SlideShare a Scribd company logo
1 of 4
Curriculum Vitae
Eng. Hakim Makram Hakim
Senior Electrical Technical Office Engineer
ACC Arrab Contractor Company Saudi Arabia
Personal Information:
 Phone : (+202) 24947985
 Mobile: +2-01279119740
 Mobile : +966537485279
 E-mail: hakim.eng2000@gmail.com
 Date of Birth: 16th January 1982, Cairo
 Nationality: Egyptian
 Address: 7 botros Hanna ain shams, Cairo, Egypt
 Marital Status: Married having one children
 Military service Postponed
Key Skills and Experiences:
 Good experience in medium voltage.
 Experience in all electrical connection inside buildings.
 Good experience in street lighting
 Experience in connection and running an electro mechanical
machines.
 Experience in all systems of light current connections : fire alarm
system, , closed circuit TV(cctv), security system , telephones, and
data works connections, as well as power management systems
 Good experience AS Site Engineer
 Good experience AS Technical Office Engineer
 Good experience in BMS
 Good experience in Dali system
 Able to learn any new system
 Good experience in Docwin
 Good experience in RMU & switchgear
Education:
 Bachelor of electrical and machine dept. 2007
Cairo University Faculty of engineering, Cairo, EGYPT
 Year :2007
 Degree:pass
 Graduation ProjectDegree:excellent
 Graduation project: automated forklift using PLC
Languages:
Arabic: (mother tongue)
English: (writing, reading, spoken, good scale)
Computer Skills:
 Windows 7, XP
 Office 2007,2008
 Revit 2014, Certified From Autodesk (KEMET CENTER)
 Auto Cad 2015
 Internet navigator
 PLC programming of Siemens step7 (using functional block and
ladder diagram).
Employment:
2 /2015-till now ACC arrab contractorcompany Saudi Arabia KAP4
Project
(As Senior Electrical Technical Office Engineer)
Job Description:
 Follow up all executive tasks in the project
 Make work shop drawings and as built drawings inside building ,
infra-structure and land scape
 Revising design drawing and adjust balance of panel boards and
calculating voltage drop and short circuit inside building , infra-
structure and land scape
 Make invoices for sub-contractor and main contractor
Make submittals for material for consultant approval
Employment:
4 /2013-1/2015 Hassanallam Sons contractor
(As Electrical Technical Office and Site Engineer)
Job Description:
 Supervision on electrical substation energizing
 Follow up all executive tasks in the project
 Make work shop drawings and as built drawings inside building ,
infra-structure and land scape
 Revising design drawing and adjust balance of panel boards and
calculating voltage drop and short circuit inside building , infra-
structure and land scape
 Make invoices for sub-contractor and main contractor
 Make submittals for material for consultant approval
4 /2012-4/2013 AAW Consulting Engineers
(As Electrical Consulting Engineer)
Job Description:
 Supervision on electrical substation energizing
 Supervision on street lighting work
 Supervision on water substation execution and startup
 Supervision on sewage and irrigation substation execution and
startup
 Follow up all executive tasks in the project
 Make inspection of work execution and material request
 Review work shop drawing and as built drawing
 Review panels and follow up installation and testing
2009 -2012 Electrum for Engineering & Trading Company
(As Electrical Engineer)
Job Description:
 Follow up all executive tasks in the project
 Supervising all technician in work field
 Finalizing all work papers
 Revising all work drawings
 Making shop Drawing , As Build , Design Using AutoCAD
January2008- April 2009 (Egypt ion electricity transmission company)
 (Trainer Protection Engineer)
Job Description:
 Training technicians
October2007-January2009 BeshySteel
(As Electrical Engineer)
Job Description:
 Maintenance and Installation for Production Line
The Projects that the applicant workedin with Electrum As technical
office:
 New Giza Residence.
 El Ein ResortHotel.
 Bat (British American Tobacco)City Stars.
 Medical Center in 6th Of October
 Cinema Mohammed Farid
 Link Misr Factory ForStorage System 10th Of Ramadan
 Cavallini Restaurant In Sun City Mall
 Golf Club House El Ain Elsoukhna
 New GizaElectricitySubstation
 UNDP(united nation)
 Arabia Mall Cinemas 6th Of October
TheProjectsthat the applicant workedin with Electrum as Site
Engineer:
 Bat (British American Tobacco)CITYSTARS.
 Cinema Mohammed Farid
 Link Misr Factory ForStorage System 10th Of Ramdan
 Cavallini Restaurant In Sun City Mall
 UNDP(united nation)
 Arabia Mall Cinemas 6th Of October
The Projects that the applicant workedin with AAW as Site
Engineer:
 EMAAR infra-structure (UP TOWN CAIRO)
 Water substation (UP TOWN CAIRO)
 Sewage substation (UP TOWN CAIRO)
 Irrigation substation (UP TOWN CAIRO)
 Street lighting installation
The Projects that the applicant workedin with Hassanallam sons as
Site& TechnicalOffice Engineer:
 EMAAR (UP TOWN CAIRO)
 Village (H,I,J,G) villas
 Village (K)
 Street lighting
 Landscape

