SlideShare a Scribd company logo
1 of 3
DDIPENDUIPENDU GGUPTAUPTA
Mobile: +91 9657003041 Email: dipendu.leo@gmail.com
Present Location: Chandrapur (Maharashtra)
Education: B.TECH 2007 Batch Mechanical Engineering
Age: 31 Yrs, Married
A committed Production cum Mechanical Maintenance professional offering 9+ years’
experience in paper converting/Packaging /FMCG
Production /Maintenance/TPM/ISO/Converting&packaging/Line in charge /Six Sigma/Boiler
Plant (Basic)/Compressor
CURRENT EMPLOYMENT
M/S BALLARPUR INDUSTRIES LTD (AVANTHA GROUP)
Assistant Manager Production (Nov-14 - Till Date)
Heading Paper converting & packaging lines of 200MT/Day having two high speed rewinder,
Synchro cutters and India’s largest A4 line with accountable for mechanical maintenance of
converting section too.
 Strategize preventive maintenance facilitating maximum equipment availability and
minimum downtime.
 Curb recurring breakdowns with superior equipment efficiency to accomplish budgeted
breakdown through critical spares management, time critical repairs and root cause
analysis such as Why-Why & Fishbone diagram practice.
 Achieve production targets as per AOP with MSD requirements; track the weekly pattern
and ensure availability of inputs at shop floor.
 Accomplish daily target for reducing WIP through conversion, finishing and lodging
planning as per equipment availability.
 Control packing cost and improve material utilization through effective supervision at
various stages of packing and enhanced productivity through labor training.
 Implement departmental guidelines with documentation related to IMS - ISO 9001:2008,
ISO 14001:2004 & OHSAS 18001:2007.
 Regulate costs through control overtime, manpower engagement and inventory
management. Maintain 5S in the department with GHK.
Notable Distinctions:
a) Replacement of end seal conveyor to inverted TG-10E (Seigling) grade conveyor.
b) Restarting of reminant reel cutting machine.
PREVIOUS ASSIGNMENTS
M/S J.K.Paper Ltd, Rayagada, Odisha (J K ORGANISATION)
Assistant Manager P M/c MECH. (Oct 2012-Nov-14)
Accountable of Mechanical Maintenance of Paper converting & packaging section having three
high speed rewinders, Synchro cutters, 3 A4 lines and Guillotine Machines, Compressors,
pulpers etc.
 Maintenance planning and scheduling of each line/Machine as per conversion plan.
 Maintenance data management.
 Modification/Up gradation to counter recurring issue or required changes.
 AMCs and work order management.
 Developing of local vendors & import substitute for non critical, non precise spares.
 Close watch on R& M budget, inventory and items to be included in CAPEX.
Project Experience:
a) Lead to commission modification of A4 line with other size like A3 and FS.
b) Resource (power & manpower) saving through modification of trim line.
c) Changing of glue applicator wheel with glue gun Nordson.
Notable Distinctions:
a) Removal of two “T” gear boxes with timer belts in cutter.
b) Changing design of overhead flights in packing machine and case packer.
M/S BALLARPUR INDUSTRIES LTD (AVANTHA GROUP)
Assistant Manager A4 Line (Oct 2009-Aug-12)
Looking after production and maintenance of A4 lines.
Project Experience:
a) Lead to commission 7 Pocket A4 line with 2 different units of wrappers.
b) Resource (power & manpower) saving through modification of trim line.
c) Optimized consumption of packing material at 2nd A4 Line.
d) Implication of DMAIC for wrappers and cartonizers.
Notable Distinctions:
a) Lead the operation team to ramp up production from 18MT/day to avg 40mt/day and
record 54mt/day of 2nd
A4 line.
b) Played stellar role in advancing the machine speed from 51 RPM to 60 RPM and reduction
of man days from 112 to 102 man days/ day.
c) Received ‘A’ (Best) rating along with cash reward of Rs 40000.
M/S ABIL, Punjab (Trident Group)
Officer (Mar 2008-Oct-2009)
Mechanical Engineer Converting
M/S MVS Engineering Limited, New Delhi
Project Engineer VPSA Plant (Jun 2007-Mar 2008)
In team for Commissioning of fully automatic DCS controlled plant at TNPL, ABIL and SPM of
450,300 and 350 NM3/hr respectively in which ABIL plant was commissioned as a team lead.
Certificate course and In house Trainings
1. Six Sigma Green Belt – Indian Statistical Institute, New Delhi
2. Manufacturing Excellence – IIMA - BGPPL Unit-Ballarpur
3. Decision Making - IIMI - BILT, Yamuna Nagar
4. Interpersonal Effectiveness - Penguin, Gurgaon

