SlideShare a Scribd company logo
1 of 3
Download to read offline
Hidayat Achmad Hanafi
Junior Project Engineer
Pesona Metro Sdn Bhd
(+60) 0173696656 | hidayathanafi92@gmail.com | Kuala Lumpur
Experience
Jun 2015 - Present Junior Project Engineer
Pesona Metro Sdn Bhd | Kuala Lumpur, Malaysia
Project: The Mews
Construction Of 1 Block Of 38-Storey Service apartment at Jalan Yap Kwan
Seng, Kuala Lumpur
1) Inspection of sub-contractor work: Formwork, Rebar, Concrete
2) Handling concrete work
3) Paperwork: Daily Report, Request for Inspection form, Site Memo
4) Supervise defect and repair work: Pressure Grouting and PU Injection
5) Monitoring site work
6) Prepare daily work planning.
7) Industrial Building System (IBS): Aluminum Formwork
Project: Third Avenue, Cyberjaya:
Cadangan Membina 1 Blok Pejabat (17 Tingkat) Beserta 1 Blok Menara SOHO
30 tingkat Dan 1 Blok Menara SOHO 30 Tingkat Di Jalan Teknorat 3, Cyber 4,
Cyberjaya.
1) Preparing Paperwork: Work Method Statement, Site Memo, Request for
Inspection, Cube Test Report
2) Closing of Non-Conformance Report and Post Concreting Work
3) Supervise defect and repair work: Pressure Grouting and PU Injection
4) Ensuring Quality Control for Structural Work (QC)
5) Industrial Building System (IBS): Aluminum Formwork
Oct 2014 - Feb 2015
(4 months )
Part Time Quantity Surveyor
Masrullah Enterprise
Industry Construction / Building / Engineering
Specialization Engineering - Civil/Construction/Structural
Role Quantity surveyor
Position Level Junior Executive
1) Projek Perumahan Penjawat Awam 1Malaysia, Presint 11 Putrajaya
2) Preparing monthly progress claim, for the structural work such as concrete,
formwork, reinforced bar
3) Ordering materials for construction progress
Feb 2014 - May 2014
(3 months )
Internship Trainee
Pesona Metro Sdn Bhd
Industry Construction / Building / Engineering
Specialization Engineering - Civil/Construction/Structural
Role Supervisor/Team Lead
Position Level Fresh / Entry Level
Projek Menara Technip, Jalan Inai Kuala Lumpur
1) Supervising site work done by worker according to construction drawing
2) Project Management
Jan 2013 - Jun 2013
(5 months )
Site Supervisor
Mayflower Land Sdn Bhd
Industry Construction / Building / Engineering
Specialization Engineering - Civil/Construction/Structural
Role Supervisor/Team Lead
Position Level Junior Executive
Projek Menara Technip, Jalan Inai Kuala Lumpur
1) Supervising site work done by worker according to construction drawing
2) Preparing site paperwork such as daily report, Request for Inspection form
(RFI)
3) Attending meeting to discuss problem occurred at site such as Main
4) Contractor Meeting, Safety Meeting, Main Contractor- Sub Contractor
Meeting
5) Handling Concrete Work
Education
Sep 2015 Universiti Tenaga Nasional (UNITEN)
Bachelor's Degree in Engineering (Civil) | Malaysia
Grade Grade B/2nd Class Upper
CGPA: 3.25
Sep 2015 Universiti Tenaga Nasional (UNITEN)
Higher Secondary/STPM/"A" Level/Pre-U in Sciences | Malaysia
Grade Grade C/2nd Class Lower
Skills
Advanced Microsoft Office
Intermediate Auto Cad
Languages
Proficiency level: 0 - Poor, 10 - Excellent
Language Spoken Written
Bahasa Malaysia
(Primary)
9 9
English 7 7`
Additional Info
Preferred Work
Location
Kuala Lumpur
Other Information
• Willing to work overtime
• Have own transport
• Fast learner
About Me
Age 24
Address Kuala Lumpur, Malaysia
Nationality Malaysia

