (power Point).ppt
Estimation (power Point).pptEstimation (power Point).ppt
Estimation (power Point).ppt
 
Nayer Resume March 2016
Nayer Resume March 2016Nayer Resume March 2016
Nayer Resume March 2016
 
Mohammad Hassan -CV
Mohammad Hassan -CVMohammad Hassan -CV
Mohammad Hassan -CV
 
Designing of an airport
Designing of an airportDesigning of an airport
Designing of an airport
 
Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16Michael Polito Resume Revised 7.17.16
Michael Polito Resume Revised 7.17.16
 
Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...Construction Planning and Scheduling of Residential Building by MS Project by...
Construction Planning and Scheduling of Residential Building by MS Project by...
 
Building ssr 2013-14
Building ssr 2013-14Building ssr 2013-14
Building ssr 2013-14
 
EstimationandCosting.ppt
EstimationandCosting.pptEstimationandCosting.ppt
EstimationandCosting.ppt
 
Eng. tarek ali cv - 29 oct 2015
Eng. tarek ali   cv - 29 oct 2015Eng. tarek ali   cv - 29 oct 2015
Eng. tarek ali cv - 29 oct 2015
 
Construction site management
Construction site managementConstruction site management
Construction site management
 

Recently uploaded

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEslot gacor bisa pakai pulsa
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoĂŁo Esperancinha
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 

Recently uploaded (20)

GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 

Hiway 1 aS ewfd efd ewfadfs qwfas EE.pptx

  • 1.
  • 2. Manual for AMO Instrumentation of Buildings, ERI- Earthquake Recording Instrument/ Accelerograph Construction Safety & Health Program, DO #13 Energy Efficiency in Buildings, Green Building Code Updating the Building Code, Building Act Streamlining Building Permitting, Simple Structures in 5-Days Building Officials, PEZA, PNP-AFP, TIEZA & DRRMSys Disaster Risk Reduction Management System
  • 3.
  • 4. THE DYNAMICS OF BUILDING PERMITTING CONSTRUCTION DEFINITIONS - OWNER - BUILDING OFFICIAL - INSPECTOR/IN-CHARGE - DESIGN PROFESSIONAL - STAFF - BUILDING PERMIT - OTHER GOV’T AGENCIES - PROJECT - CONSTRUCTOR
  • 5. THE NATIONAL BUILDING CODE ADMINISTRATIVE SANCTION AND PROCEDURES • THE DYNAMICS OF BUILDING PERMIT / CONSTRUCTION – The clearances from other gov’t agencies / Sect 302 IRR2005 (PD1096 - DPWH/ Nat Road Widening & Improvements - AIR TRANS. OFFICE (CAAP)/ Height - HLURB / Housing - DEPT OF HEALTH/ Hospital - Dept Ed/ Schools - PHIL PORT AUTHO/ Pier & Harbor - DILG/ BFP-Fire Clearance - DOTC/ Stations - DENR/ Environment - DEPT OF TOURISM/ Resorts - LGU / Zoning & - PHIL INST OF VOLC/ Faults - LAGUNA LAKE DEVT/ Discharge - MWSS/ Water Supply & Sewerage - NAT WATER RES BRD/ UG-Water Use - DEPT OF AGRIC/ Dairy & Agricultural Bldg. - DOLE/ Workers Safety - OTHERS/ MMDA/ Traffic & Drainage - NAT COUNCIL For The WDPs (Access) - NAT HOUSING AUTHO/ Re-settlements
  • 6. THE NATIONAL BUILDING CODE ADMINISTRATIVE SANCTION AND PROCEDURES • THE DYNAMICS OF BUILDING PERMITTING FOR CONSTRUCTION - BUILDING OFFICIAL- THE BO- (SECT 207, PD 1096) RESPONSIBLE FOR CARRYING OUT THE PROVISION OF THE BUILDING CODE IN THE FIELD AS WELL AS THE ENFORCEMENTS OF ORDERS AND DECISIONS MADE PURSUANT THERETO. DUTIES: (GIVEN IN SECT 207 OF THE BUILDING CODE) , AMONG THOSE DUTIES IS; - UPON COMPLAINT OR MOTO PROPIO AND AFTER THE DUE NOTICE/S AND HEARING INITIATE (ACTION ) TOWARDS ADMINISTRATIVE PROCEDINGS.
  • 7. - OWNER/ PERSON THE OWNER- REFER TO ANY INDIVIDUAL, PARTNERSHIP, CORPORATION, ASSOCIATION AND PUBLIC OR PRIVATE ORGANIZAQTION OF ANY CHARACTER WITH INTENT TO PUT UP A PROJECT. INSPECTOR & SUPV- WHO IS THE IN-CHARGE OF CONST’N COMMISSION BY THE OWNER TO PREPARE RECORD & SUPERVISION OF THE PROJECT IMPLEMENTATION. DESIGN PROFESSIONALS- COMMISSION BY THE OWNER TO PREPARE TECHNICAL DOCUMENTATIONS OF THE PROJECT FOR PERMITTING AND CONSTRUCTION CONSTRUCTOR/AMO- COMMISSIONED BY THE OWNER TO PERFORM THE IMPLEMENTATION OF THE PROJECT ACCORDING TO THE ISSUED PERMITS, PLANS AND SPECIFICATIONS. • THE DYNAMICS OF BUILDING PERMITTING FOR CONSTRUCTION
  • 8. THE NATIONAL BUILDING CODE ADMINISTRATIVE SANCTION AND PROCEDURES - BUILDING OFFICIAL- THE BO- RESPONSIBLE FOR CARRYING OUT THE PROVISION OF THE BUILDING CODE IN THE FIELD; OFFICIAL CHARGED WITH THE DUTIES OF ISSUING BUILDING PERMITS. OFFICE & STAFFS- ASSIST THE BUILDING OFFICIAL IN HANDLING THE PROCESSING OF APPLICATION FORM AND THE ISSUANCE OF, ALL KINDS OF PERMIT PERTAINING TO BUILDINGS BOTH PUBLIC AND PRIVATE, AND ALL OTHER APPURTENANCES THERETO. THE BUILDING PERMIT- SHALL MEAN THE PRINCIPAL (BUILDING) PERMIT AND ALL THE ANCILLARY OR ACCESSORY PERMITS PERTAINING TO A BUILDING AND ITS APPURTENANCES, SUCH AS MECHANICAL AND ELECTRICAL PERMITS, SANITARY/PLUMBING PERMITS, AND FENCING, SIDEWALKS, TOWERS, SIGNBOARDS, ETC. • THE DYNAMICS OF BUILDING PERMITTING FOR CONSTRUCTION
  • 9. • THE DYNAMICS OF BUILDING PERMITTING CONSTRUCTION Section 305 – Validity of Building Permits “ whenever the issuance of a permit is based on approved plans and specification which are subsequently found defective, the BO - order to correct plans & specifications - order to stop any or all building operation • Section 306- Non-Issuance, Suspension or Revocation of Building Permits - Errors found in the plans and specifications - Incorrect or inaccurate info supplied - non compliance with the provision of the Code • THE DYNAMICS OF BUILDING PERMITTING FOR CONSTRUCTION
  • 12. THE NATIONAL BUILDING CODE ADMINISTRATIVE SANCTION AND PROCEDURES SECTION 103. Scope and Application (a) The provisions of this Code shall apply to the design, location, siting, construction, alteration, repair, conversion, use, occupancy, maintenance, moving, demolition of, and addition to public and private buildings and structures, except traditional indigenous family dwellings as defined herein.
  • 13. 13 Indigenous dwelling Building any structure, . . As principal use of the lot from which it is situated. THE NATIONAL BUILDING CODE ADMINISTRATIVE SANCTION AND PROCEDURES
  • 14. Socialized housing project THE NATIONAL BUILDING CODE ADMINISTRATIVE SANCTION AND PROCEDURES
