SlideShare a Scribd company logo
1 of 3
FAHAD MUHAMMED MAHMOUED EL-REFAEY
Cairo – Egypt
felrefaey@yahoo.com
+201018983409
QC Sr. Document controller
Handover the document
Personal data
Birth date: 01-07-1967
Nationality: Egyptian
Education: B.Sc. commercial Ain shams university1990
… English & Arabic
Marital status: married have 2 children
Computer knowledge:
MS-Office grade,excellent
VBC: visual Byblos cyberspace very good
Atlas: very good
Bann: very good
Job description:
 Complete responsibilityfor certification process
 Developmentofcomputerized system in coordination with ISD departmentfor receiving,
controlling and processing ofdocumentation.
 Preparation and reviewing of certification packages.
 Final system and handover documentation
Previous experience
Duration: From FEB.2011 TILL NOW
Project: GIZA north power station (Nominal combined cycle 1500 MW)
Company name: INITEC and “MEGA” for construction & industries “MEGA”
Position: Q.C Sr. documentcontroller and HANDOVER DOCUMENT
Responsibility
 Received all RFI (requestfor inspection) from Q.C departmentfor Mechanical (equipment,test
package,painting and insulation,all reports for welding RT films,TOFD,MPI, and PWHT)
Present Occupation
Duration: From 26-01-2009 till 1-11-2011
Project: Princes NOURA BINT ABDUL RAHMAN University for women (PNUW) project,
El Seif engineering contracting company–main contractor & consolidated contractors company–
MEP contractor (Riyadh, kingdom ofSaudi Arabia)
Position: Q.C Sr. document controller and Handover the document
Responsibility
 Receive all RFI (requestfor inspection) from Q.C departmentfor civil (Foundation,Sewages &
Drainage,paving,Road…)
 Received all RFI (requestfor inspection) from Q.C departmentfor Mechanical (equipment,test
package,painting and insulation,all reports for welding RT,TOFD,MPI, and films …)
 Receive all RFI (requestfor inspection) from Q.C departmentfor Electrical (Equipment,cable list,
grounding,lighting …)
 Receive all RFI (requestfor inspection) from Q.C departmentfor instrument(local instrument,
cable list,and piping,tubing …)
 Check all ITP form and all sign.
 Check all details with ISO drawing
 Prepare check listby VBC system
 Coordination with contractor for certification purpose
 Filling all documentby system and subsystem
 Handover the documentend of project
 Reporting for management
Previous experience
Duration: From 15-6-2006 to 1-1-2009
Project: Olefin plantproject(ROPP) PETRO RABIGH, JGC Arabia, and consolidated contractors
company(CCC),
Company name: consolidated contractors company(CCC),
Position: Sr. documentcontroller (certification)
Responsibility
 Receive all RFI (requestfor inspection) from Q.C departmentfor civil (Foundation,Sewages &
Drainage,paving,Road…)
 Received all RFI (requestfor inspection) from Q.C departmentfor Mechanical (equipment,test
package,painting and insulation,all reports for welding RTfilms,TOFD,MPI, and PWHT)
 Receive all RFI (requestfor inspection) from Q.C departmentfor Electrical (Equipment,cable list,
grounding,lighting …)
 Receive all RFI (requestfor inspection) from Q.C departmentfor instrument(local instrument,
cable list,and piping,tubing …)
 Check all ITP form and all sign.
 Check all details with ISO drawing
 Prepare check listby VBC system
 Coordination with contractor for certification purpose
 Filling all documentby system and subsystem
 Handover the documentend of project
 Reporting for management
Previous experience
Duration: From OCT.2004 to MAY.2006
Project: Nubaria power station (Nominal combined cycle 2x750 MW)
Company name: MITSUBISHI & INITEC and MISR companyfor electrical & mechanical projects “KAHROMIKA”
Position: Sr. documentcontroller (certification)
Responsibility
 Received all RFI (requestfor inspection) from Q.C departmentfor Mechanical (equipment,test
package,painting and insulation,all reports for welding RTfilms,TOFD,MPI, and PWHT)
 Receive all RFI (requestfor inspection) from Q.C departmentfor Electrical (Equipment,cable list,
grounding,lighting …)
 Receive all RFI (requestfor inspection) from Q.C departmentfor instrument(local instrument,
cable list,and piping,tubing …)
 Check all ITP form and all sign.
 Check all details with ISO drawing
 Prepare check listby VBC system
 Coordination with contractor for certification purpose
 Filling all documentby system and subsystem
 Handover the documentend of project
 Reporting for management
Previous experience
Duration: From AUG.2003 to OCT. 2004
Project: Cairo north power station (Nominal combined cycle 2x750 MW)
Company name: INITEC and MISR companyfor electrical & mechanical projects “KAHROMIKA”
Position: Sr. documentcontroller (certification)
Responsibility
 Received all RFI (requestfor inspection) from Q.C departmentfor Mechanical (equipment,test
package,painting and insulation,all reports for welding RTfilms,TOFD,MPI, and PWHT)
 Receive all RFI (requestfor inspection) from Q.C departmentfor Electrical (Equipment,cable list,
grounding,lighting …)
 Receive all RFI (requestfor inspection) from Q.C departmentfor instrument(local instrument,
cable list,and piping,tubing …)
 Check all ITP form and all sign.
 Check all details with ISO drawing
 Prepare check listby VBC system
 Coordination with contractor for certification purpose
 Filling all documentby system and subsystem
 Handover the documentend of project
 Reporting for management
Previous experience
Duration: From NOV..1999 to AUG..2002
Project: MUBARAK pumping station TOSHKA – EYGPT
Company name: HITACHI and MISR Companyfor electrical & mechanical projects “KAHROMIKA”
Position: Technical office
Responsibility
 Received all ISO drawing
 Stamped and distribution one copyto construction
 Received all shipment
 Issue the material for construction
Previous experience
Duration: From MAY.1994 to AUG..1999
Project: FIBER TECH (For production fiberglass) - JUBAIL industrial city –K.S.A.
Company name: FIBERTECH
Position: material handling
Responsibility
 Received all shipment
 Issue the material for construction
Previous experience
Duration: From MAR..1992 to APR..1994
Project: Recruitment of manpower
Company name LOUTS
Position: Administrator
Truly yours,
Fahd El-Refaey

