TYPES OF APPRAISAL
 Market Appraisal - Potential market, Location and
accessibility of consumer
 Technical Appraisal - Technical Viability, Operating at
optimum level?
 Financial Appraisal - Profitability, NPV, IRR, pay back Financial Appraisal - Profitability, NPV, IRR, pay back
period, Level of Risk etc
 Socio-Economic Appraisal - Social Cost benefits, level of
savings in society
 Ecological Appraisal - Impact of the project on quality of
Air, Water, Noise, Vegetation, Human life. Likely
Damage and the cost of restoration eg. Industries
FINANCIAL APPRAISAL
The Financial Appraisal test demonstrates-
methods for analyzing and evaluating a
range of fictional accounting ratios and other
commercial data to enable the candidate tocommercial data to enable the candidate to
assess the potential risks and returns of
applications and to make preliminary
recommendations on whether or not to
advance funds.
WHY NECESSARY?
• Main problem– unlimited wants/limited
resources.
• Judicious decision required – how much to
invest/where to invest/when to invest ininvest/where to invest/when to invest in
each sector of economy to achieve highest
growth of economy.
• All sectors are required to be developed at
minimum cost while achieving highest
overall economic growth
INVESTMENT CRITERIA
To investigate efficiency and profitability of
investment in a project. Two Categories of
Investment Criteria are used :
i. Non- Discounting Cash Flow Methodsi. Non- Discounting Cash Flow Methods
ii. Discounting Cash Flow Methods (DCF
method)
NON- DISCOUNTING CASH FLOW
METHODS
• Pay back period
• Rate of Return
• Annual Equivalent Method• Annual Equivalent Method
PAY BACK PERIOD
o Time in years, necessary to accumulate from
annual cash flow (cash receipts minus cash
payments – but not depreciation) – an
amount equal to initial investment.
o Simple – but ignores time value of money.
RATE OF RETURN
o Expresses profit as percentage of Capital
employed.
o Relates average annual expected incomeo Relates average annual expected income
to total initial investment.
o Both Pay back period and ROR are
popular in private industry.
ANNUAL EQUIVALENT METHOD
Total cost is converted into total annual
amounts by replacing the investment cost
with an annual equivalent cost, adding
annual operating cost, and getting the ratioannual operating cost, and getting the ratio
between the annual benefits and the total
annual cost.
DISCOUNTING CASH FLOW METHODS
 Concept: Taking time value of money
Rs. 100 today at 10% annual interest would be Rs.
110/- after a year, Rs. 121/- after 2 years , Rs.
133/- after 3 years
 Techniques:
• Net Present Values (NPV)
• Internal Rate of Return
• Benefit/Cost Ratio.
CASH FLOW
The total amount of money being transferred into and out of a business.
Year 2012 2013 2014 2015 2016
Outflows
Infrastructure Capital Costs 139.05 324.27 382.07 450.74 340.25
Infrastructure O&M Costs 28.5 33.5 43.1 52.0 57.5
Fleet Procurement Costs 0.0 0.0 22.0 43.2 30.2
Bus O&M Costs 11.4 23.0 68.5
Other System Costs 0.6 1.2 3.4
Total Outflows 167.53 357.72 459.16 570.17 499.83Total Outflows 167.53 357.72 459.16 570.17 499.83
Inflows
Fare Revenue pa (Rs crore) 11.0 21.8 62.7
Indirect Revenue 0.8 1.5 4.4
Bus Salvage Value 0.00 0.00 0.00 0.00
Grants for
Infrastructure Capital Costs- GOI + GoG 49.25 130.81 147.22 195.29 141.99
Fleet Procurement Costs (GOI+GoG) 0.00 0.00 17.64 34.56 24.15
Devolvements from UTF (D) 0.00 0.00 75.00 80.25 85.87
Total Inflows 49.25 130.81 251.58 333.38 319.09
Annual Cashflow -118.29 -226.92 -207.59 -236.79 -180.74
PRESENT VALUE (PV)
 The value in the present of a sum of money, in
contrast to some future value it will have when it
has been invested at compound interest.
 PV = FV / (1+r)n
 PV is Present Value
 FV is Future Value
 r is the interest rate (as a decimal, so 0.10, not 10%)
 n is the number of years
instead of "adding 10%" to each year it is easier to
multiply by 1.10
Future Back to Now: what money in the future is worth now, go
backwards (dividing by 1.10 each year instead of multiplying):
Examples:
1) Sam promises you $500 next year, what is the Present
Value? (r=10%)
To take a future payment backwards one year divide by
1.10
So $500 next year is $500 ÷ 1.10 = $454.55 now
The Present Value is $454.55
PV = FV / (1+r)n
2) Alex promises you $900 in 3 years, what is the Present
Value? (r=10%)
To take a future payment backwards three years divide by
1.10 three times
So $900 in 3 years is:
$900 ÷ 1.10 ÷ 1.10 ÷ 1.10
$900 ÷ (1.10 × 1.10 × 1.10)
$900 ÷ (1.10)^3
$900 ÷ 1.331
$676.18 now
NET PRESENT VALUE
 Net Present Value (NPV) is the difference
between the present value of cash inflows and
the present value of cash outflows. NPV is used
in capital budgeting to analyze the profitability
of a projected investment or project.of a projected investment or project.
 NPV = ∑ {Future Value/(1+r)^n} - Initial
Investment
where r is the rate of return and n is the number
of time periods.
Example:
 Assume a company wants to analyze the predicted
profitability of a project that requires an initial outlay of
$10,000. Over the course of three years, the project is
expected to generate revenues of $2,000, $7,000 and
$11,000, respectively. The anticipated discount rate is
4.5%. At first glance, it seems the returns are nearly
double the investment. However, a dollar earned in three
years is not as valuable as a dollar earned today, so the
company's accountant calculates the NPV as follows tocompany's accountant calculates the NPV as follows to
