PROYECTO:
UBICACIÓN:
SEMANA:
MONTO VALORIZACION: S/6,069.83 (SEIS MIL SESENTINUEVE Y 83/100 SOLES) Precio incluye IGV
Und.
METRADO $ % METRADO $ % METRADO $ % METRADO $ %
glb 0.00 0.00% 1.00 641.81 100.00% 1.00 641.81 100.00% 0.00 0.00 0.00%
glb 0.00 0.00% 1.00 150.00 100.00% 1.00 150.00 100.00% 0.00 0.00 0.00%
glb 0.00 0.00% 1.00 425.00 100.00% 1.00 425.00 100.00% 0.00 0.00 0.00%
m3 0.00 0.00% 15.60 360.67 100.00% 15.60 360.67 100.00% 0.00 0.00 0.00%
m2 0.00 0.00% 48.00 186.24 100.00% 48.00 186.24 100.00% 0.00 0.00 0.00%
m3 0.00 0.00% 5.00 292.80 100.00% 5.00 292.80 100.00% 0.00 0.00 0.00%
m3 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 276.40 100.00%
m3 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 132.40 100.00%
m3 0.00 0.00% 14.50 2230.54 100.00% 14.50 2230.54 100.00% 0.00 0.00 0.00%
m3 0.00 0.00% 2.10 475.84 100.00% 2.10 475.84 100.00% 0.00 0.00 0.00%
m2 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 42.50 2823.70 100.00%
m2 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 1059.84 100.00%
pza 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 350.00 280.00 100.00%
kg 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 185.00 1233.95 100.00%
m3 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.90 1294.80 100.00%
m2 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 3125.76 100.00%
und 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 480.00 100.00%
m2 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 150.80 1247.12 100.00%
m2 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 445.92 100.00%
und 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 467.90 100.00%
m2 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 5329.92 100.00%
m2 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.50 1740.00 100.00%
0.00 4762.90 4762.90 19937.71
0.00 381.03 381.03 1595.02
0.00 5143.93 5143.93 21532.72
0.00 925.91 925.91 3875.89
0.00 0.00% 6069.83 19.28% 6069.83 19.28% 25408.61 80.72%
12.50
ICA-ICA-LOS AQUIJES
24,700.61
1,976.05
467.90 467.90
02.01.06 ENCHAPADO DE PISO CON CERAMICA DE 0.45x0.45 48.00
26,676.66
03 VEREDAS 1,740.00
03.01
8.27 1,247.12
02.01.04 PINTURA LATEX EN CIELORRASOS 48.00
139.20 1,740.00
02.01.05 PUERTA CONTRAPLACADA DE 1.20mX2.10m 1.00
65.12 3,125.76
02.01.02 VENTANA C/ PERFILES DE ALUMINIO - CRISTAL TEMPLADO 6MM 4.00
111.04 5,329.92
02.01.03 PINTURA LATEX EN INTERIORES Y EXTERIORES 150.80
02.01 GENERAL 11,096.62
9.29 445.92
02.01.01 FALSO CIELO RASO DE YESO 48.00
01.02.02.03.04 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 3.90 332.00 1,294.80
120.00 480.00
02 ARQUITECTURA 11,096.62
01.02.02.03.02 LADRILLO HUECO DE ARCILLA h=15 cm PARA TECHO ALIGERADO 350.00 0.80 280.00
01.02.02.03.03 ACERO fy=4200 kg/cm2 GRADO 60 en LOSAS ALIGERADAS 185.00 6.67 1,233.95
01.02.02.03 LOSAS ALIGERADAS 3,868.59
01.02.02.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS 48.00 22.08 1,059.84
01.02.02.02.02 CONCRETO SOBRECIMIENTOS MEZCLA 1:8 (100 kg/cm2) 2.10 226.59 475.84
01.02.02.02.03 CONTRAPISO DE 4" 42.50 66.44 2,823.70
01.02.02.02 CONCRETO SIMPLE 5,530.08
01.02.02.02.01 14.50 153.83 2,230.54
01.02.02.01.04 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO / VOLQ 15M3 D=10KM 10.00 27.64 276.40
01.02.02.01.05 ACARREO DE MATERIAL EXCEDENTE DIST. 30m 10.00 13.24 132.40
01.02.02.01.02 NIVELACION Y COMPACTADO DE TERRENO NORMAL (con plancha) 48.00 3.88 186.24
01.02.02.01.03 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO CON PLANCHA 5.8HP 5.00 58.56 292.80
01.02.02.01 MOVIMIENTOS DE TIERRA 1,248.51
01.02.02.01.01 EXCAVACION MANUAL DE TERRENO, MATERIAL SUELTO 15.60 23.12 360.67
01.02.01 EQUIPO DE PROTECCION INDIVIDUAL 1.00 425.00 425.00
01.02.02 CONSTRUCCION 10,647.18
01.01.02 TRAZO Y REPLANTEO DE TERRENO DURANTE LA OBRA 1.00 150.00 150.00
01.02 SEGURIDAD Y SALUD 11,072.18
OBRAS PRELIMINARES 791.81
01.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS 1.00 641.81 641.81
CONCRETO CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30%
Item Descripción Metrado Precio S/. Parcial S/.
01 ESTRUCTURAS 11,863.99
01.01
ACUMULADO SEMANA
ANTERIOR
ACTUAL VALORIZACION ACUMULADO SEMANA ACTUAL SALDO POR VALORIZAR
4801.80
08/09/2020 AL 14/09/2020
31478.46
Valorizacion Semanal N° 01 Ampliación de Oficina de C&B con Material Noble en Fundo Manuelita FYH SAC
CONCRETO VEREDAS f'c=175 kg/cm2 UN SARDINEL INCORPORADO A=1.00 m.
COSTO DIRECTO
GASTOS GENERALES 8%
COSTO TOTAL
IGV 18%
TOTAL

