Dennis G. Lambert, P.E., MASCE
 
 
 
POSITION:    Chief Market Manager, COWI Marine North America 
 
SPECIALIZATION:  Coastal, Marine and Environmental Engineering  
 
YEARS EXPERIENCE:  27 
 
EDUCATION:               
2000          M.S., Environmental Engineering: Numerical Modeling, Tulane 
University         
1996           B.S., Civil Engineering: Structural Emphasis, Tulane University 
1996           B.S., Environmental Engineering: Numerical Modeling, Tulane 
University (Dean's List, 1995) 
 
REGISTRATIONS:                    
Registered Civil Engineer, 2000, LA PE.0029326 
Registered Environmental Engineer, 2000, LA PE.0029326 
 
MEMBER:                    
Member of the American Society of Civil Engineers (1988)  
 Member of the ASCE Coasts, Oceans Ports, & Rivers Institute (2001) 
ASCE T&DI Louisiana Chapter Executive Committee (2008) 
ASCE COPRI Louisiana Chapter Executive Committee (2012) 
ASCE COPRI Waterways Committee (2014) 
ASCE COPRI Ports & Harbors Committee (2014) 
ASCE COPRI P3 for Waterways Chair (2014)  
Louisiana Civil Engineering Conference & Show Committee Member 
Tulane School of Science & Engineering Council 
Louisiana Engineering Society 
Construction Specifications Institute 
 Prestressed Concrete Institute 
 Society of Tulane Engineers / Tulane Engineering Forum Planning Committee 
 American Consulting Engineering Council's Environmental Committee 
 NCEES Environmental Engineering PE Exam Committee Member  
 Louisiana Coastal Sand Management Working Group 
 
KEY QUALIFICATIONS 
Mr.  Lambert's  work  has  focused  on  coastal,  marine  &  environmental  engineering 
including the interface between navigation and ecosystem restoration, navigation and 
flood protection, marine design, basin‐wide modeling and barrier island restoration. 
His  marine  experience  includes  marine  terminals,  marinas,  boat  launches  and 
bulkheads,  docks  and  wharfs,  dredging,  barge  loading  and  unloading,  barge  traffic 
analysis and vessel collision. 
 
 
 
Dennis G. Lambert, P.E., MASCE 
 
 
2/11 
 
DIVERSIONS,  ECOSYSTEM  RESTORATION,  FLOOD 
PROTECTION & HYDRAULIC ENGINEERING  
Lower  Mississippi  River  Diversion,  Mid  Barataria 
Sediment  Diversion,  BA‐153,  Plaquemines  Parish,  LA, 
2014  ‐  Date.  Independent  Technical  Review  Team 
Member  responsible  for  reviewing  and  optimizing 
design  for  this  keystone  ecosystem  restoration  project 
including  hydraulic  modeling  and  ship  simulation 
modeling. 
Lower  Mississippi  River  Diversion,  Mid  Breton,  Lower 
Barataria  and  Lower  Breton  Sediment  Diversion,  BA‐
153, Plaquemines Parish, LA, 2014 ‐ Date. Independent 
Technical  Review  Team  Member  responsible  for 
reviewing  and  optimizing  design  for  this  keystone 
ecosystem  restoration  project  including  hydraulic 
modeling and ship simulation modeling. 
Lower  Mississippi  River  Diversion,  Delta  Building  at 
Myrtle  Grove,  BA‐33,  LaFourche,  Jefferson  and 
Plaquemines Parishes, LA, 2005. Project Team Member 
and  coordinated  NEPA  EIS  scoping  for  this  large  civil 
works  ecosystem  restoration  project  and  basin  wide 
modeling under LCA including navigation impacts. 
Lower  Mississippi  River  Diversion,  Small  Freshwater 
Diversion to the Northwestern Barataria Basin (BA‐34, 
PPL10)  Project  Area  and  Vicinity,  St.  James  and 
Lafourche  Parishes,  LA,  2005.  Project  Team  Member 
and  coordinated  initial  surveying  and  data  collection 
efforts to restore and maintain selected cypress‐tupelo 
swamp tracts in the upper Barataria Basin. 
Barataria  Bay,  Basin  Hydrodynamic  Model  Review  & 
Development  of  New  Model,  LaFourche,  Jefferson,  & 
Plaquemines  Parishes,  LA,  2003‐2005.  Project  Team 
Member and coordinated with the USACE on exchange 
of  Bathymetric  Data  included  meetings  with  the 
Hydraulic  Branch  of  the  New  Orleans  District  and 
collaboration  between  the  Donaldsonville  to  the  Gulf 
and Morganza to the Gulf levee projects and LCA. 
Design  and  Construction  of  Improvements  to  the 
Bonnabel  Canal,  Jefferson  Parish,  LA,  2008‐2012. 
Project  Team  Member  and  provided  engineering 
support  services  on  the  project,  which  includes  the 
construction  of  concrete  box  culverts/concrete  flume, 
design of two off‐system bridge replacements, road‐way 
replacement,  and  miscellaneous  public  utilities  (water 
and  sewer)  from  the  south  end  of  Veterans  Blvd.  to 
West  Esplanade  Ave.  Additional  project  elements 
include  surveying,  geotechnical,  electrical  (street 
lighting), preparation of right‐of‐way plans (as required), 
and traffic engineering related services. The box culvert 
is within tight drainage servitude across various private 
utility  and  State  R/Ws.  The  conveyances  are  approx.  1 
mile. 
Flood Risk Assessment and Hazard Mitigation Plan for 
the Sewerage & Water Board of New Orleans (S&WB), 
New  Orleans,  LA,  2008‐2012.  Project  Manager  – 
provided  a  Hazard  Mitigation  Plan  to  include 
vulnerability  assessments,  risk  analysis  and 
identifications of hazards to critical facilities, identifying 
repetitive  losses  and  how  to  reduce  those  losses  and 
decrease  the  response  time to  a natural  or  man‐made 
hazards. The purpose of the plan was also to integrate 
risk and hazard mitigation strategies into the day‐to‐day 
activities.  The  plan  was  prepared  to  meet  the  Disaster 
Mitigation  Act  of  2000  (DMA  2000)  requirements  in 
order to maintain the S&WB’s eligibility for the Federal 
Emergency  Management  Agency  (FEMA)  Pre‐Disaster 
Mitigation (PDM) and Hazard Mitigation Grant Programs 
(HMGP). The review included the Emergency Operation 
Plan, the Operation and Maintenance Plan, the Orleans 
Parish  Hazard  Mitigation  Plan,  the  Louisiana  Hazard 
Mitigation  Plan,  Storm  proofing  Pumping  Stations  to 
improve  resiliency  of  pump  stations  during  and  after 
hazard  occurrences,  reduce  the  impact  of  flood  and 
flood related hazards on critical pumping infrastructure, 
retrofit  pump  stations  to  protect  components  from 
damage,  Enhance/Expand  Power  Generation  including 
expanded  power  generation  capability  ensuring 
continuous  operating  capability  of  pump  and  drainage 
facilities, as well as water and sewer operations, reduce 
the risk of hazard caused power outages that interrupt 
critical  operations  and  protect  critical  network 
components to implement specific protective measures 
to  fortify  critical  facilities,  reduce  the  risk  of  flood 
related  hazards  and  ensure  continued  operation.  The 
Dennis G. Lambert, P.E., MASCE 
 