determine profitability while accounting for the
discounted time value of the projected revenues:
 NPV = ∑ {Future Value/(1+r)^n} - Initial Investment
= {$2,000/(1+.045)^1} + {$7,000/(1+.045)^2} +
{$11,000/(1+.045)^3} - $10,000
= $1,913.88 + $6,410.11 + $9,639.26 - $10,000
= $7,963.25
INTERNAL RATE OF RETURN
 The IRR is the interest rate, also called the
discount rate, that is required to bring the net
present value (NPV) to zero. That is, the
interest rate that would result in the present value of
the capital investment, or cash outflow, being equal
to the value of the total returns over time, or cashto the value of the total returns over time, or cash
inflow.
 NPV= ∑ {FV/ (1+r)^n} - Initial Investment
where r is the interest rate and n is the number of
time periods. IRR is calculated using the NPV
formula by solving for r if the NPV equals zero.
Year 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033
Outflows
Infrastructure Capital Costs 23.45 46.90 46.90
139.0
5
324.2
7
382.0
7
450.7
4
340.2
5
184.3
5
168.7
5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Infrastructure O&M Costs 0.0 11.5 21.9 28.5 33.5 43.1 52.0 57.5 65.8 66.0 65.7 72.6 83.0 83.3 82.9 91.7 104.8 105.1 104.7 115.7 0.0 0.0 0.0 0.0 0.0
Fleet Procurement Costs 0.0 0.0 0.0 0.0 0.0 22.0 43.2 30.2 55.5 111.9 118.7 94.0 112.0 148.6 221.3 60.7 153.8 163.1 141.3 187.2 247.6 358.4 158.4 302.4 310.0
Bus O&M Costs 11.4 23.0 68.5 99.8 161.9 231.1 280.8 335.6 395.9 507.0 542.9 583.2 626.4 663.7 712.8 766.8 824.7 884.0 947.4
1012.
3
Other System Costs 0.6 1.2 3.4 5.0 8.1 11.6 14.0 16.8 19.8 25.4 27.1 29.2 31.3 33.2 35.6 38.3 41.2 44.2 47.4 50.6
Total Outflows 23.45 58.36 68.81
167.5
3
357.7
2
459.1
6
570.1
7
499.8
3
410.4
2
516.6
5
427.0
0
461.4
1
547.4
0
647.5
2
836.6
9
722.4
2
871.0
1
925.9
5
942.9
3
1051.
35
1052.
70
1224.
35
1086.
59
1297.
15
1372.
85
Inflows
Fare Revenue pa (Rs crore) 11.0 21.8 62.7 90.8 148.0 219.3 267.2 320.0 378.2 502.0 536.7 578.4 623.0 671.0 722.4 777.6 836.9 900.4 968.5
1036.
3
Indirect Revenue 0.8 1.5 4.4 6.4 10.4 15.3 18.7 22.4 26.5 35.1 37.6 40.5 43.6 47.0 50.6 54.4 58.6 63.0 67.8 72.5
Bus Salvage Value 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.30 2.20 4.32 3.02 5.55 11.19 11.87 9.40 11.20 14.86 22.13 6.07 15.38
Grants for
Infrastructure Capital Costs-
GOI + GoG 16.42 32.83 32.83 49.25
130.8
1
147.2
2
195.2
9
141.9
9
129.0
5
118.1
3
993.8
0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Fleet Procurement Costs
(GOI+GoG) 0.00 0.00 0.00 0.00 0.00 17.64 34.56 24.15 44.44 89.55 94.93 75.18 89.64
118.8
7
177.0
8 48.60
123.0
7
130.4
5
113.0
5
149.7
4
198.0
5
286.7
3
126.7
3
241.9
3
247.9
8
Devolvements from UTF (D) 0.00 0.00 0.00 0.00 0.00 75.00 80.25 85.87 91.88 98.31
105.1
9
112.5
5
120.4
3
128.8
6
137.8
8
147.5
4
157.8
6
168.9
1
180.7
4
193.3
9
206.9
3
221.4
1
236.9
1
253.4
9
271.2
4
Total Inflows 16.42 32.83 32.83 49.25
130.8
1
251.5
8
333.3
8
319.0
9
362.5
6
464.3
3
1428.
56
473.6
2
553.7
8
654.5
8
856.4
1
773.4
5
905.3
3
977.2
1
1023.
61
1125.
54
1248.
26
1418.
43
1349.
17
1537.
75
1643.
49
Annual Cashflow -7.04 -25.53-35.98
-
118.2
9
-
226.9
2
-
207.5
9
-
236.7
9
-
180.7
4 -47.86-52.32
1001.
56 12.21 6.37 7.05 19.72 51.04 34.32 51.26 80.68 74.20
195.5
6
194.0
8
262.5
8
240.6
0
270.6
3
IRR 8.01%
Use Excel formula to calculate IRR
=IRR(D25:AB25,0.1) = IRR (select the total annual cash flow)
COST BENEFIT ANALYSIS
 Cost-Benefit Analysis (CBA) estimates and totals up
the equivalent money value of the benefits and costs
to the community of projects to establish whether
they are worthwhile.
 Main measure of cost and benefit – is difference in
costs and benefits ‘with’ and ‘without’ projectcosts and benefits ‘with’ and ‘without’ project
 What level of output would be with the project and
what they would have been without it
 Economic Cost: The cost in economic terms means
the cost of the resource actually forgone, free from
the effect of taxes, subsidy
(factor-0.85)
STEPS INVOLVED IN A FINANCIAL
APPRAISAL OF A PROJECT
(i) A forecast of demand,
(ii) Estimation of financial costs; capital and
annual maintenance/recurring cost
(iii) Estimation of benefits on the basis of(iii) Estimation of benefits on the basis of
forecasted future traffic and
(iv) Comparison of costs and benefits for
assessing viability.
COST BENEFIT ANALYSIS of MRTS
PROJECT
• Basics involve traffic projection, estimation of costs, benefits and
conducting appraisal using ‘with’ and ‘without’ approach.
• Cost streams
 Capital cost- civil works, rolling stock, signaling, interest
(current lending rate), construction of bus way, buses
 Operating costs-metro, bus way, existing buses/private Operating costs-metro, bus way, existing buses/private
vehicle that will continue even after MRTS.
• Benefit items
 Capital and operating cost of traffic if MRTS is not taken up
This become benefit (as this is not incurred after MRTS)
 Saving due to decongestion
 Saving in travel time
 Saving in petrol/ diesel consumption
• IRR/EIRR
DECISION RULES
• NPV - Accept all projects with a positive NPV when
discounted at a rate reflecting the opportunity cost
of capital.
(Shouldn’t use NPV alone, club it with IRR)
• IRR - Accept all projects with an IRR reflecting the• IRR - Accept all projects with an IRR reflecting the
opportunity cost of capital.
• B/C - Accept all projects with a ratio (gross
benefit/Above 1.00 when discounted at a gross
costs) rate reflecting the opportunity cost of
capital.