More Related Content

What's hot

What's hot (19)

ali mostafa cv
ali mostafa cvali mostafa cv
ali mostafa cv
 
Mohamed Mustafa Ali CV
Mohamed Mustafa Ali CVMohamed Mustafa Ali CV
Mohamed Mustafa Ali CV
 
CV_WALEED
CV_WALEEDCV_WALEED
CV_WALEED
 
Saad AbuAlsamen - cv3
Saad AbuAlsamen - cv3Saad AbuAlsamen - cv3
Saad AbuAlsamen - cv3
 
Mohammad Riyad-Electrical Engineer
Mohammad Riyad-Electrical EngineerMohammad Riyad-Electrical Engineer
Mohammad Riyad-Electrical Engineer
 
Project Engineer1
Project Engineer1Project Engineer1
Project Engineer1
 
Raniah c.v sep 2018
Raniah c.v sep  2018Raniah c.v sep  2018
Raniah c.v sep 2018
 
ELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV MELECTRICAL ENGINEER CV M
ELECTRICAL ENGINEER CV M
 
MujibCV
MujibCVMujibCV
MujibCV
 
AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)AMER M.KAMAL ABBAS (Project Engineering)
AMER M.KAMAL ABBAS (Project Engineering)
 
CV 10-Feb PDF
CV 10-Feb PDFCV 10-Feb PDF
CV 10-Feb PDF
 
MOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CVMOHAN M&E SUPERVISOR CV
MOHAN M&E SUPERVISOR CV
 
Ashraf cv
Ashraf cvAshraf cv
Ashraf cv
 
Mohamed rabee cv
Mohamed rabee cvMohamed rabee cv
Mohamed rabee cv
 
Curriculum Vitae 2016
Curriculum Vitae 2016Curriculum Vitae 2016
Curriculum Vitae 2016
 
Anbu cv
Anbu cvAnbu cv
Anbu cv
 
Salah Mansour's CV-Electrical Engineer 1
Salah Mansour's CV-Electrical Engineer 1Salah Mansour's CV-Electrical Engineer 1
Salah Mansour's CV-Electrical Engineer 1
 
Mechanical & electrical engineering
Mechanical & electrical engineeringMechanical & electrical engineering
Mechanical & electrical engineering
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 

Viewers also liked

在任何造船厂营销必须被视为一门科学 Publicidad marketing
在任何造船厂营销必须被视为一门科学 Publicidad marketing在任何造船厂营销必须被视为一门科学 Publicidad marketing
在任何造船厂营销必须被视为一门科学 Publicidad marketingLuis P M
 
Tdp kinder -diagnostico de grupo1
Tdp  kinder -diagnostico de grupo1Tdp  kinder -diagnostico de grupo1
Tdp kinder -diagnostico de grupo1mariatrech
 
GE Testing Resume
GE Testing ResumeGE Testing Resume
GE Testing ResumeBrian Gorka
 
Eu unizo how green makes money november 2010c
Eu unizo how green makes money november 2010cEu unizo how green makes money november 2010c
Eu unizo how green makes money november 2010cGeert Noels
 
Definición de adecuación curricular
Definición de adecuación curricularDefinición de adecuación curricular
Definición de adecuación curricularAlondra Saucedoo
 
Chao, robin j.
Chao, robin j.Chao, robin j.
Chao, robin j.Robin Chao
 
ResumeAsOfApril_30_2016.pdf
ResumeAsOfApril_30_2016.pdfResumeAsOfApril_30_2016.pdf
ResumeAsOfApril_30_2016.pdfGregory Edwards
 