More Related Content

Similar to Val01 Oficina c&b Manuelita.pdf

Direct Shear Test
Direct Shear TestDirect Shear Test
Direct Shear TestA K
 
01 cronograma valorizado
01 cronograma valorizado01 cronograma valorizado
01 cronograma valorizadoJIMMY PANDURO
 
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
02 - Group 3 - P&ID - Piping and Instrumentation DiagramsShakeel Vakkil
 
FACTORS AFFECTING SEASONING OF TIMBER USING SAWDUST OPERATED KILN
FACTORS AFFECTING SEASONING OF TIMBER USING SAWDUST OPERATED KILN  FACTORS AFFECTING SEASONING OF TIMBER USING SAWDUST OPERATED KILN
FACTORS AFFECTING SEASONING OF TIMBER USING SAWDUST OPERATED KILN Hiran Amarasekera
 
020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)independiente
 
Report sending mails to dealers for Accepted and
Report  sending  mails to dealers for Accepted andReport  sending  mails to dealers for Accepted and
Report sending mails to dealers for Accepted andsusanta subudhi
 
Report sending mails to dealers for Accepted and
Report  sending  mails to dealers for Accepted andReport  sending  mails to dealers for Accepted and
Report sending mails to dealers for Accepted andsusanta subudhi
 
Tarea 2 hidraulica iii-cabrera arias roberto alejandro
Tarea 2 hidraulica iii-cabrera arias roberto alejandroTarea 2 hidraulica iii-cabrera arias roberto alejandro
Tarea 2 hidraulica iii-cabrera arias roberto alejandroAlejandro Cabrera
 
Mehmet Bariskan -Env. Control 2010_Design for a heating and cooling system of...
Mehmet Bariskan -Env. Control 2010_Design for a heating and cooling system of...Mehmet Bariskan -Env. Control 2010_Design for a heating and cooling system of...
Mehmet Bariskan -Env. Control 2010_Design for a heating and cooling system of...Mehmet Bariskan
 
T2 dimensional evaluation data reporting sheet from hi-precision
T2 dimensional evaluation data reporting sheet from hi-precisionT2 dimensional evaluation data reporting sheet from hi-precision
T2 dimensional evaluation data reporting sheet from hi-precisionHuang Simon
 

Similar to Val01 Oficina c&b Manuelita.pdf (18)

Diseno a corte
Diseno a corteDiseno a corte
Diseno a corte
 
Etanol density m v
Etanol density m vEtanol density m v
Etanol density m v
 
Direct Shear Test
Direct Shear TestDirect Shear Test
Direct Shear Test
 
Direct Shear Test
Direct Shear TestDirect Shear Test
Direct Shear Test
 
01 cronograma valorizado
01 cronograma valorizado01 cronograma valorizado
01 cronograma valorizado
 
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
02 - Group 3 - P&ID - Piping and Instrumentation Diagrams
 
LBA-1.pdf
LBA-1.pdfLBA-1.pdf
LBA-1.pdf
 
FACTORS AFFECTING SEASONING OF TIMBER USING SAWDUST OPERATED KILN
FACTORS AFFECTING SEASONING OF TIMBER USING SAWDUST OPERATED KILN  FACTORS AFFECTING SEASONING OF TIMBER USING SAWDUST OPERATED KILN
FACTORS AFFECTING SEASONING OF TIMBER USING SAWDUST OPERATED KILN
 