More Related Content

Viewers also liked

NUS Consulting relatore al corso sulle tecniche di negoziazione per i contrat...
NUS Consulting relatore al corso sulle tecniche di negoziazione per i contrat...NUS Consulting relatore al corso sulle tecniche di negoziazione per i contrat...
NUS Consulting relatore al corso sulle tecniche di negoziazione per i contrat...Claudio Enriquez
 
Ejercicio para sexto grado de primaria. Bloque I
Ejercicio para sexto grado de primaria. Bloque IEjercicio para sexto grado de primaria. Bloque I
Ejercicio para sexto grado de primaria. Bloque Ifreddy ceh
 
Hamdi Elmoursi Summarized CV August 2015
Hamdi Elmoursi Summarized CV August 2015Hamdi Elmoursi Summarized CV August 2015
Hamdi Elmoursi Summarized CV August 2015Hamdi Elmoursi
 
[Book] How To Uncover The Fortune That Lies Hidden In Your Business In 5 Simp...
[Book] How To Uncover The Fortune That Lies Hidden In Your Business In 5 Simp...[Book] How To Uncover The Fortune That Lies Hidden In Your Business In 5 Simp...
[Book] How To Uncover The Fortune That Lies Hidden In Your Business In 5 Simp...Stephen Gill
 
SPL Strategic Plan Preparing Team Final Report
SPL Strategic Plan Preparing Team Final ReportSPL Strategic Plan Preparing Team Final Report
SPL Strategic Plan Preparing Team Final ReportJim Loter
 
Biology of love presentation
Biology of love presentationBiology of love presentation
Biology of love presentationabonica
 
Fallo de Medro, falta de crecimiento en menores de 3 años
Fallo de Medro, falta de crecimiento en menores de 3 añosFallo de Medro, falta de crecimiento en menores de 3 años
Fallo de Medro, falta de crecimiento en menores de 3 añosJuan Alejandro Lara B.
 