  • 15. Administration and Enforcement 15 BP 220 THE NATIONAL BUILDING CODE ADMINISTRATIVE SANCTION AND PROCEDURES
  • 16. Administration and Enforcement 16 BP 220 THE NATIONAL BUILDING CODE ADMINISTRATIVE SANCTION AND PROCEDURES
  • 17. THE NATIONAL BUILDING CODE ADMINISTRATIVE SANCTION AND PROCEDURES
  • 18. Project, Project Infrastructure Project THE NATIONAL BUILDING CODE ADMINISTRATIVE SANCTION AND PROCEDURES
  • 19. Regulations Department of Building Official Office Of The Building Official Tanggapan Ng Punong Panggusali Kagawaran Ng Punong Panggusali
  • 20. Regulations BUILDING PERMIT Sizes of: Rooms Windows Doors Stair Strength/Stability of Foundations Walls Columns Flooring Sys Roofing Sys Beams and Integrity of; Painting Sealant Lighting Odor Safety in Construction Office Of The Building Official National Building Code PD 1096
  • 21. Building Permit • What is a Building Permit? – (By definition) A document issued by the Building Official (BO) to an owner/applicant to proceed with the construction, installation, addition, alteration, renovation, conversion, repair, moving, demolition or other work activity of a specific project/building/structure or portions thereof after the accompanying principal plans, specification and other pertinent documents with the duly notarized application are found satisfactory and substantially conforming with the National Building Code of the Philippines and its implementing Rules and Regulations.(IRR).
  • 22. The Building Permit –   Front Side – indicated entries from the applicant to be filled up by appropriate concerns. Box 1 for detail, scope of application Box 2 for full-time inspector of the const’n Box 3 for applicant Box 4 for lot owner Box 5 for the Notary NBC FORM NO. B - 01 Republic of the Philippines City/Municipality of __________________ Province of __________________________ OFFICE OF THE BUILDING OFFICIAL APPLICATION FOR BUILDING PERMIT BOX 1 (TO BE ACCOMPLISHED IN PRINT BY THE APPLICANT) USE OR CHARACTER OF OCCUPANCY GROUP A : RESIDENTIAL, DWELLINGS GROUP B : RESIDENTIAL HOTEL, APARTMENT GROUP C : EDUCATIONAL, RECREATIONAL GROUP D : INSTITUTIONAL GROUP E : BUSINESS AND MERCANTILE GROUP F : INDUSTRIAL GROUP G : INDUSTRIAL STORAGE AND HAZARDOUS GROUP H : RECREATIONAL, ASSEMBLY OCCUPANT LOAD LESS THAN 1000 GROUP I : RECREATIONAL, ASSEMBLY OCCUPANT LOAD 1000 OR MORE GROUP J : AGRICULTURAL, ACCESSORY SCOPE OF WORK ALTERATION NEW CONSTRUCTION ERECTION ADDITION MOVING RENOVATION CONVERSION REPAIR ACCESSORY BUILDING/STRUCTURE OTHERS (Specify) OCCUPANCY CLASSIFIED _________________________________________ NUMBER OF UNITS_______________________________________________ TOTAL FLOOR AREA ______________________________ SQUARE METERS TOTAL ESTIMATED COST P __________________________________ PROPOSED DATE OF CONSTRUCTION _________________________ EXPECTED DATE OF COMPLETION____________________________ _______________________________________________ OTHERS (Specify) ________________ (Signature Over Printed Name) (Signature Over Printed Name) WITH MY CONSENT: LOT OWNER Address CTC No Date Issued Place Issued Address CTC No Date Issued Place Issued APPLICANT: BOX 3 BOX 2 BOX 5 REPUBLIC OF THE PHILIPPINES ) CITY/MUNICIPALITY OF __________________________________________) BEFORE ME, at the City/Municipality of _____________________________________________________ , on _________________________ personally appeared the following: ______________________________________________________ _______________ ______________ ___________________________________________ ______________________________________________________ _______________ ______________ ___________________________________________ whose signatures appear hereinabove, known to me to be the same persons who executed this standard prescribed form and acknowledged to me that the same is their free and voluntary act and deed. WITNESS MY HAND AND SEAL on the date and place above written. Doc. No. ________ Page No. ________ ________________________________________________________ Book No. ________ NOTARY PUBLIC (Until December _____________ ) Series of ________ APPLICANT C.T.C. No. Date Issued Place Issued LICENSED ARCHITECT OR CIVIL ENGINEER (Full-Time Inspector and Supervisor of Construction Works) S.S C.T.C. No. Date Issued Place Issued APPLICATION NO. AREA NO OWNER/APPLICANT LAST NAME FIRST NAME M.I. TIN FOR CONSTRUCTION OWNED FORM OF OWNERSHIP BY AN ENTERPRISE ADDRESS: NO., STREET, BARANGAY, CITY/MUNICIPALITY ZIP CODE TELEPHONE NO. LOCATION OF CONSTRUCTION: LOT NO. ______ BLK NO. ________ TCT NO. ______________ TAX DEC. NO. ____________________ STREET_____________________ BARANGAY __________________________ CITY/ MUNICIPALITY OF_______________________________ FULL-TIME INSPECTOR AND SUPERVISOR OF CONSTRUCTION WORKS (REPRESENTING THE OWNER) ARCHITECT OR CIVIL ENGINEER (Signed and Sealed Over Printed Name) Date_____________________________ PRC No. Issued at TIN Date Issued PTR No. Validity BOX 4 Address DO NOT FILL-UP (NSO USE ONLY) Date______________ Date______________ NEW RENEWAL AMENDATORY RAISING