 
3/11 
 
plan ultimately assisted the S&WB in securing $141M in 
hazard  mitigation  grant  funds  for  the  Retrofit  Power 
Plant Hazard Mitigation Grant Project. 
Canal Bank Rehabilitation (Hurricane Gustav) District 5, 
Jefferson  Parish,  LA,  2010.  Project  Manager,  provided 
design  engineering  services  to  prepare  plans  and 
specifications,  including  topographic  survey, 
geotechnical  and  resident  inspection  for  repairs  and 
restoration of certain canal banks and waterways from 
damage caused by Hurricane Gustav. The restoration of 
these  banks  is  being  funded  by  the  USDA‐NCRSEWP, 
whereby Damage Survey Reports (DSRs) were generated 
identifying said banks. The DSRs included in this scope 
are  DSR  Nos.  051‐08‐042G,  051‐08‐008G  and  051‐08‐
001G.  
Lake  Cataouatche  Levee  Basin,  Jefferson  Parish,  LA, 
2005‐2007.  Project  Manager,  responsible  for 
Watershed/Master 404 Services for 9,500+ acres, which 
includes  hydraulic  and  hydrodynamic  modeling,  storm 
surge  modeling  and  wetland  delineations.  Master  404 
Services  for  9500+  acres  which  includes  hydraulic  & 
hydrodynamic modeling, storm surge modeling, wetland 
delineations, soil identification, plant identification, base 
flood  elevations,  topographical  interpolation/LIDAR, 
borrow pit coordination with USACE, geotechnical data 
analysis,  coordination  with  USACE  HTRW  studies  and 
coordination with cultural resource studies. 
Terrebonne  Bay,  Whiskey  Island  West  Flank 
Restoration; Terrebonne Parish, LA, 2004‐2005. Project 
Manager,  providing  coastal  engineering  support  for  a 
study to restore the west flank of Whiskey Island (one of 
five barrier islands comprising Louisiana’s Isles Dernieres 
barrier  island  chain).  The  chain  of  barrier  islands  is 
experiencing continued land loss and fragmentation as a 
result  of  both  natural  processes  and  human  activity. 
Coastal  engineering,  modeling,  and  design  framework 
based  on  the  adaptive  management  approach  as 
recommended is the recently released LCA Report was 
developed. This framework incorporated lessons learned 
from  the  design,  construction  and  monitoring  of 
previous  coastal  restoration  projects  in  Louisiana, 
including coastal modeling efforts, restoration template 
designs,  and  construction  methodologies.  A  suite  of 
analytical and numerical modeling tools (using the DELFT 
morphological  model)  to  investigate  a  number  of 
important  coastal  processes,  including:  morphological 
evolution,  overwash,  dune  “rollover”  and  island 
breaching  during  extreme  events,  sea  level  rise, 
sediment  losses  to  adjacent  channels  and  shoals,  and 
cross‐shore profile equilibration was adapted. 
FEMA/USACE  Riverine  Flood  Insurance  Studies, 
Orleans,  Jefferson,  Rapides,  Calcasieu,  Ascension  and 
St.  Tammany  Parishes,  LA,  2003‐2005.  Project  Team 
Member  and  coordinated  with  FEMA  Region  VI  for 
FEMA’s  Map  Modernization  Program.  Storm  surge 
modeling  includes  Lake  Pontchartrain,  Lake  Borgne, 
Barataria  Bay  and  Calcasieu  Lake  and  compiled  SELA 
hydraulic  models  for  Orleans  &  Jefferson  Parishes 
including  SWMM,  HEC  models  and  previously  UNET 
models. 
Ormond  Lakes  Hydraulic  Analysis,  St.  Charles  Parish 
Project  No.  P030305;  St.  Charles  Parish,  LA,  2004. 
Project  Manager,  performed  hydraulic  analysis  of  the 
Lake Drainage System and Pumping Station included an 
evaluation of the hydrological and hydraulic features of 
the Lake Drainage System. Accompanying the evaluation 
is a recommendation for improvements which included 
dredging  as  alternative  and  those  elements  of  the 
system that will have the greatest positive effect on the 
system, while minimizing capital outlay. 
Barataria/Plaquemines  Barrier  Shoreline  Restoration, 
Peer  Review  for  the  National  Oceanic  &  Atmospheric 
Administration  (NOAA),  Lafourche,  Jefferson  and 
Plaquemines  Parish,  LA,  2003.  Project  Team  Member 
and  coordinated  performance  assessment  of  two 
modeling  projects  which  included  Project  Area  #1: 
Chaland  Headland  –  Pass  La  Mer  to  Chaland  Pass  and 
Project  Area  #2:  Pelican  Island  –  Pass  Fontanelle  to 
Scofield Pass. 
Lower  Mississippi  River  Siphon,  LDNR  2503‐01‐03, 
Plaquemines  Parish,  LA,  2001‐2003.  Project  Team 
Member and coordinated engineering evaluation for the 
Naomi  Siphon  (BA‐03)  and  West  Point  A  La  Hache 
Siphon (BA‐04) in Plaquemines Parish. 
Dennis G. Lambert, P.E., MASCE 
 
