Masterflex W4 Waterstop
at Vertical Construction Joint
Masterflex W4 Waterstop
at Horizontal Construction Joint
Masterflex W4 Waterstop
at Horizontal Construction Joint
Masterflex W4 Waterstop
at Vertical Construction Joint
STAGE -1
TEMPORARY SHUTTER FIXING
STAGE -2
MASTERFLEX W4 WATERSTOP INSTALLING
ONTO TEMPORARY SHUTTER
STAGE -3
BASF INJECTION FLANGES INSTALLING
ONTO TEMPORARY SHUTTER
STAGE -4
BASF INJECTION FLANGES HOSE & RE-INJECTABLE HOSE
INSTALLING INTO WALL OUTSIDE JUNCTION BOX
INJECTION FLANGES HOSE
STAGE -5
RETAINING WALL CASTING
STAGE -6
FINAL STAGE TEMPORARY SHUTTER
REMOVE AND APPLIED PVC WATERPROOFING SYSTEM
VARIES
Geotextile 350gm
5mm Polypropylene Protection Board
Masterpren BG 2mm
PVC Waterproofing Membrane
Geotextile 140gm
FixingDistance<1.5M
BASF PVC Roundelle, Dia. approx. 80mm
fixed with nail and washer
Masterpren BG 2mm
PVC Waterproofing Membrane
hot air welded to PVC Roundelle
FixingDistance<1.5M
BASF Injection Flanges
Injection Flanges Hose
Junction Box
Retaining Wall
BASF Injection Flanges
Existing Masterflex W4
Waterstop (Through the Raft Slab)
Existing Masterflex W4 Waterstop
(Through the Raft Slab)
Masterflex W4 Waterstop
200mm extended for new
welding Masterflex w4
New Masterflex W4 Waterstop welded
onto Vertical Masterflex W4 Waterstop
Masterflex W4 Waterstop (Horizontal cj.)
Re-injectable Hose (Horizontal)
Re-injectable Hose (Horizontal)
Existing Masterflex W4
Waterstop through to Raft Slab
(Horizontal cj.)
RE-INJECTABEL HOSE
VARIES
cj.
cj.
Masterflex W4 Waterstop
at Vertical Construction Joint
Masterflex W4 Waterstop
at Horizontal Construction Joint
BASF Injection Flange
BASF Injection Flange
Masterflex W4 Waterstop
at Horizontal Construction Joint
JUNCTION BOX
Injection Flanges Hose
RE-INJECTABEL HOSE
BASF Injection Flange
BASF Injection
Flange
INJECTION FLANGES HOSE
RE-INJECTABEL HOSE
Masterflex W4 Waterstop
at Horizontal Construction Joint
JUNCTION BOX
Injection Flanges Hose
RE-INJECTABEL HOSE
BASF Injection Flange
BASF Injection
Flange
RETAINING WALL
RETAINING WALL
RE-INJECTABEL HOSE
NOTE:-
1) EVERY INJECTION FLANGES FIXED 1.5 METER
DISTANCE FROM THE WALL EDGES OR SLAB EDGES.
WBF - Wall Base Flange
WTF - Wall Top Flange
1. ALL DIMENSIONS ARE IN MM. OTHERWISE MENTIONED.
1.0 11-12-2014 HAM ISSUED FOR CONSTRUCTION SW SUJ
BRIDGES,VIADUCTS,RAMPS & STATIONS
Drawing Number :
Designed
Drawn
Dwg check
Rev
Title :
Discipline :
Project :
Client :
Consultant Endorsement :
DVE Endorsement :
STATUS PURPOSE OF ISSUE
Rev Date Drawn Description Chkd. App.
Reference Documents :
Notes :
Legends :
Design check
Eng check
Approved
Qatar Integrated Railway Project
Doha Metro : Major Stations
RTC/042/2012
Qatar Railways Company
P.O.Box 29988
Doha - Qatar
SAMSUNG - OHL - QBC Joint Venture
Key Plan :
AS SHOWN
Scale :Sheet Size
A1
HAM
HAM
S.S.T.
H.W. Kim
S.W.Nam
S.U.Ji
11-12-2014
11-12-2014
11-12-2014
11-12-2014
11-12-2014
11-12-2014
1.0
M007-SOQ-STR-DWG-UCSTEDU-F1-00623
-
-
08
INJECTION FLANGES TYPICAL
INSTALLATION DETAIL AT WALL
2. THE MASTERPREN BG ALONG WITH MASTERPREN PZ WILL BE
TEMPORARILY
LAYED ABOVE THE MASS CONCRETE PROTECTED BY SCREED AND IT
WILL BE FLIPPED OVER THE RAFT AFTER CASTING. SEE SECTION E
This drawing and any information or descriptive matter set out hereon is licensed
to the Qatar Railways Company and is confidential and subject to copyright.
It must not be disclosed, loaned, copied or used for manufacturing, tendering or
ISSUED FOR CONSTRUCTION
EDUCATION CITY STATION
Approved By Design Manager
DATE :
FOR CONSTRUCTION
11/12/2014
M007-SOQ-STR-DWG-UCSTEDU-F1-00623_REV1.0,11-12-201409:25:22

