REQUEST FOR PROPOSAL DOCUMENT
GRID CONNECTED SOLAR PV POWER
PLANTS ON CANAL TOP
20 MW CAPACITY
DEVELOPMENT AUTHORITY (PEDA)
EnvironmentFirst
“Let the Environment be your
Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore –
info@environmentfirst.in +91 731 6007860 www.environmentfirst.in
Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula
REQUEST FOR PROPOSAL DOCUMENT
FOR
GRID CONNECTED SOLAR PV POWER
PLANTS ON CANAL TOP
20 MW CAPACITY BY PUNJAB ENERGY
DEVELOPMENT AUTHORITY (PEDA)
EnvironmentFirst
“Let the Environment be your first Inspiration”
452001 (M.P.)
www.environmentfirst.in
Page 1
REQUEST FOR PROPOSAL DOCUMENT
GRID CONNECTED SOLAR PV POWER
BY PUNJAB ENERGY
DEVELOPMENT AUTHORITY (PEDA)
Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405
info@environmentfirst.in
Our Locations:
Punjab Energy Development Agency (PEDA) invites offers from interested project developers to
participate in the selection process for setting up of
PLANTS ON CANAL TOPS.
Canal Top Solar – Punjab State has valuable land which is very costly and in view of that
Government lays emphasis for use of irrigation canal network for implementation of SPV Power
plant for which extensive irrigation canal network is available. MNRE, Govt. of India, is p
incentive for the same to the tune of Rs. 3.00 crore per MW or 30% of the project cost which
ever is lower for the canal top SPV projects under the Pilot
development of Grid Connected Solar PV Power Plants on canal to
has sanctioned 20MW capacity Canal Top Solar PV Projects to Punjab (PEDA) under the
Ministry‘s Pilot-cum-Demonstration Project for development of Grid Connected Solar PV Power
Plants on Canal Tops. The maximum Bid Capacity is 6 MW with minimum as 1 MW only.
Fiscal Assistance / Benefits Available for Solar Power Developers under the NRSE Policy
2012:
a. 100% electricity duty for power consumed from State licensee during construction and
testing of the project shall be waived.
b. Octroi on NRSE fuels to be used for energy gen
machinery for NRSE Power Projects shall be fully exempted. Similarly Octroi on self
consumption of power by captive power plants in the same premises or thru wheeling by
open access to same group companies shall als
c. To promote usage / generation from NRSE, manufacturing & sale of NRSE devices /
systems and equipments / machinery required for NRSE Power Projects shall be
exempted from Value Added Tax (VAT) and any cess there upon.
d. 100% Exemption from entry tax in respect of all supplies (including capital goods,
structure and raw materials) made for setting up and tr
e. 100% exemption from payment of fee and stamp duty for registration / lease deed
charges for the land required for the project.
f. Agricultural land shall be allowed for setting up of Renewable Energy Power Projects in
the state and no Change of Land Use (CLU), External Development Charges (EDC) / or
any other charges / fees for the same shall be
g. Solar PV Power projects shall be exempted from obtaining any NOC / consent under
Pollution control laws from the PPCB.
h. The Solar power projects are to be installed on the canal top / available banks on the
irrigation land available as pe
(PID) will transfer canal land to PEDA on notional lease amount of
annum per MW. The leased canal land will be subsequently transferred to the Solar
Power producers for development of Solar Power Projects on Build, Operate and Own
basis for 28 years (three years shall be considered as construction period) on the same
terms and conditions set forth by PID subject to further renewal on mutually agreed
terms and conditions. Ow
amount will be deposited by the successful developer to PEDA @ Rs. 1.50 lac per
EnvironmentFirst
“Let the Environment be your
Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore –
info@environmentfirst.in +91 731 6007860 www.environmentfirst.in
Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula
Punjab Energy Development Agency (PEDA) invites offers from interested project developers to
participate in the selection process for setting up of GRID CONNECTED SOLAR PV POWER
Punjab State has valuable land which is very costly and in view of that
Government lays emphasis for use of irrigation canal network for implementation of SPV Power
plant for which extensive irrigation canal network is available. MNRE, Govt. of India, is p
incentive for the same to the tune of Rs. 3.00 crore per MW or 30% of the project cost which
ever is lower for the canal top SPV projects under the Pilot-cum-Demonstration Project for
development of Grid Connected Solar PV Power Plants on canal tops. MNRE, Govt. of India,
has sanctioned 20MW capacity Canal Top Solar PV Projects to Punjab (PEDA) under the
Demonstration Project for development of Grid Connected Solar PV Power
The maximum Bid Capacity is 6 MW with minimum as 1 MW only.
its Available for Solar Power Developers under the NRSE Policy
100% electricity duty for power consumed from State licensee during construction and
testing of the project shall be waived.
Octroi on NRSE fuels to be used for energy generation and NRSE devices / equipment /
machinery for NRSE Power Projects shall be fully exempted. Similarly Octroi on self
consumption of power by captive power plants in the same premises or thru wheeling by
open access to same group companies shall also be exempted.
To promote usage / generation from NRSE, manufacturing & sale of NRSE devices /
systems and equipments / machinery required for NRSE Power Projects shall be
exempted from Value Added Tax (VAT) and any cess there upon.
n from entry tax in respect of all supplies (including capital goods,
structure and raw materials) made for setting up and trial operations of the projects.
100% exemption from payment of fee and stamp duty for registration / lease deed
e land required for the project.
Agricultural land shall be allowed for setting up of Renewable Energy Power Projects in
the state and no Change of Land Use (CLU), External Development Charges (EDC) / or
any other charges / fees for the same shall be payable.
Solar PV Power projects shall be exempted from obtaining any NOC / consent under
Pollution control laws from the PPCB.
The Solar power projects are to be installed on the canal top / available banks on the
irrigation land available as per the proposed site locations. Punjab Irrigation Department
