You can use the following options to define how the the check horizon in the ATP check is
handled:
• Full Confirmation
Items for which the requested material availability date falls within the check horizon, but
for which inventory is insufficient, are confirmed for delivery after the check horizon. Items
with a requested material availability date after the end of the check horizon are always
confirmed fully.
• Zero Confirmation
Items for which the requested material availability date falls within the check horizon are
only confirmed against requirement and receipt elements within the check horizon.
Demand and supply with dates after the end of the check horizon are not considered. All
items with a requested material availability date after the end of the check horizon get
zero confirmed quantity.
• Ignore Check Horizon
The check horizon is not considered. Items are confirmed according to the available
stocks and supply elements.
• Further information about this feature check this note: 3282218
Result After Check Horizon
Material Master Data
The ATP check horizon is based on
the replenishment lead time
determined from the material master.
If you want the system to check the
replenishment lead time, you should
make sure that you have entered a
value in at least one of the following
three fields in the material master:
•GR (goods receipt) processing
time (Purchasing view)
•Planned delivery time (MRP I view)
•GR processing time (MRP II view)
Sample Scenarios
Scenario 1: Result after check horizon parameter is chosen as ‘Zero confirmation’
Scenario 2: Result after check horizon parameter is chosen as ‘Full Confirmation’
CO09 screen display:
Sales Order Confirmation with Scenario 1
• Sales order requested delivery date = 12.01.2023
Sales Order Confirmation with Scenario 1
• Sales order item
does not confirmed
because of end
lead time is little
than requested
delivery date.
Sales Order Confirmation with Scenario 1
• Requested Delivery Date = 11.01.2023
Sales Order Confirmation with Scenario 1
• Sales order item confirms because of requested delivery date is equal to end lead time.
Sales Order Confirmation with Scenario 2
• Requested delivery date = 10.01.2023
• Available qty = 870
Sales Order Confirmation with Scenario 2
Sales Order Confirmation with Scenario 2
• Sales order item quantity is greater than available stock. System fully confirms sales order item. As
a result of this confirmation,system creates a new schedule line with delivery date which is equal
end lead time although there is not enough available stock.
CO09 result after sales order was saved
according to Scenario 2
• There is no negative cumulative available quantity on CO09 screen.
CO09 result after sales order was saved
according to Scenario 2
• Schedule line is displayed as ‘End lead time’ in MRP element data column on CO09 screen.

More Related Content

Similar to aATP- NEW CHECK HORIZON FEATURE.pptx

Opentaps purchasing process
Opentaps purchasing processOpentaps purchasing process
Opentaps purchasing process
Nguyen Duc
 
Final presentation
Final presentationFinal presentation
Final presentation
Amogh Hajare
 
material requirements planning
material requirements planningmaterial requirements planning
material requirements planning
Amalia Syafitri
 

Similar to aATP- NEW CHECK HORIZON FEATURE.pptx (20)

Accela 2015 - Inspection Scheduling
Accela 2015 - Inspection SchedulingAccela 2015 - Inspection Scheduling
Accela 2015 - Inspection Scheduling
 
SC_CONSIGN.ppt
SC_CONSIGN.pptSC_CONSIGN.ppt
SC_CONSIGN.ppt
 
Basics of sap sd module
Basics of sap sd moduleBasics of sap sd module
Basics of sap sd module
 
Preguntas y respuestas examen de SAP PP
Preguntas y respuestas examen de SAP PPPreguntas y respuestas examen de SAP PP
Preguntas y respuestas examen de SAP PP
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
 
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
Engineering Product Mfg Co. Leverages Tally.ERP9 to run its Mfg Operations Im...
 
Subcontracting
SubcontractingSubcontracting
Subcontracting
 
Convergent Invoicing: Scheduling
Convergent Invoicing: SchedulingConvergent Invoicing: Scheduling
Convergent Invoicing: Scheduling
 
Consignment inventory
Consignment inventoryConsignment inventory
Consignment inventory
 
Base material presentation
Base material presentationBase material presentation
Base material presentation
 
Supply chain imporvement
Supply chain imporvementSupply chain imporvement
Supply chain imporvement
 
5 MRP.ppt
5 MRP.ppt5 MRP.ppt
5 MRP.ppt
 
5 MRP.ppt
5 MRP.ppt5 MRP.ppt
5 MRP.ppt
 
Opentaps purchasing process
Opentaps purchasing processOpentaps purchasing process
Opentaps purchasing process
 
Final presentation
Final presentationFinal presentation
Final presentation
 
Rsj Inspection Process Flow
Rsj Inspection Process Flow Rsj Inspection Process Flow
Rsj Inspection Process Flow
 
Con2012 jordan analyze_your_production_costs
Con2012 jordan analyze_your_production_costsCon2012 jordan analyze_your_production_costs
Con2012 jordan analyze_your_production_costs
 
material requirements planning
material requirements planningmaterial requirements planning
material requirements planning
 
Supply Chain (Good)
Supply Chain (Good)Supply Chain (Good)
Supply Chain (Good)
 
Burger King Simulation
Burger King SimulationBurger King Simulation
Burger King Simulation
 

Recently uploaded

The title is not connected to what is inside
The title is not connected to what is insideThe title is not connected to what is inside
The title is not connected to what is inside
shinachiaurasa2
 
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
The Real-World Challenges of Medical Device Cybersecurity- Mitigating Vulnera...
 
