Gregory Catanzaro
175 Bridgestone Drive
Berea, KY 40403
gvccomps@aol.com
973-615-1127
Experienced construction professional interested in a long-term position.
Loyal, honest, self motivated and hard working individual with excellent
communication and computer skills.
EXPERIENCE
*Over 30 years’ experience in the construction industry working in such capacities
as Sr. Superintendent, Lead Site Superintendent, Field Superintendent, Supervisor,
Foreman and Lead Man in ground up, Restoration, Renovation, Retail, Commercial,
Hospitality, Government, multi-family, Hospital and Medical facility, Parking Garage,
Colleges, TV Station, Residential, New and Fit out Construction.
*Experience in Big box Medium and Small box, high end retail, Estimating, Budgeting,
Client relations, Sub Contractor coordination, and Labor organization; supervised
multiple crews, multiple sites and met scheduled deadlines and budgets.
*Experience in many phases of construction including Quality control and safety,
Scheduling, Value Engineering, Architecture, Site work, Underground Utilities, Piles,
Foundations, Concrete and Pre Cast, Structural steel, Welding, Crane and Heavy
Equipment coordination. Also Demolition and Waste Removal, Layouts and Revisions,
MEP’s, Elevators, Roofing, Communications, Microwave and Satellite, Framing, Drywall,
Roofing, Finish and Millwork, Terrazzo, Hardwood carpet and Tile flooring;
Management of Sub Contractor relations, Prints and take offs, Surveying, Permits,
Inspections, Submittals, Sketching, RFI’s, Change orders and Close Out documents,
Progress Reports, pictures and Documentation, DOB inspection and relations;
ADDITIONAL SKILLS
Excellent computer skills; Repair, Programming and Maintenance. Microsoft Excel,
Word, Outlook, PowerPoint, Access, Microsoft Works, Auto Cad, Adobe, Primavera,
Prologue, and others with an Ability to pick up new applications quickly.
EDUCATION
University of Phoenix- Architecture; Continuing education;
North Hampton Community College; Business Major; College course work
completed;, Bethlehem, PA.
High School Diploma; Hasbrouck heights High School, NJ;
OSHA10 hr. safety course
NYC Superintendents safety course
PROFESSIONAL EXPERIENCE
May 2012- Present;Horizon Retail Construction Inc.;
Lead Project Superintendent;
(2)Hot Topic; Torrid; Jose A Bank; Aspen Dental;(2) Claire’s; (2)Icing; Ultra Diamond;
Kay Jewels; Addidas; Leslie’s Pools; Art of Shaving; Nine West;(2) Hertz; Dress Barn;
Jan 2012-May 2012- Brodson Construction;
Lead Project Superintendent;
Michael Kors- Miami, FL; Officine Panerai- Miami, FL
August 2011- November 2011; Shawmut Design and Construction;
Lead Project Superintendent- (Contract position)
Burberry; Luxury Apparel; Scottsdale, AZ;
Aug. 2009 to June 2011; Michilli Inc; 181 Hudson St, NYC, NY;
Traveling Sr. Project Superintendent;
Bottega Veneta; High end retail; Chicago, Il
Escada; Luxury Apparel; Dallas Tx
Roberto Cavalli; Luxury Apparel; NYC Showroom; Bal Harbour, FL;
Brunello Cucinelli; Luxury apparel; Shops at Bal Harbour, Bal Harbour, FL
Furlani Luxury Condo; Miami Beach, FL;
Roger Vivier; Luxury apparel- Shops at Bal Harbour, Bal Harbour, FL
Moncler Showroom; Wholesale showroom; Winter Clothing; Broadway, NYC;
Jan. 2007 to Mar 2009; McGowan Builders, Paterson Plank Road, North Bergen, NJ.
Sr. Project Superintendent:
Bally’s Total Fitness; Jersey City, New Jersey. October 2007 to January 2008.
WGNO/WNOL TV Station and Studio; Metairie, Louisiana. Jan. to Sept. 2007.
February 2006 to January 2007; Worth Construction; Bethel, Connecticut;
Field Superintendent
William Paterson University; Wayne, New Jersey;;
Paterson Parking Authority; Broadway, Paterson, New Jersey;