(PID) will transfer canal land to PEDA on notional lease amount of Rs. 1.50 lac per
annum per MW. The leased canal land will be subsequently transferred to the Solar
velopment of Solar Power Projects on Build, Operate and Own
basis for 28 years (three years shall be considered as construction period) on the same
terms and conditions set forth by PID subject to further renewal on mutually agreed
terms and conditions. Ownership of such land will remain with PID. The land lease
amount will be deposited by the successful developer to PEDA @ Rs. 1.50 lac per
EnvironmentFirst
“Let the Environment be your first Inspiration”
452001 (M.P.)
www.environmentfirst.in
Page 2
Punjab Energy Development Agency (PEDA) invites offers from interested project developers to
GRID CONNECTED SOLAR PV POWER
Punjab State has valuable land which is very costly and in view of that
Government lays emphasis for use of irrigation canal network for implementation of SPV Power
plant for which extensive irrigation canal network is available. MNRE, Govt. of India, is providing
incentive for the same to the tune of Rs. 3.00 crore per MW or 30% of the project cost which
Demonstration Project for
ps. MNRE, Govt. of India,
has sanctioned 20MW capacity Canal Top Solar PV Projects to Punjab (PEDA) under the
Demonstration Project for development of Grid Connected Solar PV Power
The maximum Bid Capacity is 6 MW with minimum as 1 MW only.
its Available for Solar Power Developers under the NRSE Policy
100% electricity duty for power consumed from State licensee during construction and
eration and NRSE devices / equipment /
machinery for NRSE Power Projects shall be fully exempted. Similarly Octroi on self -
consumption of power by captive power plants in the same premises or thru wheeling by
To promote usage / generation from NRSE, manufacturing & sale of NRSE devices /
systems and equipments / machinery required for NRSE Power Projects shall be
n from entry tax in respect of all supplies (including capital goods,
ial operations of the projects.
100% exemption from payment of fee and stamp duty for registration / lease deed
Agricultural land shall be allowed for setting up of Renewable Energy Power Projects in
the state and no Change of Land Use (CLU), External Development Charges (EDC) / or
Solar PV Power projects shall be exempted from obtaining any NOC / consent under
The Solar power projects are to be installed on the canal top / available banks on the
r the proposed site locations. Punjab Irrigation Department
Rs. 1.50 lac per
annum per MW. The leased canal land will be subsequently transferred to the Solar
velopment of Solar Power Projects on Build, Operate and Own
basis for 28 years (three years shall be considered as construction period) on the same
terms and conditions set forth by PID subject to further renewal on mutually agreed
nership of such land will remain with PID. The land lease
amount will be deposited by the successful developer to PEDA @ Rs. 1.50 lac per
Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405
info@environmentfirst.in
Our Locations:
annum per MW in advance i.e. every year upto or before the date of signing of Land
Lease Agreement and the same amount
Department.
Detail of sites and total Capacity for which bids are invited for Canal Top SPV Power
Plants:
S.
No.
Name of the Canal & Location
1 Main Branch Lower Canal near
Amritsar - Amritsar-
Highway
2 Kasur Branch Lower Canal near
Amritsar - Amritsar-
Highway
3 Sidhwan Branch Canal, Doraha,
Distt: Ludhiana
4 Bathinda Branch Canal ( Rara
Sahib) Distt: Ludhiana
5 Bathinda Branch Canal,
Jagera,(near Ahmedgarh) Distt:
Ludhiana
6 Bathinda Branch Canal near
Bathinda (Bathinda –
road)
7 Kotla Branch Canal near MHP
Babbanpur , Malerkotla, Distt:
Sangrur
8 Ghaggar Link (Rohti Bridge,
Nabha) Distt: Patiala
9 Ghaggar Branch (Nidampur) Distt:
Patiala
Technology:
The Bidder is free to choose any Solar PV power generation technology viz. Crystalline Silicon
Solar Cell Modules / Thin Film Modules / Concentrated PV Modules / any other technology
which can be sourced from any country.
Tariff1
:
1
CERC Tariff for FY 2015-16 for Solar PV Power Projects
EnvironmentFirst
“Let the Environment be your
Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore –
info@environmentfirst.in +91 731 6007860 www.environmentfirst.in
Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula
annum per MW in advance i.e. every year upto or before the date of signing of Land
Lease Agreement and the same amount will be forwarded to Punjab Irrigation
Detail of sites and total Capacity for which bids are invited for Canal Top SPV Power
Name of the Canal & Location Between RD‘s Capacity to be installed
(MW)
Branch Lower Canal near
-Jalandhar
90000-125000 3
Kasur Branch Lower Canal near
-Jalandhar
160310-195760 3
Sidhwan Branch Canal, Doraha, 1000-12000 2
Bathinda Branch Canal ( Rara 32250(upstream) 1
Bathinda Branch Canal,
Jagera,(near Ahmedgarh) Distt:
54000-63000 1
Bathinda Branch Canal near
Muktsar
390000-448000 2
Kotla Branch Canal near MHP
Babbanpur , Malerkotla, Distt:
76000-96000 2
Ghaggar Link (Rohti Bridge, 34671-57590 4
Ghaggar Branch (Nidampur) Distt: 40000-65000 2
The Bidder is free to choose any Solar PV power generation technology viz. Crystalline Silicon
Solar Cell Modules / Thin Film Modules / Concentrated PV Modules / any other technology
which can be sourced from any country.
16 for Solar PV Power Projects
EnvironmentFirst
“Let the Environment be your first Inspiration”
452001 (M.P.)
www.environmentfirst.in
Page 3
annum per MW in advance i.e. every year upto or before the date of signing of Land
will be forwarded to Punjab Irrigation
Detail of sites and total Capacity for which bids are invited for Canal Top SPV Power
Capacity to be installed
The Bidder is free to choose any Solar PV power generation technology viz. Crystalline Silicon
Solar Cell Modules / Thin Film Modules / Concentrated PV Modules / any other technology
Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405
info@environmentfirst.in
Our Locations:
Particulars Levellised Total
Tarrif (FY 2015
Rs. / kWh
Solar PV 7.04
MNRE, Govt. of India Financial Assistance
In addition to the above said tariff, Central Financial Assistance of Rs. 3.00 crore per MW or
30% of the project cost which ever is lower for canal top SPV Projects is available through
PEDA. This amount will be released to the selected bidders who will i