More Related Content

What's hot

Plant layout optimization in crane manufacturing using CRAFT and SLP
Plant layout optimization in crane manufacturing using CRAFT and SLPPlant layout optimization in crane manufacturing using CRAFT and SLP
Plant layout optimization in crane manufacturing using CRAFT and SLPEr Harshrajsinh Kher
 
resume_Girish_Raj
resume_Girish_Rajresume_Girish_Raj
resume_Girish_RajGirish Raj
 
Case Study for Plant Layout :: A modern analysis
Case Study for Plant Layout :: A modern analysisCase Study for Plant Layout :: A modern analysis
Case Study for Plant Layout :: A modern analysisSarang Bhutada
 
Crude-Oil Blend Scheduling Optimization: An Application with Multi-Million D...
Crude-Oil Blend Scheduling Optimization:  An Application with Multi-Million D...Crude-Oil Blend Scheduling Optimization:  An Application with Multi-Million D...
Crude-Oil Blend Scheduling Optimization: An Application with Multi-Million D...Alkis Vazacopoulos
 
Bhupendra Jain_Design & Estimation Engineer
Bhupendra Jain_Design & Estimation EngineerBhupendra Jain_Design & Estimation Engineer
Bhupendra Jain_Design & Estimation EngineerBhupendra Jain
 
KARTHIK ANAND_CAE_Resume_latest
KARTHIK ANAND_CAE_Resume_latestKARTHIK ANAND_CAE_Resume_latest
KARTHIK ANAND_CAE_Resume_latestKarthik Anand
 
KAPP Niles CNC Gear Grinders Presents: Topological Grinding of Gears
KAPP Niles CNC Gear Grinders Presents: Topological Grinding of GearsKAPP Niles CNC Gear Grinders Presents: Topological Grinding of Gears
KAPP Niles CNC Gear Grinders Presents: Topological Grinding of GearsMachine Tool Systems Inc.
 
Pen facility layout
Pen facility layoutPen facility layout
Pen facility layoutmohmedx
 

What's hot (18)

Plant layout optimization in crane manufacturing using CRAFT and SLP
Plant layout optimization in crane manufacturing using CRAFT and SLPPlant layout optimization in crane manufacturing using CRAFT and SLP
Plant layout optimization in crane manufacturing using CRAFT and SLP
 
Brajesh Resume
Brajesh ResumeBrajesh Resume
Brajesh Resume
 
apsingh resume
apsingh resume apsingh resume
apsingh resume
 
resume_Girish_Raj
resume_Girish_Rajresume_Girish_Raj
resume_Girish_Raj
 
Facility layout
Facility layoutFacility layout
Facility layout
 
Case Study for Plant Layout :: A modern analysis
Case Study for Plant Layout :: A modern analysisCase Study for Plant Layout :: A modern analysis
Case Study for Plant Layout :: A modern analysis
 
Brian Zwiebel (2)
Brian Zwiebel (2)Brian Zwiebel (2)
Brian Zwiebel (2)
 
Crude-Oil Blend Scheduling Optimization: An Application with Multi-Million D...
Crude-Oil Blend Scheduling Optimization:  An Application with Multi-Million D...Crude-Oil Blend Scheduling Optimization:  An Application with Multi-Million D...
Crude-Oil Blend Scheduling Optimization: An Application with Multi-Million D...
 
