1. Career Summary
Ahmed Darandari
Senior Strategic Planning Engineer
14 years’ Experience in Project Management Petrochemical&
Petroleum Refining, working in various critical projects including
Turn Around Projects (Manage EPCP in UK), Strategic Planning.
Main projects undertaken includes: Revival, Revamp Projects with
budget exceed 50 Million $. Also, have computer proficient in MS
Project, SAP, Caser II, RCA, ISO 9001.
Experience with SABIC
Mar 2012 – Now Sr. Strategic Planning Engineer, Engineering & Project
Management from Sep 2013 and continuing until now,
Responsible for Developing Long& Short Term Plan,
Resources Requirements, Efficiency, Benchmark, and
Market forecast, Strategy Execution Change Management.
Site Project Leader E&PM Shared Service Engineering &
Project Management from Mar 2012 until Sep 2013.
Responsible for Major Project (GRIP) Around 40 M$ site
Project at Yanpet from initiation until EPC Award.
Experience with Saudi Aramco ExxonMobil (SAMREF)
July 2007–Mar 2012 (2013 T/A) Project Engineering Clint Representative
Objective was to Retain Reliability & Enhance capacity
Responsible for initiating engineering and construction
follow up (EPCP) Resident in FWEL UK for one year,
Procurement of all items and insures delivery with correct
specification, QA/QC Coordination.
Providing engineering assistance to facilitate construction
works. Provide timely Reports. Supply latest approved
construction drawings (AFC). Develop risk Management
plan, Risk assessments.
(2010 T/A) Major Project Site Coordinator
Objective was to Retain Reliability & Comply to
Environmental requirements. e.g. Towers Material Upgrade,
New Waste Heat Boiler, Emergency Flare Smoke less
System. Scope document initiation Responsible.
Stakeholders’ requirements collecting. Interface
coordination between site departments in the Refinery.
Reviewing list of T/A activates & Develop Time schedule.
Technical Assurance for design provided by FWEL UK.
Coordinate QA/ QC. Provide & Confirm as built mark-ups.
Final Acceptance & Closing projects.
P a g e 1
Education:
College of Engineering,
King Abdulaziz University
(Jeddah, K.S.A., 2001
Qualifications:
Bachelor of Science
degree Mech. Eng.
(Production & Mech. Sys.
Design)
Nationality:
Saudi
Contact:
0590909240
darandari@sabic.com
2. Ahmed Darandari
Experience with Saudi Aramco ExxonMobil (PETROLUBE)
Sep 2001–July 2007 Acting plant manager (Jubail plant),KSA
Responsibilities include, managing the plant, production,
security, QA/QC, Maintenance, meet the safety and
environmental royal commission requirements.
Senior Production Planner
Responsibilities include, receiving logistics orders,
requesting row materials and issuing all production batches,
maintain min. & max. Stocks of finish goods, row materials.
Production Supervisor
Responsibilities include leading the production with around
70 production employees, follow up production trend and
provide progress report to the top management, entering the
seaport to arrange the special/ critical shipping activities.
Jubail Plant Revival Project Manager
Responsible for managing the Engineering, Fabrication/
installation of equipments, building services and domestic
services from tender to completion. Plant liaison working to
crucial dead lines within the design and construction phase
and co-ordination of all mechanical, electrical and civil
construction activities. Implementation of HSE regulations,
planning / programme and technical evaluation of sub-
contractors tenders, variations and equipment for
procurement. Cost control from tender to final account.
Quality, validation and commissioning of installed
equipment.
Acting Maintenance Supervisor & Certified, Internal
Auditor (QMS& EMS), Environmental system coordinator.
Responsibilities include, arrange of preventive& corrective
maintenance, warehouse obtaining spare parts and
following up with suppliers, includes getting quotations,
issuing PR and Receiving, coordinating& applying
environmental system trainings for all workers to current,
and design (maps and structures). Develop the Engineering
packages for variety of projects, member in the loss
Maintenance Forman.
Responsibilities Include field Maintenance e.g. Boilers,
compressors, pumps, heat exchangers, etc..
Also, Member of Emergency Response.
PDE Engineer, program for Three Years with hand-to-hand
field and shop work maintenance experience.
P a g e 2