1. Introduction
2. Types of Availability Check
3. Replenishment Lead time
4. Control parameters
5. Scope of check
6. Process flow
7. Transfer of Requirements in SD
8. Control elements in TOR
Introduction
 Availability check is one of the key functionalities in sales
document processing. The confirmation of delivery of
goods to customer while entering a sales document is
carried out on the basis of this check.
 Availability check can be carried out on the deadline of
goods availability that would be necessary to consider
the picking, packing and shipping time.
 Availability check can only be carried out if transfer of
requirements take place for goods from sales to
purchase or production.
Types of Availability Check
 System provides for three types of Availability check
explained as under:

ATP basis check
Available To Promise (ATP) is calculated from warehouse stock,
planned inward movement of stock (purchase orders, planned
orders etc.) & planned outward movement of stock (sales orders,
deliveries, reservations etc.)
ATP check explained in equation terms above. The check is
performed dynamically for each transaction.
ATP W/h Stock Inward mvmt. Outward Mvmt.
Types of Availability Check

Check against Product Allocation
Product allocation is used for period based distribution of
products for specified customers or regions. This check is over
the normal availability check. It is carried out in cases where
production is low and goods produced need to be distributed to
customers and ensured that first customer is not allocated
complete quantity.

Check against Planning
Check against planning is performed against planned
independent requirements which are generated from a demand
planning program.
Replenishment Lead Time
 Definition: Replenishment Lead Time (RLT) is time that
is needed to order or produce requested material. RLT is
calculated based on time maintained in master data.
 ATP check Including RLT

Availability check is calculated only up to end of RLT. If the
material availability date calculated on basis of current date lies
after RLT, system confirms the item in spite of insufficient stock
in the assumption that stock would be procured or produced by
that time. Thus confirmation can be sent to customer in this
case.
(refer example in next slide)
Replenishment Lead Time
Example: In this example (refer figure) 20 pcs of stock requested
by customer can be confirmed if RLT is included with ATP check
because although 20 pcs of stock may not be available on day
requested the date falls after the lead time specified for item and
hence stock would theoretically be available.
Replenishment Lead Time
 ATP check Excluding RLT

If RLT is not included in ATP check system performs a check on
the unrestricted stock and scope of check on inward and
outward movement of stock.
Similar example as above excluding RLT check, system would
confirm the item only when stock would actually be available.
Control Parameters
 Control Parameters of Availability Check in Sales
Following SD specific control parameters need to be maintained.

Checking Group
Checking group forms one of factors for specifying scope of
availability check. It is used for grouping of materials for
individual or collective requirements. It is assigned in material
master Sales/Plant view.

Checking Rule
Checking rule forms the other factor in specifying scope and is
assigned to each transaction in sales and distribution. The
checking rules are predefined in system.

Schedule Line Category
Schedule line category had additional check to turn on/off
availability check.
Scope of Check
 Following elements can be included in scope of
availability check

Stock
 Safety Stock
 Stock in Transfer
 Blocked Stock
 Quality Inspection

Inward/Outward movement of goods
 Purchase requisitions & orders
 Planned & Production orders
 Reservations
 Sales & Delivery requirements
 Dependent requirement
Process Flow
 The process flow in which system checks for Availability
is as follows
Requirement Type exists to
find Requirement Class
Requirement Class has
Availability Check ON
Schedule Line Category has
Availability Check ON
From Material Master of
Item
CHECKING GROUP
From Transaction (like SD
Order)
CHECKING RULE
AVAILABILITY CHECK
Transfer Of Requirements
 Requirements generated in Sales & Distribution need to
be transferred to material requirements planning to
ensure the quantities ordered are available to be
delivered on time to Customer. This is called transfer of
requirements (TOR).
 TOR are of two types:

TOR with individual requirements
A line for each individual requirement is created in availability
overview for each sales document and schedule line. This helps
in tracking the initiating document. System uses this for special
stock scenarios like Make-to-order stock, project stock etc. It can
also be used for standard orders if sales order volume is not
large and requirements need to be tracked at item level.
Transfer Of Requirements

TOR with collective requirements.
Collective requirements combine various requirements based on
following criteria:
 Plant
 Storage Location
 Batch
 Date
 Transaction &
 Requirement class
These requirements can either be created daily or weekly. The
documents initiating collective requirements cannot be directly
identified but can be traced via list of orders for material.
Control Elements in TOR
 Control Elements of significance in TOR are

Requirement type

Requirement class

Checking group

Schedule Line category
 TOR needs to be switched on at Requirements class
and Schedule line category level for proper processing.
 Plant must be defined at item level in sales document.
 Checking group must be defined in material master in
Sales/plant view.