be released as under:-
1. 40% on commissioning of the project against bank guarantee of equivalent amount valid
uptil 25 years from the commissioning of the project.
2. 60% after 3 months of continuous operation of the plant
GOI, whichever is later, against bank guarantee of equivalent amount valid uptil 25 years
from the commissioning of the plant.
FEE and Deposits :
Sr.
No.
Description
1 RfP No.
2 Cost of RFP document & Bid
Processing charges
3 E- Processing Fee through IPG /
RTGS (Non - Refundable)
EnvironmentFirst
“Let the Environment be your
Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore –
info@environmentfirst.in +91 731 6007860 www.environmentfirst.in
Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula
Levellised Total
Tarrif (FY 2015-16)
Benefit of Accelerated
Depreciation, (If
availed) Rs. / kWh
Net Levellised Tarrif (upon
adjusting for Accelerated
Depreciation benefit) (if
availed) Rs. / kWh
0.69 6.35
MNRE, Govt. of India Financial Assistance
In addition to the above said tariff, Central Financial Assistance of Rs. 3.00 crore per MW or
30% of the project cost which ever is lower for canal top SPV Projects is available through
PEDA. This amount will be released to the selected bidders who will implement the project will
40% on commissioning of the project against bank guarantee of equivalent amount valid
uptil 25 years from the commissioning of the project.
60% after 3 months of continuous operation of the plant or receipt of CFA from MNRE,
GOI, whichever is later, against bank guarantee of equivalent amount valid uptil 25 years
from the commissioning of the plant.
Details
PEDA/ET/2015-16/SP/
Cost of RFP document & Bid Non-refundable RFP Document fee Rs. 5,000/
and Non-refundable Bid evaluation charges Rs.
1,00,000/- per location through IPG / RTGS mode
only to be paid at the time of uploading of bid. The
above said total amount of Rs. 5000 + 100000 =
Rs.105000/- should be deposited together in one
column, specified in the RFP document.
Processing Fee through IPG /
Refundable)
Rs. 2,247/- (Rupees Two Thousand and Two
Hundred and Forty Only)
EnvironmentFirst
“Let the Environment be your first Inspiration”
452001 (M.P.)
www.environmentfirst.in
Page 4
Net Levellised Tarrif (upon
adjusting for Accelerated
Depreciation benefit) (if
availed) Rs. / kWh
In addition to the above said tariff, Central Financial Assistance of Rs. 3.00 crore per MW or
30% of the project cost which ever is lower for canal top SPV Projects is available through
mplement the project will
40% on commissioning of the project against bank guarantee of equivalent amount valid
or receipt of CFA from MNRE,
GOI, whichever is later, against bank guarantee of equivalent amount valid uptil 25 years
refundable RFP Document fee Rs. 5,000/-
refundable Bid evaluation charges Rs.
per location through IPG / RTGS mode
only to be paid at the time of uploading of bid. The
mount of Rs. 5000 + 100000 =
should be deposited together in one
column, specified in the RFP document.
(Rupees Two Thousand and Two
Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405
info@environmentfirst.in
Our Locations:
4 Earnest Money Deposit (EMD)
5 Performance Bank Guarantee
(PBG)
6 Validity of Proposal
Time Schedule for the bid:
Sr.
No.
Events
1 Date of uploading / publishing of e
2 Pre - bid meeting at PEDA office
3 Last date & time for submission of
Processing Fee (Non Refundable), EMD,
Formats and Technical Bid and Financial
Bid though E- Bid (Part
4 Date and Time of Opening of techno
commercial e-bid
5 Date of Opening of Price Bid
We at EnvironmentFirst Energy Services Private Limited
submission to EPC consulting. We provide complete solution of Solar power projects from pre to
post commissioning assistant as well as operation and maintenance.
EnvironmentFirst
“Let the Environment be your
Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore –
info@environmentfirst.in +91 731 6007860 www.environmentfirst.in
Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula
Earnest Money Deposit (EMD) Rs. 20,00,000/- (Rupees Twenty Lac Only) per MW
for each project in the form of BG to be submitted
at the time of RfP, valid for 180 days from last date
of submission. Scanned copy of the BG to be
uploaded online and the original BG along with
bank confirmation letter in sealed envelope to be
submitted before opening of the techno commercial
Part I of the bid.
Performance Bank Guarantee Rs. 40,00,000/- (Rupees Forty Lac Only) per MW
for each project in the form of Bank Guarantee
(BG) or through RTGS/IPD mode to be submitted
two days before (seven days before in case of BG)
signing of Implementation Agreement (IA) valid for
a period of 21 months from the date of signing of
IA.
150 days after the date of opening of techno
commercial Part I of the bid.
Date & Time
Date of uploading / publishing of e- NIT 1st April ‘2015 at 10.00 AM
bid meeting at PEDA office 16th April,2015 at 12:00 noon
Last date & time for submission of
Processing Fee (Non Refundable), EMD,
Formats and Technical Bid and Financial
Bid (Part – I & Part II)
11th May 2015 at 5.00 PM
Date and Time of Opening of techno 13th May 2015 at 12.30PM
Date of Opening of Price Bid To be conveyed subsequently
gy Services Private Limited guide you in complete process of bid
submission to EPC consulting. We provide complete solution of Solar power projects from pre to
stant as well as operation and maintenance.
EnvironmentFirst
“Let the Environment be your first Inspiration”
452001 (M.P.)
www.environmentfirst.in
Page 5
(Rupees Twenty Lac Only) per MW
for each project in the form of BG to be submitted
at the time of RfP, valid for 180 days from last date
of submission. Scanned copy of the BG to be
al BG along with
bank confirmation letter in sealed envelope to be
submitted before opening of the techno commercial
(Rupees Forty Lac Only) per MW
Bank Guarantee
(BG) or through RTGS/IPD mode to be submitted
two days before (seven days before in case of BG)
signing of Implementation Agreement (IA) valid for
a period of 21 months from the date of signing of
days after the date of opening of techno
1st April ‘2015 at 10.00 AM
16th April,2015 at 12:00 noon
11th May 2015 at 5.00 PM
May 2015 at 12.30PM
To be conveyed subsequently
in complete process of bid
submission to EPC consulting. We provide complete solution of Solar power projects from pre to