More Related Content

What's hot

Social Cost Benefit Analysis
Social Cost Benefit Analysis Social Cost Benefit Analysis
Social Cost Benefit Analysis Azam FA
 
Project appraisal and Analysis
Project appraisal and AnalysisProject appraisal and Analysis
Project appraisal and AnalysisSuhail Hussain
 
An introduction to project finance
An introduction to project financeAn introduction to project finance
An introduction to project financeAnurag Jaiswal
 
Project Management- Unit V
Project Management- Unit VProject Management- Unit V
Project Management- Unit VLamay Sabir
 
Human aspect of project management
Human aspect of project managementHuman aspect of project management
Human aspect of project managementKinshook Chaturvedi
 
project appraisal
project appraisal project appraisal
project appraisal Dronak Sahu
 
Forms of Project Organization
Forms of Project OrganizationForms of Project Organization
Forms of Project OrganizationGautam Chopra
 
Generation & Screening of Project Idea
Generation & Screening of Project IdeaGeneration & Screening of Project Idea
Generation & Screening of Project IdeaMOHAMMAD IQBAL
 
Project Financing
Project FinancingProject Financing
Project Financingkhankm
 
Comparison of npv with irr
Comparison of npv with irrComparison of npv with irr
Comparison of npv with irrMeenuKhurana7
 
Project identification & classification
Project identification & classificationProject identification & classification
Project identification & classificationRevathy Rajasekaran
 
PM Unit III - Project Cash Flows
PM   Unit III - Project Cash FlowsPM   Unit III - Project Cash Flows
PM Unit III - Project Cash FlowsGhaith Al Darmaki
 
Project management & Network analysis
Project management & Network analysisProject management & Network analysis
Project management & Network analysisHarinadh Karimikonda
 
ENVIRONMENTAL APPRAISAL OF PROJECTS
ENVIRONMENTAL  APPRAISAL OF PROJECTSENVIRONMENTAL  APPRAISAL OF PROJECTS
ENVIRONMENTAL APPRAISAL OF PROJECTSzailunnito
 
Net Present Value - NPV
Net Present Value - NPVNet Present Value - NPV
Net Present Value - NPVASAD ALI
 
Project formulation and appraisal
Project formulation and appraisalProject formulation and appraisal
Project formulation and appraisalAmandaBvera
 
Project identification and Project selection
Project identification and Project selectionProject identification and Project selection
Project identification and Project selectionAmandaBvera
 
Market Appraisal
Market AppraisalMarket Appraisal
Market AppraisalROXYMAX
 
Project formulation and appraisal
Project formulation and appraisalProject formulation and appraisal
Project formulation and appraisalSurya C D
 

What's hot (20)

Social Cost Benefit Analysis
Social Cost Benefit Analysis Social Cost Benefit Analysis
Social Cost Benefit Analysis
 
Project appraisal and Analysis
Project appraisal and AnalysisProject appraisal and Analysis
Project appraisal and Analysis
 
An introduction to project finance
An introduction to project financeAn introduction to project finance
An introduction to project finance
 
Project Management- Unit V
Project Management- Unit VProject Management- Unit V
Project Management- Unit V
 
Human aspect of project management
Human aspect of project managementHuman aspect of project management
Human aspect of project management
 
project appraisal
project appraisal project appraisal
project appraisal
 
Forms of Project Organization
Forms of Project OrganizationForms of Project Organization
Forms of Project Organization
 
Generation & Screening of Project Idea
Generation & Screening of Project IdeaGeneration & Screening of Project Idea
Generation & Screening of Project Idea
 
Project Financing
Project FinancingProject Financing
Project Financing
 
Comparison of npv with irr
Comparison of npv with irrComparison of npv with irr
Comparison of npv with irr
 
