ICTAD Formula Method for
Price Fluctuation
ICTAD Formula Method for Price
Fluctuation
The ICTAD Formula Method was introduced in January
1993.
To Reimburse of Price fluctuation of Material, Labour &
Plant in Construction.
To Calculate the amount due to the Price Fluctuation.
There are two Formula
1. Contract exceeding 10 Million
2. Contract not exceeding 10 Million
THE FORMULA METHOD FOR CONTRACT
EXCEEDING RS. 10 MILLION
F= 0.966 (V – Vna ) ∑ Px (Ixc – Ixb)
100 all inputs Ixb
F = Price adjustment for the period
V = Valuation of work done during the period concerned
Vna = Value of non – adjustable element
Px = Percentage cost contribution of input X
Ixc = Current index for input X
Ixb = Base index for input X
V - Valuation of work done during the period
concern
Valuing the cumulative work done including the 80 % of
the cost of material delivered to site but has not been
incorporated in permanent works and deducting the
cumulative payment certified up to the previous bill.
V = (Vc + Mc) – (Vp + Mp)
Vc = Cumulative Value of work done during the period concerned.
Mc = 80 % of the invoiced value of material used for permanent
works on current valuation.
Vp = Cumulative Value of work done up to previous claim.
Mp = 80 % of the invoiced value of material used for permanent
works on previous valuation.
Vna – Non Adjustable Element
 Value of work done under the items which will not be
considered for price adjustment and have been listed
accordingly in the Contract.
 Generally there are three categories of items will be
considered as non-adjustable element.
1. Items in the BOQ for which the expenditure will be fixed and
executed at early stages of contract. (Most preliminaries items
fall under this )
2. Provisional sum item.
3. Extra works items for which the rates are agreed based on the
prices prevailing at the time of execution of works or are priced at
Day-work rates.
Vna – Non Adjustable Element
Vna = Vnac – Vnap
Vnac = Cumulative of work certified under items specified as
non- adjustable element up to the current bill
Vnac = Cumulative of work certified under items specified as
non- adjustable element up to the Previous bill
Px – Input Percentages
The percentage cost contribution of major materials, Plant and Labour to
the contract.
When include these item, it is suggested to exclude the less cost
significant items, in computing the input percentages.
Combined effect of such items will be less than 10% of the total cost of
inputs.
Hence the total contribution of major inputs will be considered as 90%.
The computation of input proportions is based on the costing major input
items required for proposed construction.
The costs will be calculated using the prices that prevailed at the time of
bidding.
The cost of major inputs will be considered as 90% of the total cost.
Px – Input Percentages
Input proportion of a particular input will be computed as the ration
between the cost of the input and the cost of all inputs.
Example
Indices No Input Name Input percentage
(Px)
P2 Heavy Machinery 37.89
M7 Metal 20.66
M30 Bitumen 16.89
P3 Fuel 5.19
L2 Unskilled labor 4.35
M8 Sand 2.9
L1 Skilled labor 2.12
90
Indices
The indices used in the formula shall be those
published by ICTAD.
Monthly indices will be published in Bulletin of
Construction Statistics.
The type of indices applicable to this formula shall
be Material(M indices), Labour (L indices) & Plant
& Equipment (P indices)
Ixb – Base Indices
“Base Indices” shall be the indices for the input,
prevailing for the calendar month, one month prior
to the date set for the submission of Bid.
For Example,
If the bids were closed on any date of the month
of September, the applicable base indices shall
be the indices published for the month of August
of the same year
Ixc – Current Indices
The current index of a particular input shall be the index
