VICTAULIC, YOUR
PREFABRICATION
PARTNER
VICTAULIC, YOUR
PREFABRICATION
PARTNER
PRE-CONSTRUCTION
Information Required
•	 Schematic drawing
•	 Layout drawing
•	 Technical datasheets
3D Design
•	 Full 3D model in Revit
•	 Drawing layout “For Approval”
Advanced Bill of Material
•	 Early stage Bill of Quantities
•	 Avoid delivery problems
•	 Estimation pricing package
Pre-Fabrication
Options
•	 Loose Cut
Lengths
DESIGN BID
Refrigerant
lbs (kg)
Total Weight
(inc. Refrigerant) lbs (kg)
Water Volume gal (l) Center of Gravity ins (mm)
Evap Cond X Y Z
Operating
635
(288)
11806
(5355)
61
(233)
56
(213)
50
(1278)
37
(945)
20
(510)
Shipping
10823
(4909)
-
(-)
-
(-)
50
(1267)
37
(943)
21
(533)
4. 2.5 in. (64 mm) diameter lifting holes are provided. See installation manual for lifting instructions.
5. All water connections are given in standard U.S. pipe sizes. Standard connections are suitable for welding or grooved
couplings.
6. Vibration isolator pads are provided for field installation (0.25 in (6 mm) thick when loaded).
7. If main power wiring is brought up through the floor, this wiring must be outside the envelope of the unit.
8. The shipping skid adds 4 in. (105 mm) to the overall unit height.
9. Dimensions shown are for units with standard 150 psi (1034 kPa) design water side pressure. Check factory for unit
dimensions with higher pressures.
1. 1 in. (25 mm) FPT evaporator and condenser relief valves must be piped per ANSI/ASHRAE 15.
2. At a minimum, length of tube sheet to tube sheet dimensions is required at either end for tube removal, 36 in. (914 mm) is
required at other end and each side and top for service.
3. Final connections must allow for 0.5 in. (12.7 mm) manufacturing tolerance.
Product Drawing Unit Tag: Centrif 004 Sales Office: McQuay UK Operations
Product: Water Cooled Centrifugal Chiller Project Name: Selfridges Sales Engineer: James Henley
Model: WSC087M/E2609-2RB/C2209-2RB Date: 23/02/2015 Ver/Rev: Sheet: 1 of 5 Scale: NTS Tolerance: +/- 1.0” Dwg Units: in (mm)
WSC087MAU47GYYLBE2609BE2RBC40446CCYAC2209CLYY2RBYYYC40965CCYYYYAA134064EY2LEYYAVLWYYYYY0534YM2B1YAXS31AB0502YPYYYYM0AYW000000000000JDNNNN
No change to this drawing may be made unless approved in writing by McQuay UK Ltd. Purchaser must determine that the equipment is fit and sufficient for the job specifications
Product Drawing Unit Tag: Centrif 004 Sales Office: McQuay UK Operations
Product: Water Cooled Centrifugal Chiller Project Name: Selfridges Sales Engineer: James Henley
Model: WSC087M/E2609-2RB/C2209-2RB Date: 23/02/2015 Ver/Rev: Sheet: 2 of 5 Scale: NTS Tolerance: +/- 1.0” Dwg Units: in (mm)
WSC087MAU47GYYLBE2609BE2RBC40446CCYAC2209CLYY2RBYYYC40965CCYYYYAA134064EY2LEYYAVLWYYYYY0534YM2B1YAXS31AB0502YPYYYYM0AYW000000000000JDNNNN
No change to this drawing may be made unless approved in writing by McQuay UK Ltd. Purchaser must determine that the equipment is fit and sufficient for the job specifications
victaulic.com
06.23
7470 Rev C Updated
11/2015
© 2015 Victaulic
Company
. All rights reserved
.
ALWAYS
REFER TO ANY NOTIFICA
TIONS AT THE END OF THIS DOCUME
NT REGARD
ING PRODUC
T INSTALL
ATION, MAINTEN
ANCE OR SUPPOR
T.
2 - 12"/50 - 300 mm
1.0 PRODUCT DESCRIPTIONAvailable Sizes
• 2 – 12"/50 – 300 mmPipe Material
• Carbon steel, Stainless steelMaximum Working Pressure• Accommodates pressures ranging from full vacuum
(29.9 in Hg/760 mm Hg) up to 750 psi/5171 kPa.
• Working pressure dependent on material, wall thickness and size of pipe.
Operating Temperature
• Dependent on gasket selection from section 3.0.
Function
• Joins carbon steel and/or stainless steel pipe.
• Provides a rigid pipe joint designed to restrict axial or angular movement.
Pipe Preparation
• Cut or roll grooved in accordance with Submittal 25.01: Victaulic Standard Groove Specifications.
Codes and Requirements• Hanger support spacing corresponds to ASME B31.1 Power Piping Code and ASME B31.9 Building Services
Piping Code.
2.0 CERTIFICATION/LISTINGS
NOTES