  • 23. OTHERS(specify)________________ OCCUPANCY CLASSIFIED__________________________ TOTALESTIMATEDCOSTP___________________________ NUMBEROFUNITS_______________________________ PROPOSEDDATEOFCONSTRUCTION__________________ TOTALFLOORAREA __________________SQUAREMETERS EXPECTEDDATEOFCOMPLETION_____________________ GROUPA:RESIDENTIALDWELLINGS APPLICATIONNO. OWNER/APPLICANT LASTNAME FIRSTNAME M.I. TIN FORCONSTRUCTIONOWNEDBY ANENTERPRSE FORMOFOWNERSHIP ADDRESSNO STREET BARANGAY CITY/MUNICIPALITY ZIPCODE TELEPHONENO. LOCATIONOFCONSTRUCTION LOTNO._________ BLKNO________ TCTNO________ TAXDECNO________ STREET_______________ BARANGAY _______________CITY /MUNICIPALITY OF_______________________ SCOPEOFWORK GROUPC:EDUCATIONAL,RECREATIONAL GROUPB:RESIDENTIALHOTELAPARTMENT NEWCONSTRUCTION ERECTION______________ ADDITION______________ ALTERATION___________ GROUPD:INSTITUTIONAL GROUPG:INDUSTRIALSTORAGEANDHAZARDOUS GROUPH:RECREATIONALASSEMBLY OCCUPANTLOADLESSTHAN1000 GROUPI:RECREATIONALASSEMBLY OCCUPANTLOAD1000ORMORE GROUPF:INDUSTRIAL USEOFCHARACTEROFOCCUPANCY GROUPE:BUSINESSANDMERCANTILE GROUPJ:AGRICULTURALACCESSORY MOVING_____________________ RAISING_____________________________ ACCESORY BUILDINGSTRUCTURE_______ OTHERS(specify)_____________________ ____________________________________ RENOVATION________________ CONVERSION________________ REPAIR_____________________ NBC FORM NO. B - 01 Republic of the Philippines City/Municipality of __________________ Province of __________________________ OFFICE OF THE BUILDING OFFICIAL APPLICATION FOR BUILDING PERMIT BOX 1 (TO BE ACCOMPLISHED IN PRINT BY THE APPLICANT) USE OR CHARACTER OF OCCUPANCY GROUP A : RESIDENTIAL, DWELLINGS GROUP B : RESIDENTIAL HOTEL, APARTMENT GROUP C : EDUCATIONAL, RECREATIONAL GROUP D : INSTITUTIONAL GROUP E : BUSINESS AND MERCANTILE GROUP F : INDUSTRIAL GROUP G : INDUSTRIAL STORAGE AND HAZARDOUS GROUP H : RECREATIONAL, ASSEMBLY OCCUPANT LOAD LESS THAN 1000 GROUP I : RECREATIONAL, ASSEMBLY OCCUPANT LOAD 1000 OR MORE GROUP J : AGRICULTURAL, ACCESSORY SCOPE OF WORK ALTERATION NEW CONSTRUCTION ERECTION ADDITION MOVING RENOVATION CONVERSION REPAIR ACCESSORY BUILDING/STRUCTURE OTHERS (Specify) OCCUPANCY CLASSIFIED _________________________________________ NUMBER OF UNITS_______________________________________________ TOTAL FLOOR AREA ______________________________ SQUARE METERS TOTAL ESTIMATED COST P __________________________________ PROPOSED DATE OF CONSTRUCTION _________________________ EXPECTED DATE OF COMPLETION____________________________ _______________________________________________ OTHERS (Specify) ________________ (Signature Over Printed Name) (Signature Over Printed Name) WITH MY CONSENT: LOT OWNER Address CTC No Date Issued Place Issued Address CTC No Date Issued Place Issued APPLICANT: BOX 3 BOX 2 BOX 5 REPUBLIC OF THE PHILIPPINES ) CITY/MUNICIPALITY OF __________________________________________) BEFORE ME, at the City/Municipality of _____________________________________________________ , on _________________________ personally appeared the following: ______________________________________________________ _______________ ______________ ___________________________________________ ______________________________________________________ _______________ ______________ ___________________________________________ whose signatures appear hereinabove, known to me to be the same persons who executed this standard prescribed form and acknowledged to me that the same is their free and voluntary act and deed. WITNESS MY HAND AND SEAL on the date and place above written. Doc. No. ________ Page No. ________ ________________________________________________________ Book No. ________ NOTARY PUBLIC (Until December _____________ ) Series of ________ APPLICANT C.T.C. No. Date Issued Place Issued LICENSED ARCHITECT OR CIVIL ENGINEER (Full-Time Inspector and Supervisor of Construction Works) S.S C.T.C. No. Date Issued Place Issued APPLICATION NO. AREA NO OWNER/APPLICANT LAST NAME FIRST NAME M.I. TIN FOR CONSTRUCTION OWNED FORM OF OWNERSHIP BY AN ENTERPRISE ADDRESS: NO., STREET, BARANGAY, CITY/MUNICIPALITY ZIP CODE TELEPHONE NO. LOCATION OF CONSTRUCTION: LOT NO. ______ BLK NO. ________ TCT NO. ______________ TAX DEC. NO. ____________________ STREET_____________________ BARANGAY __________________________ CITY/ MUNICIPALITY OF_______________________________ FULL-TIME INSPECTOR AND SUPERVISOR OF CONSTRUCTION WORKS (REPRESENTING THE OWNER) ARCHITECT OR CIVIL ENGINEER (Signed and Sealed Over Printed Name) Date_____________________________ PRC No. Issued at TIN Date Issued PTR No. Validity BOX 4 Address DO NOT FILL-UP (NSO USE ONLY) Date______________ Date______________ NEW RENEWAL AMENDATORY RAISING Use Or Type of Occupancy Residential/Dwelling Grp A Res/Hotel or Apartment Grp B Educational/Recreational Grp C Institutional Grp D Business/Mercantile Grp E Industrial Building Grp F Storage/Hazard Bldg Grp G Assembly Building Grp H & I Accessory Building Grp J Scope of Work; New Construction Renovation Erection Addition Alteration Conversion Repair Demolition Raising