More Related Content

Similar to 12856009 availability-check-transfer-of-requirements-sales

Availability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements SalesAvailability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements Sales
mradwan101
 
Ais Romney 2006 Slides 11 The Expenditure Cycle
Ais Romney 2006 Slides 11 The Expenditure CycleAis Romney 2006 Slides 11 The Expenditure Cycle
Ais Romney 2006 Slides 11 The Expenditure Cycle
Sharing Slides Training
 

Similar to 12856009 availability-check-transfer-of-requirements-sales (20)

Availability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements SalesAvailability Check & Transfer Of Requirements Sales
Availability Check & Transfer Of Requirements Sales
 
Availability Check in SAP SD
Availability Check in SAP SDAvailability Check in SAP SD
Availability Check in SAP SD
 
Availability Check in SAP SD
Availability Check in SAP SDAvailability Check in SAP SD
Availability Check in SAP SD
 
AVAILABLITY CHECK.ppt
AVAILABLITY CHECK.pptAVAILABLITY CHECK.ppt
AVAILABLITY CHECK.ppt
 
Transfer of requirements in SAP SD
Transfer of requirements in SAP SDTransfer of requirements in SAP SD
Transfer of requirements in SAP SD
 
Oracle SCM Functional Interview Questions & Answers - Inventory Module - Part...
Oracle SCM Functional Interview Questions & Answers - Inventory Module - Part...Oracle SCM Functional Interview Questions & Answers - Inventory Module - Part...
Oracle SCM Functional Interview Questions & Answers - Inventory Module - Part...
 
Availability To Promise
Availability To Promise Availability To Promise
Availability To Promise
 
Oracle R12 SCM Functional Interview Questions - Order Management
Oracle R12 SCM Functional Interview Questions - Order ManagementOracle R12 SCM Functional Interview Questions - Order Management
Oracle R12 SCM Functional Interview Questions - Order Management
 
WMS_RULE.PDF
WMS_RULE.PDFWMS_RULE.PDF
WMS_RULE.PDF
 
Ppts of odoo
Ppts of odooPpts of odoo
Ppts of odoo
 
SAP MM PP Material requirement planning
SAP MM PP Material requirement planning SAP MM PP Material requirement planning
SAP MM PP Material requirement planning
 
Msd Navision
Msd NavisionMsd Navision
Msd Navision
 
Quality Inspection.pdf
Quality Inspection.pdfQuality Inspection.pdf
Quality Inspection.pdf
 
KDFJ
KDFJKDFJ
KDFJ
 
Sap production planning
Sap production planningSap production planning
Sap production planning
 
Ais Romney 2006 Slides 11 The Expenditure Cycle
Ais Romney 2006 Slides 11 The Expenditure CycleAis Romney 2006 Slides 11 The Expenditure Cycle
Ais Romney 2006 Slides 11 The Expenditure Cycle
 
Data Warehouse (ETL) testing process
Data Warehouse (ETL) testing processData Warehouse (ETL) testing process
Data Warehouse (ETL) testing process
 
Top 25 SAP MM Interview Questions & Answers | IQ Online Training
Top 25 SAP MM Interview Questions & Answers | IQ Online TrainingTop 25 SAP MM Interview Questions & Answers | IQ Online Training
Top 25 SAP MM Interview Questions & Answers | IQ Online Training
 
frppt.ims.pptx
frppt.ims.pptxfrppt.ims.pptx
frppt.ims.pptx
 
Stock overview
Stock overviewStock overview
Stock overview
 

Recently uploaded

Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...
Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...
Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...
chiefasafspells
 
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
VictoriaMetrics
 
%+27788225528 love spells in Knoxville Psychic Readings, Attraction spells,Br...
%+27788225528 love spells in Knoxville Psychic Readings, Attraction spells,Br...%+27788225528 love spells in Knoxville Psychic Readings, Attraction spells,Br...
%+27788225528 love spells in Knoxville Psychic Readings, Attraction spells,Br...
masabamasaba
 
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
Medical / Health Care (+971588192166) Mifepristone and Misoprostol tablets 200mg
 
Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...
Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...
Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...
Medical / Health Care (+971588192166) Mifepristone and Misoprostol tablets 200mg
 