020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)020 ejemplo de presupuesto (mano de obra, materiales y transporte)
020 ejemplo de presupuesto (mano de obra, materiales y transporte)
 
Prov ca
Prov caProv ca
Prov ca
 
Report sending mails to dealers for Accepted and
Report  sending  mails to dealers for Accepted andReport  sending  mails to dealers for Accepted and
Report sending mails to dealers for Accepted and
 
Report sending mails to dealers for Accepted and
Report  sending  mails to dealers for Accepted andReport  sending  mails to dealers for Accepted and
Report sending mails to dealers for Accepted and
 
Tarea 2 hidraulica iii-cabrera arias roberto alejandro
Tarea 2 hidraulica iii-cabrera arias roberto alejandroTarea 2 hidraulica iii-cabrera arias roberto alejandro
Tarea 2 hidraulica iii-cabrera arias roberto alejandro
 
P33_Nal_Comercial.pdf
P33_Nal_Comercial.pdfP33_Nal_Comercial.pdf
P33_Nal_Comercial.pdf
 
Mehmet Bariskan -Env. Control 2010_Design for a heating and cooling system of...
Mehmet Bariskan -Env. Control 2010_Design for a heating and cooling system of...Mehmet Bariskan -Env. Control 2010_Design for a heating and cooling system of...
Mehmet Bariskan -Env. Control 2010_Design for a heating and cooling system of...
 
Catalogo codiacero
Catalogo codiaceroCatalogo codiacero
Catalogo codiacero
 
Z distribution
Z distribution Z distribution
Z distribution
 
T2 dimensional evaluation data reporting sheet from hi-precision
T2 dimensional evaluation data reporting sheet from hi-precisionT2 dimensional evaluation data reporting sheet from hi-precision
T2 dimensional evaluation data reporting sheet from hi-precision
 

Recently uploaded

WHO KILLED ALASKA? #18: Mirror Memoria - "TATTOO" TRANSCRIPT.pdf
WHO KILLED ALASKA? #18: Mirror Memoria - "TATTOO" TRANSCRIPT.pdfWHO KILLED ALASKA? #18: Mirror Memoria - "TATTOO" TRANSCRIPT.pdf
WHO KILLED ALASKA? #18: Mirror Memoria - "TATTOO" TRANSCRIPT.pdfOptimistic18
 
一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证如何办理
一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证如何办理一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证如何办理
一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证如何办理nuovo1
 
C&C Artists' Websites .
C&C Artists' Websites                       .C&C Artists' Websites                       .
C&C Artists' Websites .LukeNash7
 
一比一原版(UofM毕业证书)明尼苏达大学毕业证如何办理
一比一原版(UofM毕业证书)明尼苏达大学毕业证如何办理一比一原版(UofM毕业证书)明尼苏达大学毕业证如何办理
一比一原版(UofM毕业证书)明尼苏达大学毕业证如何办理nuovo1
 
VIP/Call/Girls Nandi Hills 6378878445 Hours Service Available Day and Night
VIP/Call/Girls Nandi Hills 6378878445 Hours Service Available Day and NightVIP/Call/Girls Nandi Hills 6378878445 Hours Service Available Day and Night
VIP/Call/Girls Nandi Hills 6378878445 Hours Service Available Day and Nightdarmandersingh4580
 
Codes and conventions of film magazines.pptx
Codes and conventions of film magazines.pptxCodes and conventions of film magazines.pptx
Codes and conventions of film magazines.pptxCharlotte512934
 
NO1 Top Amil Baba In Sahiwal, Okara, Hafizabad, Mandi Bahauddin, Jhelum, Jar...
NO1 Top Amil Baba In Sahiwal, Okara, Hafizabad,  Mandi Bahauddin, Jhelum, Jar...NO1 Top Amil Baba In Sahiwal, Okara, Hafizabad,  Mandi Bahauddin, Jhelum, Jar...
NO1 Top Amil Baba In Sahiwal, Okara, Hafizabad, Mandi Bahauddin, Jhelum, Jar...Amil baba
 
在线办理(concordia学位证书)康考迪亚大学毕业证学历学位证书学费发票原版一模一样
在线办理(concordia学位证书)康考迪亚大学毕业证学历学位证书学费发票原版一模一样在线办理(concordia学位证书)康考迪亚大学毕业证学历学位证书学费发票原版一模一样
在线办理(concordia学位证书)康考迪亚大学毕业证学历学位证书学费发票原版一模一样ahafux
 