Project identification & classification
Project identification & classificationProject identification & classification
Project identification & classification
 
PM Unit III - Project Cash Flows
PM   Unit III - Project Cash FlowsPM   Unit III - Project Cash Flows
PM Unit III - Project Cash Flows
 
Project management & Network analysis
Project management & Network analysisProject management & Network analysis
Project management & Network analysis
 
ENVIRONMENTAL APPRAISAL OF PROJECTS
ENVIRONMENTAL  APPRAISAL OF PROJECTSENVIRONMENTAL  APPRAISAL OF PROJECTS
ENVIRONMENTAL APPRAISAL OF PROJECTS
 
Net Present Value - NPV
Net Present Value - NPVNet Present Value - NPV
Net Present Value - NPV
 
Project formulation and appraisal
Project formulation and appraisalProject formulation and appraisal
Project formulation and appraisal
 
Project identification and Project selection
Project identification and Project selectionProject identification and Project selection
Project identification and Project selection
 
Market Appraisal
Market AppraisalMarket Appraisal
Market Appraisal
 
Project financing
Project financingProject financing
Project financing
 
Project formulation and appraisal
Project formulation and appraisalProject formulation and appraisal
Project formulation and appraisal
 

Viewers also liked

Financial Appraisal
Financial AppraisalFinancial Appraisal
Financial AppraisalROXYMAX
 
Valuation techniques project appraisal method
Valuation techniques  project appraisal method Valuation techniques  project appraisal method
Valuation techniques project appraisal method mayank saxena
 
Methodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a ProjectMethodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a Projectimrohan1
 
Project appraisal
Project appraisalProject appraisal
Project appraisalGotham Ram
 
Project Appraisal chapter 2
Project Appraisal chapter 2Project Appraisal chapter 2
Project Appraisal chapter 2Mazhar Poohlah
 
Project appraisal for financial markets
Project appraisal for financial marketsProject appraisal for financial markets
Project appraisal for financial marketskarangoyal972
 
Market appraisal full ppt in 13 slides
Market appraisal full ppt in 13 slidesMarket appraisal full ppt in 13 slides
Market appraisal full ppt in 13 slidesLokesh Shukla
 
Project financing and appraisal atul rai
Project financing and appraisal atul raiProject financing and appraisal atul rai
Project financing and appraisal atul raitiwarineha
 
Introduction to statistics
Introduction to statisticsIntroduction to statistics
Introduction to statisticsDhwani Shah
 
Performance appraisal importance
Performance appraisal importancePerformance appraisal importance
Performance appraisal importanceluciacarter412
 
1 Definition of project
1   Definition of project1   Definition of project
1 Definition of projectSuhail Hussain
 
Case studies on economic appraisal of adaptation options in some countries
Case studies on economic appraisal of adaptation options in some countriesCase studies on economic appraisal of adaptation options in some countries
Case studies on economic appraisal of adaptation options in some countriesNAP Events
 
Market assistant performance appraisal
Market assistant performance appraisalMarket assistant performance appraisal
Market assistant performance appraisalabigailrodriguez143
 
V trust appraisal market updates
V trust appraisal market updatesV trust appraisal market updates
V trust appraisal market updatesHoem Seiha
 
Financial Management Investment Appraisal
Financial  Management    Investment  AppraisalFinancial  Management    Investment  Appraisal
Financial Management Investment AppraisalMaroof Hussain Sabri
 
Technical appraisal and change impact analysis - IDCC17 workshop
Technical appraisal and change impact analysis - IDCC17 workshopTechnical appraisal and change impact analysis - IDCC17 workshop
Technical appraisal and change impact analysis - IDCC17 workshopPERICLES_FP7
 
Introduction to environment
Introduction to environmentIntroduction to environment
Introduction to environmentDhwani Shah
 

Viewers also liked (20)

Financial appraisal techniques
Financial appraisal techniquesFinancial appraisal techniques
Financial appraisal techniques
 
Financial Appraisal
Financial AppraisalFinancial Appraisal
Financial Appraisal
 
Project appraisal
Project appraisalProject appraisal
Project appraisal
 
Valuation techniques project appraisal method
Valuation techniques  project appraisal method Valuation techniques  project appraisal method
Valuation techniques project appraisal method
 
Methodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a ProjectMethodology For Formulation And Appraisal of a Project
Methodology For Formulation And Appraisal of a Project
 
Project Appraisal
Project AppraisalProject Appraisal
Project Appraisal
 
Project appraisal
Project appraisalProject appraisal
Project appraisal
 
Project Appraisal chapter 2
Project Appraisal chapter 2Project Appraisal chapter 2
Project Appraisal chapter 2
 
Project appraisal for financial markets
Project appraisal for financial marketsProject appraisal for financial markets
Project appraisal for financial markets
 
Market appraisal full ppt in 13 slides
Market appraisal full ppt in 13 slidesMarket appraisal full ppt in 13 slides
Market appraisal full ppt in 13 slides
 
Project financing and appraisal atul rai
Project financing and appraisal atul raiProject financing and appraisal atul rai
Project financing and appraisal atul rai
 
Introduction to statistics
Introduction to statisticsIntroduction to statistics
Introduction to statistics
 
Performance appraisal importance
Performance appraisal importancePerformance appraisal importance
Performance appraisal importance
 
