Q.1 TYPES OF FEE APPLICABLE WHILE GETTING A
PERMISSION/COMMISSION ON ANY LEVEL.
Type of Construction Built Up area
Fees Rs chargable
Sq m to Sq m
A building intended to be exclusively for residence
0 75 200
76 125 350
126 200 600
201 300 900
301 400 1200
401 600 2000
601 750 2500
751 1000 3500
1001 1250 5000
1251 1500 7000
1501 2000 10000
2001 2500 15000
2500 250000
SOURCE- Pg 29 & 30, THE MADHYA PRADESH BHUMI VIKAS RULES, 1984
Addition or alteration with built up area or
external addition or alteration which does not
add to the built up area such as courtyard,
compound wall, alteration in elevation or
roofing such as tiles to A.C. Sheet of flat
surface, additional opening or closing not
covered by provision to sub-rule (1) of Rule 14
Rs. 50 in each case of building mentioned in item 1, 3
and 6 Rs.200.00 in each case of building mentioned in
item No.2, 4 and 5.
In case of addition or alteration in the
proposed plan
Up to 5% Nil
Above 5 to 10 %
Rs.5
0.00
above 10%
Fresh application
according to the rule
shall be necessary
Revalidation of the building permission
10% of the amount of fees charged originally in
respect of the building concerned
SOURCE- Pg 29 & 30, THE MADHYA PRADESH BHUMI VIKAS RULES, 1984
Q. 2 ROLES, DUTIES AND RESPONSIBILITIES OF VARIOUS BODIES- TOWN
PLANNERS, ARCHITECTS, ENGINEER, STRUCTURAL ENGINEER.
 ARCHITECT-COMPETENCE.- The licensed Architect shall be competent to carry out the work related to the
permission for building and shall be entitled to submit:-
• (a) all plans and information connected with permission for all building irrespective of size and height;
• (b) structural details and calculations for residential buildings on plot up to 500 square meters and up to
three storey's or 11 meters in height;
• (c) certificate of supervision and completion of all buildings;
• (d) all plans and related information connected with permission for development of area up to 1 hectare; and
(e) certificate of supervision for development of land area up to 1 hectare.
 (B) STRUCTURAL ENGINEER-COMPETENCE.- The licensed Structural Engineer shall be competent to carry out the
work relating to permission of building etc., and shall be entitled to submit:-
• (a) All plans and information connected with permission for residential buildings on plot up to 500 Sqm. and
up to three stories or 11 m in height.
• (b) The structural details and calculation for all buildings;
• (c) Certificate of supervision and completion of all buildings;
• (d) All plans and related information connected with permission for development of area up to one hectare;
• (e) certificates of supervision for development of land area up to one hectare.
SOURCE- Pg 33, THE MADHYA PRADESH BHUMI VIKAS RULES, 1984
 (C) ENGINEER-COMPETENCE.- The licensed Engineer shall be competent to carry out the work related to the
permission for building as given below and shall be entitled to submit :-
• (a) all plans and information connected with residential building on plot up to 300 sqm. and up to two
stories or 7.5 m in height.
• (b) structural details and calculation for all buildings up to 500 sqm and four Stories (15m);
• (c) certificate of Supervision and completion for all buildings;
• (d) all plans and related information connected with permission for development of area up to 1 hectare; and
and
• (e) Certificate of supervision for development of land area up to 1 hectare.
• (D) SUPERVISOR-COMPETENCE.- The licensed Supervisor shall be entitled to submit:-
• (a) all plans and related information connected with the permission for residential buildings up to 200 sqm.
and up to two stories or 7.5 meters height;
• (b) Certificate of supervision for buildings given in (a).
• (E) TOWN PLANNER-COMPETENCE. - The licensed Town Planner shall be entitled to submit: -
• (a) all plans and related information connected with permission for development of all areas;
• (b) Certificate of supervision for development of land of all areas.
SOURCE- Pg 34, THE MADHYA PRADESH BHUMI VIKAS RULES, 1984
SOURCE- Pg 32 & 33, THE MADHYA PRADESH BHUMI VIKAS RULES, 1984