Viewers also liked (9)

在任何造船厂营销必须被视为一门科学 Publicidad marketing
在任何造船厂营销必须被视为一门科学 Publicidad marketing在任何造船厂营销必须被视为一门科学 Publicidad marketing
在任何造船厂营销必须被视为一门科学 Publicidad marketing
 
Tdp kinder -diagnostico de grupo1
Tdp  kinder -diagnostico de grupo1Tdp  kinder -diagnostico de grupo1
Tdp kinder -diagnostico de grupo1
 
GE Testing Resume
GE Testing ResumeGE Testing Resume
GE Testing Resume
 
Eu unizo how green makes money november 2010c
Eu unizo how green makes money november 2010cEu unizo how green makes money november 2010c
Eu unizo how green makes money november 2010c
 
Definición de adecuación curricular
Definición de adecuación curricularDefinición de adecuación curricular
Definición de adecuación curricular
 
Chao, robin j.
Chao, robin j.Chao, robin j.
Chao, robin j.
 
ResumeAsOfApril_30_2016.pdf
ResumeAsOfApril_30_2016.pdfResumeAsOfApril_30_2016.pdf
ResumeAsOfApril_30_2016.pdf
 
Occupational health
Occupational healthOccupational health
Occupational health
 
El medio natural en españa
El medio natural en españaEl medio natural en españa
El medio natural en españa
 

Similar to Eng_hakim.cv (1) (1)

Similar to Eng_hakim.cv (1) (1) (20)

amr updated
amr updatedamr updated
amr updated
 
ENG Ayman ali
ENG Ayman aliENG Ayman ali
ENG Ayman ali
 
Sameh Hassan Aly Detailed CV2
Sameh Hassan Aly Detailed CV2Sameh Hassan Aly Detailed CV2
Sameh Hassan Aly Detailed CV2
 
Ahmed_Mohammed
Ahmed_MohammedAhmed_Mohammed
Ahmed_Mohammed
 
ehab mohamed
ehab mohamedehab mohamed
ehab mohamed
 
AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016AHMED MAAMOUN CV 4-2016
AHMED MAAMOUN CV 4-2016
 
cvee new
cvee newcvee new
cvee new
 
Ele. eng.
Ele. eng.Ele. eng.
Ele. eng.
 
Mohamed saad cv 14-8-2018
Mohamed saad cv 14-8-2018Mohamed saad cv 14-8-2018
Mohamed saad cv 14-8-2018
 
eng.ahmed effat mohamed taher.NEW FORM
eng.ahmed effat mohamed taher.NEW FORMeng.ahmed effat mohamed taher.NEW FORM
eng.ahmed effat mohamed taher.NEW FORM
 
Mohamed osama
Mohamed osamaMohamed osama
Mohamed osama
 
Ahmed khalefa(C.V) 2014
Ahmed khalefa(C.V) 2014Ahmed khalefa(C.V) 2014
Ahmed khalefa(C.V) 2014
 
Resume
Resume Resume
Resume
 
bernie final cv update
bernie final cv updatebernie final cv update
bernie final cv update
 
hossam electrical power engineer
hossam electrical power engineerhossam electrical power engineer
hossam electrical power engineer
 
Mohamed Mady C
Mohamed Mady CMohamed Mady C
Mohamed Mady C
 
Eslam mohamed bahr
Eslam mohamed bahrEslam mohamed bahr
Eslam mohamed bahr
 
moataz cv
moataz cvmoataz cv
moataz cv
 
Muhammad.cv
Muhammad.cvMuhammad.cv
Muhammad.cv
 
M.Ashraf
M.AshrafM.Ashraf
M.Ashraf
 

Eng_hakim.cv (1) (1)