• See Submitta
l 10.01: Victaulic
Products
for Fire Protectio
n Piping Systems
- Regulato
ry Approval
Referenc
e Guide for details.
• See Submitta
l 02.06: Victaulic
Potable Water Approval
s ANSI/NS
F for potable water approvals
if applicabl
e.
Victaulic®
QuickVic™
Rigid CouplingStyle 107N
06.23
1
System No.
LocationSubmitted By
Date Spec Section
ParagraphApproved
Date
Rev :
Checked by :
Drawn by : Date :
Drawing number :
All Victaulic drawings and piping engineering submittals will be based on information furnished to
us and is provided solely as an aid to procurement and installation. The Victaulic Company is not
responsible for design by engineer of record, erection, or operation. Liability of Victaulic Company with
reference to descriptions, lengths, locations, dimensions, or any other data shown herein is limited to the
amount charged by Victaulic Company for producing the drawing in question. In the event of an order,
Victaulic products must be used in accordance with published specifications and Victaulic literature.
NOTE: Contractor to field verify all equipment configurations, nozzle locating dimensions and
elevations for conformance to Victaulic layout drawing(s) PRIOR TO CUTTING PIPE. Please notify
Victaulic Construction Piping Services Division for recommendations regarding any deviations.
Date :
Sheet :
SELFRIDGES & Co
Chiller Room
Total - Isometric Views
15-76209 _ 05 _ Total 2-2
L. Luypaert
P. Janssens
REV 0
18/06/2015
18/06/2015
CD-Total2-2
Total isometric view
Detail secondary
chilled water pumps
Detail condenser
water pumps
Detail Primary chilled
water pumps
Detail chiller
connections
Victaulic check valve
Victaulic butterfly valve
Non - Victaulic
actuated valve
Victaulic wye strainer
Victaulic
check
valve
Victaulic
butterfly
valve
Victaulic
wye
strainer
Victaulic
butterfly
valve
Victaulic
check
valve
Victaulic
butterfly
valve
Victaulic
wye
strainer
Victaulic
butterfly
valve
Victaulic
wye
strainer
Victaulic
butterfly
valve
Victaulic
check
valve
CH - 01
CH - 02
CH - 03
CH - 04
PP - 01
PP - 02
PP - 03
PP - 04
CP - 01
CP - 02
CP - 03
CP - 04
ADS - 01
SP - 06/07
SP - 01
SP - 05
SP - 02
SP - 04
SP - 03
Heat meters
Heat meter
No. Description Issued by Date
1 Revision 1 Date 1
Info Customer :
Schematic drawing
Layout drawing
Technical Datasheets
ABOM :
Early stage BOQ
Avoid delivery problems
3D Design + Drawings for approval :
Full 3D model in Revit
Drawing layout “ For Approval “
Pre-Fabrication service:
Increase productivity on site
Construction BOM + Cut lengths
BOM’s/ Cut lengths by area for
ordering/pre-fabrication purpose
Area 1
Project meeting
Reality check
structural & civil
situation
ection Service
etal to Metal
requirement
Offset rigid couplings
Fabrication Service Explanation - REV0
15/12/2015
on Cell
s
d fittings
Cut Lengths
•	 Fabrication
Spools
•	 Skids / Modules
Fab Spools
Prefabrication
CONTRACTOR DELIVERY
CONSTRUCTION
3D Drawings for Approval Victaulic Fabrication Spools
•	 Pre-cut pipes
•	 Pre-installed fittings & valves
Skids / Modules
Construction BOM
BOM’s/ Cut length
ordering/pre-fabric
Victaulic Fabrication Cell
Pre cut pipes
VicSticks: Pre installed fittings
C
B
or
Victaulic Fabrication Cell
Pre cut pipes
VicSticks: Pre installed fittings
n + Drawings for approval :
odel in Revit
ayout “ For Approval “
Pre-Fabrication service:
Increase productivity on site
Area 1
Project meeting
Fabrication Service Explanation - REV0
15/12/2015
n + Drawings for approval :
odel in Revit
ayout “ For Approval “
Pre-Fabrication service:
Increase productivity on site
Area 1
Project meeting
Fabrication Service Explanation - REV0
15/12/2015
n + Drawings for approval :
odel in Revit
ayout “ For Approval “
Pre-Fabrication service:
Increase productivity on site
Area 1
Project meeting
Fabrication Service Explanation - REV0
15/12/2015
•	 BOMs / Cut lengths by area for ordering /
pre-fabrication purpose
Koelmachine 2
Koelmachine 1
TSA
Koeltoren 1
Koeltoren 2
1880
13344
1503419578
513584
943