Viewers also liked (10)

NUS Consulting relatore al corso sulle tecniche di negoziazione per i contrat...
NUS Consulting relatore al corso sulle tecniche di negoziazione per i contrat...NUS Consulting relatore al corso sulle tecniche di negoziazione per i contrat...
NUS Consulting relatore al corso sulle tecniche di negoziazione per i contrat...
 
Johanna Hellyer_CV
Johanna Hellyer_CVJohanna Hellyer_CV
Johanna Hellyer_CV
 
Ejercicio para sexto grado de primaria. Bloque I
Ejercicio para sexto grado de primaria. Bloque IEjercicio para sexto grado de primaria. Bloque I
Ejercicio para sexto grado de primaria. Bloque I
 
Hamdi Elmoursi Summarized CV August 2015
Hamdi Elmoursi Summarized CV August 2015Hamdi Elmoursi Summarized CV August 2015
Hamdi Elmoursi Summarized CV August 2015
 
[Book] How To Uncover The Fortune That Lies Hidden In Your Business In 5 Simp...
[Book] How To Uncover The Fortune That Lies Hidden In Your Business In 5 Simp...[Book] How To Uncover The Fortune That Lies Hidden In Your Business In 5 Simp...
[Book] How To Uncover The Fortune That Lies Hidden In Your Business In 5 Simp...
 
SPL Strategic Plan Preparing Team Final Report
SPL Strategic Plan Preparing Team Final ReportSPL Strategic Plan Preparing Team Final Report
SPL Strategic Plan Preparing Team Final Report
 
Znaki
ZnakiZnaki
Znaki
 
Manual tehfo dic-2010
Manual tehfo dic-2010Manual tehfo dic-2010
Manual tehfo dic-2010
 
Biology of love presentation
Biology of love presentationBiology of love presentation
Biology of love presentation
 
Fallo de Medro, falta de crecimiento en menores de 3 años
Fallo de Medro, falta de crecimiento en menores de 3 añosFallo de Medro, falta de crecimiento en menores de 3 años
Fallo de Medro, falta de crecimiento en menores de 3 años
 

Similar to FAHD ELREFAEY(1) (1)

Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNouman Jamil
 
Ehab C V5(2)
Ehab C V5(2)Ehab C V5(2)
Ehab C V5(2)Ehab RIZK
 
Mohamed saad cv 14-8-2018
Mohamed saad cv 14-8-2018Mohamed saad cv 14-8-2018
Mohamed saad cv 14-8-2018MohamedSaad467
 
Eng_hakim.cv (1) (1)
Eng_hakim.cv (1) (1)Eng_hakim.cv (1) (1)
Eng_hakim.cv (1) (1)Hakim Makram
 
Mohamed Mady C
Mohamed Mady CMohamed Mady C
Mohamed Mady CENGADAM
 
CV_Hany Youssif_12-2015_english
CV_Hany Youssif_12-2015_englishCV_Hany Youssif_12-2015_english
CV_Hany Youssif_12-2015_englishHany Youssif
 
ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORIKRAM HUSSAIN
 
Resume instrumentation engineer
Resume instrumentation engineer Resume instrumentation engineer
Resume instrumentation engineer zahirtec
 
‫Ammar harbi acting supervisor o&m+implementation+project management - نسخة
‫Ammar harbi acting supervisor o&m+implementation+project management - نسخة‫Ammar harbi acting supervisor o&m+implementation+project management - نسخة
‫Ammar harbi acting supervisor o&m+implementation+project management - نسخةAmmar Aldaqen
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1Mohamed Hashim
 
MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)mohamed atef
 

Similar to FAHD ELREFAEY(1) (1) (20)

Noman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updatedNoman Jamil CV and Certificates updated
Noman Jamil CV and Certificates updated
 
Ehab C V5(2)
Ehab C V5(2)Ehab C V5(2)
Ehab C V5(2)
 
Mohamed saad cv 14-8-2018
Mohamed saad cv 14-8-2018Mohamed saad cv 14-8-2018
Mohamed saad cv 14-8-2018
 