Q.3 DURATION OF SANCTION
The sanction once accorded shall remain valid up to three years. The permission shall be got
revalidated before the expiration of this period. Such revalidation may be permitted for two
consecutive terms of one year each, after which proposals shall have to be submitted afresh.
Duration of sanction:-
(1) In case of development permission under Section 30 of Madhya Pradesh Nagar Tatha Gram
Nivesh Adhiniyam, 1973 the sanction once accorded shall remain valid up to three years.
(2)The permission shall be got revalidated it expires. Such revalidation may be permitted for
two consecutive terms of one year each, after which proposals shall have to be submitted
afresh. In case the application for revalidation is submitted after the expiry of the said period
of three years, the Authority shall charge a permission fee equal to the fee prescribed under
clause (a) of sub-rule (3) of rule 21 before revalidating the same. However no fee shall be
charged if the application for revalidation is received before the expiry of its validity. The
limitation of five years shall not be relaxed.
(3)In case execution of the project begins during the validity of the permission granted under
Section 30 of the Act, the permission shall not be deemed to lapse thereafter at any time and
no revalidation shall be required.
Q.4 PERMISSIBLE GROUND COVERAGE OF INDORE
• The Joint Director, Town and Country Planning, by order dated 7.2.2005, granted permission in regard
to the building plan for residential-cum-commercial purposes subject to approval of the said building
plans by the Indore Municipal Corporation (`Corporation', for short) subject to the following
conditions:-
• The land can be used for residential-cum-commercial use, if Municipal Corporation approves the
building plans.
• The ground coverage area (covered area) will be 33% of the land area; and the floor area ratio will be
1.5.
• The height of the building will not be more than 12.0 M.
• Space for parking should be provided as per the ratio specified in Land Development Rules with
reference to the floor area of construction.
• Open Margin Space should be provided as per development Rules, that is 4.5M on the front (Western)
side, 3 M on the east, 6 meters on the north and on the south (Mahatma Gandhi Road).
Source – Smart City Indore Chapter 8
“Covered Area” means the area of the
land covered by the plinth of the
building at the ground floor level and
shall be counted as the ground
coverage. This shall exclude the area
covered by projections at slab level
and area of the plinth not covered by
roof at top.
Source - Notification No. F-23-107-
95/32-1, dt.7-4-2000, Gazette dt. 28-
4-2000 Substituted.
P- Permissible
NP- Not permissible
CA - Uses Permissible on approval by Competent Authority.
PERMISSIBLE & NON-PERMISSIBLE USES AS PER USE-
ZONES
Notes:
1. No development shall be permitted in area designated for water body, pond and talab excluding
Riverfront Development. Margins to be maintained from a designated water body shall be as per
Regulation no. 8.9 of these regulations.
2. The land designated for public purposes as shown on the Map no 1 the uses shall be permissible as per
the requirements of concerned department.
3. For all Zones,
a) if the line of a Zone divides a Building unit, the maximum permissible F.A.R. available on either part of
such Building unit shall be as per the respective Zones.
b) Such a Building unit may be developed separately as per the regulations of the Respective Zones or as
a contiguous development utilizing the combined maximum permissible F.A.R. in the part of the building
unit which lies in the Zone with higher F.A.R.
4. Public Semi-Public and Public Utilities & Facilities shall be permitted in any Zone.
1. The base FAR for zones R, RC & C shall be 1.5 or as mentioned in table 26 below.
2. Additional FAR purchasable Shall be as per table 26 below.
3. The Permissible F.A.R shall comprise Base F.A.R, TDR and Premium F.A.R as prescribed in table 26 below
MINI TEST- MARIETTE ROSE 201109044.pptx