More Related Content

What's hot

Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012Bakul Haria
 
Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Gurparvesh kaur
 
Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Headway Solar
 
Ap solar policy 2012.
Ap solar policy 2012.Ap solar policy 2012.
Ap solar policy 2012.antastoya
 
Renewable energy projects in jordan
Renewable energy projects in jordanRenewable energy projects in jordan
Renewable energy projects in jordanRCREEE
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsSanman Rajput
 
01- REEE Course - Energy Legal Framework in Jordan
01- REEE Course - Energy Legal Framework in Jordan01- REEE Course - Energy Legal Framework in Jordan
01- REEE Course - Energy Legal Framework in JordanSamer Zawaydeh
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India sanjeev jain
 
Power energy generation report
Power energy generation reportPower energy generation report
Power energy generation reportprianca07
 
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Gensol Engineering Limited
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabHeadway Solar
 
RCREEE-enerMENA_Jordan RE programs
RCREEE-enerMENA_Jordan RE programsRCREEE-enerMENA_Jordan RE programs
RCREEE-enerMENA_Jordan RE programsRCREEE
 
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.Harish Sharma
 
Penarroyo Presentation Geothermal Resources Council 2014
Penarroyo Presentation Geothermal Resources Council 2014Penarroyo Presentation Geothermal Resources Council 2014
Penarroyo Presentation Geothermal Resources Council 2014Fernando Penarroyo
 
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabHarish Sharma
 
Draft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmersDraft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmersHarish Sharma
 
Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012Headway Solar
 
Session 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, JordanSession 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, JordanOECDGlobalRelations
 
Commercial viability analysis for solar thermal power 2003-pps
Commercial viability analysis for solar thermal power 2003-ppsCommercial viability analysis for solar thermal power 2003-pps
Commercial viability analysis for solar thermal power 2003-ppsanu141
 

What's hot (20)

National Solar Mission Status (July'17)
National Solar Mission Status (July'17)National Solar Mission Status (July'17)
National Solar Mission Status (July'17)
 
Andhra Pradesh solar power policy 2012
Andhra Pradesh solar power policy  2012Andhra Pradesh solar power policy  2012
Andhra Pradesh solar power policy 2012
 
Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )Umpp(ultra mega power plant and international bidding )
Umpp(ultra mega power plant and international bidding )
 
Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014Uttar pradesh solar rooftop policy 2014
Uttar pradesh solar rooftop policy 2014
 
Ap solar policy 2012.
Ap solar policy 2012.Ap solar policy 2012.
Ap solar policy 2012.
 
Renewable energy projects in jordan
Renewable energy projects in jordanRenewable energy projects in jordan
Renewable energy projects in jordan
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
 
01- REEE Course - Energy Legal Framework in Jordan
01- REEE Course - Energy Legal Framework in Jordan01- REEE Course - Energy Legal Framework in Jordan
01- REEE Course - Energy Legal Framework in Jordan
 
Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India Renewable Energy Certificate Mechanism in India
Renewable Energy Certificate Mechanism in India
 
Power energy generation report
Power energy generation reportPower energy generation report
Power energy generation report
 
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
Notice for Energy Storage Project by Neyveli Lignite Corporation (NLC)
 
RFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in PunjabRFP for Solar Power Plant in Punjab
RFP for Solar Power Plant in Punjab
 
RCREEE-enerMENA_Jordan RE programs
RCREEE-enerMENA_Jordan RE programsRCREEE-enerMENA_Jordan RE programs
RCREEE-enerMENA_Jordan RE programs
 
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
Solar Power Scheme for Unemployed Youth and Farmers in Himachal Pradesh.
 
Penarroyo Presentation Geothermal Resources Council 2014
Penarroyo Presentation Geothermal Resources Council 2014Penarroyo Presentation Geothermal Resources Council 2014
Penarroyo Presentation Geothermal Resources Council 2014
 
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in PunjabScheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
Scheme for Allocation of Solar Power Projects to Land Owning Farmers in Punjab
 
Draft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmersDraft scheme for allocation of solar power projects for land owning farmers
Draft scheme for allocation of solar power projects for land owning farmers
 
Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012Madhya pradesh solar policy 2012
Madhya pradesh solar policy 2012
 
Session 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, JordanSession 2 Dr Ziad Jibril Sabra, Jordan
Session 2 Dr Ziad Jibril Sabra, Jordan
 
Commercial viability analysis for solar thermal power 2003-pps
Commercial viability analysis for solar thermal power 2003-ppsCommercial viability analysis for solar thermal power 2003-pps
Commercial viability analysis for solar thermal power 2003-pps
 

Similar to 20 MW Canal Top Solar RfP by PEDA

Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Headway Solar
 
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHHarish Sharma
 
Rooftop Gujarat
Rooftop Gujarat Rooftop Gujarat
Rooftop Gujarat Jay Ranvir
 
India Solar Opportunity
India Solar OpportunityIndia Solar Opportunity
India Solar Opportunitynorasco
 
Energy policy northeast
Energy policy northeastEnergy policy northeast
Energy policy northeastRohil Kumar
 
MARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTORMARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTORRanbir Ghosh
 
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIRfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIHarish Sharma
 
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...Harish Sharma
 
MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...Harish Sharma
 
PPT-SPV-Bermaco (2)
PPT-SPV-Bermaco (2)PPT-SPV-Bermaco (2)
PPT-SPV-Bermaco (2)C.P Singh
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderGensol Engineering Limited
 
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...Harish Sharma
 
Primotech rooftop plant investment
Primotech   rooftop plant investmentPrimotech   rooftop plant investment
Primotech rooftop plant investmentPRASHANT SHARMA
 
PM_kusum_yojna.pdf
PM_kusum_yojna.pdfPM_kusum_yojna.pdf
PM_kusum_yojna.pdfbhupesh Dave
 

Similar to 20 MW Canal Top Solar RfP by PEDA (20)

Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015Andhra pradesh solar policy 2015
Andhra pradesh solar policy 2015
 
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESHRfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
RfS 160 MW GRID CONNECTED SOLAR PV in UTTAR PRADESH
 
Solar Presentation
Solar PresentationSolar Presentation
Solar Presentation
 
Rooftop Gujarat
Rooftop Gujarat Rooftop Gujarat
Rooftop Gujarat
 
India Solar Opportunity
India Solar OpportunityIndia Solar Opportunity
India Solar Opportunity
 
Lobel corporate presentation
Lobel corporate presentationLobel corporate presentation
Lobel corporate presentation
 
Energy policy northeast
Energy policy northeastEnergy policy northeast
Energy policy northeast
 
MARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTORMARG-OPENACCESS-INVESTOR
MARG-OPENACCESS-INVESTOR
 
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-IIIRfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
RfS for 35 MW in Puducherry under NSM Ph-II, Batch-III
 
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
RfS for 50 MW in Solar Power projects Himachal Pradesh under NSM Ph-II, Batch...
 
MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...MNRE Clarification on the capacity with respect to inverter and eligibility o...
MNRE Clarification on the capacity with respect to inverter and eligibility o...
 
Solar power - A developer prespective
Solar power - A developer prespectiveSolar power - A developer prespective
Solar power - A developer prespective
 
PPT-SPV-Bermaco (2)
PPT-SPV-Bermaco (2)PPT-SPV-Bermaco (2)
PPT-SPV-Bermaco (2)
 
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid TenderTender summary for SECI 2500 MW Wind-Solar Hybrid Tender
Tender summary for SECI 2500 MW Wind-Solar Hybrid Tender
 
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
RfP FOR 1000 MW SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III TRANCH...
 
Primotech rooftop plant investment
Primotech   rooftop plant investmentPrimotech   rooftop plant investment
Primotech rooftop plant investment
 
1 final com.sum
1 final com.sum1 final com.sum
1 final com.sum
 
PM_kusum_yojna.pdf
PM_kusum_yojna.pdfPM_kusum_yojna.pdf
PM_kusum_yojna.pdf
 
PSP & Guidelines MOP.pptx
PSP & Guidelines MOP.pptxPSP & Guidelines MOP.pptx
PSP & Guidelines MOP.pptx
 
CK2017: SIDBI Initiatives on Clean Energy Adoption
CK2017: SIDBI Initiatives on Clean Energy Adoption CK2017: SIDBI Initiatives on Clean Energy Adoption
CK2017: SIDBI Initiatives on Clean Energy Adoption
 

More from Harish Sharma

MNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting SystemsMNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting SystemsHarish Sharma
 
MNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC SystemMNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC SystemHarish Sharma
 
Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in IndiaHarish Sharma
 
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVRfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVHarish Sharma
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Harish Sharma
 
PPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of KarnatakaPPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of KarnatakaHarish Sharma
 
RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...Harish Sharma
 
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...Harish Sharma
 
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKARfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKAHarish Sharma
 
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...Harish Sharma
 
Water Benefit Standard (WBS)
Water Benefit Standard (WBS) Water Benefit Standard (WBS)
Water Benefit Standard (WBS) Harish Sharma
 
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Harish Sharma
 
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...Harish Sharma
 
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...Harish Sharma
 
IREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEIREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEHarish Sharma
 
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS Harish Sharma
 
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...Harish Sharma
 
Bid Results for procurement of 215 MW Solar Power by UPNEDA
Bid Results for procurement of 215 MW Solar Power by UPNEDABid Results for procurement of 215 MW Solar Power by UPNEDA
Bid Results for procurement of 215 MW Solar Power by UPNEDAHarish Sharma
 
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...Harish Sharma
 
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantNet metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantHarish Sharma
 

More from Harish Sharma (20)

MNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting SystemsMNRE recomendations to States for the Solar Street Lighting Systems
MNRE recomendations to States for the Solar Street Lighting Systems
 
MNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC SystemMNRE Guidelines for off-grid and grid connected Solar DC System
MNRE Guidelines for off-grid and grid connected Solar DC System
 
Future of solar Power Projects in India
Future of solar Power Projects in IndiaFuture of solar Power Projects in India
Future of solar Power Projects in India
 
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IVRfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
RfS for 250 MW in Gujarat Solar Park under NSM Ph-II, Batch-IV
 
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
Implementation of 500 MW Grid Connected Roof Top Solar PV System Scheme in Di...
 
PPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of KarnatakaPPA draft for the development of solar power project in the state of Karnataka
PPA draft for the development of solar power project in the state of Karnataka
 
RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...RfP for tariff based competitive bidding by KREDL for the installation of 240...
RfP for tariff based competitive bidding by KREDL for the installation of 240...
 
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
RfP invited for setting up 1200 MW Solar PV by Jharkhand Renewable Energy Dev...
 
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKARfP for 1200 MW SOLAR  POWER PROJECTS IN KARNATAKA
RfP for 1200 MW SOLAR POWER PROJECTS IN KARNATAKA
 
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...Request for Proposal (RfP)  For  Installation of 2 MW Canal Top Grid connecte...
Request for Proposal (RfP) For Installation of 2 MW Canal Top Grid connecte...
 
Water Benefit Standard (WBS)
Water Benefit Standard (WBS) Water Benefit Standard (WBS)
Water Benefit Standard (WBS)
 
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
Guidelines for Implementation of Scheme for Setting up of 2000 MW Grid-conne...
 
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
250 MW GRID CONNECTED SOLAR PV POWER PROJECTS UNDER JNNSM PHASE II BATCH-III ...
 
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
RfS for Selection of “500 MW Grid Connected Solar Power Projects in Maharasht...
 
IREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEMEIREDA-NCEF REFINANCE SCHEME
IREDA-NCEF REFINANCE SCHEME
 
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
LOAN SCHEME FOR FINANCING GRID CONNECTED ROOFTOP SOLAR PV POWER PROJECTS
 
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
Illustration ppt for 2000 mw Tariff based competitive bidding of solar power ...
 
Bid Results for procurement of 215 MW Solar Power by UPNEDA
Bid Results for procurement of 215 MW Solar Power by UPNEDABid Results for procurement of 215 MW Solar Power by UPNEDA
Bid Results for procurement of 215 MW Solar Power by UPNEDA
 
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
RfP for 1MW CAPACITY/12000 CUM BIOGAS PER DAY USING CATTLE DUNG AT TAJPUR DAI...
 