Eng_hakim.cv (1) (1)
Eng_hakim.cv (1) (1)Eng_hakim.cv (1) (1)
Eng_hakim.cv (1) (1)
 
M Imran
M ImranM Imran
M Imran
 
Mohamed Mady C
Mohamed Mady CMohamed Mady C
Mohamed Mady C
 
Farookh Engr
Farookh EngrFarookh Engr
Farookh Engr
 
m raafat resume
m raafat resumem raafat resume
m raafat resume
 
CV_Hany Youssif_12-2015_english
CV_Hany Youssif_12-2015_englishCV_Hany Youssif_12-2015_english
CV_Hany Youssif_12-2015_english
 
ELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISORELECTRICAL AND INSTRUMENT SUPERVISOR
ELECTRICAL AND INSTRUMENT SUPERVISOR
 
Resume instrumentation engineer
Resume instrumentation engineer Resume instrumentation engineer
Resume instrumentation engineer
 
DOCUMENT CONTROLLER CV
DOCUMENT CONTROLLER  CVDOCUMENT CONTROLLER  CV
DOCUMENT CONTROLLER CV
 
‫Ammar harbi acting supervisor o&m+implementation+project management - نسخة
‫Ammar harbi acting supervisor o&m+implementation+project management - نسخة‫Ammar harbi acting supervisor o&m+implementation+project management - نسخة
‫Ammar harbi acting supervisor o&m+implementation+project management - نسخة
 
Alaa Mahmoud' CV
Alaa Mahmoud' CVAlaa Mahmoud' CV
Alaa Mahmoud' CV
 
Instrument Engineeer
Instrument EngineeerInstrument Engineeer
Instrument Engineeer
 
CV Electrical QA QC Engineer
CV Electrical QA QC EngineerCV Electrical QA QC Engineer
CV Electrical QA QC Engineer
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1CV_for_Mohamed_Hashim1
CV_for_Mohamed_Hashim1
 
Mohamed Abou Bakr CV
Mohamed Abou Bakr CVMohamed Abou Bakr CV
Mohamed Abou Bakr CV
 
MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)MOHAMED ATEF C.V. (updated Sept. 2015)
MOHAMED ATEF C.V. (updated Sept. 2015)
 

FAHD ELREFAEY(1) (1)