PLANT LOCATION
PLANT LOCATIONPLANT LOCATION
PLANT LOCATION
 
Resume-Shrikant Kumbhar-2
Resume-Shrikant Kumbhar-2Resume-Shrikant Kumbhar-2
Resume-Shrikant Kumbhar-2
 
Bhupendra Jain_Design & Estimation Engineer
Bhupendra Jain_Design & Estimation EngineerBhupendra Jain_Design & Estimation Engineer
Bhupendra Jain_Design & Estimation Engineer
 
6184 7 tn05
6184 7 tn056184 7 tn05
6184 7 tn05
 
KARTHIK ANAND_CAE_Resume_latest
KARTHIK ANAND_CAE_Resume_latestKARTHIK ANAND_CAE_Resume_latest
KARTHIK ANAND_CAE_Resume_latest
 
calvin resume_CAE
calvin resume_CAEcalvin resume_CAE
calvin resume_CAE
 
KAPP Niles CNC Gear Grinders Presents: Topological Grinding of Gears
KAPP Niles CNC Gear Grinders Presents: Topological Grinding of GearsKAPP Niles CNC Gear Grinders Presents: Topological Grinding of Gears
KAPP Niles CNC Gear Grinders Presents: Topological Grinding of Gears
 
Resume 2016
Resume 2016Resume 2016
Resume 2016
 
my cv_US
my cv_USmy cv_US
my cv_US
 
Pen facility layout
Pen facility layoutPen facility layout
Pen facility layout
 

Viewers also liked

2014 NEW OPP by: JHON GAGUA PUDUNAN
2014 NEW OPP by: JHON GAGUA PUDUNAN2014 NEW OPP by: JHON GAGUA PUDUNAN
2014 NEW OPP by: JHON GAGUA PUDUNANJANICEZAN PUDUNAN
 
Doğru akım devre analizi
Doğru akım devre analiziDoğru akım devre analizi
Doğru akım devre analiziOrhanSrydn
 
Conference & Events in New Zealand
Conference & Events in New ZealandConference & Events in New Zealand
Conference & Events in New ZealandJosephine Fenwicke
 
Gen 140629024147-phpapp01
Gen 140629024147-phpapp01Gen 140629024147-phpapp01
Gen 140629024147-phpapp01Klavdia Bulkaty
 
ExpertChina 2.0
ExpertChina 2.0ExpertChina 2.0
ExpertChina 2.0grantik1
 
Reuben communication-studies-ia
Reuben communication-studies-iaReuben communication-studies-ia
Reuben communication-studies-iaReuben Rose
 
Employee Stress & Wellbeing @ the Workplace - 2015
Employee Stress & Wellbeing @ the Workplace - 2015Employee Stress & Wellbeing @ the Workplace - 2015
Employee Stress & Wellbeing @ the Workplace - 2015Sabita Rebecca
 
Workplace Stress: Impact and Outcomes - An India Study 2016
Workplace Stress: Impact and Outcomes - An India Study 2016 Workplace Stress: Impact and Outcomes - An India Study 2016
Workplace Stress: Impact and Outcomes - An India Study 2016 Sabita Rebecca
 
Customer Satisfaction vs Customer Loyalty - What's the difference?
Customer Satisfaction vs Customer Loyalty - What's the difference?Customer Satisfaction vs Customer Loyalty - What's the difference?
Customer Satisfaction vs Customer Loyalty - What's the difference?Josephine Fenwicke
 

Viewers also liked (11)

2014 NEW OPP by: JHON GAGUA PUDUNAN
2014 NEW OPP by: JHON GAGUA PUDUNAN2014 NEW OPP by: JHON GAGUA PUDUNAN
2014 NEW OPP by: JHON GAGUA PUDUNAN
 
Doğru akım devre analizi
Doğru akım devre analiziDoğru akım devre analizi
Doğru akım devre analizi
 