Recently uploaded (8)

WHO KILLED ALASKA? #18: Mirror Memoria - "TATTOO" TRANSCRIPT.pdf
WHO KILLED ALASKA? #18: Mirror Memoria - "TATTOO" TRANSCRIPT.pdfWHO KILLED ALASKA? #18: Mirror Memoria - "TATTOO" TRANSCRIPT.pdf
WHO KILLED ALASKA? #18: Mirror Memoria - "TATTOO" TRANSCRIPT.pdf
 
一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证如何办理
一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证如何办理一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证如何办理
一比一原版(UC Berkeley毕业证书)加利福尼亚大学伯克利分校毕业证如何办理
 
C&C Artists' Websites .
C&C Artists' Websites                       .C&C Artists' Websites                       .
C&C Artists' Websites .
 
一比一原版(UofM毕业证书)明尼苏达大学毕业证如何办理
一比一原版(UofM毕业证书)明尼苏达大学毕业证如何办理一比一原版(UofM毕业证书)明尼苏达大学毕业证如何办理
一比一原版(UofM毕业证书)明尼苏达大学毕业证如何办理
 
VIP/Call/Girls Nandi Hills 6378878445 Hours Service Available Day and Night
VIP/Call/Girls Nandi Hills 6378878445 Hours Service Available Day and NightVIP/Call/Girls Nandi Hills 6378878445 Hours Service Available Day and Night
VIP/Call/Girls Nandi Hills 6378878445 Hours Service Available Day and Night
 
Codes and conventions of film magazines.pptx
Codes and conventions of film magazines.pptxCodes and conventions of film magazines.pptx
Codes and conventions of film magazines.pptx
 
NO1 Top Amil Baba In Sahiwal, Okara, Hafizabad, Mandi Bahauddin, Jhelum, Jar...
NO1 Top Amil Baba In Sahiwal, Okara, Hafizabad,  Mandi Bahauddin, Jhelum, Jar...NO1 Top Amil Baba In Sahiwal, Okara, Hafizabad,  Mandi Bahauddin, Jhelum, Jar...
NO1 Top Amil Baba In Sahiwal, Okara, Hafizabad, Mandi Bahauddin, Jhelum, Jar...
 
在线办理(concordia学位证书)康考迪亚大学毕业证学历学位证书学费发票原版一模一样
在线办理(concordia学位证书)康考迪亚大学毕业证学历学位证书学费发票原版一模一样在线办理(concordia学位证书)康考迪亚大学毕业证学历学位证书学费发票原版一模一样
在线办理(concordia学位证书)康考迪亚大学毕业证学历学位证书学费发票原版一模一样
 