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power PlantNet metering requirements in punjab for grid interactive rooftop SPV Power Plant
Net metering requirements in punjab for grid interactive rooftop SPV Power Plant
 

Recently uploaded

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 

Recently uploaded (20)

Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 

20 MW Canal Top Solar RfP by PEDA

  • 1. Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 info@environmentfirst.in Our Locations: REQUEST FOR PROPOSAL DOCUMENT GRID CONNECTED SOLAR PV POWER PLANTS ON CANAL TOP 20 MW CAPACITY DEVELOPMENT AUTHORITY (PEDA) EnvironmentFirst “Let the Environment be your Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – info@environmentfirst.in +91 731 6007860 www.environmentfirst.in Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula REQUEST FOR PROPOSAL DOCUMENT FOR GRID CONNECTED SOLAR PV POWER PLANTS ON CANAL TOP 20 MW CAPACITY BY PUNJAB ENERGY DEVELOPMENT AUTHORITY (PEDA) EnvironmentFirst “Let the Environment be your first Inspiration” 452001 (M.P.) www.environmentfirst.in Page 1 REQUEST FOR PROPOSAL DOCUMENT GRID CONNECTED SOLAR PV POWER BY PUNJAB ENERGY DEVELOPMENT AUTHORITY (PEDA)
  • 2. Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 info@environmentfirst.in Our Locations: Punjab Energy Development Agency (PEDA) invites offers from interested project developers to participate in the selection process for setting up of PLANTS ON CANAL TOPS. Canal Top Solar – Punjab State has valuable land which is very costly and in view of that Government lays emphasis for use of irrigation canal network for implementation of SPV Power plant for which extensive irrigation canal network is available. MNRE, Govt. of India, is p incentive for the same to the tune of Rs. 3.00 crore per MW or 30% of the project cost which ever is lower for the canal top SPV projects under the Pilot development of Grid Connected Solar PV Power Plants on canal to has sanctioned 20MW capacity Canal Top Solar PV Projects to Punjab (PEDA) under the Ministry‘s Pilot-cum-Demonstration Project for development of Grid Connected Solar PV Power Plants on Canal Tops. The maximum Bid Capacity is 6 MW with minimum as 1 MW only. Fiscal Assistance / Benefits Available for Solar Power Developers under the NRSE Policy 2012: a. 100% electricity duty for power consumed from State licensee during construction and testing of the project shall be waived. b. Octroi on NRSE fuels to be used for energy gen machinery for NRSE Power Projects shall be fully exempted. Similarly Octroi on self consumption of power by captive power plants in the same premises or thru wheeling by open access to same group companies shall als c. To promote usage / generation from NRSE, manufacturing & sale of NRSE devices / systems and equipments / machinery required for NRSE Power Projects shall be exempted from Value Added Tax (VAT) and any cess there upon. d. 100% Exemption from entry tax in respect of all supplies (including capital goods, structure and raw materials) made for setting up and tr e. 100% exemption from payment of fee and stamp duty for registration / lease deed charges for the land required for the project. f. Agricultural land shall be allowed for setting up of Renewable Energy Power Projects in the state and no Change of Land Use (CLU), External Development Charges (EDC) / or any other charges / fees for the same shall be g. Solar PV Power projects shall be exempted from obtaining any NOC / consent under Pollution control laws from the PPCB. h. The Solar power projects are to be installed on the canal top / available banks on the irrigation land available as pe (PID) will transfer canal land to PEDA on notional lease amount of annum per MW. The leased canal land will be subsequently transferred to the Solar Power producers for development of Solar Power Projects on Build, Operate and Own basis for 28 years (three years shall be considered as construction period) on the same terms and conditions set forth by PID subject to further renewal on mutually agreed terms and conditions. Ow amount will be deposited by the successful developer to PEDA @ Rs. 1.50 lac per EnvironmentFirst “Let the Environment be your Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – info@environmentfirst.in +91 731 6007860 www.environmentfirst.in Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula Punjab Energy Development Agency (PEDA) invites offers from interested project developers to participate in the selection process for setting up of GRID CONNECTED SOLAR PV POWER Punjab State has valuable land which is very costly and in view of that Government lays emphasis for use of irrigation canal network for implementation of SPV Power plant for which extensive irrigation canal network is available. MNRE, Govt. of India, is p incentive for the same to the tune of Rs. 3.00 crore per MW or 30% of the project cost which ever is lower for the canal top SPV projects under the Pilot-cum-Demonstration Project for development of Grid Connected Solar PV Power Plants on canal tops. MNRE, Govt. of India, has sanctioned 20MW capacity Canal Top Solar PV Projects to Punjab (PEDA) under the Demonstration Project for development of Grid Connected Solar PV Power The maximum Bid Capacity is 6 MW with minimum as 1 MW only. its Available for Solar Power Developers under the NRSE Policy 100% electricity duty for power consumed from State licensee during construction and testing of the project shall be waived. Octroi on NRSE fuels to be used for energy generation and NRSE devices / equipment / machinery for NRSE Power Projects shall be fully exempted. Similarly Octroi on self consumption of power by captive power plants in the same premises or thru wheeling by open access to same group companies shall also be exempted. To promote usage / generation from NRSE, manufacturing & sale of NRSE devices / systems and equipments / machinery required for NRSE Power Projects shall be exempted from Value Added Tax (VAT) and any cess there upon. n from entry tax in respect of all supplies (including capital goods, structure and raw materials) made for setting up and trial operations of the projects. 