More Related Content

What's hot

SPO-Product-Brochure
SPO-Product-BrochureSPO-Product-Brochure
SPO-Product-Brochure
Dave Holmwood
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15
John Grover
 
GE Drilling Systems Brochure
GE Drilling Systems BrochureGE Drilling Systems Brochure
GE Drilling Systems Brochure
Rosendo Ramirez
 
Proposed Methodology Shore Approach
Proposed Methodology  Shore ApproachProposed Methodology  Shore Approach
Proposed Methodology Shore Approach
Mohd Zaini Baharum
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-final
John Grover
 
02 wireline
02 wireline02 wireline
02 wireline
Johan RC
 
Subsurface safety valves
Subsurface safety valvesSubsurface safety valves
Subsurface safety valves
Akhilesh Maurya
 

What's hot (20)

Chapter 2 surface equipment (1)
Chapter 2 surface equipment (1)Chapter 2 surface equipment (1)
Chapter 2 surface equipment (1)
 
SPO-Product-Brochure
SPO-Product-BrochureSPO-Product-Brochure
SPO-Product-Brochure
 
1. completion sequance
1. completion sequance1. completion sequance
1. completion sequance
 
Casing Head Spools, Oilfield Casing Spools - WOM Group
Casing Head Spools, Oilfield Casing Spools - WOM GroupCasing Head Spools, Oilfield Casing Spools - WOM Group
Casing Head Spools, Oilfield Casing Spools - WOM Group
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15
 
GE Drilling Systems Brochure
GE Drilling Systems BrochureGE Drilling Systems Brochure
GE Drilling Systems Brochure
 
Proposed Methodology Shore Approach
Proposed Methodology  Shore ApproachProposed Methodology  Shore Approach
Proposed Methodology Shore Approach
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-final
 
Landscape Irrigation Spray heads
Landscape Irrigation Spray headsLandscape Irrigation Spray heads
Landscape Irrigation Spray heads
 
Casing design
Casing designCasing design
Casing design
 
Sequence of well completion part 1
Sequence of well completion part 1Sequence of well completion part 1
Sequence of well completion part 1
 
02 wireline
02 wireline02 wireline
02 wireline
 
Contech Slotted Drain for Commercial Markets
Contech Slotted Drain for Commercial MarketsContech Slotted Drain for Commercial Markets
Contech Slotted Drain for Commercial Markets
 
Intelligent well completion
Intelligent well completionIntelligent well completion
Intelligent well completion
 
ACT Tools
ACT Tools ACT Tools
ACT Tools
 
Collaboration delivers first Lower Tertiary smart completion system
Collaboration delivers first Lower Tertiary smart completion systemCollaboration delivers first Lower Tertiary smart completion system
Collaboration delivers first Lower Tertiary smart completion system
 
Subsurface safety valves
Subsurface safety valvesSubsurface safety valves
Subsurface safety valves
 
WELL COSTING
WELL COSTINGWELL COSTING
WELL COSTING
 
Completion equipment part 1
Completion equipment part 1Completion equipment part 1
Completion equipment part 1
 
Thermoplastic valves and control- PLASTOMATIC VALVES
Thermoplastic valves and control- PLASTOMATIC VALVESThermoplastic valves and control- PLASTOMATIC VALVES
Thermoplastic valves and control- PLASTOMATIC VALVES
 