1405
798330
286367
702









2851292375
608 522
296
13
B
845160016008951600
2000
680 2400 680
4940
3760
Rev :
Checked by :
Drawn by : Date :
Drawing number :
All Victaulic drawings and piping engineering submittals will be based on information furnished to us
and is provided solely as an aid to procurement and installation. The Victaulic Company is not responsible
for design by engineer of record, erection, or operation. Liability of Victaulic Company with reference to
descriptions, lengths, locations, dimensions, or any other data shown herein is limited to the amount
charged by Victaulic Company for producing the drawing in question. In the event of an order, Victaulic
products must be used in accordance with published specifications and Victaulic literature.
NOTE: Contractor to field verify all equipment configurations, nozzle locating dimensions and
elevations for conformance to Victaulic layout drawing(s) PRIOR TO CUTTING PIPE. Please notify
Victaulic Construction Piping Services Division for recommendations regarding any deviations.
Date :
Sheet :
St.60 Bodem
St.41 Flens Adapter Nippel
St.741 Flens Adapter
St.716H Terugslagklep
St.732 Y - Filter
St.761 MS Vlinderafsluiter Hendel
St.761 MS Vlinderafsluiter Tandwielkast
St.10 Bocht 90°
St.11 Bocht 45°
St.20 T - Stuk
St.25 Reduceer T - Stuk
St.50 Concentrisch Verloop
St.107 / 07 Rigide Koppeling
St.177 / 77 Flexibele Koppeling
Victaulic product legende :
Willemswerf
Rotterdam
Techniekruimte Koeling
( Isometrisch aanzichten )
15 - 76554 _ 02 _ MP01
M. Filek
P. Janssens
REV 0
15 / 01 / 2016
F
15 / 01 / 2016
A0 - MP01St.7340 Meetflens (Oventrop)
DETAIL VERDELER KOELTORENS
DETAIL KOELMACHINE 1
DETAIL POMPEN
DETAIL TSA DETAIL KOELMACHINE 2
DETAIL KOELTORENS OP STAALCONSTRUCTIE
Gekoeld water aanvoer
Gekoeld water retour
Condenser water
aanvoer
Condenser water Retour
No. Description Issued by Date
Com pany F lam co b.v.Type F lam c oClean F400
c apa city 7 31 ltro rder_code 2 8198
m ax.pressure 1 0bard iam eter 800
w idth
1220
h eight 1810c onnec tion D N400
R
S
T
Q
293031
Rev :
Checked by :
Drawn by : Date :
Drawing number :
Date :
Sheet :
SELFRIDGES & Co
Chiller room
Bag & Tag area 1
Bag & Tag area 1 - Chillers
CD - BT1
18/06/2015
18/06/2015
REV 0
P. Janssens
L. Luypaert
All Victaulic drawings and piping engineering submittals will be
based on information furnished to us and is provided solely as an aid to
procurement and installation. The Victaulic Company is not responsible for
design by engineer of record, erection, or operation. Liability of Victaulic
Company with reference to descriptions, lengths, locations, dimensions, or
any other data shown herein is limited to the amount charged by Victaulic
Company for producing the drawing in question. In the event of an order,
Victaulic products must be used in accordance with published
specifications and Victaulic literature.
NOTE: Contractor to field verify all equipment configurations,
nozzle locating dimensions and elevations for conformance to Victaulic
layout drawing(s) PRIOR TO CUTTING PIPE. Please notify Victaulic
Construction Piping Services Division for recommendations regarding
any deviations.
Issued by DateNo. Description
BAG & TAG
AREA 1
-
CHILLERS
CONTACT INFORMATION
Units B1 & B2,
SG1 Industrial Park
Cockerell Close
Gunnels Wood Road
Stevenage
Hertfordshire, UK
SG 1 2NB
44 1438 310 690
viceuro@victaulic.com
WHO WE ARE
VICTAULIC
Since 1919, Victaulic has been world’s leading producer of grooved mechanical couplings and pipe-joining systems.
Used in the most demanding markets, Victaulic innovative piping technologies put people to work faster while
increasing safety, ensuring reliability and maximizing efficiency. The company has 15 major manufacturing facilities,
28 branches worldwide and over 3,600 employees who speak 43 languages across the globe. With more than 1900
active global patents, Victaulic solutions are at work in 115 countries across diverse business lines including oil and
gas, chemical, mining, power generation, water and wastewater treatment, military and marine, as well as commercial
building and fire protection. Visit www.victaulic.com and follow us on LinkedIn, Facebook, Twitter, and YouTube.
VICTAULIC

More Related Content

What's hot

Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.maqsood1459
 
Welding qualification a
Welding qualification aWelding qualification a
Welding qualification aJithu John
 
Asme sec. ix bkr - 051010
Asme sec. ix   bkr - 051010Asme sec. ix   bkr - 051010
Asme sec. ix bkr - 051010Jithu John
 
ASPE CEU Pipe Hangers and Supports
ASPE CEU Pipe Hangers and SupportsASPE CEU Pipe Hangers and Supports
ASPE CEU Pipe Hangers and SupportsJim LeStage
 
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...DixitJoshi5
 
Well integrity in drilling and well operations
Well integrity in drilling and well operationsWell integrity in drilling and well operations
Well integrity in drilling and well operationsJuan Manuel Fuertes
 
Gardenworks water management forms 2014
Gardenworks water management forms 2014Gardenworks water management forms 2014
Gardenworks water management forms 2014Chuck Bowen
 