More Related Content

Similar to MINI TEST- MARIETTE ROSE 201109044.pptx

Luis Munoz Marin redevelopment Plan 08.29.2012
Luis Munoz Marin redevelopment Plan 08.29.2012Luis Munoz Marin redevelopment Plan 08.29.2012
Luis Munoz Marin redevelopment Plan 08.29.2012Candice Osborne
 
Item # 4 - 337 Ogden
Item # 4  - 337 OgdenItem # 4  - 337 Ogden
Item # 4 - 337 Ogdenahcitycouncil
 
The goa land development and building 2010.
The goa land development and building 2010.The goa land development and building 2010.
The goa land development and building 2010.Joel Manoj
 
Item #s 5&6 - 259 Montclair ROW
Item #s 5&6 - 259 Montclair ROWItem #s 5&6 - 259 Montclair ROW
Item #s 5&6 - 259 Montclair ROWahcitycouncil
 
Assisted Living Regulations
Assisted Living RegulationsAssisted Living Regulations
Assisted Living Regulationsgscplanning
 
Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)
Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)
Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)Marcellus Drilling News
 
Affordable-Housing-Policy-2013
Affordable-Housing-Policy-2013Affordable-Housing-Policy-2013
Affordable-Housing-Policy-2013Self-employed
 
Block 10102 redevelopment plan 11.25.2013 - DRAFT
Block 10102 redevelopment plan 11.25.2013 - DRAFTBlock 10102 redevelopment plan 11.25.2013 - DRAFT
Block 10102 redevelopment plan 11.25.2013 - DRAFTCandice Osborne
 
Cellular Communications Tower Regulations
Cellular Communications Tower RegulationsCellular Communications Tower Regulations
Cellular Communications Tower Regulationsgscplanning
 
Proposed Language for Infill Special Permit in Northampton Zoning
Proposed Language for Infill Special Permit in Northampton ZoningProposed Language for Infill Special Permit in Northampton Zoning
Proposed Language for Infill Special Permit in Northampton ZoningAdam Cohen
 

Similar to MINI TEST- MARIETTE ROSE 201109044.pptx (20)

Luis Munoz Marin redevelopment Plan 08.29.2012
Luis Munoz Marin redevelopment Plan 08.29.2012Luis Munoz Marin redevelopment Plan 08.29.2012
Luis Munoz Marin redevelopment Plan 08.29.2012
 
Building bye-laws-of-amritsar
Building bye-laws-of-amritsarBuilding bye-laws-of-amritsar
Building bye-laws-of-amritsar
 
Item # 4 - 337 Ogden
Item # 4  - 337 OgdenItem # 4  - 337 Ogden
Item # 4 - 337 Ogden
 
Eia 1994
Eia 1994Eia 1994
Eia 1994
 
The goa land development and building 2010.
The goa land development and building 2010.The goa land development and building 2010.
The goa land development and building 2010.
 
Item #s 5&6 - 259 Montclair ROW
Item #s 5&6 - 259 Montclair ROWItem #s 5&6 - 259 Montclair ROW
Item #s 5&6 - 259 Montclair ROW
 
Special Rules for Regulating the Construction & Maintenance in the Vicinity o...
Special Rules for Regulating the Construction & Maintenance in the Vicinity o...Special Rules for Regulating the Construction & Maintenance in the Vicinity o...
Special Rules for Regulating the Construction & Maintenance in the Vicinity o...
 
Assisted Living Regulations
Assisted Living RegulationsAssisted Living Regulations
Assisted Living Regulations
 
building rules.pptx
building rules.pptxbuilding rules.pptx
building rules.pptx
 
Delhi bye
Delhi bye Delhi bye
Delhi bye
 
Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)
Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)
Draft Rule Changes by ODNR for Construction of Well Pads in Ohio (Document 1)
 
ppt7.pdf
ppt7.pdfppt7.pdf
ppt7.pdf
 
Building_Bye_Laws.pdf
Building_Bye_Laws.pdfBuilding_Bye_Laws.pdf
Building_Bye_Laws.pdf
 
Affordable-Housing-Policy-2013
Affordable-Housing-Policy-2013Affordable-Housing-Policy-2013
Affordable-Housing-Policy-2013
 
