1. JOHN FAMELIGOS
Address: Kolokotroni 30 Street, Megalopolis 22200, Greece
Contact: 00306947203031, 00302791021111 E-mail: fameligos@gmail.com Fax: 00302791021110
SENIOR MANAGEMENT EXECUTIVE – PROJECT MANAGEMENT (ELECTRICAL)
PROFILE & VALUE
Professional matured licensing electrical engineer with 21+ years’ of career success in managing electrical projects, electri cal
maintenance, utilities/plant engineering and development with renowned engineering companies
Demonstrated competencies in project planning, designing, scheduling, tendering, procurement and resource mobilization &
management to ensure project delivery within defined cost and timelines. Adept at liaising with local and government authorities
Skilled in implementing preventive,planned and predictive maintenance practices to optimize electrical equipmentavailabilitywith a
constant endeavor to realize zero downtime. Rich exposure to sustainable construction principles and green building designs
Proven dexterity in planning,vendor development,procurement,logistics,and managementofinventory of critical spares to manage
maintenance calls expeditiously. Possess expertise in operations, preparation of SOP, designing and implementing quality control
systems & procedures to achieve highest quality standards
Proficientin selection and specification ofelectrical equipment,with rich exposure to ICT/Comms network design and MEP sys tems
strategy and design.Good knowledge of applicable local and international standards,regulations and bestpractice with a rounded
awareness ofMechanical and Public Health building services.Adeptatliaising with local authoritiesto complete the licensing process
in compliance with the legislation
Thrive in a deadline intensive environment, multi-task, perform under pressure and meet deadlines. Exceptionally well organized
with a track record thatdemonstrates selfmotivation,creativity,and initiative to achieve both personal & corporate goals while leading
multi-disciplinary coordination
Leadership Skills
Contract Management Inventory Control Site Supervision/Installation Plant Engineering Root Cause Analysis Break Down
Solutions Utilities Management Erection & Commissioning Specification & Report Writing HVAC/Troubleshooting Cross
Functional Coordination Training & Development Team Management Crisis Management
Technical Skills
Electrical Project Management MEP Design Services Electrical LV Distribution System Design Substation Planning Design
Lighting & Lighting Control Systems Design Emergency Lighting Design Fire Detection Systems Containment Systems Design
Lightning Protection Systems Design Earthing Systems Design MEP Space Planning Welding/Prefabrication
CERTIFICATION
Certification license by the Greek state through the Greek chamber of engineers (TEE) to work as an Electrical Engineer
Greek state certification - license for electrical works, installation, servicing and consulting for private sector
Certified Electrical Engineer with certification to participate in any private project, either as consultant or as a constructor
Certified to participate as a consultant in electrical and mechanical project up to grade A Class which is 80% of the total p ublic
projects annually
Certified to participate in public construction in electricaland mechanical,piping or steel structure projectup to grade B which is more
than 80% of the total public project per year
Greek state certification - license for mechanical works, installation, servicing and consulting for private sector
Greek state certification - license for public sector project consulting
Greek state certification - license for the evaluation of energy consumption and then classification of residential buildings -houses
Certification by Bureau Veritas that I am working under ISO 9001:2008 management system
CAREER PROGRESSION
Artechnika EE – Megalopolis Arcadia since 2010
2. PROJECT MANAGER – ELECTRICAL ENGINEER
Credited for implementation of electrical projects and running maintenance of electrical installations and equipments. Commended for
creating new building design in accordance with KENAK system (Kenak is a system introduced in Greek Building Industryby the state in
accordance with country obligation to conform to European Union Directive of Energy Performance of Building 2002/91/EC)
Drive the efforts to develop project objectives by reviewing project proposals and plans, after conferring with management.