2004-05-Spectrum for Living; Vercelli Construction and C. Raimondo
Construction, GC. Edison, New Jersey. Northvale, New Jersey.
Interiors and finish contracting.
Additional Project list;
Sears Department Stores, JC Penny Department Stores:
Staples Office Stores: Overlook Hospital:
Kohl’s Department Stores Pascack Valley Hospital:
Hoboken General Hospital; Rutgers Arts/ Planning Center;
Floyd Hall Arena - Yogi Berra Museum; University/ Dentistry Medicine;
Newark International Airport; Merc Pharm; Rahway, NJ;
Home Depot, Eastern Regional Offices; Sandoz Pharmaceuticals;
Bebe Stores; Dolce & Gabbana
Aspen Dental
References;
Al Ross; VP of operations; EJD Builders, Louisiana; 504-438-7307
Brian Murray; Former VP Operations; McGowan Builders; 201-341-5769
Kurt Luckstein; Diamond Mechanical; South Florida; 516-242-1542
Gary Karleson; Mall manager- Bal Harbour Shops; 305-586-0311
John Buonocore; Diamond Mechanical; NYC &Miami 386-437-7352
Robert Ilas; Sr. PM- Michilli Inc- 917-518-5511
Project list
R
e
c
e
n
t
P
r
o
j
e
c
t
L
i
s
t
/
R
e
s
p
o
n
s
i
b
i
l
i
t
i
e
s
Dolce & Gabbana- SF
California
Kohl’s- MA, CT
David’s Tea- Long Island
NY
Buffalo Wild Wings,
Scranton, PA
(2)Hot Topic; Ft Meyers, FL;
Orange Park, FL
Torrid;; St Louis, MO;
Jose A Bank-Delray Beach,
FL
Aspen Dental; Anderson,
So Carolina
(2) Claire’s; Cleveland, TN;
Tacoma, WA.
(2)Icing; Jackson, MS;
McAllen, TX;
Ultra Diamond; Woodstock,
GA
Kay Jewels; Woodstock,
GA
Addidas; Woodstock, GA
Leslie’s Pools; Lake
Charles, LA;
Art of Shaving; Miami, FL
Nine West; Alexandria, VA
(2) Hertz; Denver, CO
Dress Barn; Gary, IN
Build out-
Historic
Building
Department
Renovation-
Open store
Coffee shop
build out
Restaurant-
Build out
Renovation
Build out
Build out
Build out
Renovation
Renovation
Build out
Demo-
Renovation
Build out
Build out
Renovation
Renovation
Renovation
Renovation
Renovation
Hard Bid
5.7M
Betwe
en
80K-
1.2M
May
2012
Mar
2015
Tenant improvements of
existing spaces within
indoor mall- free
standing buildings-
Complete demolition and
removal, MEP’s, Layout,
Framing, Storefront,
Millwork, and Finishes.
Client, Architect,
Engineer, Sub
Contractor, Mall
management relations.
Change Orders, RFI’s.
Daily Reporting, Permits,
Inspections.
Officine Panerai- Bal
Harbor- FL
Tenant
Improvement
Build out
Hard Bid Lead Project
Superintendent
340K 800 March
2012
April
2012
Tenant improvement of
existing space within
indoor mall- Complete
demolition and removal,
MEP’s, Layout, Framing,
Storefront, Millwork,
Finishes. Client,
Architect, Engineer, Sub
Contractor, Mall
management relations.
Change Orders, RFI’s.
Daily Reporting, Permits,
Inspections.
Michael Kors- Bal Harbor,
FL
Tenant
Improvement
Open store
remodel
Hard Bid Lead Project
Superintendent
900K 2,000 Jan
2012
April
2012
Tenant improvement of
existing space within
indoor mall- Complete
demolition and removal,
MEP’s, Layout, Framing,
Storefront, Millwork,
Finishes. Client,
Architect, Engineer, Sub
Contractor, Mall
management relations.
Change Orders, RFI’s.
Daily Reporting, Permits,
Inspections.
Burberry Luxury Apparel/
Scottsdale, AZ
Tenant
Improvement-
Build out
Hard Bid Project
Superintendent
2.4M 5,700 Aug
2011
Nov
2011
Tenant improvement of
existing space within
indoor mall- Complete
demolition and removal,
MEP’s, Layout, Framing,
Storefront, Millwork,
Finishes. Client,
Architect, Engineer, Sub
Contractor, Mall
management relations.
Change Orders, RFI’s.
Daily Reporting, Permits,
Inspections.
N
a
m
e
/
L
o
c
a
t
i
o
n
Bottega Veneta/ Luxury
Apparel/ Chicago, IL
Tenant
Improvement/
Addition- Build
out
Negotiated Sr Traveling
Project
Superintendent
1.6M 6,100 Dec
2010
April
2011
Tenant improvement of