  • 1. FAHAD MUHAMMED MAHMOUED EL-REFAEY Cairo – Egypt felrefaey@yahoo.com +201018983409 QC Sr. Document controller Handover the document Personal data Birth date: 01-07-1967 Nationality: Egyptian Education: B.Sc. commercial Ain shams university1990 … English & Arabic Marital status: married have 2 children Computer knowledge: MS-Office grade,excellent VBC: visual Byblos cyberspace very good Atlas: very good Bann: very good Job description:  Complete responsibilityfor certification process  Developmentofcomputerized system in coordination with ISD departmentfor receiving, controlling and processing ofdocumentation.  Preparation and reviewing of certification packages.  Final system and handover documentation Previous experience Duration: From FEB.2011 TILL NOW Project: GIZA north power station (Nominal combined cycle 1500 MW) Company name: INITEC and “MEGA” for construction & industries “MEGA” Position: Q.C Sr. documentcontroller and HANDOVER DOCUMENT Responsibility  Received all RFI (requestfor inspection) from Q.C departmentfor Mechanical (equipment,test package,painting and insulation,all reports for welding RT films,TOFD,MPI, and PWHT) Present Occupation Duration: From 26-01-2009 till 1-11-2011 Project: Princes NOURA BINT ABDUL RAHMAN University for women (PNUW) project, El Seif engineering contracting company–main contractor & consolidated contractors company– MEP contractor (Riyadh, kingdom ofSaudi Arabia) Position: Q.C Sr. document controller and Handover the document Responsibility  Receive all RFI (requestfor inspection) from Q.C departmentfor civil (Foundation,Sewages & Drainage,paving,Road…)  Received all RFI (requestfor inspection) from Q.C departmentfor Mechanical (equipment,test package,painting and insulation,all reports for welding RT,TOFD,MPI, and films …)  Receive all RFI (requestfor inspection) from Q.C departmentfor Electrical (Equipment,cable list, grounding,lighting …)  Receive all RFI (requestfor inspection) from Q.C departmentfor instrument(local instrument,
  • 2. cable list,and piping,tubing …)  Check all ITP form and all sign.  Check all details with ISO drawing  Prepare check listby VBC system  Coordination with contractor for certification purpose  Filling all documentby system and subsystem  Handover the documentend of project  Reporting for management Previous experience Duration: From 15-6-2006 to 1-1-2009 Project: Olefin plantproject(ROPP) PETRO RABIGH, JGC Arabia, and consolidated contractors company(CCC), Company name: consolidated contractors company(CCC), Position: Sr. documentcontroller (certification) Responsibility  Receive all RFI (requestfor inspection) from Q.C departmentfor civil (Foundation,Sewages & Drainage,paving,Road…)  Received all RFI (requestfor inspection) from Q.C departmentfor Mechanical (equipment,test package,painting and insulation,all reports for welding RTfilms,TOFD,MPI, and PWHT)  Receive all RFI (requestfor inspection) from Q.C departmentfor Electrical (Equipment,cable list, grounding,lighting …)  Receive all RFI (requestfor inspection) from Q.C departmentfor instrument(local instrument, cable list,and piping,tubing …)  Check all ITP form and all sign.  Check all details with ISO drawing  Prepare check listby VBC system  Coordination with contractor for certification purpose  Filling all documentby system and subsystem  Handover the documentend of project  Reporting for management Previous experience Duration: From OCT.2004 to MAY.2006 Project: Nubaria power station (Nominal combined cycle 2x750 MW) Company name: MITSUBISHI & INITEC and MISR companyfor electrical & mechanical projects “KAHROMIKA” Position: Sr. documentcontroller (certification) Responsibility  Received all RFI (requestfor inspection) from Q.C departmentfor Mechanical (equipment,test package,painting and insulation,all reports for welding RTfilms,TOFD,MPI, and PWHT)  Receive all RFI (requestfor inspection) from Q.C departmentfor Electrical (Equipment,cable list, grounding,lighting …)  Receive all RFI (requestfor inspection) from Q.C departmentfor instrument(local instrument, cable list,and piping,tubing …)  Check all ITP form and all sign.  Check all details with ISO drawing  Prepare check listby VBC system  Coordination with contractor for certification purpose  Filling all documentby system and subsystem  Handover the documentend of project  Reporting for management Previous experience
  • 3. Duration: From AUG.2003 to OCT. 2004 Project: Cairo north power station (Nominal combined cycle 2x750 MW) Company name: INITEC and MISR companyfor electrical & mechanical projects “KAHROMIKA” Position: Sr. documentcontroller (certification) Responsibility  Received all RFI (requestfor inspection) from Q.C departmentfor Mechanical (equipment,test package,painting and insulation,all reports for welding RTfilms,TOFD,MPI, and PWHT)  Receive all RFI (requestfor inspection) from Q.C departmentfor Electrical (Equipment,cable list, grounding,lighting …)  Receive all RFI (requestfor inspection) from Q.C departmentfor instrument(local instrument, cable list,and piping,tubing …)  Check all ITP form and all sign.  Check all details with ISO drawing  Prepare check listby VBC system  Coordination with contractor for certification purpose  Filling all documentby system and subsystem  Handover the documentend of project  Reporting for management Previous experience Duration: From NOV..1999 to AUG..2002 Project: MUBARAK pumping station TOSHKA – EYGPT Company name: HITACHI and MISR Companyfor electrical & mechanical projects “KAHROMIKA” Position: Technical office Responsibility  Received all ISO drawing  Stamped and distribution one copyto construction  Received all shipment  Issue the material for construction Previous experience Duration: From MAY.1994 to AUG..1999 Project: FIBER TECH (For production fiberglass) - JUBAIL industrial city –K.S.A. Company name: FIBERTECH Position: material handling Responsibility  Received all shipment  Issue the material for construction Previous experience Duration: From MAR..1992 to APR..1994 Project: Recruitment of manpower Company name LOUTS Position: Administrator Truly yours, Fahd El-Refaey