1 Definition of project
1   Definition of project1   Definition of project
1 Definition of project
 
Case studies on economic appraisal of adaptation options in some countries
Case studies on economic appraisal of adaptation options in some countriesCase studies on economic appraisal of adaptation options in some countries
Case studies on economic appraisal of adaptation options in some countries
 
Market assistant performance appraisal
Market assistant performance appraisalMarket assistant performance appraisal
Market assistant performance appraisal
 
V trust appraisal market updates
V trust appraisal market updatesV trust appraisal market updates
V trust appraisal market updates
 
Financial Management Investment Appraisal
Financial  Management    Investment  AppraisalFinancial  Management    Investment  Appraisal
Financial Management Investment Appraisal
 
Technical appraisal and change impact analysis - IDCC17 workshop
Technical appraisal and change impact analysis - IDCC17 workshopTechnical appraisal and change impact analysis - IDCC17 workshop
Technical appraisal and change impact analysis - IDCC17 workshop
 
Introduction to environment
Introduction to environmentIntroduction to environment
Introduction to environment
 

Similar to Financial appraisal

Capital budgeting cash flow estimation
Capital budgeting cash flow estimationCapital budgeting cash flow estimation
Capital budgeting cash flow estimationPrafulla Tekriwal
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgetingAmeen San
 
Fundamental Skills for Real Estate Development Professionals I – Financial An...
Fundamental Skills for Real Estate Development Professionals I – Financial An...Fundamental Skills for Real Estate Development Professionals I – Financial An...
Fundamental Skills for Real Estate Development Professionals I – Financial An...Virtual ULI
 
Cf Capital Budgeting 6
Cf Capital Budgeting 6Cf Capital Budgeting 6
Cf Capital Budgeting 6rajeevgupta
 
Cf Capital Budgeting 6
Cf Capital Budgeting 6Cf Capital Budgeting 6
Cf Capital Budgeting 6rajeevgupta
 
Cf%20 Capital%20 Budgeting%206
Cf%20 Capital%20 Budgeting%206Cf%20 Capital%20 Budgeting%206
Cf%20 Capital%20 Budgeting%206rajeevgupta
 
Lecture cash flow evaluation new
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation newBsgr Planmin
 
Lecture cash flow evaluation new
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation newBsgr Planmin
 
Chapter8 investmentcriteria
Chapter8 investmentcriteriaChapter8 investmentcriteria
Chapter8 investmentcriteriaAKSHAYA0000
 
Capital Budgeting Er. S Sood
Capital Budgeting Er. S SoodCapital Budgeting Er. S Sood
Capital Budgeting Er. S Soodshart sood
 
Fundamental Skills for Real Estate Development Professionals I. Financial An...
Fundamental Skills for Real Estate Development Professionals I.  Financial An...Fundamental Skills for Real Estate Development Professionals I.  Financial An...
Fundamental Skills for Real Estate Development Professionals I. Financial An...Virtual ULI
 
UTSFinmagecapitalbugproject
UTSFinmagecapitalbugprojectUTSFinmagecapitalbugproject
UTSFinmagecapitalbugprojectJoshua C
 
capital budgeting In financial management
capital budgeting In financial managementcapital budgeting In financial management
capital budgeting In financial managementssuserc3bdcc
 
Eng econ lecture
Eng econ lectureEng econ lecture
Eng econ lectureArul Kumar
 
PPAM-AK PPT.pptx
PPAM-AK PPT.pptxPPAM-AK PPT.pptx
PPAM-AK PPT.pptxShyam273559
 

Similar to Financial appraisal (20)

Capital budgeting cash flow estimation
Capital budgeting cash flow estimationCapital budgeting cash flow estimation
Capital budgeting cash flow estimation
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Fundamental Skills for Real Estate Development Professionals I – Financial An...
Fundamental Skills for Real Estate Development Professionals I – Financial An...Fundamental Skills for Real Estate Development Professionals I – Financial An...
Fundamental Skills for Real Estate Development Professionals I – Financial An...
 
Capital Investment Analysis
Capital Investment AnalysisCapital Investment Analysis
Capital Investment Analysis
 
[Project] Financial management
[Project] Financial management[Project] Financial management
[Project] Financial management
 
Cap budget [autosaved]
Cap budget [autosaved]Cap budget [autosaved]
Cap budget [autosaved]
 
Cf Capital Budgeting 6
Cf Capital Budgeting 6Cf Capital Budgeting 6
Cf Capital Budgeting 6
 
Cf Capital Budgeting 6
Cf Capital Budgeting 6Cf Capital Budgeting 6
Cf Capital Budgeting 6
 
Cf%20 Capital%20 Budgeting%206
Cf%20 Capital%20 Budgeting%206Cf%20 Capital%20 Budgeting%206
Cf%20 Capital%20 Budgeting%206
 
Lecture cash flow evaluation new
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation new
 
Lecture cash flow evaluation new
Lecture cash flow evaluation newLecture cash flow evaluation new
Lecture cash flow evaluation new
 
Chapter8 investmentcriteria
Chapter8 investmentcriteriaChapter8 investmentcriteria
Chapter8 investmentcriteria
 
Capital Budgeting Er. S Sood
Capital Budgeting Er. S SoodCapital Budgeting Er. S Sood
Capital Budgeting Er. S Sood
 
Fundamental Skills for Real Estate Development Professionals I. Financial An...
Fundamental Skills for Real Estate Development Professionals I.  Financial An...Fundamental Skills for Real Estate Development Professionals I.  Financial An...
Fundamental Skills for Real Estate Development Professionals I. Financial An...
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
Capital budgeting
Capital budgetingCapital budgeting
Capital budgeting
 