existing space within
existing Hotel- Complete
demolition and removal,
MEP’s, Layout, Framing,
Concrete cutting,
Structural, Millwork,
Finishes. Client,
Architect, Engineer, Sub
Contractor, Landlord
relations. Change
Orders, RFI’s. Daily
Reporting, Permits,
Inspections
Escada Luxury Apparel/
Dallas, TX
Tenant
Improvement/
Addition
Negotiated Sr Traveling
Project
Superintendent
640K 5,400 Aug
2010
Nov
2010
Tenant improvement of
existing space within
existing Mall- Complete
demolition and removal,
MEP’s, Layout, Framing,
Concrete cutting,
Structural, Finishes.
Client, Architect,
Engineer, Sub
Contractor, Landlord
relations. Change
Orders, RFI’s. Daily
Reporting. Permits,
inspections.
Brunello Cucinelli/ Luxury
Apparel/ Bal Harbor, FL
Roberto Cavalli/ Luxury
Apparel/ Bal Harbor, FL
Moncler Showroom/ Luxury
Winter Apparel/ NYC, NY
Roger Vivier/ Luxury
Apparel/ Bal Harbor, FL
New Build out
of Existing
Space
Negotiated Sr Traveling
Project
Superintendent
420K
380K
150K
140K
2,400 Jan
2010
April
2010
Tenant Build Out of
existing space within
indoor mall- Complete
demolition and removal,
MEP’s, Layout, Framing,
Storefront, Millwork,
Finishes. Client,
Architect, Engineer, Mall
management relations.
Change Orders, RFI’s.
Daily Reporting, Permits,
Inspections.
Bally’s Total Fitness/ Gym-
Health Club/ Jersey City, NJ
Complete
renovation of
existing 4 story
Historic
Building
Negotiated Sr Construction
Superintendent
4.7M 4,200 Oct
2007
Jan
2009
Complete renovation of
historic 3 story building.
Complete demolition and
removal, MEP’s, Layout,
Framing, Concrete,
Structural, Underground
utilities, Stairwells,
Storefront, Finishes.
Client, Architect,
Engineer, Sub
Contractor, Landlord
relations. Change
Orders, RFI’s. Daily
Reporting, Permits,
Inspections
WGNO/ WNOL TV/
Television Station/ New
Orleans, LA
Build Out Of
Existing Space
in High Rise
building
Negotiated Construction
Superintendent
9.4M 8,400 Jan
2007
Oct
2007
Build out in high rise
building. Value
Engineering, crane and
Heavy Equipment,
Sound studio,
Microwave, Satellite,
Sound Proofing, MEP’s,
Layout, Framing,
Storefront, Millwork,
Finishes. Client,
Architect, Engineer, Sub
Contractor, Mall
management relations.
Change Orders, RFI’s.
Daily Reporting, Permits,
inspections.
Paterson Parking Authority/
Parking Garage/ Paterson,
NJ
New
Construction
Negotiated Field
Superintendent
27M Feb
2006
Jan
2007
8 story PIP and Precast
Parking Garage/ store
fronts. Concrete,
Surveying, Layout,
Underground utilities,
Roadwork, Crane and
heavy Equipment,
MEP’s, Client, Architect,
Engineer, Sub
Contractor, Landlord
relations.
William Paterson University/
Wayne, NJ
New
Construction/
Renovation
Negotiated Field
Superintendent
65M N/A Feb
2006
Jan
2007
New construction-
Atrium, Common Areas,
Stairwells, Assembly
Hall. Renovation of
Cafeteria, Study areas.
Engineering, crane and
Heavy Equipment,
Sound Proofing, MEP’s,
Layout, Framing,
Millwork, Finishes.
Client, Architect,
Engineer, Sub
Contractor, Mall
management relations.
Change Orders, RFI’s.
Daily Reporting.
Spectrum For living/
Assisted living units/
Rocklegh, NJ
New
Construction/
Interiors
Negotiated Self Employed N/A 8,000 Aug
2005
Jan
2006
Interiors contractor-
framing, drywall finishes.
R
e
c
e
n
t
P
r
o
j
e
c
t
L
i
s
t
/
R
e
s
p
o
n
s
i
b
i
l
i
t
i
e
s
Spectrum For Living/
Assisted Living Units/
Edison, NJ
New
Construction/
Interiors
Negotiated Self Employed N/A 7,000 May
2005
Sept
2005
Interiors Contractor-
framing, drywall,
Finishes.
A Plus Storage/ Storage
and offices/ Living space/
Carteret, NJ
New
Construction/
Interiors
Negotiated Self Employed N/A 42,000 Feb
2005
June
2005
Interiors Contractor-
framing, drywall,
Finishes.

