Lockout - Tagout
Control of
Hazardous Energy
OSHA Standard
1910.147
You will learn…
 Purpose of Lockout-
Tagout
Requirements for LOTO
 Types of Hazardous
Energy
 Procedures for LOTO
Types of Energy
 Electrical
 Mechanical
 Chemical
 Thermal
 Hydraulic
 Pneumatic
Electric shock can kill
 as low as 30 volts can carry enough
current to kill
Use Safe Electrical Practices
 Use non-conducting tools
 Check circuits dead
before working
 Lock & Tag source
breakers not switches
 Ensure all control power
is de-energized
 Discharge all capacitors
after Lockout
Mechanical Energy
Hazards
2 Types
Kinetic – in
motion
Potential -
stored
Kinetic Energy Hazards
Energy of moving machinery can
cause
 Amputations
 Lacerations
 Fractures
 Loss of life
Potential Energy Hazards
 Energy stored in machinery
 Weights & Springs
 Pistons under pressure
 Hydraulic controls
Stored potential energy can be
released during work causing
injury or death
Chemical Energy Hazards
Chemicals have energy that can
 start fires
 cause skin burns
 generate harmful gases or
fumes
Before working – release, drain
or vent chemicals safely
Thermal Energy Hazards
Energy of Heat (and cold)
 Hot equipment & fluids will burn you
 Cold fluids can cause injury also
 Quick release of compresses gases
can freeze your skin
 Allow equipment to reach a safe
temperature before starting work.
Hydraulic Energy
Energy of Liquids Under Pressure
 pressure can cause equipment to
move
 rapid release can cause injury
 or ejection of system parts
Relieve pressure slowly into a proper
container
Pneumatic Energy Hazards
Energy of Compressed Gases
– uncontrolled release can cause
injury
– rapid de-pressurization creates
extreme low temperature
Properly vent all systems before
starting work
First Step In LOTO
Know your equipment & systems
– hazards
– isolation points
– procedure for Lockout
Working on unfamiliar machinery is a
hazard
Who Can Lockout
Equipment?
Only Employees who
have been trained and
authorized by
management
Items needed for LOTO
 Written LOTO schedule
 Locks & Tags - identified to the
worker
 Hasps - for placing locks & tags
 Breaker Clips - for electrical LOTO
 Blank Flanges (pancakes)- for fluid
lines
 Valve Covers - for LOTO of Valves
 Plug Buckets - for electrical plugs
Use of Locks & Tags
 Use only those issued to you
 Never use another workers lock
or tag
 Ask your supervisor if you need
more LOTO equipment
6 Step LOTO Procedure
 Prepare for Shutdown
 Shutdown Equipment
 Isolate all energy sources
 Place Locks & Tags
 Release Stored Energy
 Verify Equipment Isolation
1. Prepare for Shutdown
Understand equipment
hazards
Notify other workers of
shutdown
2. Shutdown Equipment
Use normal shutdown
procedure
Turn all switches to OFF
Shut all control valves
Disable all sources of energy
3. Isolate All Energy
Sources
Shut valves
Open breakers &
disconnects
4. Place Locks & Tags on
Valves
Breakers / electrical disconnects
Block or disconnect all lines
Lock and tag blank flanges
5. Release or Block
all Stored Energy
 Discharge capacitors
 Block or release springs
 Block elevated parts
 Stop rotating flywheels
 Relieve system pressure
 Drain fluids
 Vent gases
 Allow system to cool
6. Verify Equipment
Isolation
 Check all other workers are clear
 Check locking devices securely
placed
 Check isolation
 Attempt normal startup
 Return Controls to OFF/Neutral
Release from LOTO
 Inspect Area and Equipment
 Ensure all Machine Guards in
place
 Move tools away from
equipment
 Inform others of startup
 Restore system connections
 Remove Locks & Tags
 Restore equipment to normal
 Conduct normal startup
Who can remove Locks &
Tags?
Only the employee who placed the
tag
or
a supervisor, after obtaining
permission from the worker who
placed the tag
A piece of equipment already
has a lock and tag. Do I have
to place my own locks & tags?
YES. Each person
working on the
equipment must place
their own locks and
tags to ensure their
safety.
Lockout-Tagout Protects
YOU!
USE Proper
Lockout -
Tagout
Procedures
Please be
careful when
working on
equipment