  • 24. The Building Permit – Dorsal side is the Building Permit itself and the terms and condition of the permit, appearing also the processing fees for each sectional evaluation. 1. That under Article 1723 of the Civil Code of the Philippines, the engineer or architect who drew up the plans and specifications for a building/structure is liable for damages if within fifteen (15) years from the completion of the building/structure, the same should collapse due to defect in the plans or specifications or defects in the ground. The engineer or architect who supervises the construction shall be solidarily liable with the contractor should the edifice collapse due to defect in the construction or the use of inferior materials. 2. This permit shall be accompanied by the various applicable ancillary and accessory permits, plans and specifications signed and sealed by the corresponding design professionals who shall be responsible for the comprehensive and correctness of the plans in compliance to the Code and its IRR and to all applicable referral codes and professional regulatory laws. 3. That the proposed construction/erection/addition/alteration/renovation/conversion/repair/moving/demolition, etc. shall be in conformity with the provisions of the National Building Code, and its IRR. a. That prior to commencement of the proposed projects and construction an actual relocation survey shall be conducted by a duly licensed Geodetic Engineer. b. That before commencing the excavation the person making or causing the excavation to be made shall notify in writing the owner of adjoining property not less than ten (10) days before such excavation is to be made and show how the adjoining property should be protected. c. That no person shall use or occupy a street, alley or public sidewalk for the performance of work covered by a building permit. d. That no person shall perform any work on any building or structure adjacent to a public way in general use for pedestrian travel, unless the pedestrians are protected. e. That the supervising Architect/Civil Engineer shall keep at the jobsite at all times a logbook of daily construction activities wherein the actual daily progress of construction including tests conducted, weather condition and other pertinent data are to be recorded, same shall be made available for scrutiny and comments by the OBO representative during the conduct of his/her inspection pursuant to Section 207 of the National Building Code. f. That upon completion of the construction, the said licensed supervising Architect/Civil Engineer shall submit to the Building Official duly signed and sealed logbook, as-built plans and other documents and shall also prepare and submit a Certificate of Completion of the project stating that the construction of the building/structure conform to the provision of the Code, its IRR as well as the plans and specifications. g. All such changes, modifications and alterations shall likewise be submitted to the Building Official and the subsequent amendatory permit therefor issued before any work on said changes, modifications and alterations shall be started. The as-built plans and specifications maybe just an orderly and comprehensive compilation of all documents which include the originally submitted plans and specifications of all amendments thereto as actually built or they may be an entirely new set of plans and specifications accurately describing and/or reflecting therein the building as actually built. 4. That no building/structure shall be used until the Building Official has issued a Certificate of Occupancy therefor as provided in the Code. However, a partial Certificate of Occupancy may be issued for the Use/Occupancy of a portion or portions of a building/structure prior to the completion of the entire building/structure. 5. That this permit shall not serve as an exemption from securing written clearances from various government authorities exercising regulatory function affecting buildings/structures. 6. When the construction is undertaken by contract, the work shall be done by a duly licensed and registered contractor pursuant to the provisions of the Contractor’s License Law (RA 4566). 