SlideShare a Scribd company logo
1 of 4
VADALI SRINIVAS
Blk-479, # 07-377
Sembawang Drive
Singapore-750 479
Tel® +65 6618 4794
H/Ph.: +65 9238 5254
H/ph.: +65 9139 8392
vadalisree@hotmail.com
Senior Engineering Officer (Survey)
Position Applied : -----------------------------------------------
$6000 + + Per Month
Expected Salary : -----------------------------------------------
Educational Background : 1). Bachelor Degree in Civil
Engineering, AIEM India
2). Diploma in Civil Engineering State Board of
Tech. Educ. A.P. State; India
3). Building Construction Supervisors
Safety Certificate
4). AutoCAD 2002 level 2
5). MS Office
Personal Data
Father Name : V.S. Somayajula
Mother Name : V. Subba Lakshmi
Date of Birth/ Place of Birth : 01st march 1965/ Kasimkota, A.P. State, India
Nric/Passport No : S2674315Z / N7673123
Marital Status / Nationality/Religion : Married / Indian / Hindu Brahmin
India address : Plot no-40; Vadali Home; Samatha Nagar;
Chinnamushidivada; Pendurth (Mandal)
Visakhapatnam-530 051 A.P. State, India
Professional Experience
Total No of Years : 25 Years
1. 16Th Mar 2009 to till : Land Transport Authority of Singapore
1 Hampshire Road, Blk-5; #03
Singapore 219 428
Project’s Assignment : 1). Circle line stage 4-C855 2). Downtown Line 2
C916 & C917AC918&C918Stations include
Tunnels
3). Thomson East Cost Line3 T218, T219, T220,
T221&T222 including Stations & Tunnels
Position Held : Senior Engineering Officer (Survey)
(Technical Support Officer Grade 5, Division 1)
2. 31st Mar 2003 T0 11Th Feb 2009 : Who Hup (Private) Limited
1 Fifth Avenue, #03-01 Guthrie House
Singapore 268802
Project’s Assignment : 1). West Cost proposed six blocks Condos
2). Circle line stage 1-C825
Millennia, Convention center,
Museum and Dhoby Ghaut
Stations including Tunnels
Position Held : Sr. Land Surveyor
(Junior Executive Grade II)
3. 2nd JAN 2002 TO 15th FEB 2003 : Multiplex Con. Pty. Ltd
8 New Industrial Road, #01-01
Lhk 3 Building: Singapore-536220
Project’s Assignment : 1). Lincoln Modern Condo
2). Clooney Hill Four Bungalows
3). Australian International school project
Position Held : Sr. Land Surveyor
4. 17th Aug 2001 to 31st Jan 2003 : V&M Survey Services Pte. Ltd.
518A, Macpherson Road
Singapore-368212
Position Held : Sr. Land Surveyor
Project’s Assignment : Toshiba Afpd Project (MNC Obayashi)
5. 25th Oct 1993 to 28th Feb 1998 : Shimizu Corporation; 10 Anson Road, # 26-01
International Plaza, Singapore-0207
Position Held : land Surveyor
Project’ Assignment Project
: 1). Republic Plaza “66 Storey” Super Structure
President’s Award winning in 1996
2). Singapore American School Project
3). Bank of China 37 Strey Top Down
Construction Project
6. 17th Sep 1992 to 30th Jun 1993 : Real Estate Development &
Investment Co. Ltd; P O Box- 58645, Riyadh –
11515
Saudi Arabia
Position Held : Land Surveyor
Project’ Assignment : Administration Building
ARAMCO Project Udhailiyan
7. 1st Oct 1987 to 31st Jul 1992 : Navauga Engg. Co. Pvt. Ltd.
Position Held : Land Surveyor
Project’ Assignment : Ship Building Center Construction Project,
Visakhapatnam