More Related Content

Similar to Resume Greg Catanzaro

Tony Barrier Resume 7.7.2015
Tony Barrier Resume  7.7.2015Tony Barrier Resume  7.7.2015
Tony Barrier Resume 7.7.2015Tony Barrier
 
EJP Construction Manager
EJP Construction ManagerEJP Construction Manager
EJP Construction ManagerEarl Pritchard
 
R. Resume 2015.doc
R. Resume 2015.doc R. Resume 2015.doc
R. Resume 2015.doc Robby Fremin
 
Opportunities Panelv2
Opportunities Panelv2Opportunities Panelv2
Opportunities Panelv2spodvin
 
Bob's most current resume 2-2-17
Bob's most current resume 2-2-17Bob's most current resume 2-2-17
Bob's most current resume 2-2-17Robert Luttrell
 
Christy_McKinzie_Resume_2015
Christy_McKinzie_Resume_2015Christy_McKinzie_Resume_2015
Christy_McKinzie_Resume_2015Christy McKinzie
 
resume_ security 2016 ron_carpenter
resume_ security 2016 ron_carpenterresume_ security 2016 ron_carpenter
resume_ security 2016 ron_carpenterRon Carpenter
 
Gerald Durand Resume
Gerald Durand ResumeGerald Durand Resume
Gerald Durand ResumeJerry Durand
 
Carlos Mora Resume E-REF 040415
Carlos Mora Resume E-REF 040415 Carlos Mora Resume E-REF 040415
Carlos Mora Resume E-REF 040415 Carlos V. Mora
 
Edward Galasso_09
Edward Galasso_09Edward Galasso_09
Edward Galasso_09Ed Galasso
 
160202_JG_ CV_GDS_CURRENT
160202_JG_ CV_GDS_CURRENT160202_JG_ CV_GDS_CURRENT
160202_JG_ CV_GDS_CURRENTJerry Geurts
 
Robert Faulk Resume 2011
Robert Faulk Resume 2011Robert Faulk Resume 2011
Robert Faulk Resume 2011Robert Faulk
 
22_0615_BRO_iugis_Education.pdf
22_0615_BRO_iugis_Education.pdf22_0615_BRO_iugis_Education.pdf
22_0615_BRO_iugis_Education.pdfSherylAlberico1
 