%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...
masabamasaba
 

Recently uploaded (20)

%in ivory park+277-882-255-28 abortion pills for sale in ivory park
%in ivory park+277-882-255-28 abortion pills for sale in ivory park %in ivory park+277-882-255-28 abortion pills for sale in ivory park
%in ivory park+277-882-255-28 abortion pills for sale in ivory park
 
%in tembisa+277-882-255-28 abortion pills for sale in tembisa
%in tembisa+277-882-255-28 abortion pills for sale in tembisa%in tembisa+277-882-255-28 abortion pills for sale in tembisa
%in tembisa+277-882-255-28 abortion pills for sale in tembisa
 
Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...
Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...
Love witchcraft +27768521739 Binding love spell in Sandy Springs, GA |psychic...
 
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
Large-scale Logging Made Easy: Meetup at Deutsche Bank 2024
 
AI & Machine Learning Presentation Template
AI & Machine Learning Presentation TemplateAI & Machine Learning Presentation Template
AI & Machine Learning Presentation Template
 
Artyushina_Guest lecture_YorkU CS May 2024.pptx
Artyushina_Guest lecture_YorkU CS May 2024.pptxArtyushina_Guest lecture_YorkU CS May 2024.pptx
Artyushina_Guest lecture_YorkU CS May 2024.pptx
 
%+27788225528 love spells in Knoxville Psychic Readings, Attraction spells,Br...
%+27788225528 love spells in Knoxville Psychic Readings, Attraction spells,Br...%+27788225528 love spells in Knoxville Psychic Readings, Attraction spells,Br...
%+27788225528 love spells in Knoxville Psychic Readings, Attraction spells,Br...
 
Architecture decision records - How not to get lost in the past
Architecture decision records - How not to get lost in the pastArchitecture decision records - How not to get lost in the past
Architecture decision records - How not to get lost in the past
 
%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein
%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein
%in Stilfontein+277-882-255-28 abortion pills for sale in Stilfontein
 
Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...
Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...
Crypto Cloud Review - How To Earn Up To $500 Per DAY Of Bitcoin 100% On AutoP...
 
What Goes Wrong with Language Definitions and How to Improve the Situation
What Goes Wrong with Language Definitions and How to Improve the SituationWhat Goes Wrong with Language Definitions and How to Improve the Situation
What Goes Wrong with Language Definitions and How to Improve the Situation
 
WSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital Transformation
WSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital TransformationWSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital Transformation
WSO2Con2024 - WSO2's IAM Vision: Identity-Led Digital Transformation
 
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
Abortion Pill Prices Tembisa [(+27832195400*)] 🏥 Women's Abortion Clinic in T...
 
%in Soweto+277-882-255-28 abortion pills for sale in soweto
%in Soweto+277-882-255-28 abortion pills for sale in soweto%in Soweto+277-882-255-28 abortion pills for sale in soweto
%in Soweto+277-882-255-28 abortion pills for sale in soweto
 
WSO2CON 2024 - API Management Usage at La Poste and Its Impact on Business an...
WSO2CON 2024 - API Management Usage at La Poste and Its Impact on Business an...WSO2CON 2024 - API Management Usage at La Poste and Its Impact on Business an...
WSO2CON 2024 - API Management Usage at La Poste and Its Impact on Business an...
 
WSO2CON 2024 Slides - Unlocking Value with AI
WSO2CON 2024 Slides - Unlocking Value with AIWSO2CON 2024 Slides - Unlocking Value with AI
WSO2CON 2024 Slides - Unlocking Value with AI
 
WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...
WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...
WSO2Con2024 - GitOps in Action: Navigating Application Deployment in the Plat...
 
Direct Style Effect Systems - The Print[A] Example - A Comprehension Aid
Direct Style Effect Systems -The Print[A] Example- A Comprehension AidDirect Style Effect Systems -The Print[A] Example- A Comprehension Aid
Direct Style Effect Systems - The Print[A] Example - A Comprehension Aid
 
Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...
Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...
Abortion Pills In Pretoria ](+27832195400*)[ 🏥 Women's Abortion Clinic In Pre...
 
%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...
%+27788225528 love spells in Toronto Psychic Readings, Attraction spells,Brin...
 