100% exemption from payment of fee and stamp duty for registration / lease deed e land required for the project. Agricultural land shall be allowed for setting up of Renewable Energy Power Projects in the state and no Change of Land Use (CLU), External Development Charges (EDC) / or any other charges / fees for the same shall be payable. Solar PV Power projects shall be exempted from obtaining any NOC / consent under Pollution control laws from the PPCB. The Solar power projects are to be installed on the canal top / available banks on the irrigation land available as per the proposed site locations. Punjab Irrigation Department (PID) will transfer canal land to PEDA on notional lease amount of Rs. 1.50 lac per annum per MW. The leased canal land will be subsequently transferred to the Solar velopment of Solar Power Projects on Build, Operate and Own basis for 28 years (three years shall be considered as construction period) on the same terms and conditions set forth by PID subject to further renewal on mutually agreed terms and conditions. Ownership of such land will remain with PID. The land lease amount will be deposited by the successful developer to PEDA @ Rs. 1.50 lac per EnvironmentFirst “Let the Environment be your first Inspiration” 452001 (M.P.) www.environmentfirst.in Page 2 Punjab Energy Development Agency (PEDA) invites offers from interested project developers to GRID CONNECTED SOLAR PV POWER Punjab State has valuable land which is very costly and in view of that Government lays emphasis for use of irrigation canal network for implementation of SPV Power plant for which extensive irrigation canal network is available. MNRE, Govt. of India, is providing incentive for the same to the tune of Rs. 3.00 crore per MW or 30% of the project cost which Demonstration Project for ps. MNRE, Govt. of India, has sanctioned 20MW capacity Canal Top Solar PV Projects to Punjab (PEDA) under the Demonstration Project for development of Grid Connected Solar PV Power The maximum Bid Capacity is 6 MW with minimum as 1 MW only. its Available for Solar Power Developers under the NRSE Policy 100% electricity duty for power consumed from State licensee during construction and eration and NRSE devices / equipment / machinery for NRSE Power Projects shall be fully exempted. Similarly Octroi on self - consumption of power by captive power plants in the same premises or thru wheeling by To promote usage / generation from NRSE, manufacturing & sale of NRSE devices / systems and equipments / machinery required for NRSE Power Projects shall be n from entry tax in respect of all supplies (including capital goods, ial operations of the projects. 100% exemption from payment of fee and stamp duty for registration / lease deed Agricultural land shall be allowed for setting up of Renewable Energy Power Projects in the state and no Change of Land Use (CLU), External Development Charges (EDC) / or Solar PV Power projects shall be exempted from obtaining any NOC / consent under The Solar power projects are to be installed on the canal top / available banks on the r the proposed site locations. Punjab Irrigation Department Rs. 1.50 lac per annum per MW. The leased canal land will be subsequently transferred to the Solar velopment of Solar Power Projects on Build, Operate and Own basis for 28 years (three years shall be considered as construction period) on the same terms and conditions set forth by PID subject to further renewal on mutually agreed nership of such land will remain with PID. The land lease amount will be deposited by the successful developer to PEDA @ Rs. 1.50 lac per
  • 3. Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 info@environmentfirst.in Our Locations: annum per MW in advance i.e. every year upto or before the date of signing of Land Lease Agreement and the same amount Department. Detail of sites and total Capacity for which bids are invited for Canal Top SPV Power Plants: S. No. Name of the Canal & Location 1 Main Branch Lower Canal near Amritsar - Amritsar- Highway 2 Kasur Branch Lower Canal near Amritsar - Amritsar- Highway 3 Sidhwan Branch Canal, Doraha, Distt: Ludhiana 4 Bathinda Branch Canal ( Rara Sahib) Distt: Ludhiana 5 Bathinda Branch Canal, Jagera,(near Ahmedgarh) Distt: Ludhiana 6 Bathinda Branch Canal near Bathinda (Bathinda – road) 7 Kotla Branch Canal near MHP Babbanpur , Malerkotla, Distt: Sangrur 8 Ghaggar Link (Rohti Bridge, Nabha) Distt: Patiala 9 Ghaggar Branch (Nidampur) Distt: Patiala Technology: The Bidder is free to choose any Solar PV power generation technology viz. Crystalline Silicon Solar Cell Modules / Thin Film Modules / Concentrated PV Modules / any other technology which can be sourced from any country. Tariff1 : 1 CERC Tariff for FY 2015-16 for Solar PV Power Projects EnvironmentFirst “Let the Environment be your Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – info@environmentfirst.in +91 731 6007860 www.environmentfirst.in Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula annum per MW in advance i.e. every year upto or before the date of signing of Land Lease Agreement and the same amount will be forwarded to Punjab Irrigation Detail of sites and total Capacity for which bids are invited for Canal Top SPV Power Name of the Canal & Location Between RD‘s Capacity to be installed (MW) Branch Lower Canal near -Jalandhar 90000-125000 3 Kasur Branch Lower Canal near -Jalandhar 160310-195760 3 Sidhwan Branch Canal, Doraha, 1000-12000 2 Bathinda Branch Canal ( Rara 32250(upstream) 1 Bathinda Branch Canal, Jagera,(near Ahmedgarh) Distt: 54000-63000 1 Bathinda Branch Canal near Muktsar 390000-448000 2 Kotla Branch Canal near MHP Babbanpur , Malerkotla, Distt: 76000-96000 2 Ghaggar Link (Rohti Bridge, 34671-57590 4 Ghaggar Branch (Nidampur) Distt: 40000-65000 2 The Bidder is free to choose any Solar PV power generation technology viz. Crystalline Silicon Solar Cell Modules / Thin Film Modules / Concentrated PV Modules / any other technology which can be sourced from any country. 16 for Solar PV Power Projects EnvironmentFirst “Let the Environment be your first Inspiration” 452001 (M.P.) www.environmentfirst.in Page 3 annum per MW in advance i.e. every year upto or before the date of signing of Land will be forwarded to Punjab Irrigation Detail of sites and total Capacity for which bids are invited for Canal Top SPV Power Capacity to be installed The Bidder is free to choose any Solar PV power generation technology viz. Crystalline Silicon Solar Cell Modules / Thin Film Modules / Concentrated PV Modules / any other technology
