MACHINE PERFORMANCE 
By Ir. Gan Chun Chet
MACHINE PERFORMANCE 
• IMPROVING YOUR MACHINE PERFORMANCE 
BY KNOWING IT FIRST 
• KNOWING THE CAPACITY TO PLAN AHEAD
MACHINE PERFORMANCE : RATIOS 
• UNDERSTANDING THE RATIOS 
• RATIO OF PRODUCT CHANGE (To/Ts) 
To = OPERATING TIME 
Ts = SETUP TIME 
• INDICATES THE OPERATING TIME OVER THE 
SETUP TIME
MACHINE PERFORMANCE : RATIOS 
• RATIO OF NUMBER OF SETUPS AND 
PRODUCTS (Ts/Np) 
Ts = NUMBERS OF SETUP 
Np = NUMBER OF PRODUCTS 
• INDICATES THE RATIO OF MACHINE SETUPS 
AND THE NUMBER OF PRODUCT PRODUCED 
BY THE MACHINE
MACHINE PERFORMANCE : PERFORMANCE 
INDICATOR 
• MACHINE PERFORMANCE = (To/Tt) * 100 
PERFORMANCE OF THE MACHINE IN PERCENTAGE 
(%) 
• OPERATING HOURS To 
To = Tt – (Ti + Tm + Ts) 
MACHINE TOTAL PRODUCTION HOURS Tt 
MACHINE IDLE TIME Ti 
MACHINE MAINTENANCE TIME Tm 
MACHINE SETUP TIME Ts
MACHINE PERFORMANCE : PERFORMANCE 
VARIABLES 
• MACHINE TOTAL PRODUCTION HOURS Tt (FIXED) 
TOTAL WORKING DAYS IN HOURS 
• MACHINE IDLE TIME Ti (VARIABLE) 
NO PRODUCTION SCHEDULE 
• MACHINE MAINTENANCE TIME Tm (VARIABLE) 
DEPENDING ON THE TYPE OF MAINTENANCE WORK 
• MACHINE SETUP TIME Ts (REPETITIVE) 
MONITORING REQUIRED
MACHINE PERFORMANCE : MONITORING SETUP 
TIME – STATISTIC 
• STATISTICAL TECHNIQUES 
• MAXIMUM SETUP TIME 
THE MAXIMUM TIME OF THE SETUPS 
• MINIMUM SETUP TIME 
THE MINIMUM TIME OF THE SETUPS 
• AVERAGE SETUP TIME 
• THE AVERAGE TIME OF THE SETUPS
MACHINE PERFORMANCE : MONITORING SETUP 
TIME – PREDICTION/FORECASTING 
• PREDICTION TECHNIQUE 
• CATEGORY MODE OCCURRENCE 
THE LOCATION OF THE MOST FREQUENT SETUP TIME 
• DEVIATION FROM ACTUAL BY MOVING AVERAGE 
AVERAGE OF TWO ACTUAL PASTS CALCULATED WITH 
VARYING DEVIATION 
DEVIATION FROM ACTUAL BY EXPONENTIAL SMOOTHING 
THE FRACTION OF ONE (1) GUESS OR PAST AND AN ACTUAL 
CURRENT WITH VARING DEVIATION
MACHINE PERFORMANCE : MONITORING SETUP 
TIME – PREDICTION/FORECASTING 
• PROBABILITY OF UP OR DOWN 
THE POSSIBILITIES OF EITHER AN UP, DOWN OR 
UNCHANGE COUNTED TO KNOW THE PROBABILITY 
• ANGLE OF INCLINATION 
THE SLOPE OF EACH POINT MOVEMENT, WHETHER IS 
LOCATED AT VERY HIGH ANGLE, HIGH ANGLE, LOW 
ANGLE (NEGATIVE) OR A MODERATE LOW ANGLE
MACHINE PERFORMANCE : MONITORING SETUP 
TIME – DIAGNOSE THE REPETITIVE TASKS 
• TWO TIME HIGH WITHIN THE LIMITS 
TWO TIMES THE SETUP TIME INCREASES WHETHER 
WITHIN AN UPPER LIMIT OR LOWER LIMIT WHICH IS 
A DEVIATION FROM A CHANGING MEAN TIME 
• WARNING LEVEL 
A PREDETERMINE SETPOINT TO WARN USER.
MACHINE PERFORMANCE : 
PERFORMANCE CHART 
Performance Chart 
10200 
10000 
9800 
9600 
9400 
9200 
9000 
8800 
0 500 1000 1500 
SIMULATION 
Setup Time (Ts) 
Operating Hours (To) 
Operating Hours 
(To=Tp-Ts) 
Performance Chart 
10000 
9800 
9600 
9400 
9200 
9000 
8800 
0 20 40 60 80 100 
Production Hours/ Setup Hours (Tp/Ts) 
Operating Hours (To) 