2015 asme-code-changes
2015 asme-code-changes2015 asme-code-changes
2015 asme-code-changesRita Sharan
 
Wps report
Wps reportWps report
Wps reportsohirooy
 
Merkel guide ring_guivex_kbk
Merkel guide ring_guivex_kbkMerkel guide ring_guivex_kbk
Merkel guide ring_guivex_kbkwalleseals
 
Engineering & Piping design
Engineering & Piping designEngineering & Piping design
Engineering & Piping designMusa Sabri
 
How to review wps part 1 (mau company)
How to review wps part 1 (mau company)How to review wps part 1 (mau company)
How to review wps part 1 (mau company)Mohamed Farouk
 
Safe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to FieldSafe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to FieldDesign World
 
Asmesectionix
Asmesectionix Asmesectionix
Asmesectionix Nuri Cesur
 

What's hot (20)

Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.Ms 12.doc 7.6.13.
Ms 12.doc 7.6.13.
 
Welding qualification a
Welding qualification aWelding qualification a
Welding qualification a
 
wps qualification metho
wps qualification methowps qualification metho
wps qualification metho
 
Asme sec. ix bkr - 051010
Asme sec. ix   bkr - 051010Asme sec. ix   bkr - 051010
Asme sec. ix bkr - 051010
 
ASPE CEU Pipe Hangers and Supports
ASPE CEU Pipe Hangers and SupportsASPE CEU Pipe Hangers and Supports
ASPE CEU Pipe Hangers and Supports
 
Norsok d-010u4 2013.en.02
Norsok d-010u4 2013.en.02Norsok d-010u4 2013.en.02
Norsok d-010u4 2013.en.02
 
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
WHAT IS ASME? WHO IS ASME? WHAT ASME SECTION IX MEANS? WHAT ARE WELDING DOCUM...
 
How to Qualify a Welding Procedure
How to Qualify a Welding ProcedureHow to Qualify a Welding Procedure
How to Qualify a Welding Procedure
 
Well integrity in drilling and well operations
Well integrity in drilling and well operationsWell integrity in drilling and well operations
Well integrity in drilling and well operations
 
Gardenworks water management forms 2014
Gardenworks water management forms 2014Gardenworks water management forms 2014
Gardenworks water management forms 2014
 
2015 asme-code-changes
2015 asme-code-changes2015 asme-code-changes
2015 asme-code-changes
 
Wps report
Wps reportWps report
Wps report
 
Merkel guide ring_guivex_kbk
Merkel guide ring_guivex_kbkMerkel guide ring_guivex_kbk
Merkel guide ring_guivex_kbk
 
Engineering & Piping design
Engineering & Piping designEngineering & Piping design
Engineering & Piping design
 
asme sec ix w
 asme sec ix w asme sec ix w
asme sec ix w
 
How to review wps part 1 (mau company)
How to review wps part 1 (mau company)How to review wps part 1 (mau company)
How to review wps part 1 (mau company)
 
Safe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to FieldSafe Hose Assemble: From Factory to Field
Safe Hose Assemble: From Factory to Field
 
How to produce PQR
How to produce PQRHow to produce PQR
How to produce PQR
 
Asmesectionix
Asmesectionix Asmesectionix
Asmesectionix
 
tubing SANDVIK
tubing SANDVIKtubing SANDVIK
tubing SANDVIK
 

Similar to Prefarbrication Partner

Ductware catalog connection_systems
Ductware catalog connection_systemsDuctware catalog connection_systems
Ductware catalog connection_systemsAndré Ferreira
 
PSI-130-30-0002-RC-R1_Agitators.pdf
PSI-130-30-0002-RC-R1_Agitators.pdfPSI-130-30-0002-RC-R1_Agitators.pdf
PSI-130-30-0002-RC-R1_Agitators.pdfromuloac
 
Power Generation_Project Brief Instructions 2015
Power Generation_Project Brief Instructions 2015Power Generation_Project Brief Instructions 2015
Power Generation_Project Brief Instructions 2015Graeme Simmers
 
CBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins PresentationCBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins PresentationDamian Coetzee
 
NWC-D-JCS-07-HIG-07005 C02
NWC-D-JCS-07-HIG-07005 C02NWC-D-JCS-07-HIG-07005 C02
NWC-D-JCS-07-HIG-07005 C02Michael McManus
 
Sika Waterbars®.pdf من شركه سيكا السعوديه
Sika Waterbars®.pdf من شركه سيكا السعوديهSika Waterbars®.pdf من شركه سيكا السعوديه
Sika Waterbars®.pdf من شركه سيكا السعوديهAhmed Khaskaya
 
Hydraulic Manual (Dec 2014)
Hydraulic Manual (Dec 2014)Hydraulic Manual (Dec 2014)
Hydraulic Manual (Dec 2014)Kai Li
 
Itt grinnell pipe hanger design & engineering 2008
Itt grinnell pipe hanger design & engineering 2008 Itt grinnell pipe hanger design & engineering 2008
Itt grinnell pipe hanger design & engineering 2008 ITTGRINNELL
 