More Related Content

Viewers also liked

SYNERGY Induction to Pedagogy Programme - Training of Peers (ITALIAN)
SYNERGY Induction to Pedagogy Programme - Training of Peers (ITALIAN)SYNERGY Induction to Pedagogy Programme - Training of Peers (ITALIAN)
SYNERGY Induction to Pedagogy Programme - Training of Peers (ITALIAN)Sarah Land
 
SYNERGY Induction to Pedagogy Programme - Evaluation of the Learning Resource...
SYNERGY Induction to Pedagogy Programme - Evaluation of the Learning Resource...SYNERGY Induction to Pedagogy Programme - Evaluation of the Learning Resource...
SYNERGY Induction to Pedagogy Programme - Evaluation of the Learning Resource...Sarah Land
 
Publicidade para o mundo
Publicidade para o mundoPublicidade para o mundo
Publicidade para o mundoJulia Souza
 
Steps to take before building an App (1)
Steps to take before building an App (1)Steps to take before building an App (1)
Steps to take before building an App (1)Mike Ojo
 
SYNERGY Induction to Pedagogy Programme - Learning Materials and Objectives (...
SYNERGY Induction to Pedagogy Programme - Learning Materials and Objectives (...SYNERGY Induction to Pedagogy Programme - Learning Materials and Objectives (...
SYNERGY Induction to Pedagogy Programme - Learning Materials and Objectives (...Sarah Land
 
Radiology Today December 2016
Radiology Today December 2016Radiology Today December 2016
Radiology Today December 2016Jordan Lister
 
El primer dia de Colegio
El primer dia de ColegioEl primer dia de Colegio
El primer dia de Colegiopasapera123
 

Viewers also liked (12)

Rai (1) (1)
Rai (1) (1)Rai (1) (1)
Rai (1) (1)
 
Bok Tower Ad
Bok Tower AdBok Tower Ad
Bok Tower Ad
 
SYNERGY Induction to Pedagogy Programme - Training of Peers (ITALIAN)
SYNERGY Induction to Pedagogy Programme - Training of Peers (ITALIAN)SYNERGY Induction to Pedagogy Programme - Training of Peers (ITALIAN)
SYNERGY Induction to Pedagogy Programme - Training of Peers (ITALIAN)
 
SYNERGY Induction to Pedagogy Programme - Evaluation of the Learning Resource...
SYNERGY Induction to Pedagogy Programme - Evaluation of the Learning Resource...SYNERGY Induction to Pedagogy Programme - Evaluation of the Learning Resource...
SYNERGY Induction to Pedagogy Programme - Evaluation of the Learning Resource...
 
Publicidade para o mundo
Publicidade para o mundoPublicidade para o mundo
Publicidade para o mundo
 
Steps to take before building an App (1)
Steps to take before building an App (1)Steps to take before building an App (1)
Steps to take before building an App (1)
 
-La Gran Apuesta II Parte.-
-La Gran Apuesta II Parte.--La Gran Apuesta II Parte.-
-La Gran Apuesta II Parte.-
 
SYNERGY Induction to Pedagogy Programme - Learning Materials and Objectives (...
SYNERGY Induction to Pedagogy Programme - Learning Materials and Objectives (...SYNERGY Induction to Pedagogy Programme - Learning Materials and Objectives (...
SYNERGY Induction to Pedagogy Programme - Learning Materials and Objectives (...
 