published by ICTAD for that input for the month
applicable.
The Contractor is supposed to submit the monthly
statement for the payment.
For the first interim bill, Current indices shall be taken as
the indices prevailing on the first month after
commencement of the contract.
For any other interim claim or the final claim the Current
indices shall be taken as indices prevailing for the calendar
month, one month after the previous valuation was done.
Ixc – Current Indices
Example for the use of Current Indices
Details of monthly statement submitted by the Contractor
Applicable Current Indices
Month 1 Month 2 Month 3 Month 4 Month 5 Month 6
Case a Claim 1 Claim 2 - - Claim 3 Final
Case b - Claim 1 Claim 2 - Final -
Claim 1 Claim 2 Claim3 Final Claim
Case a 6onth 1 Month 2 Month 3 Month5
Case b Month 1 Month3 - Month 4
Method Of Computation Of Price Fluctuation
The Formula is considered in two parts for the purpose of
computations:
0.966 (V – Vna ) as the first part
100
∑ Px (Ixc – Ixb) as the second part
all inputs Ixb
Method Of Computation Of Price Fluction
Computation of V- Vna
1.0 Price adjustment computation for the Valuation No
2.0 Previous Valuation
 a. Date 04/2011
 b. Cumulative value of work done Rs. 6,521,904.02
 c. Cost of material at site Rs. 450,000.00
 d. Cumulative cost of non-adjustable element Rs. 105,650.00
3.0 Current Valuation
 a. Date 09/2011
 b. Cumulative value of work done Rs. 9,745,967.43
 c. Cost of material at site Rs. -
 d. Cumulative cost of non-adjustable element Rs. 155,890.00
 e. Indices applicable for Current Valuation May/ 2011
Method Of Computation Of Price Fluctuation
 4.0 Computation of V – Vna
 V – Vna = (3b+3c-3d) –(2b+2c-2d)
 = 2,723,823.41
5.0 0.966 (V – Vna ) = 26,312.13
100
6.0 Computation of ∑ Px (Ixc – Ixb)
all inputs Ixb
Method Of Computation Of Price Fluctuation
Name of input Input
percentage (Px)
Base index
(Ixb)
Feb/2011
Current Index
(Ixc)
Px (Ixc – Ixb)
Ixb
Heavy
Machinary (P2) 37.89 313.7 313.7 0.000
Metal (M7) 20.66 267.5 273.9 0.079
Bitumen (M30) 16.89 870.7 870.7 0.000
Fuel (P3) 5.19 715.8 747.6 0.231
Unskilled
labor(L2) 4.35 352.1 352.1 0.000
Sand (M8) 2.9 1780.3 1791.0 0.017
Skilled labor
(L1) 2.12 363.5 363.5 0.000
0.327
Method Of Computation Of Price Fluctuation
 7.0 Price Adjustment for the Current variation
 F = Step 5 X Step 6
 26,312.13 X 0.327
= 8,604.06
The Formula Method For Contract Not Exceeding Rs. 10 Million
F= 0.869 (V – Vna ) (Itc – Itb)
Itb
F = Price adjustment for the period
V = Valuation of work done during the period
concerned
Vna =Value of non – adjustable element
Itc = Current Composite index for type of
work
Itb = Base Composite index for type of work
Method Of Computation Of Price Fluctuation
 Step 1: Estimating the cumulative value of work done up to
the time of valuation
 V = (Vc + Mc) – (Vp + Mp)
 Vc = Cumulative Value of work done during the period
concerned.
Mc = 80 % of the invoiced value of material used for
permanent works on current valuation.
Vp = Cumulative Value of work done up to previous
claim.
 Mp = 80 % of the invoiced value of material used for
permanent works on previous valuation.
Method Of Computation Of Price Fluctuation
Step 2: Excluding the non-adjustable element
Vna = Vnac – Vnap
Vnac = Cumulative of work certified under items specified as
non-adjustable element up to the current bill
Vnac = Cumulative of work certified under items specified as
non-adjustable element up to the Previous bill
Method Of Computation Of Price Fluctuation
Step 3: Computation of Price fluctuation
 a. Calculate the factor,
0.869 (V – Vna)
 b. Using the appropriate base and current composite
indices compute
(Itc – Itb)
Itb
 c By multiplying the result obtained from Step ‘a’ and Step
‘b’ above the price adjustment due for the current valuation
can be computed.
Presentation on calculation_of_price_escalation