Ratio (Tp/Ts)
MACHINE PERFORMANCE : 
PERFORMANCE CHART 
Ratio 
12.0 
10.0 
8.0 
6.0 
4.0 
2.0 
0.0 
0 5 10 15 
Number of Product 
Setup/Product 
Setup/Product 1 
Setup/Product 2 
Ratio 
50.0 
45.0 
40.0 
35.0 
30.0 
25.0 
20.0 
15.0 
10.0 
5.0 
0.0 
0 2 4 6 8 10 12 
Number of Product 
Operating/Product 
Operating/Product 1 
Operating/Product 2 
SIMULATION
MACHINE PERFORMANCE : 
PERFORMANCE CHART 
Operating Product 
100 
80 
60 
40 
20 
0 
0 5 10 15 
Number of Products 
Operating Time 
10 Setups 
20 Setups 
30 Setups 
• MORE SETUP, REDUCE 
OPERATING TIME 
• NOTE RATIO OF 
PRODUCTION AND SETUP 
HOURS CHART 
SIMULATION
MACHINE PERFORMANCE : 
PERFORMANCE CHART 
Warning Level 
15 15 15 15 15 15 15 15 15 15 
14.0 
18.5 
11.4 
10.8 
18.9 
11.3 
15.8 
3.1 
15.0 
12.4 
20.0 
18.0 
16.0 
14.0 
12.0 
10.0 
8.0 
6.0 
4.0 
2.0 
0.0 
0 2 4 6 8 10 12 
Number of Setups 
Time (Hours) 
Actual Time 
Warning Level 
SIMULATION
MACHINE PERFORMANCE : 
PERFORMANCE CHART 
Distribution of Hours 
2.3 
7.6 
3.4 
87 
100% 
80% 
60% 
40% 
20% 
0% 
1 
Machine 
Percentage (%) 
Percentage of Hours Spent On 
Setups (Tsn/Ttn*100) 
Percentage of Hours Spent On 
Maintenance Time (Tmn/Ttn*100) 
Percentage Machine Left Idle 
(Tin/Ttn*100) 
Machine Performance (Ton/Ttn) 
SIMULATION
MACHINE PERFORMANCE : 
PERFORMANCE CHART 
Upper and Lower Limits 
32.8 32.8 32.8 32.8 32.8 32.8 32.8 32.8 32.8 
25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 
17.3 17.3 17.3 17.3 17.3 17.3 17.3 17.3 17.3 17.3 
9.7 
19.2 
22.9 
9.6 9.6 9.6 9.6 9.6 9.6 9.6 9.6 9.6 
8.5 
16.6 
14.5 14.2 
23.3 
15.7 
13.4 
28.8 
32.1 
12.3 
19.8 
17.4 
16.5 
26.4 
18.1 
15.0 
9.6 
13.7 
4.7 
13.4 
11.5 11.8 
20.1 
13.2 
11.7 
27.8 
32.8 
15.2 
24.0 
21.5 21.0 
31.1 
23.1 
20.5 
10.6 
12.9 
1.8 
9.2 
7.4 7.3 
15.4 
8.2 
6.2 
1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 
35.0 
30.0 
25.0 
20.0 
15.0 
10.0 
5.0 
0.0 
0 2 4 6 8 10 12 
Number of Setup 
Time 
Actual Machine Setup Time 
Upper Limit (Moving Average) 
Low er Limit (Moving Average) 
Upper Limit (Exp Smoothing) 
Low er Limit (Exp Smoothing) 
Category 1 / 
Category 1 / / 2 / 
Category 2 / / 3 / 
Category 3 / / 4 / 
Category 4 / 
SIMULATION
MACHINE PERFORMANCE 
• KNOW WHAT IS ACCEPTABLE 
• MONITOR TO SEE WHETHER IT IS LOCATED AT 
YOUR MEAN PERFORMANCE 
• IDENTIFY THE IMPROVEMENT EITHER 
POSSIBLE OF NOT
MACHINE PERFORMANCE 
• STRATEGY 
• MORE OPERATION TIME 
• MORE SETUPS 
• KNOW YOUR MEAN
MACHINE PERFORMANCE 
• COST OF OPERATION 
• LINK TO TIME (POSSIBLE?) 
• EXAMPLE: 
• REDUCE SETUP? 
• INCREASE FLEXIBILTY?
MACHINE PERFORMANCE 
• KNOW YOUR MACHINE PERFORMANCE 
• KNOW YOUR MEAN PERFORMANCE 
• KNOW THE ESTIMATED PREDICTION
MACHINE PERFORMANCE 
• KNOW THE CAPACITY 
• PLAN AHEAD
MACHINE PERFORMANCE 
• EXCEL FILE – THE PURPOSE 
• ARTICLE – PREDICTIVE TECHNIQUE