More Related Content

Similar to loto.ppt

ONTAP - Lock Out, Tag Out
ONTAP - Lock Out, Tag OutONTAP - Lock Out, Tag Out
ONTAP - Lock Out, Tag OutWRDSB
 
Electrical Safety1
Electrical Safety1Electrical Safety1
Electrical Safety1jboullemet
 
Lock-Out-Tag-Out-mini-module-PDF-FINAL-Jan-2014-2.pdf
Lock-Out-Tag-Out-mini-module-PDF-FINAL-Jan-2014-2.pdfLock-Out-Tag-Out-mini-module-PDF-FINAL-Jan-2014-2.pdf
Lock-Out-Tag-Out-mini-module-PDF-FINAL-Jan-2014-2.pdfashrafhariri96
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutJulian Kalac P.Eng
 
Chapter 1 electro mecha device part 1
Chapter 1 electro mecha device part 1Chapter 1 electro mecha device part 1
Chapter 1 electro mecha device part 1Hattori Sidek
 
Lockout Tagout Guidelines
Lockout Tagout GuidelinesLockout Tagout Guidelines
Lockout Tagout Guidelineskrm corporation
 
Troubleshooting Electrical Faults
Troubleshooting Electrical FaultsTroubleshooting Electrical Faults
Troubleshooting Electrical FaultsSimutech Multimedia
 
fy15_sh-27664-sh5_Lock_Out_Tag_Out_mini_module_ppt.pptx
fy15_sh-27664-sh5_Lock_Out_Tag_Out_mini_module_ppt.pptxfy15_sh-27664-sh5_Lock_Out_Tag_Out_mini_module_ppt.pptx
fy15_sh-27664-sh5_Lock_Out_Tag_Out_mini_module_ppt.pptxnishant83985
 
Electrical 2
Electrical 2Electrical 2
Electrical 2FFSafety
 
Lock Out Tag Out
Lock Out Tag OutLock Out Tag Out
Lock Out Tag OutHvacmach
 
Fluke Ways Test Tools Can Improve Safety Around Rotating Machinery
Fluke Ways Test Tools Can Improve Safety Around Rotating MachineryFluke Ways Test Tools Can Improve Safety Around Rotating Machinery
Fluke Ways Test Tools Can Improve Safety Around Rotating MachineryTranscat
 

Similar to loto.ppt (20)

LOTO 2.ppt
LOTO 2.pptLOTO 2.ppt
LOTO 2.ppt
 
Safety Tip: Lockout/Tagout (LOTO)
Safety Tip: Lockout/Tagout (LOTO)Safety Tip: Lockout/Tagout (LOTO)
Safety Tip: Lockout/Tagout (LOTO)
 
ONTAP - Lock Out, Tag Out
ONTAP - Lock Out, Tag OutONTAP - Lock Out, Tag Out
ONTAP - Lock Out, Tag Out
 
Electrical Safety1
Electrical Safety1Electrical Safety1
Electrical Safety1
 
Lockout Tagout.ppt
Lockout Tagout.pptLockout Tagout.ppt
Lockout Tagout.ppt
 
Lockout Tagout by Snohomish County
Lockout Tagout by Snohomish CountyLockout Tagout by Snohomish County
Lockout Tagout by Snohomish County
 
Lock-Out-Tag-Out-mini-module-PDF-FINAL-Jan-2014-2.pdf
Lock-Out-Tag-Out-mini-module-PDF-FINAL-Jan-2014-2.pdfLock-Out-Tag-Out-mini-module-PDF-FINAL-Jan-2014-2.pdf
Lock-Out-Tag-Out-mini-module-PDF-FINAL-Jan-2014-2.pdf
 