7538647
75386477538647
7538647
 
Radiology Today December 2016
Radiology Today December 2016Radiology Today December 2016
Radiology Today December 2016
 
Big data taller inegi sedesol
Big data taller inegi sedesolBig data taller inegi sedesol
Big data taller inegi sedesol
 
El primer dia de Colegio
El primer dia de ColegioEl primer dia de Colegio
El primer dia de Colegio
 

Similar to Hidayat Achmad Hanafi - Resume

HOW CV 20161129
HOW CV 20161129HOW CV 20161129
HOW CV 20161129Ling How
 
IRJET - Investigation of “Delays Occuring in Construction of Commercial B...
IRJET -  	  Investigation of “Delays Occuring in Construction of Commercial B...IRJET -  	  Investigation of “Delays Occuring in Construction of Commercial B...
IRJET - Investigation of “Delays Occuring in Construction of Commercial B...IRJET Journal
 
CURRICULUM_VITAE_DEVENDRA update
CURRICULUM_VITAE_DEVENDRA updateCURRICULUM_VITAE_DEVENDRA update
CURRICULUM_VITAE_DEVENDRA updateDevendra Dongare
 
RESUME Adif Civil Latest 2015
RESUME Adif Civil Latest 2015RESUME Adif Civil Latest 2015
RESUME Adif Civil Latest 2015adif adif
 
CV-Bhat 2016
CV-Bhat 2016CV-Bhat 2016
CV-Bhat 2016bhat gb
 
Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...Suman Jyoti
 
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptxFINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptxKaushalKumar522651
 

Similar to Hidayat Achmad Hanafi - Resume (20)

HOW CV 20161129
HOW CV 20161129HOW CV 20161129
HOW CV 20161129
 
20200518 RESUME HAFIZ
20200518 RESUME HAFIZ20200518 RESUME HAFIZ
20200518 RESUME HAFIZ
 
IRJET - Investigation of “Delays Occuring in Construction of Commercial B...
IRJET -  	  Investigation of “Delays Occuring in Construction of Commercial B...IRJET -  	  Investigation of “Delays Occuring in Construction of Commercial B...
IRJET - Investigation of “Delays Occuring in Construction of Commercial B...
 
CURRICULUM_VITAE_DEVENDRA update
CURRICULUM_VITAE_DEVENDRA updateCURRICULUM_VITAE_DEVENDRA update
CURRICULUM_VITAE_DEVENDRA update
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
Civil Engineer
Civil EngineerCivil Engineer
Civil Engineer
 
CV ref
CV refCV ref
CV ref
 
RESUME Adif Civil Latest 2015
RESUME Adif Civil Latest 2015RESUME Adif Civil Latest 2015
RESUME Adif Civil Latest 2015
 
Resume Tanawat
Resume TanawatResume Tanawat
Resume Tanawat
 
CV-Bhat 2016
CV-Bhat 2016CV-Bhat 2016
CV-Bhat 2016
 
Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...Major project report of diploma civil engineering at mamts gothatar to jorpat...
Major project report of diploma civil engineering at mamts gothatar to jorpat...
 
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptxFINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
FINAL_PRESENTATION_2022_labour Productivity_Biprendra.pptx
 
AUNG MYAT KYAW's C.V
AUNG MYAT KYAW's C.VAUNG MYAT KYAW's C.V
AUNG MYAT KYAW's C.V
 
MY RESUME
MY RESUMEMY RESUME
MY RESUME
 
CV
CVCV
CV
 
Mior Shahrial Mior Abdul Yunus
Mior Shahrial Mior Abdul YunusMior Shahrial Mior Abdul Yunus
Mior Shahrial Mior Abdul Yunus
 
Rozlan Ramli 2015
Rozlan Ramli 2015Rozlan Ramli 2015
Rozlan Ramli 2015
 
Vadali_Srinivas[1]
Vadali_Srinivas[1]Vadali_Srinivas[1]
Vadali_Srinivas[1]
 
Che Abdul Roni Bin Mustafa
Che Abdul Roni Bin MustafaChe Abdul Roni Bin Mustafa
Che Abdul Roni Bin Mustafa
 
CV - Sanjeev Aggarwal
CV - Sanjeev AggarwalCV - Sanjeev Aggarwal
CV - Sanjeev Aggarwal
 

