SlideShare a Scribd company logo
1 of 42
Download to read offline
MET, sal
Majdalani Engineering & Trading 
Mission Statement:
To provide electro mechanical engineering solutions that 
are efficient, reliable, easy to maintain and cost effective. 
History….
• UNECO, The United Engineering Co. was founded
in 1956 as one of the first Air conditioning
companies in the region.
• UNECO was the exclusive TRANE distributor in
Lebanon Since 1956.
HISTORY CONT……
In 2008 M.E.T. sal, was established to take over the
Mechanical Engineering and service business from
UNECO.
LEBANON RECONSTRUCTION
We  took ownership of Beirut Central district renovation projects since 
1994
We were there from the beginning..
• Beirut Central 
district had the 
majority of 
construction activity 
aside from the 
Beirut International 
Airport and Casino 
du Liban. 
BCD –Unitary success..
• We Owned the 
Beirut Central 
district small and 
medium size 
residential projects 
by introducing the 
high rise unitary 
application using 
USA made outdoor 
units ( Solidere Lot 
671).
BCD – Applied success…
• Thru a design/build 
agreement with 
Beirut Central district 
development team, 
we managed to 
install more than 60  
air cooled heat pump 
screw chillers.
• Currently there are 
more than 75 of 
these chillers 
installed in 
Downtown Beirut
Central Plants…
• From 1969 to 2012 We have 
installed more than 80 % of the 
water cooled central plants in the 
country.
– Phoenicia Intercontinental Hotel 
1969
– AUB Medical School 1969
– UNESCO bldg 1971
– St. George Hotel 1971
– Gefinor Commercial Center 1972
– Summerland Hotel and resort 
1978.
– American University Hospital 
1994.
– Casino Du Liban 1996.
– Mount Lebanon hospital 1998.
– AUB district cooling plant 2008
AUB Central Plants…1969 till 2008
HEALTHCARE
American University of Beirut
American University of Beirut – Medical Center – OR chiller replacement 
with BMS system to monitor chiller operation from the OR suite. Project 
was won based on life cycle cost analysis between repair and replace
Lifting of New Chillers to AUB Medical 
Center Roof On March 11th ,2013
The next step.. Piping...BMS 
Geitaoui Hospital New addition
800 tons of cooling using All priamry variable pumping system
COMMERCIAL
Les Dunes Commercial Center and Holiday Inn Hotel
Les Dunes commercial Center and Holiday Inn hotel:  Scheduled replacement of 
Qty=6, 160 tons air cooled chillers. Contract was signed directly with owner. Project 
was won based on long standing relationship with the owner and based on excellent 
service record that started in 1997.
VRV INSTALLATIONS
The Square Office Bldg. – Bachoura
Supply and installation of  17 Fujiair – Inverter type VRF systems .
Private  Residence. – Downtown
Supply and installation of  TRANE– digital  type VRF systems .
Khoury Home Dept. Stores
Supply and Installation of Fujiair Inverter type VRF systems
RESIDENTIAL
The Platinum Tower
The Platinum Tower
‐ Provided design/build 
solutions for Mechanical 
works related to many 
apartments in the bldg.
‐ Provided and installed the 
mechanical system for the 
bldg. health club, including 
humidity control system for 
the indoor semi Olympic  size 
swimming pool.
Saifi Residential Bldg.
Supply and installation of TRANE VRF digital systems
HOUSE OF WORSHIP
Maronite Headquarters 
• Maronite church 
headquarters in Lebanon: 
Supply and installation of 
Qty=2 , air cooled heat 
pump chillers and supply 
of various air side 
equipment, that are being 
installed by a mechanical 
contractor under our 
supervision. Contract was 
signed directly with the 
Cardinal, based on our 
experience in the HVAC 
applications for worship 
houses.
LONGER TERM BUSINESS….
American University of Beirut
American University of Beirut – School of Medicine
Central plant Replacement 
Project is currently under bid,
with provision for value
engineering . Consultant AME
and Associates. Original plant
was executed by UNECO
1969
$400 Million New Hospital at AUB including Three 
new central plants
WE ARE PART OF THE DESIGN‐BUILD TEAM
Award winning project with 
international recognition ‐ 2009
American University of Beirut – New Central Plant 
• 3,000 tons of cooling with absorption and centrifugal 
chillers, using marine cooling 
• A design/build effort at the highest level 
• Saved the university $1million 
• Record execution time of 11 month. 
Our efforts were recognized by the University administration and 
by the American Institute of Architects as one of the top 10 
green projects in 2009.
Lowering the 1500 ton Abs. Chiller into 
the underground central plant
The Second Centrifugal Chiller being lowered to 
place
Completed Central plant
TUMO CENTER
YEREVAN ‐ AREMENIA
• Lead Design/Build EM 
Team. 
• Implementation of the 
state of the art HVAC 
system.
• Training of local 
personnel on systems 
operation and 
maintenance.
• Design and installation 
of a total BMS System, 
with remote monitoring 
and trouble shooting 
capabilities from Beirut.
Stretching the limits in providing outdoor Air 
Conditioning for Music Hall‐ Biel
CONTINUING THE APPLIED BUSINESS WITH 
CLIMAVENETA, ITALY, 2014
MAK Palace hotel, Beirut
Sin El Fil Municipality
Supply and installation of CLIMAVENTA SCROLL heat pump chillers and air handling  units
Gems Hotel – Ras Beirut
Supply and installation of CLIMAVENTA SCREW heat pump chillers and fan coil units
Gemshotel‐Ras Beirut
Supply and installation of CLIMAVENTA SCREW heat pump chillers and fan coil units
Cedim Medical Imaging Center
Providing cooling 24/7 to MRI and other medical imaging machines
Geitawoui General Hospital, Beirut