Sunil Resume 2012
Sunil Resume   2012Sunil Resume   2012
Sunil Resume 2012sunilmistry
 
Kirk_Welsh_6-1-2016_Short
Kirk_Welsh_6-1-2016_ShortKirk_Welsh_6-1-2016_Short
Kirk_Welsh_6-1-2016_ShortKirk Welsh
 

Similar to Resume Greg Catanzaro (20)

Tony Barrier Resume 7.7.2015
Tony Barrier Resume  7.7.2015Tony Barrier Resume  7.7.2015
Tony Barrier Resume 7.7.2015
 
EJP Construction Manager
EJP Construction ManagerEJP Construction Manager
EJP Construction Manager
 
Resume
ResumeResume
Resume
 
R. Resume 2015.doc
R. Resume 2015.doc R. Resume 2015.doc
R. Resume 2015.doc
 
Opportunities Panelv2
Opportunities Panelv2Opportunities Panelv2
Opportunities Panelv2
 
Bob's most current resume 2-2-17
Bob's most current resume 2-2-17Bob's most current resume 2-2-17
Bob's most current resume 2-2-17
 
Christy_McKinzie_Resume_2015
Christy_McKinzie_Resume_2015Christy_McKinzie_Resume_2015
Christy_McKinzie_Resume_2015
 
resume_ security 2016 ron_carpenter
resume_ security 2016 ron_carpenterresume_ security 2016 ron_carpenter
resume_ security 2016 ron_carpenter
 
Gerald Durand Resume
Gerald Durand ResumeGerald Durand Resume
Gerald Durand Resume
 
Carlos Mora Resume E-REF 040415
Carlos Mora Resume E-REF 040415 Carlos Mora Resume E-REF 040415
Carlos Mora Resume E-REF 040415
 
Edward Galasso_09
Edward Galasso_09Edward Galasso_09
Edward Galasso_09
 
Culanag, Desideria
Culanag, DesideriaCulanag, Desideria
Culanag, Desideria
 
160202_JG_ CV_GDS_CURRENT
160202_JG_ CV_GDS_CURRENT160202_JG_ CV_GDS_CURRENT
160202_JG_ CV_GDS_CURRENT
 
About Shawmut
About ShawmutAbout Shawmut
About Shawmut
 
Robert Faulk Resume 2011
Robert Faulk Resume 2011Robert Faulk Resume 2011
Robert Faulk Resume 2011
 
22_0615_BRO_iugis_Education.pdf
22_0615_BRO_iugis_Education.pdf22_0615_BRO_iugis_Education.pdf
22_0615_BRO_iugis_Education.pdf
 
pk 2015resumw
pk 2015resumwpk 2015resumw
pk 2015resumw
 
Sunil Resume 2012
Sunil Resume   2012Sunil Resume   2012
Sunil Resume 2012
 
Kirk_Welsh_6-1-2016_Short
Kirk_Welsh_6-1-2016_ShortKirk_Welsh_6-1-2016_Short
Kirk_Welsh_6-1-2016_Short
 