12856009 availability-check-transfer-of-requirements-sales

  • 1. Company LOGO Availability Check & TOR in Sales Sales & Distribution
  • 2. Topics 1. Introduction 2. Types of Availability Check 3. Replenishment Lead time 4. Control parameters 5. Scope of check 6. Process flow 7. Transfer of Requirements in SD 8. Control elements in TOR
  • 3. Introduction  Availability check is one of the key functionalities in sales document processing. The confirmation of delivery of goods to customer while entering a sales document is carried out on the basis of this check.  Availability check can be carried out on the deadline of goods availability that would be necessary to consider the picking, packing and shipping time.  Availability check can only be carried out if transfer of requirements take place for goods from sales to purchase or production.
  • 4. Types of Availability Check  System provides for three types of Availability check explained as under:  ATP basis check Available To Promise (ATP) is calculated from warehouse stock, planned inward movement of stock (purchase orders, planned orders etc.) & planned outward movement of stock (sales orders, deliveries, reservations etc.) ATP check explained in equation terms above. The check is performed dynamically for each transaction. ATP W/h Stock Inward mvmt. Outward Mvmt.
  • 5. Types of Availability Check  Check against Product Allocation Product allocation is used for period based distribution of products for specified customers or regions. This check is over the normal availability check. It is carried out in cases where production is low and goods produced need to be distributed to customers and ensured that first customer is not allocated complete quantity.  Check against Planning Check against planning is performed against planned independent requirements which are generated from a demand planning program.
  • 6. Replenishment Lead Time  Definition: Replenishment Lead Time (RLT) is time that is needed to order or produce requested material. RLT is calculated based on time maintained in master data.  ATP check Including RLT  Availability check is calculated only up to end of RLT. If the material availability date calculated on basis of current date lies after RLT, system confirms the item in spite of insufficient stock in the assumption that stock would be procured or produced by that time. Thus confirmation can be sent to customer in this case. (refer example in next slide)
  • 7. Replenishment Lead Time Example: In this example (refer figure) 20 pcs of stock requested by customer can be confirmed if RLT is included with ATP check because although 20 pcs of stock may not be available on day requested the date falls after the lead time specified for item and hence stock would theoretically be available.
  • 8. Replenishment Lead Time  ATP check Excluding RLT  If RLT is not included in ATP check system performs a check on the unrestricted stock and scope of check on inward and outward movement of stock. Similar example as above excluding RLT check, system would confirm the item only when stock would actually be available.
  • 9. Control Parameters  Control Parameters of Availability Check in Sales Following SD specific control parameters need to be maintained.  Checking Group Checking group forms one of factors for specifying scope of availability check. It is used for grouping of materials for individual or collective requirements. It is assigned in material master Sales/Plant view.  Checking Rule Checking rule forms the other factor in specifying scope and is assigned to each transaction in sales and distribution. The checking rules are predefined in system.  Schedule Line Category Schedule line category had additional check to turn on/off availability check.
  • 10. Scope of Check  Following elements can be included in scope of availability check  Stock  Safety Stock  Stock in Transfer  Blocked Stock  Quality Inspection  Inward/Outward movement of goods  Purchase requisitions & orders  Planned & Production orders  Reservations  Sales & Delivery requirements  Dependent requirement
  • 11. Process Flow  The process flow in which system checks for Availability is as follows Requirement Type exists to find Requirement Class Requirement Class has Availability Check ON Schedule Line Category has Availability Check ON From Material Master of Item CHECKING GROUP From Transaction (like SD Order) CHECKING RULE AVAILABILITY CHECK
  • 12. Transfer Of Requirements  Requirements generated in Sales & Distribution need to be transferred to material requirements planning to ensure the quantities ordered are available to be delivered on time to Customer. This is called transfer of requirements (TOR).  TOR are of two types:  TOR with individual requirements A line for each individual requirement is created in availability overview for each sales document and schedule line. This helps in tracking the initiating document. System uses this for special stock scenarios like Make-to-order stock, project stock etc. It can also be used for standard orders if sales order volume is not large and requirements need to be tracked at item level.
  • 13. Transfer Of Requirements  TOR with collective requirements. Collective requirements combine various requirements based on following criteria:  Plant  Storage Location  Batch  Date  Transaction &  Requirement class These requirements can either be created daily or weekly. The documents initiating collective requirements cannot be directly identified but can be traced via list of orders for material.
  • 14. Control Elements in TOR  Control Elements of significance in TOR are  Requirement type  Requirement class  Checking group  Schedule Line category  TOR needs to be switched on at Requirements class and Schedule line category level for proper processing.  Plant must be defined at item level in sales document.  Checking group must be defined in material master in Sales/plant view.