Similar to M007-SOQ-STR-DWG-UCSTEDU-F1-00623_REV1.0

SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
Sunit Dhingra
 
Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping works
Surya Kant
 
WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)
Vladimir Popovic
 
First Oil Tie-in's Status First Oil Tie-in's Status First Oil Tie-in's Status
First Oil Tie-in's Status First Oil Tie-in's Status First Oil Tie-in's StatusFirst Oil Tie-in's Status First Oil Tie-in's Status First Oil Tie-in's Status
First Oil Tie-in's Status First Oil Tie-in's Status First Oil Tie-in's Status
R SIVAKUMAR
 

Similar to M007-SOQ-STR-DWG-UCSTEDU-F1-00623_REV1.0 (20)

EBSE + ES3 Commercial Presentation
EBSE + ES3 Commercial PresentationEBSE + ES3 Commercial Presentation
EBSE + ES3 Commercial Presentation
 
Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.
Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.
Sales Presentation: Water Closet Supports by Jay R. Smith Mfg. Co.
 
Pipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & CatchpitsPipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & Catchpits
 
Dual proof e 2016
Dual proof e 2016Dual proof e 2016
Dual proof e 2016
 
2376 robor ductile_iron_brochure5
2376 robor ductile_iron_brochure52376 robor ductile_iron_brochure5
2376 robor ductile_iron_brochure5
 
design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...
design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...
design-and-installation-guide-for-pvc-fittings-and-laterals-for-solid-wall-pv...
 
Barrier Bac Architects Binder
Barrier Bac Architects BinderBarrier Bac Architects Binder
Barrier Bac Architects Binder
 
Gc hv-005 rev.a01
Gc hv-005 rev.a01Gc hv-005 rev.a01
Gc hv-005 rev.a01
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
 
Method statement piping works
Method statement piping worksMethod statement piping works
Method statement piping works
 
Method of statement piping works
Method of statement piping works Method of statement piping works
Method of statement piping works
 
Rehab Solutions for Today's Infrastructure
Rehab Solutions for Today's InfrastructureRehab Solutions for Today's Infrastructure
Rehab Solutions for Today's Infrastructure
 
Waterguard pvc water stop
Waterguard   pvc water stopWaterguard   pvc water stop
Waterguard pvc water stop
 
Cement based solutions for early return to service
Cement based solutions for early return to serviceCement based solutions for early return to service
Cement based solutions for early return to service
 
introduction to molecular oriented polyvinyl chloride pvco pipe
introduction to molecular oriented polyvinyl chloride pvco pipeintroduction to molecular oriented polyvinyl chloride pvco pipe
introduction to molecular oriented polyvinyl chloride pvco pipe
 
Stage presentation v07
Stage presentation v07Stage presentation v07
Stage presentation v07
 
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh RajputCasing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
Casing Design | Tubing | Well Control | Drilling | Gaurav Singh Rajput
 
Advancements in concrete repair technologies and techniques
Advancements in concrete repair technologies and techniquesAdvancements in concrete repair technologies and techniques
Advancements in concrete repair technologies and techniques
 
WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)WS RC Tank Debeljaca (700m3)
WS RC Tank Debeljaca (700m3)
 
First Oil Tie-in's Status First Oil Tie-in's Status First Oil Tie-in's Status
First Oil Tie-in's Status First Oil Tie-in's Status First Oil Tie-in's StatusFirst Oil Tie-in's Status First Oil Tie-in's Status First Oil Tie-in's Status
First Oil Tie-in's Status First Oil Tie-in's Status First Oil Tie-in's Status
 

