1. GaneshJ.P.
Contact:8939663071~Email:ganeshpatelj@gmail.com.
-------------------------------------------------------------------------------------------------------------------------------
SeekingchallengingassignmentsinIndustrialanddetailedEngineering/Partownershipfor
manufacturingengineering withorganizationof highrepute preferableinprocess re-engineeringMNC.
Profile Summary
10 yearsof experience inIndustrial Engineering,Process Engineering,Projectexecution,Production
Management,OperationManagement,QualityManagementandProcessControl
Knowledge of developing, implementing and maintaining methods, operation sequence and
processes in the Business Process service industry.
In-depthunderstandof Processdeterminingthe time standardsandmakesrecommendationfor
betterresource utilization.
Knowledgeof developingandimplementingthe SOP’s/qualitysystem, processdesign,ReadingP&ID
to meetthe qualitystandard.
Effective communicator&negotiatorwithstronganalytical,problem solvingand organizational
abilities.
Core Competencies
Operation Management
It involvesthe responsibilityof ensuringthatbusinessoperationare efficientintermof usingas
fewresourcesasneededandeffectiveintermof meetingcustomerrequirement.
It isconcernedwithmanagingthe processthatconvertinputsintoOutput.
Industrial Engineering
Determinestimestandardsandmakesrecommendationforbetterresource utilizationandprocess
optimization/re-engineeringbasedonIndustrial Engineeringtoolsandmethods.
To maintainsrecordsandreportingsystemsforcoordinationof service delivery operations.
Quality Assurance
Identifyingthe areaof obstructions/Qualityfailure,advisingonthe system&processchangesfor
qualitative improvement.
To Supports/drivesoperational excellenceinitiativesbyprovidingasoliddecisionbase and
opportunityassessments.
Strong Knowledge in 5S, LEAN, PDCA, Kaizen activities, VSM and Six-Sigma.
OrganizationalExperience
Since Sep’12 with HewlettPackard Enterprises,Chennai as Mfg. /Industrial Engineer.
Key ResultAreas:
Carryingout the requirementanalysison understanding, developing,maintainingthe methods,
operationsequence andprocesscapabilities.
Ascertainingthe preparationof time standardsandmakesrecommendationforbetterresource
utilizationandprocessoptimization/re-engineeringbasedonIndustrialEngineeringtoolsand
2. GaneshJ.P.
Contact:8939663071~Email:ganeshpatelj@gmail.com.
-------------------------------------------------------------------------------------------------------------------------------
methods.
Developedsubjectmatterknowledge andIndustrial Engineeringknowledgetodrive the cost
effectivenessof Businessprocess service andoptimizesthe output(e.g.productivity).
Highlights:
Significantlycontributedinthe:
Implementationof Global Operatingmodel forClientsand standardization of the process.
Preparingthe time standardsandmakesrecommendationforbetterresource byidentifyingvalue
add and NonValue addactives.
Implementationof Costeffective processdesignbyprocessoptimization.
From Aug’10 to Sep’12 Triumph International (India) Pvt, Ltd, Chennai as Sr. Process Engineer.
Key ResultAreas:
Main ResponsibilityisachievingMaximumPlantEfficiencythroughrecognizedIETechniques.
Preparingline planandworkstationlayout.
PerformingTime &MotionStudy to arrive Capacity,StandardTime & Targets
Productlayout,Plantlayout,MethoddocumentationsandLine Balancing
OperationbreakdownforvariousStyles
Balancedthe line bycloselymonitoredthe WIPinthe line andAbsenteeism.
From July’07 to Aug’12 Gokaldas Export (India) Pvt, Ltd, Bangalore as SeniorIndustrial Engineer
.Key ResultAreas:
To fix Man Power& Man powerbalancing.
Productionplanning&control of allocatedstyles.
Productlayout,Plantlayout,MethoddocumentationsandLine Balancing.
To studypeople’sefficiencyintheirworkingenvironment(use Ergonomics).
Responsible forincreasingproductivitythroughcombinedworksteps,removingnon-valueadded
tasksand the developmentof effective workpractices
Monitoredequipmentdowntimeand implementedcorrective actionprocedures.
Monitoredmachine utilizationandprovidingdetailedbi-monthlyreportsonmachine downtime.
Analysisof Operatorperformance,BatchPerformance andefficiency.Periodical analysisof factory
efficiencybytaking Motionstudies(TimestudyandMethodstudy),etc.
Prepare orderwise actual costand profitabilityreports.
Reduce the waste intermof overinventory,waitingtime,overprocessing,andoptimumutilization
of man andmachineriesimplementedthe onlinepacking
Academic Details
BE (Mechanical) fromCSICollage of EngineeringinCoimbatore inApril2003.
Diploma in Mechanical Engineering from Al-Ameen institute of technology in April 2000.
IT Skills