Coke drum applications Claudio Allevato
Coke drum applications Claudio AllevatoCoke drum applications Claudio Allevato
Coke drum applications Claudio AllevatoMinacore
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)hepemod733
 
ACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standardACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standardssuser8685dc
 
Introduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdfIntroduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdfdeckyantony
 
Mauli Engineering Services Presentation
Mauli Engineering Services PresentationMauli Engineering Services Presentation
Mauli Engineering Services PresentationMauli Engineering
 
DFM & M-Flow Report-TQC ST Cap
DFM & M-Flow Report-TQC ST CapDFM & M-Flow Report-TQC ST Cap
DFM & M-Flow Report-TQC ST CapKanissh GK
 
INTEGRATING SLD WBS GANTT MOS BOQ TR
INTEGRATING SLD WBS GANTT MOS BOQ TRINTEGRATING SLD WBS GANTT MOS BOQ TR
INTEGRATING SLD WBS GANTT MOS BOQ TRHasanMersin2
 
Auxillary Transformer GTP & Drawings for Substation
Auxillary Transformer GTP & Drawings for SubstationAuxillary Transformer GTP & Drawings for Substation
Auxillary Transformer GTP & Drawings for SubstationDeelipZope
 

Similar to Prefarbrication Partner (20)

Ductware catalog connection_systems
Ductware catalog connection_systemsDuctware catalog connection_systems
Ductware catalog connection_systems
 
PSI-130-30-0002-RC-R1_Agitators.pdf
PSI-130-30-0002-RC-R1_Agitators.pdfPSI-130-30-0002-RC-R1_Agitators.pdf
PSI-130-30-0002-RC-R1_Agitators.pdf
 
Power Generation_Project Brief Instructions 2015
Power Generation_Project Brief Instructions 2015Power Generation_Project Brief Instructions 2015
Power Generation_Project Brief Instructions 2015
 
CBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins PresentationCBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins Presentation
 
NWC-D-JCS-07-HIG-07005 C02
NWC-D-JCS-07-HIG-07005 C02NWC-D-JCS-07-HIG-07005 C02
NWC-D-JCS-07-HIG-07005 C02
 
Sika Waterbars®.pdf من شركه سيكا السعوديه
Sika Waterbars®.pdf من شركه سيكا السعوديهSika Waterbars®.pdf من شركه سيكا السعوديه
Sika Waterbars®.pdf من شركه سيكا السعوديه
 
FLOTROM - Consultancy profile
FLOTROM - Consultancy profileFLOTROM - Consultancy profile
FLOTROM - Consultancy profile
 
14 mq11 02-te-0000-ee0012-0
14 mq11 02-te-0000-ee0012-014 mq11 02-te-0000-ee0012-0
14 mq11 02-te-0000-ee0012-0
 
Hydraulic Manual (Dec 2014)
Hydraulic Manual (Dec 2014)Hydraulic Manual (Dec 2014)
Hydraulic Manual (Dec 2014)
 
Itt grinnell pipe hanger design & engineering 2008
Itt grinnell pipe hanger design & engineering 2008 Itt grinnell pipe hanger design & engineering 2008
Itt grinnell pipe hanger design & engineering 2008
 
Coke drum applications Claudio Allevato
Coke drum applications Claudio AllevatoCoke drum applications Claudio Allevato
Coke drum applications Claudio Allevato
 
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)23.  CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
23. CIWPF-MPT-WPR-0023_21-Mar-24.pptx (SMARK)
 
AGP-13-R
AGP-13-RAGP-13-R
AGP-13-R
 
ACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standardACI 318-19 Presentation - changes to the concrete design standard
ACI 318-19 Presentation - changes to the concrete design standard
 
Introduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdfIntroduction to ASME VIII Div 1 (ATS).pdf
Introduction to ASME VIII Div 1 (ATS).pdf
 
Mauli Engineering Services Presentation
Mauli Engineering Services PresentationMauli Engineering Services Presentation
Mauli Engineering Services Presentation
 
DFM & M-Flow Report-TQC ST Cap
DFM & M-Flow Report-TQC ST CapDFM & M-Flow Report-TQC ST Cap
DFM & M-Flow Report-TQC ST Cap
 
INTEGRATING SLD WBS GANTT MOS BOQ TR
INTEGRATING SLD WBS GANTT MOS BOQ TRINTEGRATING SLD WBS GANTT MOS BOQ TR
INTEGRATING SLD WBS GANTT MOS BOQ TR
 
POWER SYSTEM.pdf
POWER SYSTEM.pdfPOWER SYSTEM.pdf
POWER SYSTEM.pdf
 
Auxillary Transformer GTP & Drawings for Substation
Auxillary Transformer GTP & Drawings for SubstationAuxillary Transformer GTP & Drawings for Substation
Auxillary Transformer GTP & Drawings for Substation
 

More from Graeme Simmers

Mining Market_MB-306 REV E
Mining Market_MB-306 REV EMining Market_MB-306 REV E
Mining Market_MB-306 REV EGraeme Simmers
 