Responsible for initiation and execution of contracts
Oversee all phases ofprojectexecution;approve engineering/design changes,troubleshootandresolve complextechnical problems,
consistently meeting project deadlines with highest possible quality standards
Develop plan to use European Norms EN ISO 13790:2008, Space Heating and Cooling EN ISO 13720. Hot water 15316-3-1 etc,
Lighting 15193 to implement the European directive 2002/91/EC
Solely responsible for determining projectresponsibilities byidentifying projectphases and elements;Assigning personnel to phases
and elements; Reviewing bids from contractors
Played an integral role to determine project specifications by studying product design, customer requirements, and performance
standards, completing technical studies and preparing cost estimates
Provide on-site managementand quality control to ensure projects mettime and budgetrequirements and builtin accordance with
contract documents
Judiciouslyhandled Design – Consulting Engineering works for a number ofsolar panel electrical power projects(varies from 20KW
up to 2 MW) and also monitored construction activities, as required
Awarded the temporary inspector status for issuing building classification certificates
Initiated the system of WOW (War on Waste) and Quality Circle
Comprehension and assimilation of contractual obligations, rights, and scope of work. Engineered preparation of the MOU’s, legal
drafting and other contractual documents
Geared the activities for preparing tenders,inviting proposal,opening,& finalizing the Vendor based on qualitystandards complying
with the international/co. norms and techno - commercial discussions with vendors
Actively engaged with the consulting aspects of engineering as well as the construction - installation aspects
Ensure thatthe commissioning obligations ofthe projectare carried outin accordancewith the terms ofcontract,qualityan d schedule
in conformance with the good practice of commissioning standards
Implement preventive, planned and predictive maintenance to maximize operational availability of equipments
Responsible for designing various electrical layouts/drawings/schedules in accordance with local and international stand ards
Handle electrical operations, including short circuit, cable pulling tension, lighting, grounding, and equipment sizing
Perform scheme test/functional test, testing of inter‐trip panel and tripping matrix and monitor testing of electrical interlocking
schemes
Associated closely with recruiting specialists and sub-contractors in addition to overseeing the accounting, costing and billing.
Undergoing projects.
1)Being awarded from the biggestcompany in Greece PPC(Public Power Corporation ) a contract-project to check and re
design in accordance with all the applicable local and international standards and state regulations ,all the supported to the
production ‘service installations’ for Ptolemaida lignite pit.Ptolemaida lignite pitlocated in north Greece is the third lignite pit i n
Europe and the sixth in the world. I am steel working on this project.
2) I have being awarded a new project from the municipality ofMegalopoli . The projectis to design and install in two
different settlemenets one of one hundred houses and a second off three hundred houses drinking water supply .That mens
new water tanks ,pumping stations , piping ,meatering instruments etc.
3)My final project is an one year contract Aug 2016 with the Municipality of Megalopolis , supervising and suggesting for th e
fire protection and safety of labor for all the installations ofthe municipality which means offices , MEP services unit,Schools
,Nursery.
Artechniki EE - Megalopolis Arcadia 2006 – 2009
PROJECT MANAGER – ELECTRICAL ENGINEER
Recognised for completing the preventive and predictive maintenance and overhauling ofmachines according to preventive check sheet
schedule. Devised effective strategies to manage project schedules by studying project plan and specifications; calculating time
requirements and sequencing projectelements.Led & guided the team in ensuring compliance to all safety norms to minimize/achieve
ZERO accidents through the appropriate fire protection system & safety equipments
3. Proactively prepared projectstatus reports bycollecting,analyzing,and summarizing information andtrends;recommendingactions.
Used IT systems to keep track of people and progress
Effectively liaised with customers on a regular basis to ensurethe successful design andconstruction of the project to agreed budgets
and time frames
Handled sites, coordinated project activities, and provided technical inputs. Carried out a survey and investigation of projects/
schemes as per contractspecifications.Identified andfinalized the workforce,ensuringqualitysupplyofmaterials for effective project
development
Managed the documentation for electrical commissioning that included taking over certificates, as built drawings, manufacturer
manuals and instructions, snagging lists, test procedures, risk assessment and health and safety method statement, and end of
commissioning reports
Structured annual operational budget and implemented control measures to contain expenses within defined limits
Drove the efforts for preparing all cost summaries and reports,ensuring managementwas provided with all necessaryinformation
for bid review to enable competitive pricing decisions
Organized various training sessions for the team to enhance their performance
Developed vendors and negotiated with them to finalize the contract and ensured supplyof material at the bestqualitative products
at most competitive prices for effective project development
Private Technical Office (Freelance Electrical Engineer) 2004 – present
.