More Related Content

What's hot

Cnc 4-g cod language -hiast
Cnc 4-g cod language -hiastCnc 4-g cod language -hiast
Cnc 4-g cod language -hiastahmad almaleh
 
General Purpose Lab Centrifuge
General Purpose Lab CentrifugeGeneral Purpose Lab Centrifuge
General Purpose Lab Centrifugeacmasindia
 
Microfuge Centrifuge by ACMAS Technologies Pvt Ltd.
Microfuge Centrifuge by ACMAS Technologies Pvt Ltd.Microfuge Centrifuge by ACMAS Technologies Pvt Ltd.
Microfuge Centrifuge by ACMAS Technologies Pvt Ltd.Acmas Technologies Pvt. Ltd.
 
T_STANDALONE_AXIS-ASME-RTTB01800202PAS0367-data-v1.1
T_STANDALONE_AXIS-ASME-RTTB01800202PAS0367-data-v1.1T_STANDALONE_AXIS-ASME-RTTB01800202PAS0367-data-v1.1
T_STANDALONE_AXIS-ASME-RTTB01800202PAS0367-data-v1.1Patrick Volluz
 
ACT Aero 2010
ACT Aero 2010ACT Aero 2010
ACT Aero 2010mmogle
 
WQD2011 - INNOVATION - EMAL - Torque measuring device
WQD2011 - INNOVATION - EMAL - Torque measuring deviceWQD2011 - INNOVATION - EMAL - Torque measuring device
WQD2011 - INNOVATION - EMAL - Torque measuring deviceDubai Quality Group
 
Harmonic hpf series_specsheet
Harmonic hpf series_specsheetHarmonic hpf series_specsheet
Harmonic hpf series_specsheetElectromate
 
Description of Enefit-280 technology
Description of Enefit-280 technologyDescription of Enefit-280 technology
Description of Enefit-280 technologyHanno Luukas
 
súng vặn bulong, xiết bulong,súng gõ xĩ
súng vặn bulong, xiết bulong,súng gõ xĩsúng vặn bulong, xiết bulong,súng gõ xĩ
súng vặn bulong, xiết bulong,súng gõ xĩBac Ngo Sy
 
Product Bulletin Ametek 119655-00
Product Bulletin Ametek 119655-00Product Bulletin Ametek 119655-00
Product Bulletin Ametek 119655-00Eddy Suwito AS
 
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...ATIF HUSSAIN
 
Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... ...
Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... ...Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... ...
Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... ...ATIF HUSSAIN
 
Toyota 8 fg35n forklift service repair manual
Toyota 8 fg35n forklift service repair manualToyota 8 fg35n forklift service repair manual
Toyota 8 fg35n forklift service repair manualudfjjdjkskkemmd
 

What's hot (20)

Summer training KIET
Summer training KIETSummer training KIET
Summer training KIET
 
Cnc 4-g cod language -hiast
Cnc 4-g cod language -hiastCnc 4-g cod language -hiast
Cnc 4-g cod language -hiast
 
General Purpose Lab Centrifuge
General Purpose Lab CentrifugeGeneral Purpose Lab Centrifuge
General Purpose Lab Centrifuge
 
Wagner`s shaking machine
Wagner`s shaking machineWagner`s shaking machine
Wagner`s shaking machine
 
Microfuge Centrifuge by ACMAS Technologies Pvt Ltd.
Microfuge Centrifuge by ACMAS Technologies Pvt Ltd.Microfuge Centrifuge by ACMAS Technologies Pvt Ltd.
Microfuge Centrifuge by ACMAS Technologies Pvt Ltd.
 
Sadguruppt
SadgurupptSadguruppt
Sadguruppt
 
T_STANDALONE_AXIS-ASME-RTTB01800202PAS0367-data-v1.1
T_STANDALONE_AXIS-ASME-RTTB01800202PAS0367-data-v1.1T_STANDALONE_AXIS-ASME-RTTB01800202PAS0367-data-v1.1
T_STANDALONE_AXIS-ASME-RTTB01800202PAS0367-data-v1.1
 
ACT Aero 2010
ACT Aero 2010ACT Aero 2010
ACT Aero 2010
 
Stroboscope by ACMAS Technologies Pvt Ltd.
Stroboscope by ACMAS Technologies Pvt Ltd.Stroboscope by ACMAS Technologies Pvt Ltd.
Stroboscope by ACMAS Technologies Pvt Ltd.
 
Presentation Nov
Presentation NovPresentation Nov
Presentation Nov
 
DAINFERN - WESTERN SKYLIGHT
DAINFERN - WESTERN SKYLIGHTDAINFERN - WESTERN SKYLIGHT
DAINFERN - WESTERN SKYLIGHT
 
WQD2011 - INNOVATION - EMAL - Torque measuring device
WQD2011 - INNOVATION - EMAL - Torque measuring deviceWQD2011 - INNOVATION - EMAL - Torque measuring device
WQD2011 - INNOVATION - EMAL - Torque measuring device
 
Harmonic hpf series_specsheet
Harmonic hpf series_specsheetHarmonic hpf series_specsheet
Harmonic hpf series_specsheet
 
Description of Enefit-280 technology
Description of Enefit-280 technologyDescription of Enefit-280 technology
Description of Enefit-280 technology
 
súng vặn bulong, xiết bulong,súng gõ xĩ
súng vặn bulong, xiết bulong,súng gõ xĩsúng vặn bulong, xiết bulong,súng gõ xĩ
súng vặn bulong, xiết bulong,súng gõ xĩ
 
Fanuc g code
Fanuc g codeFanuc g code
Fanuc g code
 
Product Bulletin Ametek 119655-00
Product Bulletin Ametek 119655-00Product Bulletin Ametek 119655-00
Product Bulletin Ametek 119655-00
 
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
Projects Department Weekly Report - SVC AlJouf-2, Dynamic and Static Rea... d...
 
Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... ...
Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... ...Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... ...
Projects Department Weekly Report - SVC Hail-2, Dynamic and Static React.... ...
 