 
4/11 
 
MARINE, WATERWAYS, PORTS & HARBORS 
Lower  Mississippi  River,  Port  of  New  Orleans,  Fender 
Piling  Feasibility  Study,  Poland‐Pauline  Wharfs,  New 
Orleans,  LA,  2014.  Project  Manager,  prepared  a 
feasibility  report  for  fender  piling  and  the  Poland‐
Pauline Wharfs. The facility consists of five berths within 
the  Poland  Street  Wharf  and  one  berth  referred  to  as 
Pauline  Street  which  were  all  built  at  different  times 
(1923‐1940). Berths 1, 2, and 3 are the permanent lay 
berth for the Cape Kennedy and Cape Knox RRF vessels. 
These  vessels  are  moored  IA  W  Navy  Heavy  Weather 
Mooring Service Type III requirements and do not sortie 
from the berth during severe weather. The Port of New 
Orleans is currently designing a third cruise terminal at 
the  Poland‐Pauline  Wharfs  for  the  AIDA  Cruise  Line  to 
berth the ship VITA for several port of call cruises to be 
berthed  at  Poland  Avenue  Berths  4  and  5.  The  VITA 
carries  1,266  passengers,  is  42,289  GT,  is  665  ft.  long, 
and needs at least 21 ft. of draft. In its present condition, 
due to barge traffic and tug boats in the area, about 58 
out of 133 fender piles are missing in this 800 linear feet 
berth. The VITA berth has many fender piles are missing, 
leaving the wharf substructure vulnerable to damage by 
vessel  collisions.  Pilings  are  to  be  embedded  in  the 
riverbed  varying  between  El.  ‐35  ft.  and  El  ‐65  ft. 
Evaluation  of  inspection  reports  were  performed  in 
accordance  with  "American  Society  of  Civil  Engineers 
(ASCE) Manuals and Reports on Engineering Practice No. 
101,  Underwater  Investigations  and  Standard  Practice 
Manual"  and  Department  of  Defense  Handbook 
MOORING DESIGN MIL‐HDBK‐1026/4. 
Lower Mississippi River & Inland Waterway Navigation 
Study,  New  Orleans,  LA,  2013.  Project  Team  Member 
and coordinated with shallow draft vessel fleet through 
Greater  New  Orleans  area  and  assisted  in  design 
guidance  for  application  to  mooring  facilities  and 
anchorages intended to secure vessels during hurricane 
events  along  the  Lower  Mississippi  River,  IHNC  and 
Harvey/Algiers  Canals.  Coordination  included  the 
Greater New Orleans Barge Fleet Association, American 
Waterways  Operators,  Gulf  Intercoastal  Waterway 
Association, US Coast Guard, Port of New Orleans, Canal 
Barge, Ingram Barge, Kirby Inland Marine, Turn Services 
/ Associated Terminals and various marine terminals and 
barge  fleeting  operators  utilizing  dead  man  moored 
vessels. Mooring criteria evaluated included TN N‐1628 
(1982)  Wind‐Induced  Steady  Loads  on  Ships;  DM  26.4 
(1986) Fixed Moorings; DM 26.5 (1985) Fleet Moorings; 
TR‐6003‐OCN (1997) Wind and Current Forces/Moments 
on  Multi‐ple  Ships;  UFC  4‐159‐03  (2005)  Design: 
Moorings;  OCIMF  (1992,  1997,  2008).  Mooring 
Equipment Guidelines; BS 6349‐1 (1989) Part 1: Code of 
practice  for  general  criteria;  BS  6349‐6  (1989)  Part  6: 
Design  of  inshore  moorings  and  floating  structures; 
DNV‐RP‐C205  (2010)  Environmental  Conditions  and 
Environ‐mental  Loads;  PrEN  1991‐1‐4.  Eurocode  1: 
Actions  on  structures  –  Wind  actions;  PIANC  (1995) 
Criteria  for  Movements  of  Moored  Ships  in  Harbours; 
API  RP  2SK  (2005)  Stationkeeping  Systems  for  Floating 
Structures. 
Lake  Pontchartrain,  New  Orleans  Municipal  Yacht 
Harbor, FEMA PW(s) 11698, 11803, 11841, 11160, 7208, 
7393  &  7396  Orleans  Parish,  LA,  2009‐2010.  Project 
Manager,  including  sediment  sampling,  bathymetry, 
tidal  data,  topographical  surveys,  applications  for 
Section 404, Section 10 and Coastal Use Permits, dredge 
design  including  all  cross‐sections,  structural  pier 
assessments in accordance with PIANC, UFC, USACE and 
ASCE  (Report  50)  standards.  The  undertaking  included 
development  of  three  Preliminary  Design  Alternatives, 
Hydrodynamic  and  Storm  Surge  Modeling  and  Coastal 
Engineering,  producing  Final  Deliverable,  Plans  & 
Specifications,  providing  Inland  Testing  Manuel  Tier  II 
Sampling & Analysis and Recap in accordance with the 
USEPA,  LDEQ  and  USACE  guidelines,  providing  all 
permitting  services  for  LDNR,  LDEQ  and  USACE, 
providing  oversight  of  the  geotechnical,  hazard, 
bathymetric  and  land‐side  surveying  services.  Also 
performed a Phase II ESA on the New Orleans Municipal 
Yacht Harbor (MYH) sediments where the sediment was 
tested  and  compared  to  risk  assessment  (RECAP) 
standards.  A  total  of  18  boreholes  were  advanced. 
Samples  were  collected  at  established  intervals.  Field 
boring  logs  and  office  generated  boring  logs  for  the 
same  boreholes  were  checked  where  a  QA/QC  was 
performed between the two field geologist logs. 
Dennis G. Lambert, P.E., MASCE 
 