More Related Content

What's hot

Types of joints in rigid pavement
Types of joints in rigid pavementTypes of joints in rigid pavement
Types of joints in rigid pavementBhavya Jaiswal
 
Rate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisRate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisJaptyesh Singh
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineeringKailash Chander
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of RatesRaj Shah
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -artijagadish108
 
Estimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionEstimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionAshwiniChaudhari13
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and materialALI HYDER GADHI
 
Acceptance criteria of cube
Acceptance criteria of cubeAcceptance criteria of cube
Acceptance criteria of cubeSantosh Shah
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionWaleed Liaqat
 
Pavement materials in Road Construction
Pavement materials in Road ConstructionPavement materials in Road Construction
Pavement materials in Road Constructionsrinivas2036
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentationcynfang Fong
 
Unit 02 unit – ii project planning and scheduling
Unit 02 unit – ii project planning and schedulingUnit 02 unit – ii project planning and scheduling
Unit 02 unit – ii project planning and schedulingRAMCHANDRA KODAM
 

What's hot (20)

Rate analysis vansheika
Rate analysis   vansheikaRate analysis   vansheika
Rate analysis vansheika
 
Types of joints in rigid pavement
Types of joints in rigid pavementTypes of joints in rigid pavement
Types of joints in rigid pavement
 
Construction contracts
Construction contractsConstruction contracts
Construction contracts
 
Rate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate AnalyisisRate analysis road work in Estimation & Rate Analyisis
Rate analysis road work in Estimation & Rate Analyisis
 
Contracts
ContractsContracts
Contracts
 
Rate analysis in civil engineering
Rate analysis in civil engineeringRate analysis in civil engineering
Rate analysis in civil engineering
 
Schedule of Rates
Schedule of RatesSchedule of Rates
Schedule of Rates
 
Earnest Money
Earnest MoneyEarnest Money
Earnest Money
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
 
Drawing And Report
Drawing And Report Drawing And Report
Drawing And Report
 
Estimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provisionEstimating, administrative approval, technical sanction, budget provision
Estimating, administrative approval, technical sanction, budget provision
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and material
 
Bills of quantities
Bills of quantitiesBills of quantities
Bills of quantities
 
Acceptance criteria of cube
Acceptance criteria of cubeAcceptance criteria of cube
Acceptance criteria of cube
 
ESTIMATING AND COSTING
ESTIMATING AND COSTINGESTIMATING AND COSTING
ESTIMATING AND COSTING
 
Key Components of Cost Estimation in construction
Key Components of Cost Estimation in constructionKey Components of Cost Estimation in construction
Key Components of Cost Estimation in construction
 
Pavement materials in Road Construction
Pavement materials in Road ConstructionPavement materials in Road Construction
Pavement materials in Road Construction
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentation
 
Types of contracts
Types of contractsTypes of contracts
Types of contracts
 
Unit 02 unit – ii project planning and scheduling
Unit 02 unit – ii project planning and schedulingUnit 02 unit – ii project planning and scheduling
Unit 02 unit – ii project planning and scheduling
 

Similar to Presentation on calculation_of_price_escalation

STANDARD PROCEDURE AND FORMULA FOR PRICE ADJUSTMENT.pptx
STANDARD PROCEDURE AND FORMULA FOR PRICE ADJUSTMENT.pptxSTANDARD PROCEDURE AND FORMULA FOR PRICE ADJUSTMENT.pptx
STANDARD PROCEDURE AND FORMULA FOR PRICE ADJUSTMENT.pptxengradilkhursheed
 
ESTIMATING and coasting of electrical equipment.
ESTIMATING and coasting of electrical equipment.ESTIMATING and coasting of electrical equipment.
ESTIMATING and coasting of electrical equipment.subhamkumar01122000
 
Cost concepts
Cost conceptsCost concepts
Cost conceptswolfaze
 
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptxCost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptxObsaKamil
 