leonardhill
leonardhillleonardhill
leonardhill
 

Resume Greg Catanzaro

  • 1. Gregory Catanzaro 175 Bridgestone Drive Berea, KY 40403 gvccomps@aol.com 973-615-1127 Experienced construction professional interested in a long-term position. Loyal, honest, self motivated and hard working individual with excellent communication and computer skills. EXPERIENCE *Over 30 years’ experience in the construction industry working in such capacities as Sr. Superintendent, Lead Site Superintendent, Field Superintendent, Supervisor, Foreman and Lead Man in ground up, Restoration, Renovation, Retail, Commercial, Hospitality, Government, multi-family, Hospital and Medical facility, Parking Garage, Colleges, TV Station, Residential, New and Fit out Construction. *Experience in Big box Medium and Small box, high end retail, Estimating, Budgeting, Client relations, Sub Contractor coordination, and Labor organization; supervised multiple crews, multiple sites and met scheduled deadlines and budgets. *Experience in many phases of construction including Quality control and safety, Scheduling, Value Engineering, Architecture, Site work, Underground Utilities, Piles, Foundations, Concrete and Pre Cast, Structural steel, Welding, Crane and Heavy Equipment coordination. Also Demolition and Waste Removal, Layouts and Revisions, MEP’s, Elevators, Roofing, Communications, Microwave and Satellite, Framing, Drywall, Roofing, Finish and Millwork, Terrazzo, Hardwood carpet and Tile flooring; Management of Sub Contractor relations, Prints and take offs, Surveying, Permits, Inspections, Submittals, Sketching, RFI’s, Change orders and Close Out documents, Progress Reports, pictures and Documentation, DOB inspection and relations; ADDITIONAL SKILLS Excellent computer skills; Repair, Programming and Maintenance. Microsoft Excel, Word, Outlook, PowerPoint, Access, Microsoft Works, Auto Cad, Adobe, Primavera, Prologue, and others with an Ability to pick up new applications quickly. EDUCATION University of Phoenix- Architecture; Continuing education; North Hampton Community College; Business Major; College course work completed;, Bethlehem, PA. High School Diploma; Hasbrouck heights High School, NJ; OSHA10 hr. safety course NYC Superintendents safety course
  • 2. PROFESSIONAL EXPERIENCE May 2012- Present;Horizon Retail Construction Inc.; Lead Project Superintendent; (2)Hot Topic; Torrid; Jose A Bank; Aspen Dental;(2) Claire’s; (2)Icing; Ultra Diamond; Kay Jewels; Addidas; Leslie’s Pools; Art of Shaving; Nine West;(2) Hertz; Dress Barn; Jan 2012-May 2012- Brodson Construction; Lead Project Superintendent; Michael Kors- Miami, FL; Officine Panerai- Miami, FL August 2011- November 2011; Shawmut Design and Construction; Lead Project Superintendent- (Contract position) Burberry; Luxury Apparel; Scottsdale, AZ; Aug. 2009 to June 2011; Michilli Inc; 181 Hudson St, NYC, NY; Traveling Sr. Project Superintendent; Bottega Veneta; High end retail; Chicago, Il Escada; Luxury Apparel; Dallas Tx Roberto Cavalli; Luxury Apparel; NYC Showroom; Bal Harbour, FL; Brunello Cucinelli; Luxury apparel; Shops at Bal Harbour, Bal Harbour, FL Furlani Luxury Condo; Miami Beach, FL; Roger Vivier; Luxury apparel- Shops at Bal Harbour, Bal Harbour, FL Moncler Showroom; Wholesale showroom; Winter Clothing; Broadway, NYC; Jan. 2007 to Mar 2009; McGowan Builders, Paterson Plank Road, North Bergen, NJ. Sr. Project Superintendent: Bally’s Total Fitness; Jersey City, New Jersey. October 2007 to January 2008. WGNO/WNOL TV Station and Studio; Metairie, Louisiana. Jan. to Sept. 2007. February 2006 to January 2007; Worth Construction; Bethel, Connecticut; Field Superintendent William Paterson University; Wayne, New Jersey;; Paterson