Duties and Responsibilities Tunnels & Under Ground Stations
To maintenance of survey control network in C825 & C855 to ensure good correlation at
interface for CCL1&CCL4 & including planning for transfer of tunnel controls.
To maintenance of survey control network in C916, C917A, C918 & C919 to ensure
good correlation at interface for DTL2 & including planning for transfer of tunnel
controls.
To maintenance of survey control network in T218, T219 T220, T221&T222to ensure
good correlation at interface for TEL3 & including planning for transfer of tunnel
controls. To assist the project, teem in all aspects of tunnels survey works including:
1). Verification of contractor’s survey controls for tunnel transfer 2). TBM launch
surveys 3). As built wriggle survey of all the tunnels 4. Survey check of 1st stage
concrete. To assist the Engineering Teem in all aspects of station survey works for DTL2
and CCL1/4/5 including: 1). Verification of contractor’s survey controls in the stations
2). Checking of station boundary, guide & diaphragm walls 3). Verification of CCL MRT
reserves for DBC & setting out works around CCL stations 4). Verification of monitoring
data when requested. To assist the Engineering Teem in office administration works such
as processing, preparation of spreadsheets for field’s survey results, database inputs
(Tunnel Offset Database) and collation of data for analysis for onward transmissions. To
assist the Engineering Teem for ad-hoc topographical & setting-out surveys requested by
other division’s e.g. topographical surveys for increase in stabling in UPD, slope
management at different portal & establishing of survey controls for future MRT
projects.
Survey Software’s using for field data processing
1. StarNet 2. NRG Surveys 3. Align EXE 4. Trimble Digital Level 5. SRlevel
Duties and Responsibilities High-rise buildings
Provide setting out grid line references and establish elevations to minimize errors. To provide
reference lines as per project requirement to complete within the time. Check as-built alignment
and elevations before & after concreting. Monitoring settlement markers vertical & horizontal
according to Clint requirement. To maintain calibration records for ISO certification. Run
traverse to check control stations horizontal, vertical survey to minimize errors. To provide
control stations and TBM for tunnel alignments & track alignments. To check D’ wall monitoring
& road monitoring and maintain proper records. To establish cut-off levels, pile cap setting out,
check ECC of board piles. To maintain proper records upon completion of project to handover to
Clint. I can handle independently any kind of construction projects & open land surveys
Instruments Used
Total Stations Used: Leica TCA 1600, 1800, 2003, TCRA 1201 & TM30. Sokkia set 310 & 330R,
Nikon DTM 420, Topcon and all other kinds of brands, power sets & total stations in the market
available now.
Digital Levels and Auto Levels Used: Trimble Dini, Leica DNA, and all other kinds in the market
available now.
Date: (VADALI SRINIVAS)
Place: Singapore (Signature of the Applicant)