Toyota 8 fg35n forklift service repair manual
Toyota 8 fg35n forklift service repair manualToyota 8 fg35n forklift service repair manual
Toyota 8 fg35n forklift service repair manual
 

Similar to Production - Reducing Machine Setup Time - IEM

Hitachi Zaxis ZX450-3 Zx870 Excavator Service Manual.pdf
Hitachi Zaxis ZX450-3 Zx870 Excavator Service Manual.pdfHitachi Zaxis ZX450-3 Zx870 Excavator Service Manual.pdf
Hitachi Zaxis ZX450-3 Zx870 Excavator Service Manual.pdfExcavator
 
Hitachi Zaxis ZX140-3 Zx310 Excavator Service Manual.pdf
Hitachi Zaxis ZX140-3 Zx310 Excavator Service Manual.pdfHitachi Zaxis ZX140-3 Zx310 Excavator Service Manual.pdf
Hitachi Zaxis ZX140-3 Zx310 Excavator Service Manual.pdfExcavator
 
Hitachi Zaxis ZX70-3 to Zx350 Excavator Service Manual.pdf
Hitachi Zaxis ZX70-3 to Zx350 Excavator Service Manual.pdfHitachi Zaxis ZX70-3 to Zx350 Excavator Service Manual.pdf
Hitachi Zaxis ZX70-3 to Zx350 Excavator Service Manual.pdfExcavator
 
Value stream mapping (future state)
Value stream mapping (future state)Value stream mapping (future state)
Value stream mapping (future state)nestor martinez
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)MohammedLahssaini1
 
MTM & Lean Application Case Studies
MTM & Lean Application Case StudiesMTM & Lean Application Case Studies
MTM & Lean Application Case StudiesTmtm Tmtm
 
Value stream mapping (current state)
Value stream mapping (current state)Value stream mapping (current state)
Value stream mapping (current state)nestor martinez
 
PLC problem troubleshooting
PLC problem troubleshooting PLC problem troubleshooting
PLC problem troubleshooting shashank tiwari
 
Cnc Milling (Heidenhain ISO)
Cnc Milling (Heidenhain ISO)Cnc Milling (Heidenhain ISO)
Cnc Milling (Heidenhain ISO)NavinBurnwal1
 
relayr IOT solutions - industrial performance optimization
relayr IOT solutions - industrial performance optimizationrelayr IOT solutions - industrial performance optimization
relayr IOT solutions - industrial performance optimizationJens Mueller
 
Factory analysis simulation 2
Factory analysis simulation 2Factory analysis simulation 2
Factory analysis simulation 2Ra'uf Tailony
 
Design improvements and costing analysis
Design improvements and costing analysisDesign improvements and costing analysis
Design improvements and costing analysisASHISH MENKUDALE
 
Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...
Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...
Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...Eylül Ceren Altın
 
Toyota 8 fg50n forklift service repair manual
Toyota 8 fg50n forklift service repair manualToyota 8 fg50n forklift service repair manual
Toyota 8 fg50n forklift service repair manualfhjsjkdmemm
 

Similar to Production - Reducing Machine Setup Time - IEM (20)

Hitachi Zaxis ZX450-3 Zx870 Excavator Service Manual.pdf
Hitachi Zaxis ZX450-3 Zx870 Excavator Service Manual.pdfHitachi Zaxis ZX450-3 Zx870 Excavator Service Manual.pdf
Hitachi Zaxis ZX450-3 Zx870 Excavator Service Manual.pdf
 
Hitachi Zaxis ZX140-3 Zx310 Excavator Service Manual.pdf
Hitachi Zaxis ZX140-3 Zx310 Excavator Service Manual.pdfHitachi Zaxis ZX140-3 Zx310 Excavator Service Manual.pdf
Hitachi Zaxis ZX140-3 Zx310 Excavator Service Manual.pdf
 
Hitachi Zaxis ZX70-3 to Zx350 Excavator Service Manual.pdf
Hitachi Zaxis ZX70-3 to Zx350 Excavator Service Manual.pdfHitachi Zaxis ZX70-3 to Zx350 Excavator Service Manual.pdf
Hitachi Zaxis ZX70-3 to Zx350 Excavator Service Manual.pdf
 
Haeger Profit Center
Haeger Profit CenterHaeger Profit Center
Haeger Profit Center
 
Value stream mapping (future state)
Value stream mapping (future state)Value stream mapping (future state)
Value stream mapping (future state)
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
 
MTM & Lean Application Case Studies
MTM & Lean Application Case StudiesMTM & Lean Application Case Studies
MTM & Lean Application Case Studies
 
ZIPPTORK Torque controller and monitoring system - 2020 Update
ZIPPTORK Torque controller and monitoring system - 2020 UpdateZIPPTORK Torque controller and monitoring system - 2020 Update
ZIPPTORK Torque controller and monitoring system - 2020 Update
 
ZIPPTORK Torque control system catalog 2021 Edition
ZIPPTORK Torque control system catalog 2021 EditionZIPPTORK Torque control system catalog 2021 Edition
ZIPPTORK Torque control system catalog 2021 Edition
 
Value stream mapping (current state)
Value stream mapping (current state)Value stream mapping (current state)
Value stream mapping (current state)
 
ZIPPTORK Torque Control System Catalogue - Oct 2020 Edition
ZIPPTORK Torque Control System Catalogue - Oct 2020 EditionZIPPTORK Torque Control System Catalogue - Oct 2020 Edition
ZIPPTORK Torque Control System Catalogue - Oct 2020 Edition
 
PLC problem troubleshooting
PLC problem troubleshooting PLC problem troubleshooting
PLC problem troubleshooting
 
Cnc Milling (Heidenhain ISO)
Cnc Milling (Heidenhain ISO)Cnc Milling (Heidenhain ISO)
Cnc Milling (Heidenhain ISO)
 