More Related Content

Similar to MET presentation -2015

Similar to MET presentation -2015 (20)

Mazen ALoud-CV-7916
Mazen ALoud-CV-7916Mazen ALoud-CV-7916
Mazen ALoud-CV-7916
 
CV MZ
CV MZCV MZ
CV MZ
 
HD CV SHORT WORD rev 03
HD CV SHORT WORD rev 03HD CV SHORT WORD rev 03
HD CV SHORT WORD rev 03
 
PROGETTI
PROGETTIPROGETTI
PROGETTI
 
Raz training report
Raz training reportRaz training report
Raz training report
 
Morsy Shaban HILL FORMAT CV Oct. 30, 2015
Morsy Shaban HILL FORMAT CV Oct. 30, 2015Morsy Shaban HILL FORMAT CV Oct. 30, 2015
Morsy Shaban HILL FORMAT CV Oct. 30, 2015
 
Plexux holding
Plexux holdingPlexux holding
Plexux holding
 
SAMER CV
SAMER CVSAMER CV
SAMER CV
 
zk resume
zk resumezk resume
zk resume
 
CV-rev5
CV-rev5CV-rev5
CV-rev5
 
PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015PLB Format CV Updated 16-03-2015
PLB Format CV Updated 16-03-2015
 
site manager /construction manager
site manager /construction managersite manager /construction manager
site manager /construction manager
 
Michael Dismore Resume 24-04-14
Michael Dismore Resume 24-04-14Michael Dismore Resume 24-04-14
Michael Dismore Resume 24-04-14
 
Da vinci tower
Da vinci towerDa vinci tower
Da vinci tower
 
c v english
c v englishc v english
c v english
 
Britco_Changing_The_Way_The_World_Builds_Introduction_August 2014
Britco_Changing_The_Way_The_World_Builds_Introduction_August 2014Britco_Changing_The_Way_The_World_Builds_Introduction_August 2014
Britco_Changing_The_Way_The_World_Builds_Introduction_August 2014
 
last c v 1-1-15
last c v 1-1-15last c v 1-1-15
last c v 1-1-15
 
amrocvEN1-updated 15
amrocvEN1-updated 15amrocvEN1-updated 15
amrocvEN1-updated 15
 
Marwan Bou Antoun
Marwan Bou AntounMarwan Bou Antoun
Marwan Bou Antoun
 
Presentation belgian companies active in sustainable building
Presentation belgian companies active in sustainable buildingPresentation belgian companies active in sustainable building
Presentation belgian companies active in sustainable building
 

MET presentation -2015