 
5/11 
 
Lower  Mississippi  River  Sand  Mining  /  Scofield  Island 
Restoration  (BA‐40),  Scoping  Phase,  Plaquemines 
Parish, LA, 2006. Project Team Member and coordinated 
the scoping of the design & permitting of this proposed 
sand  mining  operation  located  in  Plaquemines  Parish. 
The  volume  of  the  sand  to  be  mined  is  estimated 
between  3Mcy  and  4Mcy.  The  Limits  of  Permissible 
Excavation  in  the  river  will  be  compliant  with  MVN 
Standard Drawing File No. H‐8‐45755. Further, all access 
to the batture near the borrow site will be proposed by 
levee ramps complaint with MVN Standard Drawing File 
No. H‐18‐24854. All anchorages and barge fleeting areas 
along with riverbank revetments were identified. 
Lower  Mississippi  River,  Marine  Terminal  and  Dock, 
Vopak Terminal, Westwego, LA, 2006. Project Manager, 
dredge design for marine terminal and dock. The Limits 
of  Permissible  Excavation  in  the  river  were  compliant 
with  MVN  Standard  Drawing  File  No.  H‐8‐45755. 
Further, all access to the marine terminal and dock via 
levee  ramps  were  designed  complaint  with  MVN 
Standard  Drawing  File  No.  H‐18‐24854.  All  anchorages 
and  barge  fleeting  areas  along  with  riverbank 
revetments were identified. 
Empire Water Way Boat Hoist, Pier and Bulkhead with 
Incidental  Dredging,  EN‐20‐010‐2415  &  P20001891; 
Plaquemines  Parish,  LA,  2005.  Project  Manager, 
responsible  for  the  design  &  permitting  of  a  proposed 
pier  and  bulk‐head  on  the  Empire  Waterway  that 
included  dredging.  Task(s)  included  super‐imposing the 
right‐of‐way maps of the Empire Waterway onto the site 
survey and cross‐sections. Design included 8” steel pipe 
and decking. 
Lower  Mississippi  River  Sand  Mining  Design  & 
Permitting  –  Westwego  Facility  (EI‐20‐020‐0695), 
Jefferson  Parish,  LA,  2001  &  2006.  Project  Manager, 
responsible  for  the  design  &  permitting  of  these  sand 
mining operation located in Westwego. The capacity of 
the stockpile is 200,000 cubic yards at West‐wego and 
pumped twice a year. The capacity of the borrow area is 
1,500,000  cubic  yards  at  Westwego.  The  Limits  of 
Permissible  Stockpile  on  the  riverbank  were  compliant 
with  MVN  Standard  Drawing  File  No.  H‐8‐45756.  The 
Limits  of  Permissible  Excavation  in  the  river  were 
compliant  with  MVN  Standard  Drawing  File  No.  H‐8‐
45755. Further, all access to the batture by levee ramps 
were  designed  complaint  with  MVN  Standard  Drawing 
File  No.  H‐18‐24854. All  anchorages  and  barge  fleeting 
areas along with riverbank revetments were identified. 
Lower  Mississippi  River  Sand  Mining  Design  & 
Permitting  –  Lower  Coast  Algiers  (EI‐20‐020‐0693), 
Algiers, LA, 2001 & 2006. Project Manager, responsible 
for  the  design  &  permitting  of  these  sand  mining 
operation located in Lower Coast Algiers. The capacity of 
the stockpile at Lower Coast Algiers area was calculated 
to be 195,000 cubic yards and the pit is pumped twice a 
year. The capacity of the borrow area for Lower Coast 
Algiers was calculated to be 3,300,000 cubic yards. The 
Limits  of  Permissible  Stockpile  on  the  riverbank  were 
compliant  with  MVN  Standard  Drawing  File  No.  H‐8‐
45756. The Limits of Permissible Excavation in the river 
were compliant with MVN Standard Drawing File No. H‐
8‐45755.  Further,  all  access  to  the  batture  by  levee 
ramps  were  designed  complaint  with  MVN  Standard 
Drawing File No. H‐18‐24854. All anchorages and barge 
fleeting  areas  along  with  riverbank  revetments  were 
identified. 
Inland Bay Oil Platform / Marine Terminal SPCC/NPDES 
Evaluation,  June  Energy,  Inc./TORCH,  Grand  Coquille 
Bay and Empire, LA, 1998.  Project Manager, regulatory 
Evaluation  of  offshore  platform  including  dock  and 
closure of 29‐B Production Operations. 
Marine  Terminal  Evaluation  with  Hazardous  Waste 
Above‐ground  Storage  Tanks,  Solid  Waste 
Management  Units  and  Wastewater  Treatment  Unit, 
Exxon  Chemical  (USA),  Inc.,  Baton  Rouge,  LA,  1992. 
Project  Team  Member  and  coordinated  regulatory 
Evaluation  of  Hazardous  Waste  Above‐ground  Storage 
Tanks, Solid Waste Management Units and Wastewater 
Treatment Unit 
Marine  Oil  Terminal  Assessment  with  Bulk  Liquid 
Storage,  BP  Oil,  Port  Sulphur,  LA,  1991.  Project  Team 
Member  and  coordinated  regulatory  Evaluation  of 
Hazardous  and  Solid  Waste  Management  and  Marine 
Terminal Operations. 
Dennis G. Lambert, P.E., MASCE 
 