ZIPPTORK Torque control system catalog - July 2021
ZIPPTORK Torque control system catalog - July 2021ZIPPTORK Torque control system catalog - July 2021
ZIPPTORK Torque control system catalog - July 2021
 
relayr IOT solutions - industrial performance optimization
relayr IOT solutions - industrial performance optimizationrelayr IOT solutions - industrial performance optimization
relayr IOT solutions - industrial performance optimization
 
Factory analysis simulation 2
Factory analysis simulation 2Factory analysis simulation 2
Factory analysis simulation 2
 
Design improvements and costing analysis
Design improvements and costing analysisDesign improvements and costing analysis
Design improvements and costing analysis
 
Fadal Siemens Control Touch Probe Manual
Fadal Siemens Control Touch Probe ManualFadal Siemens Control Touch Probe Manual
Fadal Siemens Control Touch Probe Manual
 
Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...
Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...
Performance and Efficiency Analysis with Value Stream Mapping for Increasing ...
 
Toyota 8 fg50n forklift service repair manual
Toyota 8 fg50n forklift service repair manualToyota 8 fg50n forklift service repair manual
Toyota 8 fg50n forklift service repair manual
 

More from Gan Chun Chet

Trust Measurement Presentation_Part 3
Trust Measurement Presentation_Part 3Trust Measurement Presentation_Part 3
Trust Measurement Presentation_Part 3Gan Chun Chet
 
Predicting Machine Setup Time_Suggeting A Limit Determiner, Institute of Engi...
Predicting Machine Setup Time_Suggeting A Limit Determiner, Institute of Engi...Predicting Machine Setup Time_Suggeting A Limit Determiner, Institute of Engi...
Predicting Machine Setup Time_Suggeting A Limit Determiner, Institute of Engi...Gan Chun Chet
 
Predictive Method in Analyzing Past Data_(May_09), Institute of Engineers Mal...
Predictive Method in Analyzing Past Data_(May_09), Institute of Engineers Mal...Predictive Method in Analyzing Past Data_(May_09), Institute of Engineers Mal...
Predictive Method in Analyzing Past Data_(May_09), Institute of Engineers Mal...Gan Chun Chet
 
Modelling Trust of Customer and Supplier Interaction_2023 Vol 10 Issue 1.pdf
Modelling Trust of Customer and Supplier Interaction_2023 Vol 10 Issue 1.pdfModelling Trust of Customer and Supplier Interaction_2023 Vol 10 Issue 1.pdf
Modelling Trust of Customer and Supplier Interaction_2023 Vol 10 Issue 1.pdfGan Chun Chet
 
Oil and Gas Industry : Datasheet for Fire and Gas Detectors.pdf
Oil and Gas Industry : Datasheet for Fire and Gas Detectors.pdfOil and Gas Industry : Datasheet for Fire and Gas Detectors.pdf
Oil and Gas Industry : Datasheet for Fire and Gas Detectors.pdfGan Chun Chet
 
Fire and Gas Detection System : Part 3_Technical Features, Locating Detectors...
Fire and Gas Detection System : Part 3_Technical Features, Locating Detectors...Fire and Gas Detection System : Part 3_Technical Features, Locating Detectors...
Fire and Gas Detection System : Part 3_Technical Features, Locating Detectors...Gan Chun Chet
 
Fire and Gas Detection System : Part 2_Block Diagram_Philosophy, Signal Types...
Fire and Gas Detection System : Part 2_Block Diagram_Philosophy, Signal Types...Fire and Gas Detection System : Part 2_Block Diagram_Philosophy, Signal Types...
Fire and Gas Detection System : Part 2_Block Diagram_Philosophy, Signal Types...Gan Chun Chet
 
Fire and Gas Detection System : Part 1_The Field Devices and Its Panels
Fire and Gas Detection System : Part 1_The Field Devices and Its PanelsFire and Gas Detection System : Part 1_The Field Devices and Its Panels
Fire and Gas Detection System : Part 1_The Field Devices and Its PanelsGan Chun Chet
 
Trust Measurement Presentation_2.pptx
Trust Measurement Presentation_2.pptxTrust Measurement Presentation_2.pptx
Trust Measurement Presentation_2.pptxGan Chun Chet
 
Boundary Layer Oscillation for Aircraft Cavity/Surfaces
Boundary Layer Oscillation for Aircraft Cavity/SurfacesBoundary Layer Oscillation for Aircraft Cavity/Surfaces
Boundary Layer Oscillation for Aircraft Cavity/SurfacesGan Chun Chet
 
Noise dB to dBA Calculation_Gan Chun Chet.pptx
Noise dB to dBA Calculation_Gan Chun Chet.pptxNoise dB to dBA Calculation_Gan Chun Chet.pptx
Noise dB to dBA Calculation_Gan Chun Chet.pptxGan Chun Chet
 
Noise Error Calculation_Gan Chun Chet.pptx
Noise Error Calculation_Gan Chun Chet.pptxNoise Error Calculation_Gan Chun Chet.pptx
Noise Error Calculation_Gan Chun Chet.pptxGan Chun Chet
 
Noise_Proofing Linking Equations.pdf
Noise_Proofing Linking Equations.pdfNoise_Proofing Linking Equations.pdf
Noise_Proofing Linking Equations.pdfGan Chun Chet
 
The Prediction of Time Trending Techniques in Manufacuturing
The Prediction of Time Trending Techniques in ManufacuturingThe Prediction of Time Trending Techniques in Manufacuturing
The Prediction of Time Trending Techniques in ManufacuturingGan Chun Chet
 