Commercial Building Services_MB-100 Rev D
Commercial Building Services_MB-100 Rev DCommercial Building Services_MB-100 Rev D
Commercial Building Services_MB-100 Rev DGraeme Simmers
 
Commercial Building Services
Commercial Building ServicesCommercial Building Services
Commercial Building ServicesGraeme Simmers
 
StrengThin100 System - thinwall stainless
StrengThin100 System - thinwall stainlessStrengThin100 System - thinwall stainless
StrengThin100 System - thinwall stainlessGraeme Simmers
 
CPS - Faster from the Start
CPS - Faster from the StartCPS - Faster from the Start
CPS - Faster from the StartGraeme Simmers
 
Data Centers - Pipe Joining Solutions
Data Centers - Pipe Joining SolutionsData Centers - Pipe Joining Solutions
Data Centers - Pipe Joining SolutionsGraeme Simmers
 

More from Graeme Simmers (7)

Mining Market_MB-306 REV E
Mining Market_MB-306 REV EMining Market_MB-306 REV E
Mining Market_MB-306 REV E
 
Commercial Building Services_MB-100 Rev D
Commercial Building Services_MB-100 Rev DCommercial Building Services_MB-100 Rev D
Commercial Building Services_MB-100 Rev D
 
Revit invite
Revit inviteRevit invite
Revit invite
 
Commercial Building Services
Commercial Building ServicesCommercial Building Services
Commercial Building Services
 
StrengThin100 System - thinwall stainless
StrengThin100 System - thinwall stainlessStrengThin100 System - thinwall stainless
StrengThin100 System - thinwall stainless
 
CPS - Faster from the Start
CPS - Faster from the StartCPS - Faster from the Start
CPS - Faster from the Start
 
Data Centers - Pipe Joining Solutions
Data Centers - Pipe Joining SolutionsData Centers - Pipe Joining Solutions
Data Centers - Pipe Joining Solutions
 