Item # 3 - 321 Argo
Item # 3 - 321 ArgoItem # 3 - 321 Argo
Item # 3 - 321 Argo
 
Block 10102 redevelopment plan 11.25.2013 - DRAFT
Block 10102 redevelopment plan 11.25.2013 - DRAFTBlock 10102 redevelopment plan 11.25.2013 - DRAFT
Block 10102 redevelopment plan 11.25.2013 - DRAFT
 
DDAs Building ByLaws
DDAs Building ByLawsDDAs Building ByLaws
DDAs Building ByLaws
 
Cellular Communications Tower Regulations
Cellular Communications Tower RegulationsCellular Communications Tower Regulations
Cellular Communications Tower Regulations
 
Proposed Language for Infill Special Permit in Northampton Zoning
Proposed Language for Infill Special Permit in Northampton ZoningProposed Language for Infill Special Permit in Northampton Zoning
Proposed Language for Infill Special Permit in Northampton Zoning
 
Hrc nmmc guidelines
Hrc nmmc guidelinesHrc nmmc guidelines
Hrc nmmc guidelines
 

Recently uploaded

multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communicationpanditadesh123
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdfHafizMudaserAhmad
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Coursebim.edu.pl
 
Forming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptForming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptNoman khan
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书rnrncn29
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdfsahilsajad201
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptJohnWilliam111370
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Erbil Polytechnic University
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxRomil Mishra
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESkarthi keyan
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxStephen Sitton
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Romil Mishra
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxRomil Mishra
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodManicka Mamallan Andavar
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.elesangwon
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating SystemRashmi Bhat
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionSneha Padhiar
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...Erbil Polytechnic University
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Sumanth A
 

Recently uploaded (20)

multiple access in wireless communication
multiple access in wireless communicationmultiple access in wireless communication
multiple access in wireless communication
 
11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf11. Properties of Liquid Fuels in Energy Engineering.pdf
11. Properties of Liquid Fuels in Energy Engineering.pdf
 
Katarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School CourseKatarzyna Lipka-Sidor - BIM School Course
Katarzyna Lipka-Sidor - BIM School Course
 
Forming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).pptForming section troubleshooting checklist for improving wire life (1).ppt
Forming section troubleshooting checklist for improving wire life (1).ppt
 
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
『澳洲文凭』买麦考瑞大学毕业证书成绩单办理澳洲Macquarie文凭学位证书
 
Robotics Group 10 (Control Schemes) cse.pdf
Robotics Group 10  (Control Schemes) cse.pdfRobotics Group 10  (Control Schemes) cse.pdf
Robotics Group 10 (Control Schemes) cse.pdf
 
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.pptROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
ROBOETHICS-CCS345 ETHICS AND ARTIFICIAL INTELLIGENCE.ppt
 
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
Comparative study of High-rise Building Using ETABS,SAP200 and SAFE., SAFE an...
 
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptxCurve setting (Basic Mine Surveying)_MI10412MI.pptx
Curve setting (Basic Mine Surveying)_MI10412MI.pptx
 
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTESCME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
CME 397 - SURFACE ENGINEERING - UNIT 1 FULL NOTES
 
Turn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptxTurn leadership mistakes into a better future.pptx
Turn leadership mistakes into a better future.pptx
 
Designing pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptxDesigning pile caps according to ACI 318-19.pptx
Designing pile caps according to ACI 318-19.pptx
 
Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________Gravity concentration_MI20612MI_________
Gravity concentration_MI20612MI_________
 
Mine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptxMine Environment II Lab_MI10448MI__________.pptx
Mine Environment II Lab_MI10448MI__________.pptx
 
Levelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument methodLevelling - Rise and fall - Height of instrument method
Levelling - Rise and fall - Height of instrument method
 
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
2022 AWS DNA Hackathon 장애 대응 솔루션 jarvis.
 
Main Memory Management in Operating System
Main Memory Management in Operating SystemMain Memory Management in Operating System
Main Memory Management in Operating System
 
Cost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based questionCost estimation approach: FP to COCOMO scenario based question
Cost estimation approach: FP to COCOMO scenario based question
 
"Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ..."Exploring the Essential Functions and Design Considerations of Spillways in ...
"Exploring the Essential Functions and Design Considerations of Spillways in ...
 