Cost Concepts.ppt
Cost Concepts.pptCost Concepts.ppt
Cost Concepts.pptmimay2795
 
Product costing in SAP - a primer
Product costing in SAP - a primerProduct costing in SAP - a primer
Product costing in SAP - a primerRajesh Shanbhag
 
cost estimation and break even analysis
cost estimation and break even analysiscost estimation and break even analysis
cost estimation and break even analysisDr Naim R Kidwai
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2Shze Hwa Lee
 
Problem 20-1A Production cost flow and measurement; journal entrie.docx
Problem 20-1A Production cost flow and measurement; journal entrie.docxProblem 20-1A Production cost flow and measurement; journal entrie.docx
Problem 20-1A Production cost flow and measurement; journal entrie.docxChantellPantoja184
 
221t13Assi g nrrent Print Vieryv1.Exercise 15-9.docx
221t13Assi g nrrent Print Vieryv1.Exercise 15-9.docx221t13Assi g nrrent Print Vieryv1.Exercise 15-9.docx
221t13Assi g nrrent Print Vieryv1.Exercise 15-9.docxeugeniadean34240
 
Lecture -4.pptxTender & Tender Notice bfh
Lecture -4.pptxTender & Tender Notice bfhLecture -4.pptxTender & Tender Notice bfh
Lecture -4.pptxTender & Tender Notice bfh2cd
 

Similar to Presentation on calculation_of_price_escalation (17)

STANDARD PROCEDURE AND FORMULA FOR PRICE ADJUSTMENT.pptx
STANDARD PROCEDURE AND FORMULA FOR PRICE ADJUSTMENT.pptxSTANDARD PROCEDURE AND FORMULA FOR PRICE ADJUSTMENT.pptx
STANDARD PROCEDURE AND FORMULA FOR PRICE ADJUSTMENT.pptx
 
PROCESS-COSTING
PROCESS-COSTING PROCESS-COSTING
PROCESS-COSTING
 
Product costing
Product costingProduct costing
Product costing
 
ESTIMATING and coasting of electrical equipment.
ESTIMATING and coasting of electrical equipment.ESTIMATING and coasting of electrical equipment.
ESTIMATING and coasting of electrical equipment.
 
Cost concepts
Cost conceptsCost concepts
Cost concepts
 
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptxCost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
Cost and Management Accounting I Chapter 3 (2)(2)-1 (1).pptx
 
Job order costing
Job order costingJob order costing
Job order costing
 
Cost Concepts.ppt
Cost Concepts.pptCost Concepts.ppt
Cost Concepts.ppt
 
Product costing in SAP - a primer
Product costing in SAP - a primerProduct costing in SAP - a primer
Product costing in SAP - a primer
 
cost estimation and break even analysis
cost estimation and break even analysiscost estimation and break even analysis
cost estimation and break even analysis
 
Professional practice 2
Professional practice 2Professional practice 2
Professional practice 2
 
Problem 20-1A Production cost flow and measurement; journal entrie.docx
Problem 20-1A Production cost flow and measurement; journal entrie.docxProblem 20-1A Production cost flow and measurement; journal entrie.docx
Problem 20-1A Production cost flow and measurement; journal entrie.docx
 
221t13Assi g nrrent Print Vieryv1.Exercise 15-9.docx
221t13Assi g nrrent Print Vieryv1.Exercise 15-9.docx221t13Assi g nrrent Print Vieryv1.Exercise 15-9.docx
221t13Assi g nrrent Print Vieryv1.Exercise 15-9.docx
 
Cost Estimation
Cost EstimationCost Estimation
Cost Estimation
 
Cost concepts
Cost conceptsCost concepts
Cost concepts
 
Job costing slides
Job costing slidesJob costing slides
Job costing slides
 
Lecture -4.pptxTender & Tender Notice bfh
Lecture -4.pptxTender & Tender Notice bfhLecture -4.pptxTender & Tender Notice bfh
Lecture -4.pptxTender & Tender Notice bfh
 