7. The Owner/Permittee shall submit a duly accomplished prescribed “Notice of Construction” to the Office of the Building Official prior to any construction activity. 8. The Owner/Permittee shall put a Building Permit sign which complies with the prescribed dimensions and information, which shall remain posted on the construction site for the duration of the construction. BUILDING OFFICIAL (Signature Over Printed Name) Date _________________ PERMIT ISSUED BY: BUILDING PERMIT BUILDING PERMIT NO. Permit is issued to__________________________for the proposed _________________________________ under____________________, of Group_____, located at Lot No._____Block No.______OCT/TCT No. ______, _______________Street, Barangay_________________, City/Municipality of_______________________ subject to the following: (Owner/Applicant) (Type of Project) NOTE : THIS PERMIT MAY BE CANCELLED OR REVOKED PURSUANT TO SECTIONS 305 AND 306 OF THE “NATIONAL BUILDING CODE” DATE ISSUED OFFICIAL RECEIPT NO. DATE PAID (Use or Character of Occupancy) M M D D Y Y M M D D Y Y BOX 6 (TO BE ACCOMPLISHED BY THE PROCESSING AND EVALUATION DIVISION) AMOUNT DUE ASSESSED BY TOTAL LINE AND GRADE (Geodetic) FENCING ARCHITECTURAL ELECTRICAL MECHANICAL PLUMBING SANITARY LOCATIONAL/ZONING OF LAND USE ELECTRONICS PROCESSING FEE FILING FEE CIVIL/STRUCTURAL ONE HALF (½) OF FIRE SERVICE FUND (FSF) ASSESSED FEES O.R. NUMBER DATE PAID INTERIOR BOX 7 (TO BE ACCOMPLISHED BY THE BUILDING OFFICIAL) NSO  Dorsal side – indicated entries from the OBO Box 6 for processing & evaluation division Box 7 for the Building Official which is the Building Permit itself. Section 304 – IRR 2005 PD1096 On issuance of building permit in item 5 terms and condition of permit When the construction is undertaken by contract, the work shall be done by a duly licensed and registered contractor pursuant to the provisions of the Contractor’s License Law (RA 4566) Item 6 on condition of Building Permit Issuance When the construction is undertaken by contract, the work shall be done by a duly licensed and registered contractor pursuant to the provisions Contractor’s License Law (RA 4566)
  • 26. ADMINISTRATION AND ENFORCEMENT ORGANIZATION OF DOCUMENTATION Organization of the Forms Building Permit Ancillary Permits Accessory Permits Bldg Permit, Form No. B-01 Architectural Permit, Form No. A-01 Civil/Structural Permit, Form No. A-02 Electrical Permit, Form No. A-03 Mechanical Permit, Form No. A-04 Sanitary Permit, Form No. A-05 Plumbing Permit, Form No. A-06 Electronic Permit, Form No. A-07 Sidewalk Constn. Permit, Form No. B-04 Sidewalk enclosure Permit, Form No. B-05 Scaffolding Permit, Form No. B-06 GP & Excavation Permit, Form No. B-02 5 copies/set 5 copies/set 5 copies/set 5 copies/set 5 copies/set 5 copies/set 5 copies/set 5 copies/set 5 copies/set 5 copies/set 5 copies/set 5 copies/set (Notarized) (Not Notarize) (Not Notarize) 60 copies
  • 27. ADMINISTRATION AND ENFORCEMENT Organization of the Forms Clearances (applicable) Support Documents Special Requirements Zoning / Local LGU Proponent Agency (institutions) Agency jurisdiction (widening, etc) 5 sets Constn Plan (min 12 copies/set) Geodetic Relocation Survey True Copies of TCT/OCT Tax Dec + Current Tax Receipt Specifications (min 12 copies/set Struct. Analysis/comp. (min 12 copies/set) Authorization, Secretary’s Cert., Soil Classification Report, Barangay, Homeowner’s, 3 copies 3 copies 3 copies 60 copies 5 copies 3 copies 6 copies 60 copies 60 copies 60 copies 5 copies (Owner) (Technical) (BO options) Bill of Materials. (min 12 copies/set) Technical/Professional ID (3 copies/tech 24 copies 60 copies (+) Total - - - 352 copies 292 copies
  • 28. NBC - IRR/ Administration & Enforcement 28 NBC – (NR)IRR BP Processing Flow Administrative & Enforcement REQUIRED CLEARANCES MUN/CITY TREASURER VERIFICATION OF ZONING & OTHER CLEARNCES FINAL EVALUATION AND RECOMMENDATION LINE AND GRADE (GEODETIC) ARCHITECTURAL INTERIOR/ ACCESSIBILITY PLUMBING SANITARY ELECTRICAL ELECTRONICS & COMMUNICATION MECHANICAL OTHERS (SPECIFY, REPAIR) CIVIL/ STRUCTURAL LAND USE AND ZONING BUILDING OFFICIAL APPLICATION REALEASE TRUE COPY TCT TAXDEC & RCPT (LEASE CNTRCT) SETS OF PLANS & SPECIFICATN (A/S, S/P, E & M) GOV’T & EXEMP PROCESSINGOF BUILDING PERMIT APPLICATION PAYMENT OF FEES 1 2 3 4 5 6 7 8 9 11 12 10 13 Endorsed one set of plans Bureau of Fire Protection Valid for five days
  • 29. Hierarchy of Building Development / Building Code Requirement 1- Planning 2- Permitting 3- Construction 4- Completion