Conference & Events in New Zealand
Conference & Events in New ZealandConference & Events in New Zealand
Conference & Events in New Zealand
 
Gen 140629024147-phpapp01
Gen 140629024147-phpapp01Gen 140629024147-phpapp01
Gen 140629024147-phpapp01
 
ExpertChina 2.0
ExpertChina 2.0ExpertChina 2.0
ExpertChina 2.0
 
Gen.adam
Gen.adamGen.adam
Gen.adam
 
Water resources
Water resourcesWater resources
Water resources
 
Reuben communication-studies-ia
Reuben communication-studies-iaReuben communication-studies-ia
Reuben communication-studies-ia
 
Employee Stress & Wellbeing @ the Workplace - 2015
Employee Stress & Wellbeing @ the Workplace - 2015Employee Stress & Wellbeing @ the Workplace - 2015
Employee Stress & Wellbeing @ the Workplace - 2015
 
Workplace Stress: Impact and Outcomes - An India Study 2016
Workplace Stress: Impact and Outcomes - An India Study 2016 Workplace Stress: Impact and Outcomes - An India Study 2016
Workplace Stress: Impact and Outcomes - An India Study 2016
 
Customer Satisfaction vs Customer Loyalty - What's the difference?
Customer Satisfaction vs Customer Loyalty - What's the difference?Customer Satisfaction vs Customer Loyalty - What's the difference?
Customer Satisfaction vs Customer Loyalty - What's the difference?
 

Similar to CV d gupta (20)

Maintenance Head
Maintenance  HeadMaintenance  Head
Maintenance Head
 
road overseas updated 06.06.2016
road overseas updated 06.06.2016road overseas updated 06.06.2016
road overseas updated 06.06.2016
 
Operational Excellence Consultant
Operational Excellence ConsultantOperational Excellence Consultant
Operational Excellence Consultant
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 
Dino_with_photodoc1
Dino_with_photodoc1Dino_with_photodoc1
Dino_with_photodoc1
 
Maintenance Engineer
Maintenance EngineerMaintenance Engineer
Maintenance Engineer
 
Resume
ResumeResume
Resume
 
cv boda dec15
cv boda dec15cv boda dec15
cv boda dec15
 
UDAY Rsm-16
UDAY Rsm-16UDAY Rsm-16
UDAY Rsm-16
 
RAJESH ROUSHAN .
RAJESH ROUSHAN .RAJESH ROUSHAN .
RAJESH ROUSHAN .
 
CV_Ananta_Halder_Stnd.
CV_Ananta_Halder_Stnd.CV_Ananta_Halder_Stnd.
CV_Ananta_Halder_Stnd.
 
Assistant manager in maintenance
Assistant manager in maintenanceAssistant manager in maintenance
Assistant manager in maintenance
 
RAJESH ROUSHAN
RAJESH ROUSHANRAJESH ROUSHAN
RAJESH ROUSHAN
 
lokanath resume (1)
lokanath resume (1)lokanath resume (1)
lokanath resume (1)
 
ncb
ncbncb
ncb
 
ajay cv new (3)
ajay cv new (3)ajay cv new (3)
ajay cv new (3)
 
Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).Senior Mechanical Engineer (Maintenance).
Senior Mechanical Engineer (Maintenance).
 
CV- chandra prakash yadav
CV- chandra prakash yadavCV- chandra prakash yadav
CV- chandra prakash yadav
 
Resume 1 (1)
Resume 1 (1)Resume 1 (1)
Resume 1 (1)
 