Prefarbrication Partner

  • 2. PRE-CONSTRUCTION Information Required • Schematic drawing • Layout drawing • Technical datasheets 3D Design • Full 3D model in Revit • Drawing layout “For Approval” Advanced Bill of Material • Early stage Bill of Quantities • Avoid delivery problems • Estimation pricing package Pre-Fabrication Options • Loose Cut Lengths DESIGN BID Refrigerant lbs (kg) Total Weight (inc. Refrigerant) lbs (kg) Water Volume gal (l) Center of Gravity ins (mm) Evap Cond X Y Z Operating 635 (288) 11806 (5355) 61 (233) 56 (213) 50 (1278) 37 (945) 20 (510) Shipping 10823 (4909) - (-) - (-) 50 (1267) 37 (943) 21 (533) 4. 2.5 in. (64 mm) diameter lifting holes are provided. See installation manual for lifting instructions. 5. All water connections are given in standard U.S. pipe sizes. Standard connections are suitable for welding or grooved couplings. 6. Vibration isolator pads are provided for field installation (0.25 in (6 mm) thick when loaded). 7. If main power wiring is brought up through the floor, this wiring must be outside the envelope of the unit. 8. The shipping skid adds 4 in. (105 mm) to the overall unit height. 9. Dimensions shown are for units with standard 150 psi (1034 kPa) design water side pressure. Check factory for unit dimensions with higher pressures. 1. 1 in. (25 mm) FPT evaporator and condenser relief valves must be piped per ANSI/ASHRAE 15. 2. At a minimum, length of tube sheet to tube sheet dimensions is required at either end for tube removal, 36 in. (914 mm) is required at other end and each side and top for service. 3. Final connections must allow for 0.5 in. (12.7 mm) manufacturing tolerance. Product Drawing Unit Tag: Centrif 004 Sales Office: McQuay UK Operations Product: Water Cooled Centrifugal Chiller Project Name: Selfridges Sales Engineer: James Henley Model: WSC087M/E2609-2RB/C2209-2RB Date: 23/02/2015 Ver/Rev: Sheet: 1 of 5 Scale: NTS Tolerance: +/- 1.0” Dwg Units: in (mm) WSC087MAU47GYYLBE2609BE2RBC40446CCYAC2209CLYY2RBYYYC40965CCYYYYAA134064EY2LEYYAVLWYYYYY0534YM2B1YAXS31AB0502YPYYYYM0AYW000000000000JDNNNN No change to this drawing may be made unless approved in writing by McQuay UK Ltd. Purchaser must determine that the equipment is fit and sufficient for the job specifications Product Drawing Unit Tag: Centrif 004 Sales Office: McQuay UK Operations Product: Water Cooled Centrifugal Chiller Project Name: Selfridges Sales Engineer: James Henley Model: WSC087M/E2609-2RB/C2209-2RB Date: 23/02/2015 Ver/Rev: Sheet: 2 of 5 Scale: NTS Tolerance: +/- 1.0” Dwg Units: in (mm) WSC087MAU47GYYLBE2609BE2RBC40446CCYAC2209CLYY2RBYYYC40965CCYYYYAA134064EY2LEYYAVLWYYYYY0534YM2B1YAXS31AB0502YPYYYYM0AYW000000000000JDNNNN No change to this drawing may be made unless approved in writing by McQuay UK Ltd. Purchaser must determine that the equipment is fit and sufficient for the job specifications victaulic.com 06.23 7470 Rev C Updated 11/2015 © 2015 Victaulic Company . All rights reserved . ALWAYS REFER TO ANY NOTIFICA TIONS AT THE END OF THIS DOCUME NT REGARD ING PRODUC T INSTALL ATION, MAINTEN ANCE OR SUPPOR T. 2 - 12"/50 - 300 mm 1.0 PRODUCT DESCRIPTIONAvailable Sizes • 2 – 12"/50 – 300 mmPipe Material • Carbon steel, Stainless steelMaximum Working Pressure• Accommodates pressures ranging from full vacuum (29.9 in Hg/760 mm Hg) up to 750 psi/5171 kPa. • Working pressure dependent on material, wall thickness and size of pipe. Operating Temperature • Dependent on gasket selection from section 3.0. Function • Joins carbon steel and/or stainless steel pipe. • Provides a rigid pipe joint designed to restrict axial or angular movement. Pipe Preparation • Cut or roll grooved in accordance with Submittal 25.01: Victaulic Standard Groove Specifications. Codes and Requirements• Hanger support spacing corresponds to ASME B31.1 Power Piping Code and ASME B31.9 Building Services Piping Code. 2.0 CERTIFICATION/LISTINGS NOTES • See Submitta l 10.01: Victaulic Products for Fire Protectio n Piping Systems - Regulato ry Approval Referenc e Guide for details. • See Submitta l 02.06: Victaulic Potable Water Approval s ANSI/NS F for potable water approvals if applicabl e. Victaulic® QuickVic™ Rigid CouplingStyle 107N 06.23 1 System No. LocationSubmitted By Date Spec Section ParagraphApproved Date Rev : Checked by : Drawn by : Date : Drawing number : All Victaulic drawings and piping engineering submittals will be based on information furnished to us and is provided solely as an aid to procurement and installation. The Victaulic Company is not responsible for design by engineer of record, erection, or operation. Liability of Victaulic Company with reference to descriptions, lengths, locations, dimensions, or any other data shown herein is limited to the amount charged by Victaulic Company for producing the drawing in question. In the event of an order, Victaulic products must be used in accordance with published specifications and Victaulic literature. NOTE: Contractor to field verify all equipment configurations, nozzle locating dimensions and elevations for conformance to Victaulic layout drawing(s) PRIOR TO CUTTING PIPE. Please notify Victaulic Construction Piping Services Division for recommendations regarding any deviations. Date : Sheet : SELFRIDGES & Co Chiller Room Total - Isometric Views 15-76209 _ 05 _ Total 2-2 L. Luypaert P. Janssens REV 0 18/06/2015 18/06/2015 CD-Total2-2 Total isometric view Detail secondary chilled water pumps Detail condenser water pumps Detail Primary chilled water pumps Detail chiller connections Victaulic check valve Victaulic butterfly valve Non - Victaulic actuated valve Victaulic wye strainer Victaulic check valve Victaulic butterfly valve Victaulic wye strainer Victaulic butterfly valve Victaulic check valve Victaulic butterfly valve Victaulic wye strainer Victaulic butterfly valve Victaulic wye strainer Victaulic butterfly valve Victaulic check valve CH - 01 CH - 02 CH - 03 CH - 04 PP - 01 PP - 02 PP - 03 PP - 04 CP - 01 CP - 02 CP - 03 CP - 04 ADS - 01 SP - 06/07 SP - 01 SP - 05 SP - 02 SP - 04 SP - 03 Heat meters Heat meter No. Description Issued by Date 1 Revision 1 Date 1 Info Customer : Schematic drawing Layout drawing Technical Datasheets ABOM : Early stage BOQ Avoid delivery problems 3D Design + Drawings for approval : Full 3D model in Revit Drawing layout “ For Approval “ Pre-Fabrication service: Increase productivity on site Construction BOM + Cut lengths BOM’s/ Cut lengths by area for ordering/pre-fabrication purpose Area 1 Project meeting Reality check structural & civil situation ection Service etal to Metal requirement Offset rigid couplings Fabrication Service Explanation - REV0 15/12/2015 on Cell s d fittings Cut Lengths • Fabrication Spools • Skids / Modules Fab Spools Prefabrication