UTSFinmagecapitalbugproject
UTSFinmagecapitalbugprojectUTSFinmagecapitalbugproject
UTSFinmagecapitalbugproject
 
capital budgeting In financial management
capital budgeting In financial managementcapital budgeting In financial management
capital budgeting In financial management
 
Eng econ lecture
Eng econ lectureEng econ lecture
Eng econ lecture
 
PPAM-AK PPT.pptx
PPAM-AK PPT.pptxPPAM-AK PPT.pptx
PPAM-AK PPT.pptx
 

More from Dhwani Shah

Frequency distribution, central tendency, measures of dispersion
Frequency distribution, central tendency, measures of dispersionFrequency distribution, central tendency, measures of dispersion
Frequency distribution, central tendency, measures of dispersionDhwani Shah
 
Traffic & Transportation surveys
Traffic & Transportation surveysTraffic & Transportation surveys
Traffic & Transportation surveysDhwani Shah
 
Traffic and Transportation problems
Traffic and Transportation problemsTraffic and Transportation problems
Traffic and Transportation problemsDhwani Shah
 
Basics of transportation planning
Basics of transportation planningBasics of transportation planning
Basics of transportation planningDhwani Shah
 
Introduction to transport planning
Introduction to transport planningIntroduction to transport planning
Introduction to transport planningDhwani Shah
 

More from Dhwani Shah (6)

Frequency distribution, central tendency, measures of dispersion
Frequency distribution, central tendency, measures of dispersionFrequency distribution, central tendency, measures of dispersion
Frequency distribution, central tendency, measures of dispersion
 
Traffic & Transportation surveys
Traffic & Transportation surveysTraffic & Transportation surveys
Traffic & Transportation surveys
 
Project cycle
Project cycleProject cycle
Project cycle
 
Traffic and Transportation problems
Traffic and Transportation problemsTraffic and Transportation problems
Traffic and Transportation problems
 
Basics of transportation planning
Basics of transportation planningBasics of transportation planning
Basics of transportation planning
 
Introduction to transport planning
Introduction to transport planningIntroduction to transport planning
Introduction to transport planning
 

Recently uploaded

Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfUjwalaBharambe
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxDr.Ibrahim Hassaan
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for BeginnersSabitha Banu
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupJonathanParaisoCruz
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxUnboundStockton
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxRaymartEstabillo3
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatYousafMalik24
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdfFraming an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
Framing an Appropriate Research Question 6b9b26d93da94caf993c038d9efcdedb.pdf
 
Gas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptxGas measurement O2,Co2,& ph) 04/2024.pptx
Gas measurement O2,Co2,& ph) 04/2024.pptx
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 
OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...OS-operating systems- ch04 (Threads) ...
OS-operating systems- ch04 (Threads) ...
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
 
Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
Full Stack Web Development Course for Beginners
Full Stack Web Development Course  for BeginnersFull Stack Web Development Course  for Beginners
Full Stack Web Development Course for Beginners
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
MARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized GroupMARGINALIZATION (Different learners in Marginalized Group
MARGINALIZATION (Different learners in Marginalized Group
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
Blooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docxBlooming Together_ Growing a Community Garden Worksheet.docx
Blooming Together_ Growing a Community Garden Worksheet.docx
 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptxEPANDING THE CONTENT OF AN OUTLINE using notes.pptx
EPANDING THE CONTENT OF AN OUTLINE using notes.pptx
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Earth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice greatEarth Day Presentation wow hello nice great
Earth Day Presentation wow hello nice great
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 