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
call girls in Vaishali (Ghaziabad) 🔝 >༒8448380779 🔝 genuine Escort Service 🔝✔️✔️
 
The title is not connected to what is inside
The title is not connected to what is insideThe title is not connected to what is inside
The title is not connected to what is inside
 
%in kaalfontein+277-882-255-28 abortion pills for sale in kaalfontein
%in kaalfontein+277-882-255-28 abortion pills for sale in kaalfontein%in kaalfontein+277-882-255-28 abortion pills for sale in kaalfontein
%in kaalfontein+277-882-255-28 abortion pills for sale in kaalfontein
 
AI & Machine Learning Presentation Template
AI & Machine Learning Presentation TemplateAI & Machine Learning Presentation Template
AI & Machine Learning Presentation Template
 
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdfLearn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
Learn the Fundamentals of XCUITest Framework_ A Beginner's Guide.pdf
 
A Secure and Reliable Document Management System is Essential.docx
A Secure and Reliable Document Management System is Essential.docxA Secure and Reliable Document Management System is Essential.docx
A Secure and Reliable Document Management System is Essential.docx
 
How To Troubleshoot Collaboration Apps for the Modern Connected Worker
How To Troubleshoot Collaboration Apps for the Modern Connected WorkerHow To Troubleshoot Collaboration Apps for the Modern Connected Worker
How To Troubleshoot Collaboration Apps for the Modern Connected Worker
 
%in Midrand+277-882-255-28 abortion pills for sale in midrand
%in Midrand+277-882-255-28 abortion pills for sale in midrand%in Midrand+277-882-255-28 abortion pills for sale in midrand
%in Midrand+277-882-255-28 abortion pills for sale in midrand
 
Unlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language ModelsUnlocking the Future of AI Agents with Large Language Models
Unlocking the Future of AI Agents with Large Language Models
 
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Pushp Vihar (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
 
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
Shapes for Sharing between Graph Data Spaces - and Epistemic Querying of RDF-...
 
LEVEL 5 - SESSION 1 2023 (1).pptx - PDF 123456
LEVEL 5   - SESSION 1 2023 (1).pptx - PDF 123456LEVEL 5   - SESSION 1 2023 (1).pptx - PDF 123456
LEVEL 5 - SESSION 1 2023 (1).pptx - PDF 123456
 
The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...
The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...
The Guide to Integrating Generative AI into Unified Continuous Testing Platfo...
 
Define the academic and professional writing..pdf
Define the academic and professional writing..pdfDefine the academic and professional writing..pdf
Define the academic and professional writing..pdf
 
Azure_Native_Qumulo_High_Performance_Compute_Benchmarks.pdf
Azure_Native_Qumulo_High_Performance_Compute_Benchmarks.pdfAzure_Native_Qumulo_High_Performance_Compute_Benchmarks.pdf
Azure_Native_Qumulo_High_Performance_Compute_Benchmarks.pdf
 
Right Money Management App For Your Financial Goals
Right Money Management App For Your Financial GoalsRight Money Management App For Your Financial Goals
Right Money Management App For Your Financial Goals
 
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdfThe Ultimate Test Automation Guide_ Best Practices and Tips.pdf
The Ultimate Test Automation Guide_ Best Practices and Tips.pdf
 
%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein
%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein
%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein
 
Direct Style Effect Systems - The Print[A] Example - A Comprehension Aid
Direct Style Effect Systems -The Print[A] Example- A Comprehension AidDirect Style Effect Systems -The Print[A] Example- A Comprehension Aid
Direct Style Effect Systems - The Print[A] Example - A Comprehension Aid
 

aATP- NEW CHECK HORIZON FEATURE.pptx

  • 2. New Check Horizon Feature You can use the following options to define how the the check horizon in the ATP check is handled: • Full Confirmation Items for which the requested material availability date falls within the check horizon, but for which inventory is insufficient, are confirmed for delivery after the check horizon. Items with a requested material availability date after the end of the check horizon are always confirmed fully. • Zero Confirmation Items for which the requested material availability date falls within the check horizon are only confirmed against requirement and receipt elements within the check horizon. Demand and supply with dates after the end of the check horizon are not considered. All items with a requested material availability date after the end of the check horizon get zero confirmed quantity. • Ignore Check Horizon The check horizon is not considered. Items are confirmed according to the available stocks and supply elements. • Further information about this feature check this note: 3282218
  • 4. Material Master Data The ATP check horizon is based on the replenishment lead time determined from the material master. If you want the system to check the replenishment lead time, you should make sure that you have entered a value in at least one of the following three fields in the material master: •GR (goods receipt) processing time (Purchasing view) •Planned delivery time (MRP I view) •GR processing time (MRP II view)
  • 5. Sample Scenarios Scenario 1: Result after check horizon parameter is chosen as ‘Zero confirmation’ Scenario 2: Result after check horizon parameter is chosen as ‘Full Confirmation’ CO09 screen display:
  • 6. Sales Order Confirmation with Scenario 1 • Sales order requested delivery date = 12.01.2023
  • 7. Sales Order Confirmation with Scenario 1 • Sales order item does not confirmed because of end lead time is little than requested delivery date.
  • 8. Sales Order Confirmation with Scenario 1 • Requested Delivery Date = 11.01.2023
  • 9. Sales Order Confirmation with Scenario 1 • Sales order item confirms because of requested delivery date is equal to end lead time.
  • 10. Sales Order Confirmation with Scenario 2 • Requested delivery date = 10.01.2023 • Available qty = 870
  • 11. Sales Order Confirmation with Scenario 2
  • 12. Sales Order Confirmation with Scenario 2 • Sales order item quantity is greater than available stock. System fully confirms sales order item. As a result of this confirmation,system creates a new schedule line with delivery date which is equal end lead time although there is not enough available stock.
  • 13. CO09 result after sales order was saved according to Scenario 2 • There is no negative cumulative available quantity on CO09 screen.
  • 14. CO09 result after sales order was saved according to Scenario 2 • Schedule line is displayed as ‘End lead time’ in MRP element data column on CO09 screen.