Parking Authority; Broadway, Paterson, New Jersey; 2004-05-Spectrum for Living; Vercelli Construction and C. Raimondo Construction, GC. Edison, New Jersey. Northvale, New Jersey. Interiors and finish contracting. Additional Project list; Sears Department Stores, JC Penny Department Stores: Staples Office Stores: Overlook Hospital: Kohl’s Department Stores Pascack Valley Hospital: Hoboken General Hospital; Rutgers Arts/ Planning Center; Floyd Hall Arena - Yogi Berra Museum; University/ Dentistry Medicine; Newark International Airport; Merc Pharm; Rahway, NJ; Home Depot, Eastern Regional Offices; Sandoz Pharmaceuticals; Bebe Stores; Dolce & Gabbana Aspen Dental References; Al Ross; VP of operations; EJD Builders, Louisiana; 504-438-7307 Brian Murray; Former VP Operations; McGowan Builders; 201-341-5769 Kurt Luckstein; Diamond Mechanical; South Florida; 516-242-1542 Gary Karleson; Mall manager- Bal Harbour Shops; 305-586-0311 John Buonocore; Diamond Mechanical; NYC &Miami 386-437-7352 Robert Ilas; Sr. PM- Michilli Inc- 917-518-5511
  • 3. Project list R e c e n t P r o j e c t L i s t / R e s p o n s i b i l i t i e s Dolce & Gabbana- SF California Kohl’s- MA, CT David’s Tea- Long Island NY Buffalo Wild Wings, Scranton, PA (2)Hot Topic; Ft Meyers, FL; Orange Park, FL Torrid;; St Louis, MO; Jose A Bank-Delray Beach, FL Aspen Dental; Anderson, So Carolina (2) Claire’s; Cleveland, TN; Tacoma, WA. (2)Icing; Jackson, MS; McAllen, TX; Ultra Diamond; Woodstock, GA Kay Jewels; Woodstock, GA Addidas; Woodstock, GA Leslie’s Pools; Lake Charles, LA; Art of Shaving; Miami, FL Nine West; Alexandria, VA (2) Hertz; Denver, CO Dress Barn; Gary, IN Build out- Historic Building Department Renovation- Open store Coffee shop build out Restaurant- Build out Renovation Build out Build out Build out Renovation Renovation Build out Demo- Renovation Build out Build out Renovation Renovation Renovation Renovation Renovation Hard Bid 5.7M Betwe en 80K- 1.2M May 2012 Mar 2015 Tenant improvements of existing spaces within indoor mall- free standing buildings- Complete demolition and removal, MEP’s, Layout, Framing, Storefront, Millwork, and Finishes. Client, Architect, Engineer, Sub Contractor, Mall management relations. Change Orders, RFI’s. Daily Reporting, Permits, Inspections.
  • 4. Officine Panerai- Bal Harbor- FL Tenant Improvement Build out Hard Bid Lead Project Superintendent 340K 800 March 2012 April 2012 Tenant improvement of existing space within indoor mall- Complete demolition and removal, MEP’s, Layout, Framing, Storefront, Millwork, Finishes. Client, Architect, Engineer, Sub Contractor, Mall management relations. Change Orders, RFI’s. Daily Reporting, Permits, Inspections. Michael Kors- Bal Harbor, FL Tenant Improvement Open store remodel Hard Bid Lead Project Superintendent 900K 2,000 Jan 2012 April 2012 Tenant improvement of existing space within indoor mall- Complete demolition and removal, MEP’s, Layout, Framing, Storefront, Millwork, Finishes. Client, Architect, Engineer, Sub Contractor, Mall management relations. Change Orders, RFI’s. Daily Reporting, Permits, Inspections. Burberry Luxury Apparel/ Scottsdale, AZ Tenant Improvement- Build out Hard Bid Project Superintendent 2.4M 5,700 Aug 2011 Nov 2011 Tenant improvement of existing space within indoor mall- Complete demolition and removal, MEP’s, Layout, Framing, Storefront, Millwork, Finishes. Client, Architect, Engineer, Sub Contractor, Mall management relations. Change Orders, RFI’s. Daily Reporting, Permits, Inspections. N a m e / L o c a t i o n Bottega Veneta/ Luxury Apparel/ Chicago, IL Tenant Improvement/ Addition- Build out Negotiated Sr Traveling Project Superintendent 1.6M 6,100 Dec 2010 April 2011 Tenant improvement of existing space within existing Hotel- Complete demolition and removal, MEP’s, Layout, Framing, Concrete cutting, Structural, Millwork, Finishes. Client, Architect, Engineer, Sub Contractor, Landlord relations. Change Orders, RFI’s. Daily Reporting, Permits, Inspections