The Philosophy and Characteristics of Trust Measurement in Practice.docx
The Philosophy and Characteristics of Trust Measurement in Practice.docxThe Philosophy and Characteristics of Trust Measurement in Practice.docx
The Philosophy and Characteristics of Trust Measurement in Practice.docxGan Chun Chet
 
Trust Measurement Gan Chun Chet 07.01.2022
Trust Measurement Gan Chun Chet 07.01.2022Trust Measurement Gan Chun Chet 07.01.2022
Trust Measurement Gan Chun Chet 07.01.2022Gan Chun Chet
 
mV to dBm Airflow Across Cavity_Gan Chun Chet_07.01.2021
mV to dBm Airflow Across Cavity_Gan Chun Chet_07.01.2021mV to dBm Airflow Across Cavity_Gan Chun Chet_07.01.2021
mV to dBm Airflow Across Cavity_Gan Chun Chet_07.01.2021Gan Chun Chet
 
Control System_3rd Order System_Root Locus Method
Control System_3rd Order System_Root Locus MethodControl System_3rd Order System_Root Locus Method
Control System_3rd Order System_Root Locus MethodGan Chun Chet
 
PID Controllers Control Engineering
PID Controllers Control EngineeringPID Controllers Control Engineering
PID Controllers Control EngineeringGan Chun Chet
 
Noise Reduction Modelling Study for Aircraft Cavity - Chun C Gan
Noise Reduction Modelling Study for Aircraft Cavity  - Chun C GanNoise Reduction Modelling Study for Aircraft Cavity  - Chun C Gan
Noise Reduction Modelling Study for Aircraft Cavity - Chun C GanGan Chun Chet
 

More from Gan Chun Chet (20)

Trust Measurement Presentation_Part 3
Trust Measurement Presentation_Part 3Trust Measurement Presentation_Part 3
Trust Measurement Presentation_Part 3
 
Predicting Machine Setup Time_Suggeting A Limit Determiner, Institute of Engi...
Predicting Machine Setup Time_Suggeting A Limit Determiner, Institute of Engi...Predicting Machine Setup Time_Suggeting A Limit Determiner, Institute of Engi...
Predicting Machine Setup Time_Suggeting A Limit Determiner, Institute of Engi...
 
Predictive Method in Analyzing Past Data_(May_09), Institute of Engineers Mal...
Predictive Method in Analyzing Past Data_(May_09), Institute of Engineers Mal...Predictive Method in Analyzing Past Data_(May_09), Institute of Engineers Mal...
Predictive Method in Analyzing Past Data_(May_09), Institute of Engineers Mal...
 
Modelling Trust of Customer and Supplier Interaction_2023 Vol 10 Issue 1.pdf
Modelling Trust of Customer and Supplier Interaction_2023 Vol 10 Issue 1.pdfModelling Trust of Customer and Supplier Interaction_2023 Vol 10 Issue 1.pdf
Modelling Trust of Customer and Supplier Interaction_2023 Vol 10 Issue 1.pdf
 
Oil and Gas Industry : Datasheet for Fire and Gas Detectors.pdf
Oil and Gas Industry : Datasheet for Fire and Gas Detectors.pdfOil and Gas Industry : Datasheet for Fire and Gas Detectors.pdf
Oil and Gas Industry : Datasheet for Fire and Gas Detectors.pdf
 
Fire and Gas Detection System : Part 3_Technical Features, Locating Detectors...
Fire and Gas Detection System : Part 3_Technical Features, Locating Detectors...Fire and Gas Detection System : Part 3_Technical Features, Locating Detectors...
Fire and Gas Detection System : Part 3_Technical Features, Locating Detectors...
 
Fire and Gas Detection System : Part 2_Block Diagram_Philosophy, Signal Types...
Fire and Gas Detection System : Part 2_Block Diagram_Philosophy, Signal Types...Fire and Gas Detection System : Part 2_Block Diagram_Philosophy, Signal Types...
Fire and Gas Detection System : Part 2_Block Diagram_Philosophy, Signal Types...
 
Fire and Gas Detection System : Part 1_The Field Devices and Its Panels
Fire and Gas Detection System : Part 1_The Field Devices and Its PanelsFire and Gas Detection System : Part 1_The Field Devices and Its Panels
Fire and Gas Detection System : Part 1_The Field Devices and Its Panels
 
Trust Measurement Presentation_2.pptx
Trust Measurement Presentation_2.pptxTrust Measurement Presentation_2.pptx
Trust Measurement Presentation_2.pptx
 
Boundary Layer Oscillation for Aircraft Cavity/Surfaces
Boundary Layer Oscillation for Aircraft Cavity/SurfacesBoundary Layer Oscillation for Aircraft Cavity/Surfaces
Boundary Layer Oscillation for Aircraft Cavity/Surfaces
 
Noise dB to dBA Calculation_Gan Chun Chet.pptx
Noise dB to dBA Calculation_Gan Chun Chet.pptxNoise dB to dBA Calculation_Gan Chun Chet.pptx
Noise dB to dBA Calculation_Gan Chun Chet.pptx
 
Noise Error Calculation_Gan Chun Chet.pptx
Noise Error Calculation_Gan Chun Chet.pptxNoise Error Calculation_Gan Chun Chet.pptx
Noise Error Calculation_Gan Chun Chet.pptx
 