Recently uploaded

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 

Recently uploaded (20)

Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 

Presentation on calculation_of_price_escalation

  • 1. ICTAD Formula Method for Price Fluctuation
  • 2. ICTAD Formula Method for Price Fluctuation The ICTAD Formula Method was introduced in January 1993. To Reimburse of Price fluctuation of Material, Labour & Plant in Construction. To Calculate the amount due to the Price Fluctuation. There are two Formula 1. Contract exceeding 10 Million 2. Contract not exceeding 10 Million
  • 3. THE FORMULA METHOD FOR CONTRACT EXCEEDING RS. 10 MILLION F= 0.966 (V – Vna ) ∑ Px (Ixc – Ixb) 100 all inputs Ixb F = Price adjustment for the period V = Valuation of work done during the period concerned Vna = Value of non – adjustable element Px = Percentage cost contribution of input X Ixc = Current index for input X Ixb = Base index for input X
  • 4. V - Valuation of work done during the period concern Valuing the cumulative work done including the 80 % of the cost of material delivered to site but has not been incorporated in permanent works and deducting the cumulative payment certified up to the previous bill. V = (Vc + Mc) – (Vp + Mp) Vc = Cumulative Value of work done during the period concerned. Mc = 80 % of the invoiced value of material used for permanent works on current valuation. Vp = Cumulative Value of work done up to previous claim. Mp = 80 % of the invoiced value of material used for permanent works on previous valuation.
  • 5. Vna – Non Adjustable Element  Value of work done under the items which will not be considered for price adjustment and have been listed accordingly in the Contract.  Generally there are three categories of items will be considered as non-adjustable element. 1. Items in the BOQ for which the expenditure will be fixed and executed at early stages of contract. (Most preliminaries items fall under this ) 2. Provisional sum item. 3. Extra works items for which the rates are agreed based on the prices prevailing at the time of execution of works or are priced at Day-work rates.
  • 6. Vna – Non Adjustable Element Vna = Vnac – Vnap Vnac = Cumulative of work certified under items specified as non- adjustable element up to the current bill Vnac = Cumulative of work certified under items specified as non- adjustable element up to the Previous bill
  • 7. Px – Input Percentages The percentage cost contribution of major materials, Plant and Labour to the contract. When include these item, it is suggested to exclude the less cost significant items, in computing the input percentages. Combined effect of such items will be less than 10% of the total cost of inputs. Hence the total contribution of major inputs will be considered as 90%. The computation of input proportions is based on the costing major input items required for proposed construction. The costs will be calculated using the prices that prevailed at the time of bidding. The cost of major inputs will be considered as 90% of the total cost.
  • 8. Px – Input Percentages Input proportion of a particular input will be computed as the ration between the cost of the input and the cost of all inputs. Example Indices No Input Name Input percentage (Px) P2 Heavy Machinery 37.89 M7 Metal 20.66 M30 Bitumen 16.89 P3 Fuel 5.19 L2 Unskilled labor 4.35 M8 Sand 2.9 L1 Skilled labor 2.12 90
  • 9. Indices The indices used in the formula shall be those published by ICTAD. Monthly indices will be published in Bulletin of Construction Statistics. The type of indices applicable to this formula shall be Material(M indices), Labour (L indices) & Plant & Equipment (P indices)
  • 10. Ixb – Base Indices “Base Indices” shall be the indices for the input, prevailing for the calendar month, one month prior to the date set for the submission of Bid. For Example, If the bids were closed on any date of the month of September, the applicable base indices shall be the indices published for the month of August of the same year