 
6/11 
 
Marine  Terminal  Evaluation  with  Bulk  Liquid  Storage 
and  Magnesium  Ox‐ide  Solids  Centrifuge  Rejects, 
WITCO  Corporation,  Gretna,  LA,  1991.  Project  Team 
Member  and  coordinated  regulatory  Evaluation  of 
Magnesium Oxide Solids Centrifuge Rejects and Marine 
Terminal Operations. 
Marine  Terminal  Evaluation  of  Barge,  Rail  and  Truck 
Loading/Unloading  Operations,  Westlake  Styrene, 
Sulphur,  LA,  1990.  Project  Team  Member  and 
coordinated  regulatory  Evaluation  of  Barge,  Rail  and 
Truck Loading Operations. 
Marine  Terminal  Evaluation  for  NEPA  EIS  of  Formosa 
Plastics  $1.5B  Plant  Expansion  including  Waterway 
Impacts,  Pointe  Comfort,  TX,  1990.  Project  Team 
Member  and  coordinated  evaluation  of  Sodium 
Hydroxide  Accidental  Release  (by  rail,  truck  and 
barge/ship) as part of a NEPA EIS in conjunction with a 
NPDES  permit(s)  application  and  included  barge 
operations along the GIWW and berthing facility. 
Marine  Oil  Terminal  with  Bulk  Liquid  Storage  and 
Remedial  RCRA  Investigation/Feasibility  Study,  Delta 
Commodities,  Inc.,  Harvey,  LA,  1988.  Project  Team 
Member and coordinated soil sampling and monitoring 
well  installation  in  tank  farm  serviced  by  marine 
terminal loading/off‐loading. 
Marine  Oil  Terminal  with  Bulk  Liquid  Rail  and  Tank 
Farm,  Southern  Pacific  Railroad,  Avondale,  LA,  1988. 
Project  Manager  at  Leaking  Oilfield  Tank  Battery  near 
Bayou Sauvage National Wildlife Refuge. 
VESSEL COLLISION AND WATERWAY CROSSING OF 
HYDRAULIC STRUCTURES 
Bayou St. John (Park Island) Bridge, Orleans Parish, LA, 
2010‐2012.  Project  Manager,  providing  construction  & 
inspection services for the bridge crossing over Bayou St. 
John,  a  designated  Louisiana  Historic  and  Scenic  River 
(Act 267, Enacted by the Legislature of Louisiana July 18, 
1982) 
Florida Avenue Bridge – Poland Avenue/Alvar Streetto 
Tupelo  Street,  Orleans  Parish,  LA,  2005‐2007.  Project 
Manager,  peer  review  of preliminary  &  final  plans  and 
specifications for the Florida Ave Bridge over the Inner 
Harbor Navigational Canal. Tasks include constructability 
review  and  research,  use  of  Accelerated  Construction 
Technology  Transfer  (ACTT)  techniques,  and 
investigation/preparation  to  reduce  impact  on  traffic 
disruptions  on  rehabilitation  segments  along  with 
identifying all utilities such as a 48" water main. Vessel 
collisions  guidelines  considered  under  AASHTO  Guide 
Specifications  and  Commentary  for  Vessel  Collision 
Design  of  Highway  Bridges,  2nd  Edition,  with  2010 
Interim Revisions. 
Bayou Dularge Bridge Pier Protection System (includes 
Bridge  Hydraulic  Analysis,  Marine  Structural 
Assessment/Vessel  Collision)  Terrebonne  Parish,  LA, 
2000‐2001.  Project  Team  Member  and  coordinated 
preparation  of  a  Claim  for  Equitable  Adjustment  on 
behalf of the contractor. The basis of the claim was due 
to a gross benchmark error in hydraulic data discovered 
during  construction  oversight.  The  DOTD  reported  the 
benchmark as the vertical control point at elevation +9.0 
NAVD  88.  Subsequent  surveys  by  CMC  and  LDOTD 
proved the correct elevation to be at +7.3 NAVD 88, an 
error of 1.7 feet. Claim included:  Significant error in the 
vertical  control  point  elevation  affecting  Item  No. 
805(07), Class S Concrete, Item No. 805(02), Class A(m) 
Concrete, Item No. 806(01) Deformed Reinforced Steel 
and Item No. 804(04)J, Pipe Piles;  Failure to convert the 
datum  properly  affecting  Item  No.  805(07),  Class  S 
Concrete,  Item  No.  805(02),  Class  A(m)  Concrete,  Item 
No.  806(01)  Deformed  Reinforced  Steel  and  Item  No. 
804(04)J, Pipe Piles; Lack of historical data for high tide 
and  low  tide  between  circa  1975  and  1998  affecting 
Item  No.  805(07),  Class  S  Concrete,  Item  No.  805(02), 
Class  A(m)  Concrete,  Item  No.  806(01)  Deformed 
Reinforced  Steel  and  Item  No.  804(04)J,  Pipe  Piles;  In‐
correct number of units on Item No. 202(02)I, Removal 
of  Existing  Timber  Fender  System;  Unforeseen 
conditions,  such  as  obstructions  and  welded  structural 
elements,  to  Item  No.  202(02)J,  Removal  of  Existing 
Dolphins.  Vessel  collision  guidelines  considered  under 
1991 AASHTO Guide Specifications and Commentary for 
Vessel. 
Dennis G. Lambert, P.E., MASCE 
 