  • 3. CONTRACTOR DELIVERY CONSTRUCTION 3D Drawings for Approval Victaulic Fabrication Spools • Pre-cut pipes • Pre-installed fittings & valves Skids / Modules Construction BOM BOM’s/ Cut length ordering/pre-fabric Victaulic Fabrication Cell Pre cut pipes VicSticks: Pre installed fittings C B or Victaulic Fabrication Cell Pre cut pipes VicSticks: Pre installed fittings n + Drawings for approval : odel in Revit ayout “ For Approval “ Pre-Fabrication service: Increase productivity on site Area 1 Project meeting Fabrication Service Explanation - REV0 15/12/2015 n + Drawings for approval : odel in Revit ayout “ For Approval “ Pre-Fabrication service: Increase productivity on site Area 1 Project meeting Fabrication Service Explanation - REV0 15/12/2015 n + Drawings for approval : odel in Revit ayout “ For Approval “ Pre-Fabrication service: Increase productivity on site Area 1 Project meeting Fabrication Service Explanation - REV0 15/12/2015 • BOMs / Cut lengths by area for ordering / pre-fabrication purpose Koelmachine 2 Koelmachine 1 TSA Koeltoren 1 Koeltoren 2 1880 13344 1503419578 513584 943           1405 798330 286367 702          2851292375 608 522 296 13 B 845160016008951600 2000 680 2400 680 4940 3760 Rev : Checked by : Drawn by : Date : Drawing number : All Victaulic drawings and piping engineering submittals will be based on information furnished to us and is provided solely as an aid to procurement and installation. The Victaulic Company is not responsible for design by engineer of record, erection, or operation. Liability of Victaulic Company with reference to descriptions, lengths, locations, dimensions, or any other data shown herein is limited to the amount charged by Victaulic Company for producing the drawing in question. In the event of an order, Victaulic products must be used in accordance with published specifications and Victaulic literature. NOTE: Contractor to field verify all equipment configurations, nozzle locating dimensions and elevations for conformance to Victaulic layout drawing(s) PRIOR TO CUTTING PIPE. Please notify Victaulic Construction Piping Services Division for recommendations regarding any deviations. Date : Sheet : St.60 Bodem St.41 Flens Adapter Nippel St.741 Flens Adapter St.716H Terugslagklep St.732 Y - Filter St.761 MS Vlinderafsluiter Hendel St.761 MS Vlinderafsluiter Tandwielkast St.10 Bocht 90° St.11 Bocht 45° St.20 T - Stuk St.25 Reduceer T - Stuk St.50 Concentrisch Verloop St.107 / 07 Rigide Koppeling St.177 / 77 Flexibele Koppeling Victaulic product legende : Willemswerf Rotterdam Techniekruimte Koeling ( Isometrisch aanzichten ) 15 - 76554 _ 02 _ MP01 M. Filek P. Janssens REV 0 15 / 01 / 2016 F 15 / 01 / 2016 A0 - MP01St.7340 Meetflens (Oventrop) DETAIL VERDELER KOELTORENS DETAIL KOELMACHINE 1 DETAIL POMPEN DETAIL TSA DETAIL KOELMACHINE 2 DETAIL KOELTORENS OP STAALCONSTRUCTIE Gekoeld water aanvoer Gekoeld water retour Condenser water aanvoer Condenser water Retour No. Description Issued by Date Com pany F lam co b.v.Type F lam c oClean F400 c apa city 7 31 ltro rder_code 2 8198 m ax.pressure 1 0bard iam eter 800 w idth 1220 h eight 1810c onnec tion D N400 R S T Q 293031 Rev : Checked by : Drawn by : Date : Drawing number : Date : Sheet : SELFRIDGES & Co Chiller room Bag & Tag area 1 Bag & Tag area 1 - Chillers CD - BT1 18/06/2015 18/06/2015 REV 0 P. Janssens L. Luypaert All Victaulic drawings and piping engineering submittals will be based on information furnished to us and is provided solely as an aid to procurement and installation. The Victaulic Company is not responsible for design by engineer of record, erection, or operation. Liability of Victaulic Company with reference to descriptions, lengths, locations, dimensions, or any other data shown herein is limited to the amount charged by Victaulic Company for producing the drawing in question. In the event of an order, Victaulic products must be used in accordance with published specifications and Victaulic literature. NOTE: Contractor to field verify all equipment configurations, nozzle locating dimensions and elevations for conformance to Victaulic layout drawing(s) PRIOR TO CUTTING PIPE. Please notify Victaulic Construction Piping Services Division for recommendations regarding any deviations. Issued by DateNo. Description BAG & TAG AREA 1 - CHILLERS
  • 4. CONTACT INFORMATION Units B1 & B2, SG1 Industrial Park Cockerell Close Gunnels Wood Road Stevenage Hertfordshire, UK SG 1 2NB 44 1438 310 690 viceuro@victaulic.com WHO WE ARE VICTAULIC Since 1919, Victaulic has been world’s leading producer of grooved mechanical couplings and pipe-joining systems. Used in the most demanding markets, Victaulic innovative piping technologies put people to work faster while increasing safety, ensuring reliability and maximizing efficiency. The company has 15 major manufacturing facilities, 28 branches worldwide and over 3,600 employees who speak 43 languages across the globe. With more than 1900 active global patents, Victaulic solutions are at work in 115 countries across diverse business lines including oil and gas, chemical, mining, power generation, water and wastewater treatment, military and marine, as well as commercial building and fire protection. Visit www.victaulic.com and follow us on LinkedIn, Facebook, Twitter, and YouTube. VICTAULIC