  • 30. Processing of completed construction covered by Building Permit Completed Construction Certificate of Occupancy Certificate of Occupancy – shall be issued by the Local Building Official after final inspection and submittal of a Certificate of Completion and found that the building or structure complies with the provisions of the National Building Code
  • 31. NBC FORM NO. B - 01 Republic of the Philippines City/Municipality of __________________ Province of __________________________ OFFICE OF THE BUILDING OFFICIAL APPLICATION FOR BUILDING PERMIT BOX 1 (TO BE ACCOMPLISHED IN PRINT BY THE APPLICANT) USE OR CHARACTER OF OCCUPANCY GROUP A : RESIDENTIAL, DWELLINGS GROUP B : RESIDENTIAL HOTEL, APARTMENT GROUP C : EDUCATIONAL, RECREATIONAL GROUP D : INSTITUTIONAL GROUP E : BUSINESS AND MERCANTILE GROUP F : INDUSTRIAL GROUP G : INDUSTRIAL STORAGE AND HAZARDOUS GROUP H : RECREATIONAL, ASSEMBLY OCCUPANT LOAD LESS THAN 1000 GROUP I : RECREATIONAL, ASSEMBLY OCCUPANT LOAD 1000 OR MORE GROUP J : AGRICULTURAL, ACCESSORY SCOPE OF WORK ALTERATION NEW CONSTRUCTION ERECTION ADDITION MOVING RENOVATION CONVERSION REPAIR ACCESSORY BUILDING/STRUCTURE OTHERS (Specify) OCCUPANCY CLASSIFIED _________________________________________ NUMBER OF UNITS_______________________________________________ TOTAL FLOOR AREA ______________________________ SQUARE METERS TOTAL ESTIMATED COST P __________________________________ PROPOSED DATE OF CONSTRUCTION _________________________ EXPECTED DATE OF COMPLETION____________________________ _______________________________________________ OTHERS (Specify) ________________ (Signature Over Printed Name) (Signature Over Printed Name) WITH MY CONSENT: LOT OWNER Address CTC No Date Issued Place Issued Address CTC No Date Issued Place Issued APPLICANT: BOX 3 BOX 2 BOX 5 REPUBLIC OF THE PHILIPPINES ) CITY/MUNICIPALITY OF __________________________________________) BEFORE ME, at the City/Municipality of _____________________________________________________ , on _________________________ personally appeared the following: ______________________________________________________ _______________ ______________ ___________________________________________ ______________________________________________________ _______________ ______________ ___________________________________________ whose signatures appear hereinabove, known to me to be the same persons who executed this standard prescribed form and acknowledged to me that the same is their free and voluntary act and deed. WITNESS MY HAND AND SEAL on the date and place above written. Doc. No. ________ Page No. ________ ________________________________________________________ Book No. ________ NOTARY PUBLIC (Until December _____________ ) Series of ________ APPLICANT C.T.C. No. Date Issued Place Issued LICENSED ARCHITECT OR CIVIL ENGINEER (Full-Time Inspector and Supervisor of Construction Works) S.S C.T.C. No. Date Issued Place Issued APPLICATION NO. AREA NO OWNER/APPLICANT LAST NAME FIRST NAME M.I. TIN FOR CONSTRUCTION OWNED FORM OF OWNERSHIP BY AN ENTERPRISE ADDRESS: NO., STREET, BARANGAY, CITY/MUNICIPALITY ZIP CODE TELEPHONE NO. LOCATION OF CONSTRUCTION: LOT NO. ______ BLK NO. ________ TCT NO. ______________ TAX DEC. NO. ____________________ STREET_____________________ BARANGAY __________________________ CITY/ MUNICIPALITY OF_______________________________ FULL-TIME INSPECTOR AND SUPERVISOR OF CONSTRUCTION WORKS (REPRESENTING THE OWNER) ARCHITECT OR CIVIL ENGINEER (Signed and Sealed Over Printed Name) Date_____________________________ PRC No. Issued at TIN Date Issued PTR No. Validity BOX 4 Address DO NOT FILL-UP (NSO USE ONLY) Date______________ Date______________ NEW RENEWAL AMENDATORY RAISING
  • 32.
  • 33.
  • 34.
  • 35. 3) Light and ventilation (NBC IRR-8) Office of the Building Official NBCDO-DPWH SECTION 309- CERTIFICATE OF OCCUPANCY Q. Steps in Securing Certificate or Occupancy Step 1- The owner/applicant from his/her inquiry shall be provided with information as well as forms and checklist of requirements to be accomplished and submitted for application of Certificate of Occupancy. Step 2- Owner/Applicant shall fill-up with appropriate information all required application forms and submit together with the requirements stated in the checklist; a) Certificate of Completion (signed and sealed by In-charge of Construction and Authorized Managing Officer (AMO)) b) Logbook (signed and sealed by In-charge of Construction) c) As-built plan and specifications jointly signed and sealed by the designing Architect or Civil Engineer and the Architect or Civil Engineer In-charge of Construction (shall also be signed by contractor if the construction is done by contract) and confirmed by the owner. Said plans and specifications shall reflect faithfully all changes, modifications and alterations made on the originally approved plans and specifications which are the basis of issuance of the original building permit. Note: All changes, modifications and alterations shall be covered by subsequent amandatory permit therefore issued by the Building Official before any work on said changes, modifications and alterations shall be started. d) Originally issued plans and specifications e) And all as required and stated in the checklist provided Step 3- Received complete required documents , stamped (OBO Logo and date), generate number and enter information details to computer filing. Step 4- Distribute documents to different processing group and make review of the building based on the Certificate of Completion, logbook, plans, as-built plans as the case maybe, and specification. 