 
7/11 
 
Bridge Load Rating LFM Update contract for District 02 
& 07, LA, 1999. Project Team Member and coordinated 
categorizing 93 existing steel and pre‐stressed concreted 
bridge structures by District, Structure No., Route, Recall 
No.,  Type,  Year  and  Design  Load.  Each  drawing  was 
obtained  through  DOTD  General  Files  and  all  roll 
numbers  were  marked.  All  data  was  placed  in  a 
spreadsheet  to  prioritize  prior  to  running  the  Bridge 
Loading software. Vessel collision guidelines considered 
under  1991  AASHTO  Guide  Specifications  and 
Commentary for Vessel. 
Bayou  Segnette  ‐  Lapalco  Blvd.  Bridge  (US90  to 
Westwood Dr.), Jefferson Parish, LA, 1998‐1999. Project 
Manager,  provided  impact  modeling  and  Section  4(f) 
Evaluation  including  new  Bridge  over  navigable 
waterway,  Bayou  Segnette  for  Section  10  permitting 
through  the  Bayou  Segnette  State  Park  of  a  two‐lane 
widening  and  navigable  canal  crossing  using  1991 
AASHTO  Guide  Specifications  and  Commentary  for 
Vessel. 
NEPA  AND  DESIGN  OF  TRANSPORTATION  & 
TRANSIT SYSTEMS  
DOTD  S.P.  700‐26‐0289,  NEPA  Environmental 
Assessment,  Veterans  Memorial  Boulevard  Widening, 
Jefferson Parish, LA, 2009‐2011. Provided NEPA EA for 
this  road  improvement  under  the  Urban  Systems 
Program  for  the  DOTD  and  the  Regional  Planning 
Commission.  Includes  a  Phase  I  ESA,  Wet‐land 
Delineation, Noise Study and familiarity with 24 CFR Part 
58, and other federal laws and authorities, including the 
National  Historic  Preservation  Act,  Executive  Order 
11988 (Floodplain Management), Executive Order 11990 
(Wetland  Protection),  Clean  Air  Act,  24  CFR  Part  51, 
Executive Order 12898 (Environmental Justice), Coastal 
Zone  Management  Act  of  1972,  Coastal  Barrier 
Resources Act of 1982, Endangered Species Act of 1973, 
and Wild and Scenic Rivers Act of 1968. 
DOTD  S.P.  736‐26‐0001,  NEPA  Environmental 
Assessment,  Earhart  Expressway/Causeway 
Interchange, Route LA 3139, Jefferson Parish, LA, 2005‐
2007.  Preparation  of  NEPA  documentation  to  support 
LADOTD’s  Feasibility  Study  for  interchange  to  connect 
the two highways included noise & air quality modeling. 
DOTD  S.P.  700‐26‐0254,  NEPA  Environmental 
Assessment,  Harvey  Boulevard  (Wall  Boulevard  to 
Peters Road), Jefferson Parish, LA, 2003‐2006. Provided 
NEPA  EA  for  this  road  improvement  under  the  Urban 
Systems  Pro‐gram  for  the  DOTD  and  the  Regional 
Planning  Commission.  Includes  a  Phase  I  ESA,  Wetland 
Delineation, Noise Study and familiarity with 24 CFR Part 
58, and other federal laws and authorities, including the 
National  Historic  Preservation  Act,  Executive  Order 
11988 (Floodplain Management), Executive Order 11990 
(Wetland  Protection),  Clean  Air  Act,  24  CFR  Part  51, 
Executive Order 12898 (Environmental Justice), Coastal 
Zone  Management  Act  of  1972,  Coastal  Barrier 
Resources Act of 1982, Endangered Species Act of 1973, 
and Wild and Scenic Rivers Act of 1968. 
DOTD  S.P.  700‐08‐0123,  NEPA  Environmental 
Assessment,  Hamilton  Road  (I‐20  to  Benton  Road), 
Bossier  Parish,  LA,  2004‐2006.  Provide  air  quality  and 
noise  modeling  as  part  of  preparation  of  EA  during 
project  planning.  Examined  multiple  alignments  and 
various  types  of  roadways  (divided,  curb‐and‐gutter, 
etc.)  
DOTD  S.P.  700‐52‐0124  (TIMED);  NEPA  Environmental 
Impact Statement (EIS); I‐12 to Bush, Route LA 3241, St. 
Tammany  Parish,  LA,  2003‐2006.  Preparation  of 
Environmental  Assessment  during  project  planning. 
Examined  multiple  alignments  and  various  types  of 
roadways (divided, curb and gutter, etc.) included noise 
and air quality modeling. 
DOTD  S.P.  700‐10‐0139,  NEPA  Environmental 
Assessment,  Relocated  LA  1138‐2,  Route  LA  1138‐2, 
Calcasieu,  LA,  2004‐2006.  Preparation  of  NEPA 
documentation  to  support  DOTD’s  Feasibility  Study  for 
interchange to connect the two highways included noise 
and air quality modeling. 
DOTD  S.P.  700‐26‐0078,  NEPA  Environmental 
Assessment,  Jones  Creek  Road,  East  Baton  Rouge 
Parish, LA, 2004‐2005. Preparation of the Environmental 
Assessment. Project involved widening an existing urban 
Dennis G. Lambert, P.E., MASCE 
 
