1. FAHAD MUHAMMED MAHMOUED EL-REFAEY
Cairo – Egypt
felrefaey@yahoo.com
+201018983409
QC Sr. Document controller
Handover the document
Personal data
Birth date: 01-07-1967
Nationality: Egyptian
Education: B.Sc. commercial Ain shams university1990
… English & Arabic
Marital status: married have 2 children
Computer knowledge:
MS-Office grade,excellent
VBC: visual Byblos cyberspace very good
Atlas: very good
Bann: very good
Job description:
Complete responsibilityfor certification process
Developmentofcomputerized system in coordination with ISD departmentfor receiving,
controlling and processing ofdocumentation.
Preparation and reviewing of certification packages.
Final system and handover documentation
Previous experience
Duration: From FEB.2011 TILL NOW
Project: GIZA north power station (Nominal combined cycle 1500 MW)
Company name: INITEC and “MEGA” for construction & industries “MEGA”
Position: Q.C Sr. documentcontroller and HANDOVER DOCUMENT
Responsibility
Received all RFI (requestfor inspection) from Q.C departmentfor Mechanical (equipment,test
package,painting and insulation,all reports for welding RT films,TOFD,MPI, and PWHT)
Present Occupation
Duration: From 26-01-2009 till 1-11-2011
Project: Princes NOURA BINT ABDUL RAHMAN University for women (PNUW) project,
El Seif engineering contracting company–main contractor & consolidated contractors company–
MEP contractor (Riyadh, kingdom ofSaudi Arabia)
Position: Q.C Sr. document controller and Handover the document
Responsibility
Receive all RFI (requestfor inspection) from Q.C departmentfor civil (Foundation,Sewages &
Drainage,paving,Road…)
Received all RFI (requestfor inspection) from Q.C departmentfor Mechanical (equipment,test
package,painting and insulation,all reports for welding RT,TOFD,MPI, and films …)
Receive all RFI (requestfor inspection) from Q.C departmentfor Electrical (Equipment,cable list,
grounding,lighting …)
Receive all RFI (requestfor inspection) from Q.C departmentfor instrument(local instrument,
2. cable list,and piping,tubing …)
Check all ITP form and all sign.
Check all details with ISO drawing
Prepare check listby VBC system
Coordination with contractor for certification purpose
Filling all documentby system and subsystem
Handover the documentend of project
Reporting for management
Previous experience
Duration: From 15-6-2006 to 1-1-2009
Project: Olefin plantproject(ROPP) PETRO RABIGH, JGC Arabia, and consolidated contractors
company(CCC),
Company name: consolidated contractors company(CCC),
Position: Sr. documentcontroller (certification)
Responsibility
Receive all RFI (requestfor inspection) from Q.C departmentfor civil (Foundation,Sewages &
Drainage,paving,Road…)
Received all RFI (requestfor inspection) from Q.C departmentfor Mechanical (equipment,test
package,painting and insulation,all reports for welding RTfilms,TOFD,MPI, and PWHT)
Receive all RFI (requestfor inspection) from Q.C departmentfor Electrical (Equipment,cable list,
grounding,lighting …)
Receive all RFI (requestfor inspection) from Q.C departmentfor instrument(local instrument,
cable list,and piping,tubing …)
Check all ITP form and all sign.
Check all details with ISO drawing
Prepare check listby VBC system
Coordination with contractor for certification purpose
Filling all documentby system and subsystem
Handover the documentend of project
Reporting for management
Previous experience
Duration: From OCT.2004 to MAY.2006
Project: Nubaria power station (Nominal combined cycle 2x750 MW)
Company name: MITSUBISHI & INITEC and MISR companyfor electrical & mechanical projects “KAHROMIKA”
Position: Sr. documentcontroller (certification)
Responsibility
Received all RFI (requestfor inspection) from Q.C departmentfor Mechanical (equipment,test
package,painting and insulation,all reports for welding RTfilms,TOFD,MPI, and PWHT)
Receive all RFI (requestfor inspection) from Q.C departmentfor Electrical (Equipment,cable list,
grounding,lighting …)
Receive all RFI (requestfor inspection) from Q.C departmentfor instrument(local instrument,
cable list,and piping,tubing …)
Check all ITP form and all sign.
Check all details with ISO drawing
Prepare check listby VBC system
Coordination with contractor for certification purpose
Filling all documentby system and subsystem
Handover the documentend of project
Reporting for management
Previous experience
3. Duration: From AUG.2003 to OCT. 2004
Project: Cairo north power station (Nominal combined cycle 2x750 MW)
Company name: INITEC and MISR companyfor electrical & mechanical projects “KAHROMIKA”
Position: Sr. documentcontroller (certification)
Responsibility
Received all RFI (requestfor inspection) from Q.C departmentfor Mechanical (equipment,test
package,painting and insulation,all reports for welding RTfilms,TOFD,MPI, and PWHT)
Receive all RFI (requestfor inspection) from Q.C departmentfor Electrical (Equipment,cable list,
grounding,lighting …)
Receive all RFI (requestfor inspection) from Q.C departmentfor instrument(local instrument,
cable list,and piping,tubing …)
Check all ITP form and all sign.
Check all details with ISO drawing
Prepare check listby VBC system
Coordination with contractor for certification purpose
Filling all documentby system and subsystem
Handover the documentend of project
Reporting for management
Previous experience
Duration: From NOV..1999 to AUG..2002
Project: MUBARAK pumping station TOSHKA – EYGPT
Company name: HITACHI and MISR Companyfor electrical & mechanical projects “KAHROMIKA”
Position: Technical office
Responsibility
Received all ISO drawing
Stamped and distribution one copyto construction
Received all shipment
Issue the material for construction
Previous experience
Duration: From MAY.1994 to AUG..1999
Project: FIBER TECH (For production fiberglass) - JUBAIL industrial city –K.S.A.
Company name: FIBERTECH
Position: material handling
Responsibility
Received all shipment
Issue the material for construction
Previous experience
Duration: From MAR..1992 to APR..1994
Project: Recruitment of manpower
Company name LOUTS
Position: Administrator
Truly yours,