1. Architectural and Fire Safety- 1) Types of Construction (NBC IRR-4) 2) Requirements of Fire Zones (NBC IRR-5) / Fire Safety Inspection Certificate is required for all buildings/structures, if non-available per MOA dated Aug 1, 1978 between MPW & MOND, the Building Official may issue the Certificate of Occupancy with the condition that the fire safety requirement shall be complied with the prescribed period set forth in the Fire Code of the Philippines.
  • 36. OFFICE OF THE BUILDING OFFICIAL / NBCDO
  • 37.
  • 38.
  • 39. Section 301 PD 1096 • SECTION 301- Building Permits No person, firm or corporation, including any agency or instrumentally of the government shall construct, alter, repair, convert, use, occupy,, move, demolish, and add any building/structure or any portion thereof or cause the same to be done, without first obtaining a building permit therefore from the Building Official assigned in the place where the subject building/structure is located or to be done.
  • 40. NBC - IRR/ Administration & Enforcement 40 The Sy Building Dangerous Building – Sy Building Collapses
  • 41. NBC - IRR/ Administration & Enforcement 41 Deep excavation besides an existing high rise building requires soil exploration
  • 42. NBC - IRR/ Administration & Enforcement 42 Sign(1) Structure Collapses Dangerous Structure – SB (Mandaluyong Collapses
  • 43. NBC - IRR/ Administration & Enforcement Sign(2) Structures Collapses The Millenyo Challenges the Billboards
  • 44.
  • 45. THE OZONE DISCO a) Architectural Failure b) Electrical Failure c) Structural Failure The Ozone Disco
  • 47. FEB. 25, 1983 OCT. 3, 1984 IRR /EFFECT PRES MARCOS SIGNED THIS ACT SCOPE ALL BLDG & STRUCT PERMIT -IRR 1: SCOPE & APP -IRR 2: MIN REQ’MENTS -IRR 3: SPECIFIC REQ. -IRR 4: TRANSPORT REQ -IRR 5: ADM & ENF APPLICATION -CONSTRUCTN -REPAIR -RENOVATION -CHANGE OCCUP INCORPORATED IN DESIGN & FACILITIES INSTALLATION NEW PROPOSED EXISTING a) PRIMARY FUNCTION b) 10% OF TOTAL NUMBER c) INGRESS/EGRESS d) PARKING AREAS a) WORK TO BE DONE AT PRIMARY FUNCTION b) USE OF ELEVATOR/LEVEL c) 10% LIMIT ON FUNCTION ROOM d) NOT EFFECT STRUCTURAL e) COST NOT MORE THAN 20% /BLDG f) NO LEGAL EFFECT BOTH PRIVATE PUBLIC NON- ISSUANCE WHEN NOT TO ISSUE VIOLATION BY CONSTITUTE -OWNER -CONTRACTOR -ARCHITECT -ENGINEER -BLDG OFF’L NON-COMPLIANCE -STAIRS -WALKWAYS -CORRIDORS -DOORS/ENTR -WASH/REST RM -LIFTS/ELEV -RAMP -PARKING -SWITCHES/ -HANDRAILS -THRESHOLDS -FLOOR FINISHES -DRINKING FOUN -PUB TELEPHONE -SEATING CAPACITY EDUC INST AIRPORTS SHOPS/EST SPORT CX RECREA CX PARKING PUB TRANS STREETS HIGHWAY PED XING B P 34 4 – Hi sto gr a m
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 55.
  • 56.
  • 57.
  • 59. LRA BRGY CPDO BFP OBO CHO MAYNILAD TELCO ASSESOR AGENCY C o n s t r u c t i o n 1/7 2/3 3/2 4/1 5/1 6/1 7/5 8/7 10/1 9/12 11/1 Transactions 11/38 12/1 13/1 14/5 15/1 16/1 17/5 18/1 19/1 20/1 21/1 22/1 23/18 24/1 25/1 26/21 27/5 29. Receive inspection from the Appraiser of CAO 1Day no charge 28. Apply for the tax declaration of improvement at the City Assessor's Office (CAO) 1Day no charge 30. Obtain the tax declaration of improvement from the CAO Company should request the technical conditions for making the necessary utility connections. At this point, the company also starts negotiations on conditions for the supply of these utilities. 3 Days no charge 28/1 29/1 30/3 Pre-Cons. /BP Post-Cons / CO.
  • 60. LRA BRGY CPDO BFP OBO CHO MAYNILAD TELCO ASSESOR AGENCY C o n s t r u c t i o n 1/7 2/3 3/2 4/1 5/1 6/1 7/5 8/7 10/1 9/12 11/1 Transactions 11/38 12/1 13/1 14/5 15/1 16/1 17/5 18/1 19/1 20/1 21/1 22/1 23/18 24/1 25/1 26/21 27/5 28/1 29/1 30/3 Transaction 19/65 Pre-Cons. /BP Post-Cons / CO.
  • 61. LRA BRGY CPDO BFP OBO CHO MAYNILAD TELCO ASSESOR AGENCY C o n s t r u c t i o n 1/7 2/3 3/2 4/1 5/1 6/1 7/5 8/7 10/1 9/12 11/1 Transactions 11/38 12/1 13/1 14/5 15/1 16/1 17/5 18/1 19/1 20/1 21/1 22/1 23/18 24/1 25/1 26/21 27/5 28/1 29/1 30/3 Transactions 19/65 Completed Transaction 30/103 Pre-Cons. /BP Bldg Permit Post-Cons / CO Cert of Occupancy.
  • 63.