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
Robotics-Asimov's Laws, Mechanical Subsystems, Robot Kinematics, Robot Dynami...
 

MINI TEST- MARIETTE ROSE 201109044.pptx

  • 1. MINI TEST MARIETTE ROSE GEORGE 201109044 B.PLANNING 3RD YEAR, 6TH SEMESTER ARC 301- BYE LAWS
  • 2. Q.1 TYPES OF FEE APPLICABLE WHILE GETTING A PERMISSION/COMMISSION ON ANY LEVEL. Type of Construction Built Up area Fees Rs chargable Sq m to Sq m A building intended to be exclusively for residence 0 75 200 76 125 350 126 200 600 201 300 900 301 400 1200 401 600 2000 601 750 2500 751 1000 3500 1001 1250 5000 1251 1500 7000 1501 2000 10000 2001 2500 15000 2500 250000 SOURCE- Pg 29 & 30, THE MADHYA PRADESH BHUMI VIKAS RULES, 1984
  • 3. Addition or alteration with built up area or external addition or alteration which does not add to the built up area such as courtyard, compound wall, alteration in elevation or roofing such as tiles to A.C. Sheet of flat surface, additional opening or closing not covered by provision to sub-rule (1) of Rule 14 Rs. 50 in each case of building mentioned in item 1, 3 and 6 Rs.200.00 in each case of building mentioned in item No.2, 4 and 5. In case of addition or alteration in the proposed plan Up to 5% Nil Above 5 to 10 % Rs.5 0.00 above 10% Fresh application according to the rule shall be necessary Revalidation of the building permission 10% of the amount of fees charged originally in respect of the building concerned SOURCE- Pg 29 & 30, THE MADHYA PRADESH BHUMI VIKAS RULES, 1984
  • 4. Q. 2 ROLES, DUTIES AND RESPONSIBILITIES OF VARIOUS BODIES- TOWN PLANNERS, ARCHITECTS, ENGINEER, STRUCTURAL ENGINEER.  ARCHITECT-COMPETENCE.- The licensed Architect shall be competent to carry out the work related to the permission for building and shall be entitled to submit:- • (a) all plans and information connected with permission for all building irrespective of size and height; • (b) structural details and calculations for residential buildings on plot up to 500 square meters and up to three storey's or 11 meters in height; • (c) certificate of supervision and completion of all buildings; • (d) all plans and related information connected with permission for development of area up to 1 hectare; and (e) certificate of supervision for development of land area up to 1 hectare.  (B) STRUCTURAL ENGINEER-COMPETENCE.- The licensed Structural Engineer shall be competent to carry out the work relating to permission of building etc., and shall be entitled to submit:- • (a) All plans and information connected with permission for residential buildings on plot up to 500 Sqm. and up to three stories or 11 m in height. • (b) The structural details and calculation for all buildings; • (c) Certificate of supervision and completion of all buildings; • (d) All plans and related information connected with permission for development of area up to one hectare; • (e) certificates of supervision for development of land area up to one hectare. SOURCE- Pg 33, THE MADHYA PRADESH BHUMI VIKAS RULES, 1984
  • 5.  (C) ENGINEER-COMPETENCE.- The licensed Engineer shall be competent to carry out the work related to the permission for building as given below and shall be entitled to submit :- • (a) all plans and information connected with residential building on plot up to 300 sqm. and up to two stories or 7.5 m in height. • (b) structural details and calculation for all buildings up to 500 sqm and four Stories (15m); • (c) certificate of Supervision and completion for all buildings; • (d) all plans and related information connected with permission for development of area up to 1 hectare; and and • (e) Certificate of supervision for development of land area up to 1 hectare. • (D) SUPERVISOR-COMPETENCE.- The licensed Supervisor shall be entitled to submit:- • (a) all plans and related information connected with the permission for residential buildings up to 200 sqm. and up to two stories or 7.5 meters height; • (b) Certificate of supervision for buildings given in (a). • (E) TOWN PLANNER-COMPETENCE. - The licensed Town Planner shall be entitled to submit: - • (a) all plans and related information connected with permission for development of all areas; • (b) Certificate of supervision for development of land of all areas. SOURCE- Pg 34, THE MADHYA PRADESH BHUMI VIKAS RULES, 1984