Noise_Proofing Linking Equations.pdf
Noise_Proofing Linking Equations.pdfNoise_Proofing Linking Equations.pdf
Noise_Proofing Linking Equations.pdf
 
The Prediction of Time Trending Techniques in Manufacuturing
The Prediction of Time Trending Techniques in ManufacuturingThe Prediction of Time Trending Techniques in Manufacuturing
The Prediction of Time Trending Techniques in Manufacuturing
 
The Philosophy and Characteristics of Trust Measurement in Practice.docx
The Philosophy and Characteristics of Trust Measurement in Practice.docxThe Philosophy and Characteristics of Trust Measurement in Practice.docx
The Philosophy and Characteristics of Trust Measurement in Practice.docx
 
Trust Measurement Gan Chun Chet 07.01.2022
Trust Measurement Gan Chun Chet 07.01.2022Trust Measurement Gan Chun Chet 07.01.2022
Trust Measurement Gan Chun Chet 07.01.2022
 
mV to dBm Airflow Across Cavity_Gan Chun Chet_07.01.2021
mV to dBm Airflow Across Cavity_Gan Chun Chet_07.01.2021mV to dBm Airflow Across Cavity_Gan Chun Chet_07.01.2021
mV to dBm Airflow Across Cavity_Gan Chun Chet_07.01.2021
 
Control System_3rd Order System_Root Locus Method
Control System_3rd Order System_Root Locus MethodControl System_3rd Order System_Root Locus Method
Control System_3rd Order System_Root Locus Method
 
PID Controllers Control Engineering
PID Controllers Control EngineeringPID Controllers Control Engineering
PID Controllers Control Engineering
 
Noise Reduction Modelling Study for Aircraft Cavity - Chun C Gan
Noise Reduction Modelling Study for Aircraft Cavity  - Chun C GanNoise Reduction Modelling Study for Aircraft Cavity  - Chun C Gan
Noise Reduction Modelling Study for Aircraft Cavity - Chun C Gan
 