CV d gupta

  • 1. DDIPENDUIPENDU GGUPTAUPTA Mobile: +91 9657003041 Email: dipendu.leo@gmail.com Present Location: Chandrapur (Maharashtra) Education: B.TECH 2007 Batch Mechanical Engineering Age: 31 Yrs, Married A committed Production cum Mechanical Maintenance professional offering 9+ years’ experience in paper converting/Packaging /FMCG Production /Maintenance/TPM/ISO/Converting&packaging/Line in charge /Six Sigma/Boiler Plant (Basic)/Compressor CURRENT EMPLOYMENT M/S BALLARPUR INDUSTRIES LTD (AVANTHA GROUP) Assistant Manager Production (Nov-14 - Till Date) Heading Paper converting & packaging lines of 200MT/Day having two high speed rewinder, Synchro cutters and India’s largest A4 line with accountable for mechanical maintenance of converting section too.  Strategize preventive maintenance facilitating maximum equipment availability and minimum downtime.  Curb recurring breakdowns with superior equipment efficiency to accomplish budgeted breakdown through critical spares management, time critical repairs and root cause analysis such as Why-Why & Fishbone diagram practice.  Achieve production targets as per AOP with MSD requirements; track the weekly pattern and ensure availability of inputs at shop floor.  Accomplish daily target for reducing WIP through conversion, finishing and lodging planning as per equipment availability.  Control packing cost and improve material utilization through effective supervision at various stages of packing and enhanced productivity through labor training.  Implement departmental guidelines with documentation related to IMS - ISO 9001:2008, ISO 14001:2004 & OHSAS 18001:2007.  Regulate costs through control overtime, manpower engagement and inventory management. Maintain 5S in the department with GHK. Notable Distinctions: a) Replacement of end seal conveyor to inverted TG-10E (Seigling) grade conveyor. b) Restarting of reminant reel cutting machine.
  • 2. PREVIOUS ASSIGNMENTS M/S J.K.Paper Ltd, Rayagada, Odisha (J K ORGANISATION) Assistant Manager P M/c MECH. (Oct 2012-Nov-14) Accountable of Mechanical Maintenance of Paper converting & packaging section having three high speed rewinders, Synchro cutters, 3 A4 lines and Guillotine Machines, Compressors, pulpers etc.  Maintenance planning and scheduling of each line/Machine as per conversion plan.  Maintenance data management.  Modification/Up gradation to counter recurring issue or required changes.  AMCs and work order management.  Developing of local vendors & import substitute for non critical, non precise spares.  Close watch on R& M budget, inventory and items to be included in CAPEX. Project Experience: a) Lead to commission modification of A4 line with other size like A3 and FS. b) Resource (power & manpower) saving through modification of trim line. c) Changing of glue applicator wheel with glue gun Nordson. Notable Distinctions: a) Removal of two “T” gear boxes with timer belts in cutter. b) Changing design of overhead flights in packing machine and case packer. M/S BALLARPUR INDUSTRIES LTD (AVANTHA GROUP) Assistant Manager A4 Line (Oct 2009-Aug-12) Looking after production and maintenance of A4 lines. Project Experience: a) Lead to commission 7 Pocket A4 line with 2 different units of wrappers. b) Resource (power & manpower) saving through modification of trim line. c) Optimized consumption of packing material at 2nd A4 Line. d) Implication of DMAIC for wrappers and cartonizers. Notable Distinctions: a) Lead the operation team to ramp up production from 18MT/day to avg 40mt/day and record 54mt/day of 2nd A4 line. b) Played stellar role in advancing the machine speed from 51 RPM to 60 RPM and reduction of man days from 112 to 102 man days/ day. c) Received ‘A’ (Best) rating along with cash reward of Rs 40000.
  • 3. M/S ABIL, Punjab (Trident Group) Officer (Mar 2008-Oct-2009) Mechanical Engineer Converting M/S MVS Engineering Limited, New Delhi Project Engineer VPSA Plant (Jun 2007-Mar 2008) In team for Commissioning of fully automatic DCS controlled plant at TNPL, ABIL and SPM of 450,300 and 350 NM3/hr respectively in which ABIL plant was commissioned as a team lead. Certificate course and In house Trainings 1. Six Sigma Green Belt – Indian Statistical Institute, New Delhi 2. Manufacturing Excellence – IIMA - BGPPL Unit-Ballarpur 3. Decision Making - IIMI - BILT, Yamuna Nagar 4. Interpersonal Effectiveness - Penguin, Gurgaon