M007-SOQ-STR-DWG-UCSTEDU-F1-00623_REV1.0

  • 1. CB 04 10000 SB 09 SB 06 SB05SB04SB02 SB03 SB 07 SB07 SB 08 SB 10 CB 01 CB 02 CB 03 CB 05 SB01 Masterflex W4 Waterstop at Vertical Construction Joint Masterflex W4 Waterstop at Horizontal Construction Joint Masterflex W4 Waterstop at Horizontal Construction Joint Masterflex W4 Waterstop at Vertical Construction Joint STAGE -1 TEMPORARY SHUTTER FIXING STAGE -2 MASTERFLEX W4 WATERSTOP INSTALLING ONTO TEMPORARY SHUTTER STAGE -3 BASF INJECTION FLANGES INSTALLING ONTO TEMPORARY SHUTTER STAGE -4 BASF INJECTION FLANGES HOSE & RE-INJECTABLE HOSE INSTALLING INTO WALL OUTSIDE JUNCTION BOX INJECTION FLANGES HOSE STAGE -5 RETAINING WALL CASTING STAGE -6 FINAL STAGE TEMPORARY SHUTTER REMOVE AND APPLIED PVC WATERPROOFING SYSTEM VARIES Geotextile 350gm 5mm Polypropylene Protection Board Masterpren BG 2mm PVC Waterproofing Membrane Geotextile 140gm FixingDistance<1.5M BASF PVC Roundelle, Dia. approx. 80mm fixed with nail and washer Masterpren BG 2mm PVC Waterproofing Membrane hot air welded to PVC Roundelle FixingDistance<1.5M BASF Injection Flanges Injection Flanges Hose Junction Box Retaining Wall BASF Injection Flanges Existing Masterflex W4 Waterstop (Through the Raft Slab) Existing Masterflex W4 Waterstop (Through the Raft Slab) Masterflex W4 Waterstop 200mm extended for new welding Masterflex w4 New Masterflex W4 Waterstop welded onto Vertical Masterflex W4 Waterstop Masterflex W4 Waterstop (Horizontal cj.) Re-injectable Hose (Horizontal) Re-injectable Hose (Horizontal) Existing Masterflex W4 Waterstop through to Raft Slab (Horizontal cj.) RE-INJECTABEL HOSE VARIES cj. cj. Masterflex W4 Waterstop at Vertical Construction Joint Masterflex W4 Waterstop at Horizontal Construction Joint BASF Injection Flange BASF Injection Flange Masterflex W4 Waterstop at Horizontal Construction Joint JUNCTION BOX Injection Flanges Hose RE-INJECTABEL HOSE BASF Injection Flange BASF Injection Flange INJECTION FLANGES HOSE RE-INJECTABEL HOSE Masterflex W4 Waterstop at Horizontal Construction Joint JUNCTION BOX Injection Flanges Hose RE-INJECTABEL HOSE BASF Injection Flange BASF Injection Flange RETAINING WALL RETAINING WALL RE-INJECTABEL HOSE NOTE:- 1) EVERY INJECTION FLANGES FIXED 1.5 METER DISTANCE FROM THE WALL EDGES OR SLAB EDGES. WBF - Wall Base Flange WTF - Wall Top Flange 1. ALL DIMENSIONS ARE IN MM. OTHERWISE MENTIONED. 1.0 11-12-2014 HAM ISSUED FOR CONSTRUCTION SW SUJ BRIDGES,VIADUCTS,RAMPS & STATIONS Drawing Number : Designed Drawn Dwg check Rev Title : Discipline : Project : Client : Consultant Endorsement : DVE Endorsement : STATUS PURPOSE OF ISSUE Rev Date Drawn Description Chkd. App. Reference Documents : Notes : Legends : Design check Eng check Approved Qatar Integrated Railway Project Doha Metro : Major Stations RTC/042/2012 Qatar Railways Company P.O.Box 29988 Doha - Qatar SAMSUNG - OHL - QBC Joint Venture Key Plan : AS SHOWN Scale :Sheet Size A1 HAM HAM S.S.T. H.W. Kim S.W.Nam S.U.Ji 11-12-2014 11-12-2014 11-12-2014 11-12-2014 11-12-2014 11-12-2014 1.0 M007-SOQ-STR-DWG-UCSTEDU-F1-00623 - - 08 INJECTION FLANGES TYPICAL INSTALLATION DETAIL AT WALL 2. THE MASTERPREN BG ALONG WITH MASTERPREN PZ WILL BE TEMPORARILY LAYED ABOVE THE MASS CONCRETE PROTECTED BY SCREED AND IT WILL BE FLIPPED OVER THE RAFT AFTER CASTING. SEE SECTION E This drawing and any information or descriptive matter set out hereon is licensed to the Qatar Railways Company and is confidential and subject to copyright. It must not be disclosed, loaned, copied or used for manufacturing, tendering or ISSUED FOR CONSTRUCTION EDUCATION CITY STATION Approved By Design Manager DATE : FOR CONSTRUCTION 11/12/2014 M007-SOQ-STR-DWG-UCSTEDU-F1-00623_REV1.0,11-12-201409:25:22