More Related Content

Viewers also liked

2016 Umre Turları Pozitiftur.com.tr
2016 Umre Turları Pozitiftur.com.tr2016 Umre Turları Pozitiftur.com.tr
2016 Umre Turları Pozitiftur.com.trEmre YALCIN
 
Gestão Tecnologia Digitais
Gestão Tecnologia DigitaisGestão Tecnologia Digitais
Gestão Tecnologia DigitaisEduardo Schrappe
 
Trabajo de curriculo ii
Trabajo de curriculo iiTrabajo de curriculo ii
Trabajo de curriculo iieliosejo
 
Trabajo tecnología.
Trabajo tecnología.Trabajo tecnología.
Trabajo tecnología.juanfer1811
 
Problemas de empleo
Problemas de empleoProblemas de empleo
Problemas de empleolucero1998
 
REPRESENTACIÓN DE RIQUEZA Y POBREZA EN EL MUNDO
REPRESENTACIÓN DE   RIQUEZA Y POBREZA EN EL MUNDO REPRESENTACIÓN DE   RIQUEZA Y POBREZA EN EL MUNDO
REPRESENTACIÓN DE RIQUEZA Y POBREZA EN EL MUNDO Luis Alberto Ali Rodas
 
RUE - Capítulo VII - Dos Uniformes dos Estabelecimentos de Ensino
RUE - Capítulo VII - Dos Uniformes dos Estabelecimentos de EnsinoRUE - Capítulo VII - Dos Uniformes dos Estabelecimentos de Ensino
RUE - Capítulo VII - Dos Uniformes dos Estabelecimentos de EnsinoFalcão Brasil
 
R-2 Regulamento de Continências Honras Sinais de Respeito e Cerimonial Militar
R-2 Regulamento de Continências Honras Sinais de Respeito e Cerimonial MilitarR-2 Regulamento de Continências Honras Sinais de Respeito e Cerimonial Militar
R-2 Regulamento de Continências Honras Sinais de Respeito e Cerimonial MilitarFalcão Brasil
 

Viewers also liked (17)

Articlenationalpost
ArticlenationalpostArticlenationalpost
Articlenationalpost
 
Vf028
Vf028Vf028
Vf028
 
журнал 2015
журнал 2015журнал 2015
журнал 2015
 
Vf048
Vf048Vf048
Vf048
 
2016 Umre Turları Pozitiftur.com.tr
2016 Umre Turları Pozitiftur.com.tr2016 Umre Turları Pozitiftur.com.tr
2016 Umre Turları Pozitiftur.com.tr
 
Gestão Tecnologia Digitais
Gestão Tecnologia DigitaisGestão Tecnologia Digitais
Gestão Tecnologia Digitais
 
Vf010
Vf010Vf010
Vf010
 
CV
CVCV
CV
 
Trabajo de curriculo ii
Trabajo de curriculo iiTrabajo de curriculo ii
Trabajo de curriculo ii
 
Maravilhoso momento
Maravilhoso momentoMaravilhoso momento
Maravilhoso momento
 
Trabajo tecnología.
Trabajo tecnología.Trabajo tecnología.
Trabajo tecnología.
 
yeywaoverview
yeywaoverviewyeywaoverview
yeywaoverview
 
Problemas de empleo
Problemas de empleoProblemas de empleo
Problemas de empleo
 
REPRESENTACIÓN DE RIQUEZA Y POBREZA EN EL MUNDO
REPRESENTACIÓN DE   RIQUEZA Y POBREZA EN EL MUNDO REPRESENTACIÓN DE   RIQUEZA Y POBREZA EN EL MUNDO
REPRESENTACIÓN DE RIQUEZA Y POBREZA EN EL MUNDO
 
RUE - Capítulo VII - Dos Uniformes dos Estabelecimentos de Ensino
RUE - Capítulo VII - Dos Uniformes dos Estabelecimentos de EnsinoRUE - Capítulo VII - Dos Uniformes dos Estabelecimentos de Ensino
RUE - Capítulo VII - Dos Uniformes dos Estabelecimentos de Ensino
 
R-2 Regulamento de Continências Honras Sinais de Respeito e Cerimonial Militar
R-2 Regulamento de Continências Honras Sinais de Respeito e Cerimonial MilitarR-2 Regulamento de Continências Honras Sinais de Respeito e Cerimonial Militar
R-2 Regulamento de Continências Honras Sinais de Respeito e Cerimonial Militar
 
Akshara[4_0]
Akshara[4_0]Akshara[4_0]
Akshara[4_0]
 

Similar to Vadali_Srinivas[1] (20)

Senior Surveyor CV
Senior Surveyor CV Senior Surveyor CV
Senior Surveyor CV
 
GIRIRAJAN
GIRIRAJANGIRIRAJAN
GIRIRAJAN
 
Borapureddi Ashok_present
Borapureddi Ashok_presentBorapureddi Ashok_present
Borapureddi Ashok_present
 
C.V.constr. (1)
C.V.constr. (1)C.V.constr. (1)
C.V.constr. (1)
 
MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)
 
SATHEES CV (Updated)
SATHEES CV (Updated)SATHEES CV (Updated)
SATHEES CV (Updated)
 