  • 11. Ixc – Current Indices The current index of a particular input shall be the index published by ICTAD for that input for the month applicable. The Contractor is supposed to submit the monthly statement for the payment. For the first interim bill, Current indices shall be taken as the indices prevailing on the first month after commencement of the contract. For any other interim claim or the final claim the Current indices shall be taken as indices prevailing for the calendar month, one month after the previous valuation was done.
  • 12. Ixc – Current Indices Example for the use of Current Indices Details of monthly statement submitted by the Contractor Applicable Current Indices Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Case a Claim 1 Claim 2 - - Claim 3 Final Case b - Claim 1 Claim 2 - Final - Claim 1 Claim 2 Claim3 Final Claim Case a 6onth 1 Month 2 Month 3 Month5 Case b Month 1 Month3 - Month 4
  • 13. Method Of Computation Of Price Fluctuation The Formula is considered in two parts for the purpose of computations: 0.966 (V – Vna ) as the first part 100 ∑ Px (Ixc – Ixb) as the second part all inputs Ixb
  • 14. Method Of Computation Of Price Fluction Computation of V- Vna 1.0 Price adjustment computation for the Valuation No 2.0 Previous Valuation  a. Date 04/2011  b. Cumulative value of work done Rs. 6,521,904.02  c. Cost of material at site Rs. 450,000.00  d. Cumulative cost of non-adjustable element Rs. 105,650.00 3.0 Current Valuation  a. Date 09/2011  b. Cumulative value of work done Rs. 9,745,967.43  c. Cost of material at site Rs. -  d. Cumulative cost of non-adjustable element Rs. 155,890.00  e. Indices applicable for Current Valuation May/ 2011
  • 15. Method Of Computation Of Price Fluctuation  4.0 Computation of V – Vna  V – Vna = (3b+3c-3d) –(2b+2c-2d)  = 2,723,823.41 5.0 0.966 (V – Vna ) = 26,312.13 100 6.0 Computation of ∑ Px (Ixc – Ixb) all inputs Ixb
  • 16. Method Of Computation Of Price Fluctuation Name of input Input percentage (Px) Base index (Ixb) Feb/2011 Current Index (Ixc) Px (Ixc – Ixb) Ixb Heavy Machinary (P2) 37.89 313.7 313.7 0.000 Metal (M7) 20.66 267.5 273.9 0.079 Bitumen (M30) 16.89 870.7 870.7 0.000 Fuel (P3) 5.19 715.8 747.6 0.231 Unskilled labor(L2) 4.35 352.1 352.1 0.000 Sand (M8) 2.9 1780.3 1791.0 0.017 Skilled labor (L1) 2.12 363.5 363.5 0.000 0.327
  • 17. Method Of Computation Of Price Fluctuation  7.0 Price Adjustment for the Current variation  F = Step 5 X Step 6  26,312.13 X 0.327 = 8,604.06
  • 18. The Formula Method For Contract Not Exceeding Rs. 10 Million F= 0.869 (V – Vna ) (Itc – Itb) Itb F = Price adjustment for the period V = Valuation of work done during the period concerned Vna =Value of non – adjustable element Itc = Current Composite index for type of work Itb = Base Composite index for type of work
  • 19. Method Of Computation Of Price Fluctuation  Step 1: Estimating the cumulative value of work done up to the time of valuation  V = (Vc + Mc) – (Vp + Mp)  Vc = Cumulative Value of work done during the period concerned. Mc = 80 % of the invoiced value of material used for permanent works on current valuation. Vp = Cumulative Value of work done up to previous claim.  Mp = 80 % of the invoiced value of material used for permanent works on previous valuation.
  • 20. Method Of Computation Of Price Fluctuation Step 2: Excluding the non-adjustable element Vna = Vnac – Vnap Vnac = Cumulative of work certified under items specified as non-adjustable element up to the current bill Vnac = Cumulative of work certified under items specified as non-adjustable element up to the Previous bill
  • 21. Method Of Computation Of Price Fluctuation Step 3: Computation of Price fluctuation  a. Calculate the factor, 0.869 (V – Vna)  b. Using the appropriate base and current composite indices compute (Itc – Itb) Itb  c By multiplying the result obtained from Step ‘a’ and Step ‘b’ above the price adjustment due for the current valuation can be computed.