 
8/11 
 
two‐lane facility to five‐lane facility included noise & air 
quality modeling. 
DOTD  S.P.  700‐26‐0258,  NEPA  Environmental 
Assessment,  Peters  Road  Widening,  Jefferson  Parish, 
LA,  2004‐2006.  Preparation  of  Environmental 
Assessment during project planning. Examined multiple 
alignments and various types of roadways (divided, curb 
and gutter, etc.) included noise and air quality modeling. 
DOTD  S.P.  700‐17‐0169,  NEPA  Environmental 
Assessment, Central Thruway, East Baton Rouge Parish, 
LA,  2002‐2003.  Noise  modeling  for  new  four‐lane, 
divided facility. 
DOTD  S.P.  742‐26‐0030,  NEPA  Environmental 
Assessment,  Lapalco  Blvd.  Extension  (US90  to 
Westwood  Dr.),  Jefferson  Parish,  LA,  1998‐1999. 
Provided  air,  noise  and  hydrologic  impact  modeling, 
Phase  I  ESAs,  oversaw  wet‐land  and  historical/cultural 
resources surveys, traffic projects, line & grade, Section 
4(f)  Evaluation  including  new  Bridge  over  Bayou 
Segnette (Section 10) through the Bayou Segnette State 
Park and two‐lane widening, etc. 
DOTD  S.P.  742‐26‐0029,  NEPA  Environmental 
Assessment, Lapalco Blvd. Extension (Westwood Dr. to 
Barataria  Boulevard),  Jefferson  Parish,  LA,  1998‐1999. 
Provided  air,  noise  and  hydrologic  impact  modeling, 
Phase  I  ESAs,  oversaw  wetland  and  historical/cultural 
resources surveys, traffic projections, line & grade, for a 
two‐lane widening, etc. 
Canal Street Streetcar (Redline) Emergency Installation 
of  a  Portable  Electric  Substation  provide  by  the 
Massachusetts  Bay  Transportation  Authority  (MBTA), 
Regional Transit Authority, Orleans Parish, LA, 2006. A 
22‐year‐old  portable  electric  substation  contained  in  a 
60ft tractor trailer was loaned by the MBTA to the RTA 
to  run  the  Redline  along  Canal  Street.  The  station 
contained  rectifiers  that  converted  alternating‐current 
electricity  into  the  direct  current.  Provided  permitting 
and oversight for the installation of the unit adjacent to 
the RTA Canal Street Facility along N. White Street.  
Canal Boulevard Streetcar & Bus Terminal, Fatal Flaws 
and  FTA  Categorical  Exclusion  Checklist, 
LA030072.1065.1372102T4, Regional Transit Authority, 
Orleans  Parish,  LA,  2005. Review of conceptual design 
for  the  terminal;  Review  of  the  NEPA  Environmental 
Impact  Statement  for  the  Canal  Street  Streetcar 
prepared  in  July  of  1997;  Review  of  the  Major 
Investment Study and the Canal Street Corridor Project 
prepared in March of 1995; Review of Geotechnical Data 
obtained for evaluation with respect to the conceptual 
design; Review of the funding sources for the extension 
project  and  its  compliance  under  Section 303(a)(51)  of 
TEA‐21, the Full Funding Grant Agreement and Section 
5309  New  Starts  funding  requirements;  Reviewed  the 
System  Linkage,  Streetcar  Capacity,  Transportation 
Demand, and Governmental  Authority and  Funding  (as 
discussed  above);  Prepared  the  Environmental  Fatal 
Flaws  Analysis  of  the  project;  Prepared  the  Technical 
Feasibility  of  the  project;  and  Prepared  the  Financial 
Implications of the project. Prepared the Supplement to 
the Categorical Exclusion Checklist (Section 771.117(d)) 
which  included:  Detailed  Project  Description;  Location; 
Metropolitan  Planning  and  Air  Quality  Conformity; 
Zoning;  Traffic  Impacts;  CO  Hot  Spots;  Historic 
Resources; Noise; Vibration; Acquisitions & Relocations; 
Hazardous  Materials;  Community  Disruption  and 
Environmental  Justice;  Use  of  Public  Parkland  and 
Recreation  Areas;  Impact  on  Wetlands;  Floodplain 
Impacts;  Impacts  on  Water  Quality,  Navigable 
Waterways  &  Coastal  Zone;  Impacts  on  Ecologically‐
Sensitive  Areas  and  Endangered  Species;  Impacts  on 
Safety  and  Security;  and  Impacts  Caused  by 
Construction.  
NOAB  15‐07‐01,  North  Perimeter  Road  Improvements 
and  Runway  6‐24  Conversion  Design  Services,  Louis 
Armstrong  International  Airport,  2009‐2011.  Provided 
design  engineering  services  for  North  Perimeter  Road 
and the conversion of Runway 6‐24 to a Taxiway. 
DPW 2005‐E02, Design of Old Spanish Trail, City of New 
Orleans, LA, 2008‐2012. Provided design services for the 
project,  which  involved  total  reconstruction,  concrete 
and asphalt and all utilities (water, sewer and drainage). 
DOTD  S.P.  H.007213,  Veterans  Memorial  Boulevard 
Expansion,  City  of  Kenner,  LA,  2008‐2012.  Provide 
Dennis G. Lambert, P.E., MASCE 
 