Financial appraisal

  • 1. Subject: FINANCIAL APPRAISAL Subject: URBAN FINANCE Dhwani Shah, Assistant Professor Bhaikaka Centre for Human Settlements, APIED, Vallabh Vidyanagar. Date- 17/12/2015
  • 2. TYPES OF APPRAISAL  Market Appraisal - Potential market, Location and accessibility of consumer  Technical Appraisal - Technical Viability, Operating at optimum level?  Financial Appraisal - Profitability, NPV, IRR, pay back Financial Appraisal - Profitability, NPV, IRR, pay back period, Level of Risk etc  Socio-Economic Appraisal - Social Cost benefits, level of savings in society  Ecological Appraisal - Impact of the project on quality of Air, Water, Noise, Vegetation, Human life. Likely Damage and the cost of restoration eg. Industries
  • 3. FINANCIAL APPRAISAL The Financial Appraisal test demonstrates- methods for analyzing and evaluating a range of fictional accounting ratios and other commercial data to enable the candidate tocommercial data to enable the candidate to assess the potential risks and returns of applications and to make preliminary recommendations on whether or not to advance funds.
  • 4. WHY NECESSARY? • Main problem– unlimited wants/limited resources. • Judicious decision required – how much to invest/where to invest/when to invest ininvest/where to invest/when to invest in each sector of economy to achieve highest growth of economy. • All sectors are required to be developed at minimum cost while achieving highest overall economic growth
  • 5. INVESTMENT CRITERIA To investigate efficiency and profitability of investment in a project. Two Categories of Investment Criteria are used : i. Non- Discounting Cash Flow Methodsi. Non- Discounting Cash Flow Methods ii. Discounting Cash Flow Methods (DCF method)
  • 6. NON- DISCOUNTING CASH FLOW METHODS • Pay back period • Rate of Return • Annual Equivalent Method• Annual Equivalent Method
  • 7. PAY BACK PERIOD o Time in years, necessary to accumulate from annual cash flow (cash receipts minus cash payments – but not depreciation) – an amount equal to initial investment. o Simple – but ignores time value of money.
  • 8. RATE OF RETURN o Expresses profit as percentage of Capital employed. o Relates average annual expected incomeo Relates average annual expected income to total initial investment. o Both Pay back period and ROR are popular in private industry.
  • 9. ANNUAL EQUIVALENT METHOD Total cost is converted into total annual amounts by replacing the investment cost with an annual equivalent cost, adding annual operating cost, and getting the ratioannual operating cost, and getting the ratio between the annual benefits and the total annual cost.
  • 10. DISCOUNTING CASH FLOW METHODS  Concept: Taking time value of money Rs. 100 today at 10% annual interest would be Rs. 110/- after a year, Rs. 121/- after 2 years , Rs. 133/- after 3 years  Techniques: • Net Present Values (NPV) • Internal Rate of Return • Benefit/Cost Ratio.
  • 11. CASH FLOW The total amount of money being transferred into and out of a business. Year 2012 2013 2014 2015 2016 Outflows Infrastructure Capital Costs 139.05 324.27 382.07 450.74 340.25 Infrastructure O&M Costs 28.5 33.5 43.1 52.0 57.5 Fleet Procurement Costs 0.0 0.0 22.0 43.2 30.2 Bus O&M Costs 11.4 23.0 68.5 Other System Costs 0.6 1.2 3.4 Total Outflows 167.53 357.72 459.16 570.17 499.83Total Outflows 167.53 357.72 459.16 570.17 499.83 Inflows Fare Revenue pa (Rs crore) 11.0 21.8 62.7 Indirect Revenue 0.8 1.5 4.4 Bus Salvage Value 0.00 0.00 0.00 0.00 Grants for Infrastructure Capital Costs- GOI + GoG 49.25 130.81 147.22 195.29 141.99 Fleet Procurement Costs (GOI+GoG) 0.00 0.00 17.64 34.56 24.15 Devolvements from UTF (D) 0.00 0.00 75.00 80.25 85.87 Total Inflows 49.25 130.81 251.58 333.38 319.09 Annual Cashflow -118.29 -226.92 -207.59 -236.79 -180.74
  • 12. PRESENT VALUE (PV)  The value in the present of a sum of money, in contrast to some future value it will have when it has been invested at compound interest.  PV = FV / (1+r)n  PV is Present Value  FV is Future Value  r is the interest rate (as a decimal, so 0.10, not 10%)  n is the number of years
  • 13. instead of "adding 10%" to each year it is easier to multiply by 1.10 Future Back to Now: what money in the future is worth now, go backwards (dividing by 1.10 each year instead of multiplying):
  • 14. Examples: 1) Sam promises you $500 next year, what is the Present Value? (r=10%) To take a future payment backwards one year divide by 1.10 So $500 next year is $500 ÷ 1.10 = $454.55 now The Present Value is $454.55 PV = FV / (1+r)n 2) Alex promises you $900 in 3 years, what is the Present Value? (r=10%) To take a future payment backwards three years divide by 1.10 three times So $900 in 3 years is: $900 ÷ 1.10 ÷ 1.10 ÷ 1.10 $900 ÷ (1.10 × 1.10 × 1.10) $900 ÷ (1.10)^3 $900 ÷ 1.331 $676.18 now
  • 15. NET PRESENT VALUE  Net Present Value (NPV) is the difference between the present value of cash inflows and the present value of cash outflows. NPV is used in capital budgeting to analyze the profitability of a projected investment or project.of a projected investment or project.  NPV = ∑ {Future Value/(1+r)^n} - Initial Investment where r is the rate of return and n is the number of time periods.