Val01 Oficina c&b Manuelita.pdf

  • 1. PROYECTO: UBICACIÓN: SEMANA: MONTO VALORIZACION: S/6,069.83 (SEIS MIL SESENTINUEVE Y 83/100 SOLES) Precio incluye IGV Und. METRADO $ % METRADO $ % METRADO $ % METRADO $ % glb 0.00 0.00% 1.00 641.81 100.00% 1.00 641.81 100.00% 0.00 0.00 0.00% glb 0.00 0.00% 1.00 150.00 100.00% 1.00 150.00 100.00% 0.00 0.00 0.00% glb 0.00 0.00% 1.00 425.00 100.00% 1.00 425.00 100.00% 0.00 0.00 0.00% m3 0.00 0.00% 15.60 360.67 100.00% 15.60 360.67 100.00% 0.00 0.00 0.00% m2 0.00 0.00% 48.00 186.24 100.00% 48.00 186.24 100.00% 0.00 0.00 0.00% m3 0.00 0.00% 5.00 292.80 100.00% 5.00 292.80 100.00% 0.00 0.00 0.00% m3 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 276.40 100.00% m3 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 10.00 132.40 100.00% m3 0.00 0.00% 14.50 2230.54 100.00% 14.50 2230.54 100.00% 0.00 0.00 0.00% m3 0.00 0.00% 2.10 475.84 100.00% 2.10 475.84 100.00% 0.00 0.00 0.00% m2 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 42.50 2823.70 100.00% m2 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 1059.84 100.00% pza 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 350.00 280.00 100.00% kg 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 185.00 1233.95 100.00% m3 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 3.90 1294.80 100.00% m2 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 3125.76 100.00% und 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 4.00 480.00 100.00% m2 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 150.80 1247.12 100.00% m2 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 445.92 100.00% und 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 1.00 467.90 100.00% m2 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 48.00 5329.92 100.00% m2 0.00 0.00% 0.00 0.00% 0.00 0.00 0.00% 12.50 1740.00 100.00% 0.00 4762.90 4762.90 19937.71 0.00 381.03 381.03 1595.02 0.00 5143.93 5143.93 21532.72 0.00 925.91 925.91 3875.89 0.00 0.00% 6069.83 19.28% 6069.83 19.28% 25408.61 80.72% 12.50 ICA-ICA-LOS AQUIJES 24,700.61 1,976.05 467.90 467.90 02.01.06 ENCHAPADO DE PISO CON CERAMICA DE 0.45x0.45 48.00 26,676.66 03 VEREDAS 1,740.00 03.01 8.27 1,247.12 02.01.04 PINTURA LATEX EN CIELORRASOS 48.00 139.20 1,740.00 02.01.05 PUERTA CONTRAPLACADA DE 1.20mX2.10m 1.00 65.12 3,125.76 02.01.02 VENTANA C/ PERFILES DE ALUMINIO - CRISTAL TEMPLADO 6MM 4.00 111.04 5,329.92 02.01.03 PINTURA LATEX EN INTERIORES Y EXTERIORES 150.80 02.01 GENERAL 11,096.62 9.29 445.92 02.01.01 FALSO CIELO RASO DE YESO 48.00 01.02.02.03.04 CONCRETO EN LOSAS ALIGERADAS f'c=210 kg/cm2 3.90 332.00 1,294.80 120.00 480.00 02 ARQUITECTURA 11,096.62 01.02.02.03.02 LADRILLO HUECO DE ARCILLA h=15 cm PARA TECHO ALIGERADO 350.00 0.80 280.00 01.02.02.03.03 ACERO fy=4200 kg/cm2 GRADO 60 en LOSAS ALIGERADAS 185.00 6.67 1,233.95 01.02.02.03 LOSAS ALIGERADAS 3,868.59 01.02.02.03.01 ENCOFRADO Y DESENCOFRADO NORMAL EN LOSAS ALIGERADAS 48.00 22.08 1,059.84 01.02.02.02.02 CONCRETO SOBRECIMIENTOS MEZCLA 1:8 (100 kg/cm2) 2.10 226.59 475.84 01.02.02.02.03 CONTRAPISO DE 4" 42.50 66.44 2,823.70 01.02.02.02 CONCRETO SIMPLE 5,530.08 01.02.02.02.01 14.50 153.83 2,230.54 01.02.02.01.04 ELIMINACION DE MATERIAL EXCEDENTE CARGUIO / VOLQ 15M3 D=10KM 10.00 27.64 276.40 01.02.02.01.05 ACARREO DE MATERIAL EXCEDENTE DIST. 30m 10.00 13.24 132.40 01.02.02.01.02 NIVELACION Y COMPACTADO DE TERRENO NORMAL (con plancha) 48.00 3.88 186.24 01.02.02.01.03 RELLENO Y COMPACTACION CON MATERIAL DE PRESTAMO CON PLANCHA 5.8HP 5.00 58.56 292.80 01.02.02.01 MOVIMIENTOS DE TIERRA 1,248.51 01.02.02.01.01 EXCAVACION MANUAL DE TERRENO, MATERIAL SUELTO 15.60 23.12 360.67 01.02.01 EQUIPO DE PROTECCION INDIVIDUAL 1.00 425.00 425.00 01.02.02 CONSTRUCCION 10,647.18 01.01.02 TRAZO Y REPLANTEO DE TERRENO DURANTE LA OBRA 1.00 150.00 150.00 01.02 SEGURIDAD Y SALUD 11,072.18 OBRAS PRELIMINARES 791.81 01.01.01 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS 1.00 641.81 641.81 CONCRETO CIMIENTOS CORRIDOS MEZCLA 1:10 CEMENTO-HORMIGON 30% Item Descripción Metrado Precio S/. Parcial S/. 01 ESTRUCTURAS 11,863.99 01.01 ACUMULADO SEMANA ANTERIOR ACTUAL VALORIZACION ACUMULADO SEMANA ACTUAL SALDO POR VALORIZAR 4801.80 08/09/2020 AL 14/09/2020 31478.46 Valorizacion Semanal N° 01 Ampliación de Oficina de C&B con Material Noble en Fundo Manuelita FYH SAC CONCRETO VEREDAS f'c=175 kg/cm2 UN SARDINEL INCORPORADO A=1.00 m. COSTO DIRECTO GASTOS GENERALES 8% COSTO TOTAL IGV 18% TOTAL