RAJESH RAMU CV
RAJESH RAMU CVRAJESH RAMU CV
RAJESH RAMU CV
 
Peeyush Resume
Peeyush ResumePeeyush Resume
Peeyush Resume
 
N.A. Wijitha CV MEP UD
N.A. Wijitha CV MEP UDN.A. Wijitha CV MEP UD
N.A. Wijitha CV MEP UD
 
RMJugueta Resume 01172016
RMJugueta Resume 01172016RMJugueta Resume 01172016
RMJugueta Resume 01172016
 
kolligars-I-1
kolligars-I-1kolligars-I-1
kolligars-I-1
 
My Resume.1
My Resume.1My Resume.1
My Resume.1
 
Resume
ResumeResume
Resume
 
Reden_CV
Reden_CVReden_CV
Reden_CV
 
CV-Bhat 2016
CV-Bhat 2016CV-Bhat 2016
CV-Bhat 2016
 
Cv kannan
Cv kannanCv kannan
Cv kannan
 
Resume--Shishir
Resume--ShishirResume--Shishir
Resume--Shishir
 
C.V28-01-2016
C.V28-01-2016C.V28-01-2016
C.V28-01-2016
 
BENEDICK RUBIO RESUME
BENEDICK RUBIO RESUMEBENEDICK RUBIO RESUME
BENEDICK RUBIO RESUME
 
ANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGE
ANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGEANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGE
ANALYSIS, MODELLING AND ESTIMATION OF SUSPENSION BRIDGE
 

Vadali_Srinivas[1]