Ensured all engineering work was carried out in accordance with specifications, laws, rules, regulations and other contractual
requirements
Fully accountable for managing projects from conception, design through to completion
Devised effective strategies for carrying out loop checks, interlocks checks before startup and supervision ofsafe plantstartup and
stabilization within stipulated time after planned maintenance
Actively involved in communicating project directions to the clients, colleagues, partners and suppliers
Key player to conduct root cause analysis of failures and provide breakdown solutions within the minimum time lapse
Organized and managed resources while creatingestimates, work breakdown structure,projectplan,contingencyplan & schedules,
preventive maintenance related to instrumentation, identifying risks within defined scope, quality, time and cost constraints
Established plan for ensuring compliance to all HSE activities and practices
Conducted periodic reviews ofengineering,procurementstatus and site activity for electrical and instrumentation items and provided
necessary reinforcements
Undergoing project:
1)Holds the distinction of working on a projectfor the municipality ofMegalopoli,to fetch economical – ecological gain ofdesign
and install - construct new pump stations and new feed fresh water tanks for the supply of fresh water of town Karytaina .
Seller Electromechanica AE-Athens, Greece 2002 – 2004
V.P./PROJECT MANAGER – ELECTRICAL ENGINEER
Rewarded with 10% of the new founded company and promoted as a vice president
PAST EXPERIENCE
TECHNICAL DIRECTOR, Seller Hellas AE-Athens, Greece, 2000 – 2004
SITE PROJECT MANAGER, Speco EPE (Babcock - Noell KRC), Athens, Greece, 1996 – 2000
RADIO COMMUNICATION TECHNICIAN, The Greek Army, 1994 – 1996
Projects Handled
MEP maintenance works and HVAC maintenance work atMercedes Benz Hellas Buildings premises
Consulting fuel gas system,LPG at Meat companyin Falesia
Building construction,Wood processing industryat Analipsi Messinia
Engineering and design consultancies for Mercedes Benz Hellas
Mercedes Benz Hellas – Reconstruction ofFinancial Service Building
Mercedes Benz Hellas – Reconstruction ofmain Show Room Hall ofStars
Hotel Pelargos atKarytaina Arcadia
4. Hotel Isari at Isari Arcadia
Contractor works for the Public Power Company
Consulting works for the Public Power Company
Installation ofpower substation (20 KVto 0.4 KV), building HVAC systems,backup power from diesel power generators,all electrical
switch boards,refrigeration machineryroom and systems,production machinery,plumbing,LPG/Natural gas, and lighting systems
Construction ofFlue Gas Desulfurization system for UnitIV of Public Power, Megalopolis Greece
Construction offood industryKaramolegos
Construction offood industryStergiou Panrico
Construction and maintenance work for Chipita (Edita) food Industry
Construction and maintenance ofa numerous power substation 20kVto 400V and 20KV to 6.6KV
Design – Consulting Engineering works for a number of solar panel electrical power projects varies from 20KWup to 2 MW
EDUCATION & CREDENTIAL
M.Sc. in Control Systems,Imperial College,Universityof London,1993
B.Eng. in Electrical and Electronic Engineering,Universityof Greenwich,1991
MEMBERSHIP
Institution of Engineering and Technology(IET) -UK No:83614970
Technical Chamber ofGreece No: 94248
IT SKILLS
AutoCAD, Revit, MS Office, MS Project, Intellicad,4M MEP Fine (Fine Electrical,Fine HVAC, Fine Sani, Fine Fire, Fine GAS, Fine
LIFT, Fine Light)
4M Kenak – Sustainable Construction Principles software
4M Fine Gas – FLOW (Gases medical or fuel simulator)
Date of Birth: 13th
Jun, 1967 | Driving License: International Driving License