Population forecasting methods are needed to design water supply systems for the expected future population in the design period, rather than just the current population. Short term forecasting methods include arithmetic progression, geometric progression, and decreasing rate of increase models, while long term methods include comparative, ratio & correlation, component, and logistic curve fitting techniques. Arithmetic progression assumes a constant rate of population increase over time.