  • 4. Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 info@environmentfirst.in Our Locations: Particulars Levellised Total Tarrif (FY 2015 Rs. / kWh Solar PV 7.04 MNRE, Govt. of India Financial Assistance In addition to the above said tariff, Central Financial Assistance of Rs. 3.00 crore per MW or 30% of the project cost which ever is lower for canal top SPV Projects is available through PEDA. This amount will be released to the selected bidders who will i be released as under:- 1. 40% on commissioning of the project against bank guarantee of equivalent amount valid uptil 25 years from the commissioning of the project. 2. 60% after 3 months of continuous operation of the plant GOI, whichever is later, against bank guarantee of equivalent amount valid uptil 25 years from the commissioning of the plant. FEE and Deposits : Sr. No. Description 1 RfP No. 2 Cost of RFP document & Bid Processing charges 3 E- Processing Fee through IPG / RTGS (Non - Refundable) EnvironmentFirst “Let the Environment be your Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – info@environmentfirst.in +91 731 6007860 www.environmentfirst.in Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula Levellised Total Tarrif (FY 2015-16) Benefit of Accelerated Depreciation, (If availed) Rs. / kWh Net Levellised Tarrif (upon adjusting for Accelerated Depreciation benefit) (if availed) Rs. / kWh 0.69 6.35 MNRE, Govt. of India Financial Assistance In addition to the above said tariff, Central Financial Assistance of Rs. 3.00 crore per MW or 30% of the project cost which ever is lower for canal top SPV Projects is available through PEDA. This amount will be released to the selected bidders who will implement the project will 40% on commissioning of the project against bank guarantee of equivalent amount valid uptil 25 years from the commissioning of the project. 60% after 3 months of continuous operation of the plant or receipt of CFA from MNRE, GOI, whichever is later, against bank guarantee of equivalent amount valid uptil 25 years from the commissioning of the plant. Details PEDA/ET/2015-16/SP/ Cost of RFP document & Bid Non-refundable RFP Document fee Rs. 5,000/ and Non-refundable Bid evaluation charges Rs. 1,00,000/- per location through IPG / RTGS mode only to be paid at the time of uploading of bid. The above said total amount of Rs. 5000 + 100000 = Rs.105000/- should be deposited together in one column, specified in the RFP document. Processing Fee through IPG / Refundable) Rs. 2,247/- (Rupees Two Thousand and Two Hundred and Forty Only) EnvironmentFirst “Let the Environment be your first Inspiration” 452001 (M.P.) www.environmentfirst.in Page 4 Net Levellised Tarrif (upon adjusting for Accelerated Depreciation benefit) (if availed) Rs. / kWh In addition to the above said tariff, Central Financial Assistance of Rs. 3.00 crore per MW or 30% of the project cost which ever is lower for canal top SPV Projects is available through mplement the project will 40% on commissioning of the project against bank guarantee of equivalent amount valid or receipt of CFA from MNRE, GOI, whichever is later, against bank guarantee of equivalent amount valid uptil 25 years refundable RFP Document fee Rs. 5,000/- refundable Bid evaluation charges Rs. per location through IPG / RTGS mode only to be paid at the time of uploading of bid. The mount of Rs. 5000 + 100000 = should be deposited together in one column, specified in the RFP document. (Rupees Two Thousand and Two
  • 5. Registered Office: Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 info@environmentfirst.in Our Locations: 4 Earnest Money Deposit (EMD) 5 Performance Bank Guarantee (PBG) 6 Validity of Proposal Time Schedule for the bid: Sr. No. Events 1 Date of uploading / publishing of e 2 Pre - bid meeting at PEDA office 3 Last date & time for submission of Processing Fee (Non Refundable), EMD, Formats and Technical Bid and Financial Bid though E- Bid (Part 4 Date and Time of Opening of techno commercial e-bid 5 Date of Opening of Price Bid We at EnvironmentFirst Energy Services Private Limited submission to EPC consulting. We provide complete solution of Solar power projects from pre to post commissioning assistant as well as operation and maintenance. EnvironmentFirst “Let the Environment be your Environmentfirst Energy Services (P) Ltd.; Prakrati Corporate, 405 – Block A; Y N Road, Indore – info@environmentfirst.in +91 731 6007860 www.environmentfirst.in Mumbai, Chennai, Ahmedabad, Jaipur, Panchkula Earnest Money Deposit (EMD) Rs. 20,00,000/- (Rupees Twenty Lac Only) per MW for each project in the form of BG to be submitted at the time of RfP, valid for 180 days from last date of submission. Scanned copy of the BG to be uploaded online and the original BG along with bank confirmation letter in sealed envelope to be submitted before opening of the techno commercial Part I of the bid. Performance Bank Guarantee Rs. 40,00,000/- (Rupees Forty Lac Only) per MW for each project in the form of Bank Guarantee (BG) or through RTGS/IPD mode to be submitted two days before (seven days before in case of BG) signing of Implementation Agreement (IA) valid for a period of 21 months from the date of signing of IA. 150 days after the date of opening of techno commercial Part I of the bid. Date & Time Date of uploading / publishing of e- NIT 1st April ‘2015 at 10.00 AM bid meeting at PEDA office 16th April,2015 at 12:00 noon Last date & time for submission of Processing Fee (Non Refundable), EMD, Formats and Technical Bid and Financial Bid (Part – I & Part II) 11th May 2015 at 5.00 PM Date and Time of Opening of techno 13th May 2015 at 12.30PM Date of Opening of Price Bid To be conveyed subsequently gy Services Private Limited guide you in complete process of bid submission to EPC consulting. We provide complete solution of Solar power projects from pre to stant as well as operation and maintenance. EnvironmentFirst “Let the Environment be your first Inspiration” 452001 (M.P.) www.environmentfirst.in Page 5 (Rupees Twenty Lac Only) per MW for each project in the form of BG to be submitted at the time of RfP, valid for 180 days from last date of submission. Scanned copy of the BG to be al BG along with bank confirmation letter in sealed envelope to be submitted before opening of the techno commercial (Rupees Forty Lac Only) per MW Bank Guarantee (BG) or through RTGS/IPD mode to be submitted two days before (seven days before in case of BG) signing of Implementation Agreement (IA) valid for a period of 21 months from the date of signing of days after the date of opening of techno 1st April ‘2015 at 10.00 AM 16th April,2015 at 12:00 noon 11th May 2015 at 5.00 PM May 2015 at 12.30PM To be conveyed subsequently in complete process of bid submission to EPC consulting. We provide complete solution of Solar power projects from pre to