LOTOTO PDF.pdf
LOTOTO PDF.pdfLOTOTO PDF.pdf
LOTOTO PDF.pdf
 
Machine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag OutMachine Safeguarding with Lock Out Tag Out
Machine Safeguarding with Lock Out Tag Out
 
loto
lotoloto
loto
 
Chapter 1 electro mecha device part 1
Chapter 1 electro mecha device part 1Chapter 1 electro mecha device part 1
Chapter 1 electro mecha device part 1
 
SCS Safety Training (2).pdf
SCS Safety Training (2).pdfSCS Safety Training (2).pdf
SCS Safety Training (2).pdf
 
Lockout Tagout Guidelines
Lockout Tagout GuidelinesLockout Tagout Guidelines
Lockout Tagout Guidelines
 
Troubleshooting Electrical Faults
Troubleshooting Electrical FaultsTroubleshooting Electrical Faults
Troubleshooting Electrical Faults
 
fy15_sh-27664-sh5_Lock_Out_Tag_Out_mini_module_ppt.pptx
fy15_sh-27664-sh5_Lock_Out_Tag_Out_mini_module_ppt.pptxfy15_sh-27664-sh5_Lock_Out_Tag_Out_mini_module_ppt.pptx
fy15_sh-27664-sh5_Lock_Out_Tag_Out_mini_module_ppt.pptx
 
Electrical2
Electrical2Electrical2
Electrical2
 
Electrical 2
Electrical 2Electrical 2
Electrical 2
 
Lock Out Tag Out
Lock Out Tag OutLock Out Tag Out
Lock Out Tag Out
 
Fluke Ways Test Tools Can Improve Safety Around Rotating Machinery
Fluke Ways Test Tools Can Improve Safety Around Rotating MachineryFluke Ways Test Tools Can Improve Safety Around Rotating Machinery
Fluke Ways Test Tools Can Improve Safety Around Rotating Machinery
 
Lockout tagout
Lockout tagoutLockout tagout
Lockout tagout
 

Recently uploaded

Elo Cakes | Premium Cake Shop | Order Now
Elo Cakes | Premium Cake Shop | Order NowElo Cakes | Premium Cake Shop | Order Now
Elo Cakes | Premium Cake Shop | Order NowElo Cakes
 
Story of the Origin of Some Foods in Bengal.docx
Story of the Origin of Some Foods in Bengal.docxStory of the Origin of Some Foods in Bengal.docx
Story of the Origin of Some Foods in Bengal.docxTapas Kumar Basu
 
Grocery_ POS_ Billing _Software (1).pptx
Grocery_ POS_ Billing _Software (1).pptxGrocery_ POS_ Billing _Software (1).pptx
Grocery_ POS_ Billing _Software (1).pptxQueueBuster
 
Postharvest technology and manageent.ppt
Postharvest technology  and manageent.pptPostharvest technology  and manageent.ppt
Postharvest technology and manageent.pptnazmulhrt
 
NO1 Top Black Magic Expert Specialist In UK Black Magic Expert Specialist In ...
NO1 Top Black Magic Expert Specialist In UK Black Magic Expert Specialist In ...NO1 Top Black Magic Expert Specialist In UK Black Magic Expert Specialist In ...
NO1 Top Black Magic Expert Specialist In UK Black Magic Expert Specialist In ...Amil baba
 
100^%)( FORDSBURG))(*((+27838792658))*))௹ )Abortion Pills for Sale in Benoni,...
100^%)( FORDSBURG))(*((+27838792658))*))௹ )Abortion Pills for Sale in Benoni,...100^%)( FORDSBURG))(*((+27838792658))*))௹ )Abortion Pills for Sale in Benoni,...
100^%)( FORDSBURG))(*((+27838792658))*))௹ )Abortion Pills for Sale in Benoni,...drjose256
 