  • 6. SOURCE- Pg 32 & 33, THE MADHYA PRADESH BHUMI VIKAS RULES, 1984
  • 7. Q.3 DURATION OF SANCTION The sanction once accorded shall remain valid up to three years. The permission shall be got revalidated before the expiration of this period. Such revalidation may be permitted for two consecutive terms of one year each, after which proposals shall have to be submitted afresh. Duration of sanction:- (1) In case of development permission under Section 30 of Madhya Pradesh Nagar Tatha Gram Nivesh Adhiniyam, 1973 the sanction once accorded shall remain valid up to three years. (2)The permission shall be got revalidated it expires. Such revalidation may be permitted for two consecutive terms of one year each, after which proposals shall have to be submitted afresh. In case the application for revalidation is submitted after the expiry of the said period of three years, the Authority shall charge a permission fee equal to the fee prescribed under clause (a) of sub-rule (3) of rule 21 before revalidating the same. However no fee shall be charged if the application for revalidation is received before the expiry of its validity. The limitation of five years shall not be relaxed. (3)In case execution of the project begins during the validity of the permission granted under Section 30 of the Act, the permission shall not be deemed to lapse thereafter at any time and no revalidation shall be required.
  • 8. Q.4 PERMISSIBLE GROUND COVERAGE OF INDORE • The Joint Director, Town and Country Planning, by order dated 7.2.2005, granted permission in regard to the building plan for residential-cum-commercial purposes subject to approval of the said building plans by the Indore Municipal Corporation (`Corporation', for short) subject to the following conditions:- • The land can be used for residential-cum-commercial use, if Municipal Corporation approves the building plans. • The ground coverage area (covered area) will be 33% of the land area; and the floor area ratio will be 1.5. • The height of the building will not be more than 12.0 M. • Space for parking should be provided as per the ratio specified in Land Development Rules with reference to the floor area of construction. • Open Margin Space should be provided as per development Rules, that is 4.5M on the front (Western) side, 3 M on the east, 6 meters on the north and on the south (Mahatma Gandhi Road). Source – Smart City Indore Chapter 8
  • 9. “Covered Area” means the area of the land covered by the plinth of the building at the ground floor level and shall be counted as the ground coverage. This shall exclude the area covered by projections at slab level and area of the plinth not covered by roof at top. Source - Notification No. F-23-107- 95/32-1, dt.7-4-2000, Gazette dt. 28- 4-2000 Substituted.
  • 10. P- Permissible NP- Not permissible CA - Uses Permissible on approval by Competent Authority. PERMISSIBLE & NON-PERMISSIBLE USES AS PER USE- ZONES
  • 11.
  • 12. Notes: 1. No development shall be permitted in area designated for water body, pond and talab excluding Riverfront Development. Margins to be maintained from a designated water body shall be as per Regulation no. 8.9 of these regulations. 2. The land designated for public purposes as shown on the Map no 1 the uses shall be permissible as per the requirements of concerned department. 3. For all Zones, a) if the line of a Zone divides a Building unit, the maximum permissible F.A.R. available on either part of such Building unit shall be as per the respective Zones. b) Such a Building unit may be developed separately as per the regulations of the Respective Zones or as a contiguous development utilizing the combined maximum permissible F.A.R. in the part of the building unit which lies in the Zone with higher F.A.R. 4. Public Semi-Public and Public Utilities & Facilities shall be permitted in any Zone. 1. The base FAR for zones R, RC & C shall be 1.5 or as mentioned in table 26 below. 2. Additional FAR purchasable Shall be as per table 26 below. 3. The Permissible F.A.R shall comprise Base F.A.R, TDR and Premium F.A.R as prescribed in table 26 below