  • 1. VADALI SRINIVAS Blk-479, # 07-377 Sembawang Drive Singapore-750 479 Tel® +65 6618 4794 H/Ph.: +65 9238 5254 H/ph.: +65 9139 8392 vadalisree@hotmail.com Senior Engineering Officer (Survey) Position Applied : ----------------------------------------------- $6000 + + Per Month Expected Salary : ----------------------------------------------- Educational Background : 1). Bachelor Degree in Civil Engineering, AIEM India 2). Diploma in Civil Engineering State Board of Tech. Educ. A.P. State; India 3). Building Construction Supervisors Safety Certificate 4). AutoCAD 2002 level 2 5). MS Office Personal Data Father Name : V.S. Somayajula Mother Name : V. Subba Lakshmi Date of Birth/ Place of Birth : 01st march 1965/ Kasimkota, A.P. State, India Nric/Passport No : S2674315Z / N7673123 Marital Status / Nationality/Religion : Married / Indian / Hindu Brahmin India address : Plot no-40; Vadali Home; Samatha Nagar; Chinnamushidivada; Pendurth (Mandal) Visakhapatnam-530 051 A.P. State, India Professional Experience Total No of Years : 25 Years 1. 16Th Mar 2009 to till : Land Transport Authority of Singapore 1 Hampshire Road, Blk-5; #03 Singapore 219 428 Project’s Assignment : 1). Circle line stage 4-C855 2). Downtown Line 2 C916 & C917AC918&C918Stations include Tunnels 3). Thomson East Cost Line3 T218, T219, T220, T221&T222 including Stations & Tunnels Position Held : Senior Engineering Officer (Survey) (Technical Support Officer Grade 5, Division 1)
  • 2. 2. 31st Mar 2003 T0 11Th Feb 2009 : Who Hup (Private) Limited 1 Fifth Avenue, #03-01 Guthrie House Singapore 268802 Project’s Assignment : 1). West Cost proposed six blocks Condos 2). Circle line stage 1-C825 Millennia, Convention center, Museum and Dhoby Ghaut Stations including Tunnels Position Held : Sr. Land Surveyor (Junior Executive Grade II) 3. 2nd JAN 2002 TO 15th FEB 2003 : Multiplex Con. Pty. Ltd 8 New Industrial Road, #01-01 Lhk 3 Building: Singapore-536220 Project’s Assignment : 1). Lincoln Modern Condo 2). Clooney Hill Four Bungalows 3). Australian International school project Position Held : Sr. Land Surveyor 4. 17th Aug 2001 to 31st Jan 2003 : V&M Survey Services Pte. Ltd. 518A, Macpherson Road Singapore-368212 Position Held : Sr. Land Surveyor Project’s Assignment : Toshiba Afpd Project (MNC Obayashi) 5. 25th Oct 1993 to 28th Feb 1998 : Shimizu Corporation; 10 Anson Road, # 26-01 International Plaza, Singapore-0207 Position Held : land Surveyor Project’ Assignment Project : 1). Republic Plaza “66 Storey” Super Structure President’s Award winning in 1996 2). Singapore American School Project 3). Bank of China 37 Strey Top Down Construction Project 6. 17th Sep 1992 to 30th Jun 1993 : Real Estate Development & Investment Co. Ltd; P O Box- 58645, Riyadh – 11515 Saudi Arabia Position Held : Land Surveyor Project’ Assignment : Administration Building ARAMCO Project Udhailiyan 7. 1st Oct 1987 to 31st Jul 1992 : Navauga Engg. Co. Pvt. Ltd. Position Held : Land Surveyor Project’ Assignment : Ship Building Center Construction Project,
  • 3. Visakhapatnam Duties and Responsibilities Tunnels & Under Ground Stations To maintenance of survey control network in C825 & C855 to ensure good correlation at interface for CCL1&CCL4 & including planning for transfer of tunnel controls. To maintenance of survey control network in C916, C917A, C918 & C919 to ensure good correlation at interface for DTL2 & including planning for transfer of tunnel controls. To maintenance of survey control network in T218, T219 T220, T221&T222to ensure good correlation at interface for TEL3 & including planning for transfer of tunnel controls. To assist the project, teem in all aspects of tunnels survey works including: 1). Verification of contractor’s survey controls for tunnel transfer 2). TBM launch surveys 3). As built wriggle survey of all the tunnels 4. Survey check of 1st stage concrete. To assist the Engineering Teem in all aspects of station survey works for DTL2 and CCL1/4/5 including: 1). Verification of contractor’s survey controls in the stations 2). Checking of station boundary, guide & diaphragm walls 3). Verification of CCL MRT reserves for DBC & setting out works around CCL stations 4). Verification of monitoring data when requested. To assist the Engineering Teem in office administration works such as processing, preparation of spreadsheets for field’s survey results, database inputs (Tunnel Offset Database) and collation of data for analysis for onward transmissions. To assist the Engineering Teem for ad-hoc topographical & setting-out surveys requested by other division’s e.g. topographical surveys for increase in stabling in UPD, slope management at different portal & establishing of survey controls for future MRT projects. Survey Software’s using for field data processing 1. StarNet 2. NRG Surveys 3. Align EXE 4. Trimble Digital Level 5. SRlevel Duties and Responsibilities High-rise buildings Provide setting out grid line references and establish elevations to minimize errors. To provide reference lines as per project requirement to complete within the time. Check as-built alignment and elevations before & after concreting. Monitoring settlement markers vertical & horizontal according to Clint requirement. To maintain calibration records for ISO certification. Run traverse to check control stations horizontal, vertical survey to minimize errors. To provide control stations and TBM for tunnel alignments & track alignments. To check D’ wall monitoring & road monitoring and maintain proper records. To establish cut-off levels, pile cap setting out, check ECC of board piles. To maintain proper records upon completion of project to handover to Clint. I can handle independently any kind of construction projects & open land surveys Instruments Used Total Stations Used: Leica TCA 1600, 1800, 2003, TCRA 1201 & TM30. Sokkia set 310 & 330R, Nikon DTM 420, Topcon and all other kinds of brands, power sets & total stations in the market available now. Digital Levels and Auto Levels Used: Trimble Dini, Leica DNA, and all other kinds in the market available now.
  • 4. Date: (VADALI SRINIVAS) Place: Singapore (Signature of the Applicant)