  • 16. Example:  Assume a company wants to analyze the predicted profitability of a project that requires an initial outlay of $10,000. Over the course of three years, the project is expected to generate revenues of $2,000, $7,000 and $11,000, respectively. The anticipated discount rate is 4.5%. At first glance, it seems the returns are nearly double the investment. However, a dollar earned in three years is not as valuable as a dollar earned today, so the company's accountant calculates the NPV as follows tocompany's accountant calculates the NPV as follows to determine profitability while accounting for the discounted time value of the projected revenues:  NPV = ∑ {Future Value/(1+r)^n} - Initial Investment = {$2,000/(1+.045)^1} + {$7,000/(1+.045)^2} + {$11,000/(1+.045)^3} - $10,000 = $1,913.88 + $6,410.11 + $9,639.26 - $10,000 = $7,963.25
  • 17. INTERNAL RATE OF RETURN  The IRR is the interest rate, also called the discount rate, that is required to bring the net present value (NPV) to zero. That is, the interest rate that would result in the present value of the capital investment, or cash outflow, being equal to the value of the total returns over time, or cashto the value of the total returns over time, or cash inflow.  NPV= ∑ {FV/ (1+r)^n} - Initial Investment where r is the interest rate and n is the number of time periods. IRR is calculated using the NPV formula by solving for r if the NPV equals zero.
  • 18. Year 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 Outflows Infrastructure Capital Costs 23.45 46.90 46.90 139.0 5 324.2 7 382.0 7 450.7 4 340.2 5 184.3 5 168.7 5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Infrastructure O&M Costs 0.0 11.5 21.9 28.5 33.5 43.1 52.0 57.5 65.8 66.0 65.7 72.6 83.0 83.3 82.9 91.7 104.8 105.1 104.7 115.7 0.0 0.0 0.0 0.0 0.0 Fleet Procurement Costs 0.0 0.0 0.0 0.0 0.0 22.0 43.2 30.2 55.5 111.9 118.7 94.0 112.0 148.6 221.3 60.7 153.8 163.1 141.3 187.2 247.6 358.4 158.4 302.4 310.0 Bus O&M Costs 11.4 23.0 68.5 99.8 161.9 231.1 280.8 335.6 395.9 507.0 542.9 583.2 626.4 663.7 712.8 766.8 824.7 884.0 947.4 1012. 3 Other System Costs 0.6 1.2 3.4 5.0 8.1 11.6 14.0 16.8 19.8 25.4 27.1 29.2 31.3 33.2 35.6 38.3 41.2 44.2 47.4 50.6 Total Outflows 23.45 58.36 68.81 167.5 3 357.7 2 459.1 6 570.1 7 499.8 3 410.4 2 516.6 5 427.0 0 461.4 1 547.4 0 647.5 2 836.6 9 722.4 2 871.0 1 925.9 5 942.9 3 1051. 35 1052. 70 1224. 35 1086. 59 1297. 15 1372. 85 Inflows Fare Revenue pa (Rs crore) 11.0 21.8 62.7 90.8 148.0 219.3 267.2 320.0 378.2 502.0 536.7 578.4 623.0 671.0 722.4 777.6 836.9 900.4 968.5 1036. 3 Indirect Revenue 0.8 1.5 4.4 6.4 10.4 15.3 18.7 22.4 26.5 35.1 37.6 40.5 43.6 47.0 50.6 54.4 58.6 63.0 67.8 72.5 Bus Salvage Value 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1.30 2.20 4.32 3.02 5.55 11.19 11.87 9.40 11.20 14.86 22.13 6.07 15.38 Grants for Infrastructure Capital Costs- GOI + GoG 16.42 32.83 32.83 49.25 130.8 1 147.2 2 195.2 9 141.9 9 129.0 5 118.1 3 993.8 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Fleet Procurement Costs (GOI+GoG) 0.00 0.00 0.00 0.00 0.00 17.64 34.56 24.15 44.44 89.55 94.93 75.18 89.64 118.8 7 177.0 8 48.60 123.0 7 130.4 5 113.0 5 149.7 4 198.0 5 286.7 3 126.7 3 241.9 3 247.9 8 Devolvements from UTF (D) 0.00 0.00 0.00 0.00 0.00 75.00 80.25 85.87 91.88 98.31 105.1 9 112.5 5 120.4 3 128.8 6 137.8 8 147.5 4 157.8 6 168.9 1 180.7 4 193.3 9 206.9 3 221.4 1 236.9 1 253.4 9 271.2 4 Total Inflows 16.42 32.83 32.83 49.25 130.8 1 251.5 8 333.3 8 319.0 9 362.5 6 464.3 3 1428. 56 473.6 2 553.7 8 654.5 8 856.4 1 773.4 5 905.3 3 977.2 1 1023. 61 1125. 54 1248. 26 1418. 43 1349. 17 1537. 75 1643. 49 Annual Cashflow -7.04 -25.53-35.98 - 118.2 9 - 226.9 2 - 207.5 9 - 236.7 9 - 180.7 4 -47.86-52.32 1001. 56 12.21 6.37 7.05 19.72 51.04 34.32 51.26 80.68 74.20 195.5 6 194.0 8 262.5 8 240.6 0 270.6 3 IRR 8.01% Use Excel formula to calculate IRR =IRR(D25:AB25,0.1) = IRR (select the total annual cash flow)
  • 19. COST BENEFIT ANALYSIS  Cost-Benefit Analysis (CBA) estimates and totals up the equivalent money value of the benefits and costs to the community of projects to establish whether they are worthwhile.  Main measure of cost and benefit – is difference in costs and benefits ‘with’ and ‘without’ projectcosts and benefits ‘with’ and ‘without’ project  What level of output would be with the project and what they would have been without it  Economic Cost: The cost in economic terms means the cost of the resource actually forgone, free from the effect of taxes, subsidy (factor-0.85)
  • 20. STEPS INVOLVED IN A FINANCIAL APPRAISAL OF A PROJECT (i) A forecast of demand, (ii) Estimation of financial costs; capital and annual maintenance/recurring cost (iii) Estimation of benefits on the basis of(iii) Estimation of benefits on the basis of forecasted future traffic and (iv) Comparison of costs and benefits for assessing viability.
  • 21. COST BENEFIT ANALYSIS of MRTS PROJECT • Basics involve traffic projection, estimation of costs, benefits and conducting appraisal using ‘with’ and ‘without’ approach. • Cost streams  Capital cost- civil works, rolling stock, signaling, interest (current lending rate), construction of bus way, buses  Operating costs-metro, bus way, existing buses/private Operating costs-metro, bus way, existing buses/private vehicle that will continue even after MRTS. • Benefit items  Capital and operating cost of traffic if MRTS is not taken up This become benefit (as this is not incurred after MRTS)  Saving due to decongestion  Saving in travel time  Saving in petrol/ diesel consumption • IRR/EIRR
  • 22. DECISION RULES • NPV - Accept all projects with a positive NPV when discounted at a rate reflecting the opportunity cost of capital. (Shouldn’t use NPV alone, club it with IRR) • IRR - Accept all projects with an IRR reflecting the• IRR - Accept all projects with an IRR reflecting the opportunity cost of capital. • B/C - Accept all projects with a ratio (gross benefit/Above 1.00 when discounted at a gross costs) rate reflecting the opportunity cost of capital.