Medical Foods final.ppt (Regulatory Aspects of Food & Nutraceiticals)
Medical Foods final.ppt (Regulatory Aspects of Food & Nutraceiticals)Medical Foods final.ppt (Regulatory Aspects of Food & Nutraceiticals)
Medical Foods final.ppt (Regulatory Aspects of Food & Nutraceiticals)Lokesh Kothari
 
NO1 Pakistan Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Y...
NO1 Pakistan Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Y...NO1 Pakistan Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Y...
NO1 Pakistan Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Y...Amil Baba Dawood bangali
 
FSSAI.ppt Food safety standards act in RAFN
FSSAI.ppt Food safety standards act in RAFNFSSAI.ppt Food safety standards act in RAFN
FSSAI.ppt Food safety standards act in RAFNLokesh Kothari
 

Recently uploaded (10)

Elo Cakes | Premium Cake Shop | Order Now
Elo Cakes | Premium Cake Shop | Order NowElo Cakes | Premium Cake Shop | Order Now
Elo Cakes | Premium Cake Shop | Order Now
 
Story of the Origin of Some Foods in Bengal.docx
Story of the Origin of Some Foods in Bengal.docxStory of the Origin of Some Foods in Bengal.docx
Story of the Origin of Some Foods in Bengal.docx
 
Grocery_ POS_ Billing _Software (1).pptx
Grocery_ POS_ Billing _Software (1).pptxGrocery_ POS_ Billing _Software (1).pptx
Grocery_ POS_ Billing _Software (1).pptx
 
Postharvest technology and manageent.ppt
Postharvest technology  and manageent.pptPostharvest technology  and manageent.ppt
Postharvest technology and manageent.ppt
 
NO1 Top Black Magic Expert Specialist In UK Black Magic Expert Specialist In ...
NO1 Top Black Magic Expert Specialist In UK Black Magic Expert Specialist In ...NO1 Top Black Magic Expert Specialist In UK Black Magic Expert Specialist In ...
NO1 Top Black Magic Expert Specialist In UK Black Magic Expert Specialist In ...
 
100^%)( FORDSBURG))(*((+27838792658))*))௹ )Abortion Pills for Sale in Benoni,...
100^%)( FORDSBURG))(*((+27838792658))*))௹ )Abortion Pills for Sale in Benoni,...100^%)( FORDSBURG))(*((+27838792658))*))௹ )Abortion Pills for Sale in Benoni,...
100^%)( FORDSBURG))(*((+27838792658))*))௹ )Abortion Pills for Sale in Benoni,...
 
Medical Foods final.ppt (Regulatory Aspects of Food & Nutraceiticals)
Medical Foods final.ppt (Regulatory Aspects of Food & Nutraceiticals)Medical Foods final.ppt (Regulatory Aspects of Food & Nutraceiticals)
Medical Foods final.ppt (Regulatory Aspects of Food & Nutraceiticals)
 
Chaine des Rotisseurs Gala Dinner Menu May 25 2024 Cambodia
Chaine des Rotisseurs Gala Dinner Menu May 25 2024 CambodiaChaine des Rotisseurs Gala Dinner Menu May 25 2024 Cambodia
Chaine des Rotisseurs Gala Dinner Menu May 25 2024 Cambodia
 
NO1 Pakistan Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Y...
NO1 Pakistan Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Y...NO1 Pakistan Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Y...
NO1 Pakistan Amil Baba In Bahawalpur, Sargodha, Sialkot, Sheikhupura, Rahim Y...
 