Production - Reducing Machine Setup Time - IEM

  • 1. MACHINE PERFORMANCE By Ir. Gan Chun Chet
  • 2. MACHINE PERFORMANCE • IMPROVING YOUR MACHINE PERFORMANCE BY KNOWING IT FIRST • KNOWING THE CAPACITY TO PLAN AHEAD
  • 3. MACHINE PERFORMANCE : RATIOS • UNDERSTANDING THE RATIOS • RATIO OF PRODUCT CHANGE (To/Ts) To = OPERATING TIME Ts = SETUP TIME • INDICATES THE OPERATING TIME OVER THE SETUP TIME
  • 4. MACHINE PERFORMANCE : RATIOS • RATIO OF NUMBER OF SETUPS AND PRODUCTS (Ts/Np) Ts = NUMBERS OF SETUP Np = NUMBER OF PRODUCTS • INDICATES THE RATIO OF MACHINE SETUPS AND THE NUMBER OF PRODUCT PRODUCED BY THE MACHINE
  • 5. MACHINE PERFORMANCE : PERFORMANCE INDICATOR • MACHINE PERFORMANCE = (To/Tt) * 100 PERFORMANCE OF THE MACHINE IN PERCENTAGE (%) • OPERATING HOURS To To = Tt – (Ti + Tm + Ts) MACHINE TOTAL PRODUCTION HOURS Tt MACHINE IDLE TIME Ti MACHINE MAINTENANCE TIME Tm MACHINE SETUP TIME Ts
  • 6. MACHINE PERFORMANCE : PERFORMANCE VARIABLES • MACHINE TOTAL PRODUCTION HOURS Tt (FIXED) TOTAL WORKING DAYS IN HOURS • MACHINE IDLE TIME Ti (VARIABLE) NO PRODUCTION SCHEDULE • MACHINE MAINTENANCE TIME Tm (VARIABLE) DEPENDING ON THE TYPE OF MAINTENANCE WORK • MACHINE SETUP TIME Ts (REPETITIVE) MONITORING REQUIRED
  • 7. MACHINE PERFORMANCE : MONITORING SETUP TIME – STATISTIC • STATISTICAL TECHNIQUES • MAXIMUM SETUP TIME THE MAXIMUM TIME OF THE SETUPS • MINIMUM SETUP TIME THE MINIMUM TIME OF THE SETUPS • AVERAGE SETUP TIME • THE AVERAGE TIME OF THE SETUPS
  • 8. MACHINE PERFORMANCE : MONITORING SETUP TIME – PREDICTION/FORECASTING • PREDICTION TECHNIQUE • CATEGORY MODE OCCURRENCE THE LOCATION OF THE MOST FREQUENT SETUP TIME • DEVIATION FROM ACTUAL BY MOVING AVERAGE AVERAGE OF TWO ACTUAL PASTS CALCULATED WITH VARYING DEVIATION DEVIATION FROM ACTUAL BY EXPONENTIAL SMOOTHING THE FRACTION OF ONE (1) GUESS OR PAST AND AN ACTUAL CURRENT WITH VARING DEVIATION
  • 9. MACHINE PERFORMANCE : MONITORING SETUP TIME – PREDICTION/FORECASTING • PROBABILITY OF UP OR DOWN THE POSSIBILITIES OF EITHER AN UP, DOWN OR UNCHANGE COUNTED TO KNOW THE PROBABILITY • ANGLE OF INCLINATION THE SLOPE OF EACH POINT MOVEMENT, WHETHER IS LOCATED AT VERY HIGH ANGLE, HIGH ANGLE, LOW ANGLE (NEGATIVE) OR A MODERATE LOW ANGLE
  • 10. MACHINE PERFORMANCE : MONITORING SETUP TIME – DIAGNOSE THE REPETITIVE TASKS • TWO TIME HIGH WITHIN THE LIMITS TWO TIMES THE SETUP TIME INCREASES WHETHER WITHIN AN UPPER LIMIT OR LOWER LIMIT WHICH IS A DEVIATION FROM A CHANGING MEAN TIME • WARNING LEVEL A PREDETERMINE SETPOINT TO WARN USER.
  • 11. MACHINE PERFORMANCE : PERFORMANCE CHART Performance Chart 10200 10000 9800 9600 9400 9200 9000 8800 0 500 1000 1500 SIMULATION Setup Time (Ts) Operating Hours (To) Operating Hours (To=Tp-Ts) Performance Chart 10000 9800 9600 9400 9200 9000 8800 0 20 40 60 80 100 Production Hours/ Setup Hours (Tp/Ts) Operating Hours (To) Ratio (Tp/Ts)
  • 12. MACHINE PERFORMANCE : PERFORMANCE CHART Ratio 12.0 10.0 8.0 6.0 4.0 2.0 0.0 0 5 10 15 Number of Product Setup/Product Setup/Product 1 Setup/Product 2 Ratio 50.0 45.0 40.0 35.0 30.0 25.0 20.0 15.0 10.0 5.0 0.0 0 2 4 6 8 10 12 Number of Product Operating/Product Operating/Product 1 Operating/Product 2 SIMULATION
  • 13. MACHINE PERFORMANCE : PERFORMANCE CHART Operating Product 100 80 60 40 20 0 0 5 10 15 Number of Products Operating Time 10 Setups 20 Setups 30 Setups • MORE SETUP, REDUCE OPERATING TIME • NOTE RATIO OF PRODUCTION AND SETUP HOURS CHART SIMULATION
  • 14. MACHINE PERFORMANCE : PERFORMANCE CHART Warning Level 15 15 15 15 15 15 15 15 15 15 14.0 18.5 11.4 10.8 18.9 11.3 15.8 3.1 15.0 12.4 20.0 18.0 16.0 14.0 12.0 10.0 8.0 6.0 4.0 2.0 0.0 0 2 4 6 8 10 12 Number of Setups Time (Hours) Actual Time Warning Level SIMULATION
  • 15. MACHINE PERFORMANCE : PERFORMANCE CHART Distribution of Hours 2.3 7.6 3.4 87 100% 80% 60% 40% 20% 0% 1 Machine Percentage (%) Percentage of Hours Spent On Setups (Tsn/Ttn*100) Percentage of Hours Spent On Maintenance Time (Tmn/Ttn*100) Percentage Machine Left Idle (Tin/Ttn*100) Machine Performance (Ton/Ttn) SIMULATION
  • 16. MACHINE PERFORMANCE : PERFORMANCE CHART Upper and Lower Limits 32.8 32.8 32.8 32.8 32.8 32.8 32.8 32.8 32.8 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 25.0 17.3 17.3 17.3 17.3 17.3 17.3 17.3 17.3 17.3 17.3 9.7 19.2 22.9 9.6 9.6 9.6 9.6 9.6 9.6 9.6 9.6 9.6 8.5 16.6 14.5 14.2 23.3 15.7 13.4 28.8 32.1 12.3 19.8 17.4 16.5 26.4 18.1 15.0 9.6 13.7 4.7 13.4 11.5 11.8 20.1 13.2 11.7 27.8 32.8 15.2 24.0 21.5 21.0 31.1 23.1 20.5 10.6 12.9 1.8 9.2 7.4 7.3 15.4 8.2 6.2 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 1.8 35.0 30.0 25.0 20.0 15.0 10.0 5.0 0.0 0 2 4 6 8 10 12 Number of Setup Time Actual Machine Setup Time Upper Limit (Moving Average) Low er Limit (Moving Average) Upper Limit (Exp Smoothing) Low er Limit (Exp Smoothing) Category 1 / Category 1 / / 2 / Category 2 / / 3 / Category 3 / / 4 / Category 4 / SIMULATION
  • 17. MACHINE PERFORMANCE • KNOW WHAT IS ACCEPTABLE • MONITOR TO SEE WHETHER IT IS LOCATED AT YOUR MEAN PERFORMANCE • IDENTIFY THE IMPROVEMENT EITHER POSSIBLE OF NOT
  • 18. MACHINE PERFORMANCE • STRATEGY • MORE OPERATION TIME • MORE SETUPS • KNOW YOUR MEAN
  • 19. MACHINE PERFORMANCE • COST OF OPERATION • LINK TO TIME (POSSIBLE?) • EXAMPLE: • REDUCE SETUP? • INCREASE FLEXIBILTY?
  • 20. MACHINE PERFORMANCE • KNOW YOUR MACHINE PERFORMANCE • KNOW YOUR MEAN PERFORMANCE • KNOW THE ESTIMATED PREDICTION
  • 21. MACHINE PERFORMANCE • KNOW THE CAPACITY • PLAN AHEAD
  • 22. MACHINE PERFORMANCE • EXCEL FILE – THE PURPOSE • ARTICLE – PREDICTIVE TECHNIQUE