Hidayat Achmad Hanafi - Resume

  • 1. Hidayat Achmad Hanafi Junior Project Engineer Pesona Metro Sdn Bhd (+60) 0173696656 | hidayathanafi92@gmail.com | Kuala Lumpur Experience Jun 2015 - Present Junior Project Engineer Pesona Metro Sdn Bhd | Kuala Lumpur, Malaysia Project: The Mews Construction Of 1 Block Of 38-Storey Service apartment at Jalan Yap Kwan Seng, Kuala Lumpur 1) Inspection of sub-contractor work: Formwork, Rebar, Concrete 2) Handling concrete work 3) Paperwork: Daily Report, Request for Inspection form, Site Memo 4) Supervise defect and repair work: Pressure Grouting and PU Injection 5) Monitoring site work 6) Prepare daily work planning. 7) Industrial Building System (IBS): Aluminum Formwork Project: Third Avenue, Cyberjaya: Cadangan Membina 1 Blok Pejabat (17 Tingkat) Beserta 1 Blok Menara SOHO 30 tingkat Dan 1 Blok Menara SOHO 30 Tingkat Di Jalan Teknorat 3, Cyber 4, Cyberjaya. 1) Preparing Paperwork: Work Method Statement, Site Memo, Request for Inspection, Cube Test Report 2) Closing of Non-Conformance Report and Post Concreting Work 3) Supervise defect and repair work: Pressure Grouting and PU Injection 4) Ensuring Quality Control for Structural Work (QC) 5) Industrial Building System (IBS): Aluminum Formwork Oct 2014 - Feb 2015 (4 months ) Part Time Quantity Surveyor Masrullah Enterprise Industry Construction / Building / Engineering Specialization Engineering - Civil/Construction/Structural Role Quantity surveyor Position Level Junior Executive 1) Projek Perumahan Penjawat Awam 1Malaysia, Presint 11 Putrajaya 2) Preparing monthly progress claim, for the structural work such as concrete, formwork, reinforced bar 3) Ordering materials for construction progress
  • 2. Feb 2014 - May 2014 (3 months ) Internship Trainee Pesona Metro Sdn Bhd Industry Construction / Building / Engineering Specialization Engineering - Civil/Construction/Structural Role Supervisor/Team Lead Position Level Fresh / Entry Level Projek Menara Technip, Jalan Inai Kuala Lumpur 1) Supervising site work done by worker according to construction drawing 2) Project Management Jan 2013 - Jun 2013 (5 months ) Site Supervisor Mayflower Land Sdn Bhd Industry Construction / Building / Engineering Specialization Engineering - Civil/Construction/Structural Role Supervisor/Team Lead Position Level Junior Executive Projek Menara Technip, Jalan Inai Kuala Lumpur 1) Supervising site work done by worker according to construction drawing 2) Preparing site paperwork such as daily report, Request for Inspection form (RFI) 3) Attending meeting to discuss problem occurred at site such as Main 4) Contractor Meeting, Safety Meeting, Main Contractor- Sub Contractor Meeting 5) Handling Concrete Work Education Sep 2015 Universiti Tenaga Nasional (UNITEN) Bachelor's Degree in Engineering (Civil) | Malaysia Grade Grade B/2nd Class Upper CGPA: 3.25 Sep 2015 Universiti Tenaga Nasional (UNITEN) Higher Secondary/STPM/"A" Level/Pre-U in Sciences | Malaysia Grade Grade C/2nd Class Lower
  • 3. Skills Advanced Microsoft Office Intermediate Auto Cad Languages Proficiency level: 0 - Poor, 10 - Excellent Language Spoken Written Bahasa Malaysia (Primary) 9 9 English 7 7` Additional Info Preferred Work Location Kuala Lumpur Other Information • Willing to work overtime • Have own transport • Fast learner About Me Age 24 Address Kuala Lumpur, Malaysia Nationality Malaysia