FSSAI.ppt Food safety standards act in RAFN
FSSAI.ppt Food safety standards act in RAFNFSSAI.ppt Food safety standards act in RAFN
FSSAI.ppt Food safety standards act in RAFN
 

loto.ppt

  • 1. Lockout - Tagout Control of Hazardous Energy OSHA Standard 1910.147
  • 2. You will learn…  Purpose of Lockout- Tagout Requirements for LOTO  Types of Hazardous Energy  Procedures for LOTO
  • 3. Types of Energy  Electrical  Mechanical  Chemical  Thermal  Hydraulic  Pneumatic
  • 4. Electric shock can kill  as low as 30 volts can carry enough current to kill
  • 5. Use Safe Electrical Practices  Use non-conducting tools  Check circuits dead before working  Lock & Tag source breakers not switches  Ensure all control power is de-energized  Discharge all capacitors after Lockout
  • 6. Mechanical Energy Hazards 2 Types Kinetic – in motion Potential - stored
  • 7. Kinetic Energy Hazards Energy of moving machinery can cause  Amputations  Lacerations  Fractures  Loss of life
  • 8. Potential Energy Hazards  Energy stored in machinery  Weights & Springs  Pistons under pressure  Hydraulic controls Stored potential energy can be released during work causing injury or death
  • 9. Chemical Energy Hazards Chemicals have energy that can  start fires  cause skin burns  generate harmful gases or fumes Before working – release, drain or vent chemicals safely
  • 10. Thermal Energy Hazards Energy of Heat (and cold)  Hot equipment & fluids will burn you  Cold fluids can cause injury also  Quick release of compresses gases can freeze your skin  Allow equipment to reach a safe temperature before starting work.
  • 11. Hydraulic Energy Energy of Liquids Under Pressure  pressure can cause equipment to move  rapid release can cause injury  or ejection of system parts Relieve pressure slowly into a proper container
  • 12. Pneumatic Energy Hazards Energy of Compressed Gases – uncontrolled release can cause injury – rapid de-pressurization creates extreme low temperature Properly vent all systems before starting work
  • 13. First Step In LOTO Know your equipment & systems – hazards – isolation points – procedure for Lockout Working on unfamiliar machinery is a hazard
  • 14. Who Can Lockout Equipment? Only Employees who have been trained and authorized by management
  • 15. Items needed for LOTO  Written LOTO schedule  Locks & Tags - identified to the worker  Hasps - for placing locks & tags  Breaker Clips - for electrical LOTO  Blank Flanges (pancakes)- for fluid lines  Valve Covers - for LOTO of Valves  Plug Buckets - for electrical plugs
  • 16. Use of Locks & Tags  Use only those issued to you  Never use another workers lock or tag  Ask your supervisor if you need more LOTO equipment
  • 17. 6 Step LOTO Procedure  Prepare for Shutdown  Shutdown Equipment  Isolate all energy sources  Place Locks & Tags  Release Stored Energy  Verify Equipment Isolation
  • 18. 1. Prepare for Shutdown Understand equipment hazards Notify other workers of shutdown
  • 19. 2. Shutdown Equipment Use normal shutdown procedure Turn all switches to OFF Shut all control valves Disable all sources of energy
  • 20. 3. Isolate All Energy Sources Shut valves Open breakers & disconnects
  • 21. 4. Place Locks & Tags on Valves Breakers / electrical disconnects Block or disconnect all lines Lock and tag blank flanges
  • 22. 5. Release or Block all Stored Energy  Discharge capacitors  Block or release springs  Block elevated parts  Stop rotating flywheels  Relieve system pressure  Drain fluids  Vent gases  Allow system to cool
  • 23. 6. Verify Equipment Isolation  Check all other workers are clear  Check locking devices securely placed  Check isolation  Attempt normal startup  Return Controls to OFF/Neutral
  • 24. Release from LOTO  Inspect Area and Equipment  Ensure all Machine Guards in place  Move tools away from equipment  Inform others of startup  Restore system connections  Remove Locks & Tags  Restore equipment to normal  Conduct normal startup
  • 25. Who can remove Locks & Tags? Only the employee who placed the tag or a supervisor, after obtaining permission from the worker who placed the tag
  • 26. A piece of equipment already has a lock and tag. Do I have to place my own locks & tags? YES. Each person working on the equipment must place their own locks and tags to ensure their safety.
  • 27. Lockout-Tagout Protects YOU! USE Proper Lockout - Tagout Procedures Please be careful when working on equipment