  • 1. Curriculum Vitae Eng. Hakim Makram Hakim Senior Electrical Technical Office Engineer ACC Arrab Contractor Company Saudi Arabia Personal Information:  Phone : (+202) 24947985  Mobile: +2-01279119740  Mobile : +966537485279  E-mail: hakim.eng2000@gmail.com  Date of Birth: 16th January 1982, Cairo  Nationality: Egyptian  Address: 7 botros Hanna ain shams, Cairo, Egypt  Marital Status: Married having one children  Military service Postponed Key Skills and Experiences:  Good experience in medium voltage.  Experience in all electrical connection inside buildings.  Good experience in street lighting  Experience in connection and running an electro mechanical machines.  Experience in all systems of light current connections : fire alarm system, , closed circuit TV(cctv), security system , telephones, and data works connections, as well as power management systems  Good experience AS Site Engineer  Good experience AS Technical Office Engineer  Good experience in BMS  Good experience in Dali system  Able to learn any new system  Good experience in Docwin  Good experience in RMU & switchgear
  • 2. Education:  Bachelor of electrical and machine dept. 2007 Cairo University Faculty of engineering, Cairo, EGYPT  Year :2007  Degree:pass  Graduation ProjectDegree:excellent  Graduation project: automated forklift using PLC Languages: Arabic: (mother tongue) English: (writing, reading, spoken, good scale) Computer Skills:  Windows 7, XP  Office 2007,2008  Revit 2014, Certified From Autodesk (KEMET CENTER)  Auto Cad 2015  Internet navigator  PLC programming of Siemens step7 (using functional block and ladder diagram). Employment: 2 /2015-till now ACC arrab contractorcompany Saudi Arabia KAP4 Project (As Senior Electrical Technical Office Engineer) Job Description:  Follow up all executive tasks in the project  Make work shop drawings and as built drawings inside building , infra-structure and land scape  Revising design drawing and adjust balance of panel boards and calculating voltage drop and short circuit inside building , infra- structure and land scape  Make invoices for sub-contractor and main contractor Make submittals for material for consultant approval Employment: 4 /2013-1/2015 Hassanallam Sons contractor (As Electrical Technical Office and Site Engineer) Job Description:  Supervision on electrical substation energizing  Follow up all executive tasks in the project
  • 3.  Make work shop drawings and as built drawings inside building , infra-structure and land scape  Revising design drawing and adjust balance of panel boards and calculating voltage drop and short circuit inside building , infra- structure and land scape  Make invoices for sub-contractor and main contractor  Make submittals for material for consultant approval 4 /2012-4/2013 AAW Consulting Engineers (As Electrical Consulting Engineer) Job Description:  Supervision on electrical substation energizing  Supervision on street lighting work  Supervision on water substation execution and startup  Supervision on sewage and irrigation substation execution and startup  Follow up all executive tasks in the project  Make inspection of work execution and material request  Review work shop drawing and as built drawing  Review panels and follow up installation and testing 2009 -2012 Electrum for Engineering & Trading Company (As Electrical Engineer) Job Description:  Follow up all executive tasks in the project  Supervising all technician in work field  Finalizing all work papers  Revising all work drawings  Making shop Drawing , As Build , Design Using AutoCAD January2008- April 2009 (Egypt ion electricity transmission company)  (Trainer Protection Engineer) Job Description:  Training technicians October2007-January2009 BeshySteel (As Electrical Engineer) Job Description:  Maintenance and Installation for Production Line
  • 4. The Projects that the applicant workedin with Electrum As technical office:  New Giza Residence.  El Ein ResortHotel.  Bat (British American Tobacco)City Stars.  Medical Center in 6th Of October  Cinema Mohammed Farid  Link Misr Factory ForStorage System 10th Of Ramadan  Cavallini Restaurant In Sun City Mall  Golf Club House El Ain Elsoukhna  New GizaElectricitySubstation  UNDP(united nation)  Arabia Mall Cinemas 6th Of October TheProjectsthat the applicant workedin with Electrum as Site Engineer:  Bat (British American Tobacco)CITYSTARS.  Cinema Mohammed Farid  Link Misr Factory ForStorage System 10th Of Ramdan  Cavallini Restaurant In Sun City Mall  UNDP(united nation)  Arabia Mall Cinemas 6th Of October The Projects that the applicant workedin with AAW as Site Engineer:  EMAAR infra-structure (UP TOWN CAIRO)  Water substation (UP TOWN CAIRO)  Sewage substation (UP TOWN CAIRO)  Irrigation substation (UP TOWN CAIRO)  Street lighting installation The Projects that the applicant workedin with Hassanallam sons as Site& TechnicalOffice Engineer:  EMAAR (UP TOWN CAIRO)  Village (H,I,J,G) villas  Village (K)  Street lighting  Landscape