  • 5. Escada Luxury Apparel/ Dallas, TX Tenant Improvement/ Addition Negotiated Sr Traveling Project Superintendent 640K 5,400 Aug 2010 Nov 2010 Tenant improvement of existing space within existing Mall- Complete demolition and removal, MEP’s, Layout, Framing, Concrete cutting, Structural, Finishes. Client, Architect, Engineer, Sub Contractor, Landlord relations. Change Orders, RFI’s. Daily Reporting. Permits, inspections. Brunello Cucinelli/ Luxury Apparel/ Bal Harbor, FL Roberto Cavalli/ Luxury Apparel/ Bal Harbor, FL Moncler Showroom/ Luxury Winter Apparel/ NYC, NY Roger Vivier/ Luxury Apparel/ Bal Harbor, FL New Build out of Existing Space Negotiated Sr Traveling Project Superintendent 420K 380K 150K 140K 2,400 Jan 2010 April 2010 Tenant Build Out of existing space within indoor mall- Complete demolition and removal, MEP’s, Layout, Framing, Storefront, Millwork, Finishes. Client, Architect, Engineer, Mall management relations. Change Orders, RFI’s. Daily Reporting, Permits, Inspections. Bally’s Total Fitness/ Gym- Health Club/ Jersey City, NJ Complete renovation of existing 4 story Historic Building Negotiated Sr Construction Superintendent 4.7M 4,200 Oct 2007 Jan 2009 Complete renovation of historic 3 story building. Complete demolition and removal, MEP’s, Layout, Framing, Concrete, Structural, Underground utilities, Stairwells, Storefront, Finishes. Client, Architect, Engineer, Sub Contractor, Landlord relations. Change Orders, RFI’s. Daily Reporting, Permits, Inspections
  • 6. WGNO/ WNOL TV/ Television Station/ New Orleans, LA Build Out Of Existing Space in High Rise building Negotiated Construction Superintendent 9.4M 8,400 Jan 2007 Oct 2007 Build out in high rise building. Value Engineering, crane and Heavy Equipment, Sound studio, Microwave, Satellite, Sound Proofing, MEP’s, Layout, Framing, Storefront, Millwork, Finishes. Client, Architect, Engineer, Sub Contractor, Mall management relations. Change Orders, RFI’s. Daily Reporting, Permits, inspections. Paterson Parking Authority/ Parking Garage/ Paterson, NJ New Construction Negotiated Field Superintendent 27M Feb 2006 Jan 2007 8 story PIP and Precast Parking Garage/ store fronts. Concrete, Surveying, Layout, Underground utilities, Roadwork, Crane and heavy Equipment, MEP’s, Client, Architect, Engineer, Sub Contractor, Landlord relations. William Paterson University/ Wayne, NJ New Construction/ Renovation Negotiated Field Superintendent 65M N/A Feb 2006 Jan 2007 New construction- Atrium, Common Areas, Stairwells, Assembly Hall. Renovation of Cafeteria, Study areas. Engineering, crane and Heavy Equipment, Sound Proofing, MEP’s, Layout, Framing, Millwork, Finishes. Client, Architect, Engineer, Sub Contractor, Mall management relations. Change Orders, RFI’s. Daily Reporting. Spectrum For living/ Assisted living units/ Rocklegh, NJ New Construction/ Interiors Negotiated Self Employed N/A 8,000 Aug 2005 Jan 2006 Interiors contractor- framing, drywall finishes.
  • 7. R e c e n t P r o j e c t L i s t / R e s p o n s i b i l i t i e s Spectrum For Living/ Assisted Living Units/ Edison, NJ New Construction/ Interiors Negotiated Self Employed N/A 7,000 May 2005 Sept 2005 Interiors Contractor- framing, drywall, Finishes. A Plus Storage/ Storage and offices/ Living space/ Carteret, NJ New Construction/ Interiors Negotiated Self Employed N/A 42,000 Feb 2005 June 2005 Interiors Contractor- framing, drywall, Finishes.