 
9/11 
 
design services for the widening of Veterans Memorial 
Boulevard  (four‐lane  Boulevard)  from  Loyola  Drive  to 
the  St.  Charles  Parish  line.  The  project  also  includes 
bridge replacement. 
DOTD  S.P.  742‐26‐0056,  Lapalco  Boulevard  Overlay 
(Murphy  Canal  to  Brooklyn Avenue),  Jefferson  Parish, 
LA,  2005‐2007.  Provided  design  services  for  asphalt 
overlay and curb & gutter reconstruction. 
DOTD S.P. 713‐36‐0100 [Construction Inspection]; Off‐
System Highway Bridge Program, Bayou St. John (Park 
Island),  Orleans  Parish,  LA,  2010‐2012.  Providing 
construction & inspection services for the project. 
DOTD S.P. 742‐36‐0116 [Construction Inspection], FAP 
No.  STE‐3602(512);  Fleur  de  Lis  Drive  Improvements, 
Phase  I;  Orleans  Parish,  LA,  2007‐2009.  Provided 
construction inspection services for this project. 
DOTD S.P. 700‐92‐0016 (TIMED); Florida Avenue Bridge 
– Poland Avenue/Alvar Streetto Tupelo Street, Orleans 
Parish,  LA,  2005‐2007.  Preliminary  &  final  plans  and 
specifications peer review & constructability review for 
the  Florida  Ave  Bridge  over  the  Inner  Harbor 
Navigational  Canal.  Tasks  include  constructability 
research,  use  of  Accelerated  Construction  Technology 
Transfer (ACTT), and investigation/preparation to reduce 
impact on traffic disruptions on rehabilitation segments 
along  with  identifying  all  utilities  such  as  a  48"  water 
main. 
I‐49 Alignment Coordination for Jefferson Parish, Bayou 
Segnette/Lake  Cataouatche  Study  Area,  Jefferson 
Parish, LA, 2005‐2007. Alignment review: future street, 
sewer, drainage, and water evaluation. 
31st  Street  Design  –  Overlay  &  Total  Reconstruction 
Design/Construction Engineering & Inspection Services, 
City  of  Kenner,  LA,  2002‐2003.  Design  the  overlay  & 
total reconstruct segments of 31st Street which includes 
an analysis of the drainage System and pumping Station 
present.  The  analysis  consisted  of  an  evaluation  of  all 
utilities  including  waterlines.  Features  of  the  drainage 
system  and  subsequent  evaluation  recommended  the 
need  for  improvements  which  included  waterlines  & 
other utilities with the greatest impact/positive effect on 
the  system,  while  minimizing  capital  outlay. 
Recommendations were made for improvements to the 
Drainage  System  using  StormCAD  and  checked  against 
the  Rational  Method.  Also  provided  construction 
administration. 
Rio Vista Subdivision Design, Jefferson Parish, LA, 2005‐
2007. Designed a 34 Lot Subdivision which includes an 
analysis of new drainage, water and sewer infrastructure 
and  tie‐in.  Analysis  consisted  of  an  evaluation  of  the 
hydrological and hydraulic features of the three systems. 
Accompanying the evaluation is a recommendation for 
the  improvement  which  included  elements  of  the 
system that will have the greatest positive effect on the 
system, while minimizing capital investment. 
DOTD  S.P.  744‐52‐0020;  Tammany  Trace  Bicycle 
Tunnel,  St.  Tammany  Parish,  LA,  2001‐2002.  Prepared 
the Tammany Trace Bicycle Tunnel Traffic Plan. 
DOTD S.P. 245‐90‐0051; Bayou Dularge Pier Protection 
System  (includes  Bridge  Hydraulic  Analysis,  Marine 
Structural  Assessment/Vessel  Collision)  Terrebonne 
Parish,  LA,  2000‐2001.  Prepared  a  Claim  for  Equitable 
Adjustment on behalf of the contractor. The basis of the 
claim was due to a gross benchmark error in hydraulic 
data  discovered  during  construction  oversight.  The 
DOTD  reported  the  benchmark  as  the  vertical  control 
point at elevation +9.0 NAVD 88. Subsequent surveys by 
CMC and LDOTD proved the correct elevation to be at 
+7.3  NAVD  88,  an  error  of  1.7  feet.  Claim  included:  
Significant  error  in  the  vertical  control  point  elevation 
affecting  Item  No.  805(07),  Class  S  Concrete,  Item  No. 
805(02),  Class  A(m)  Concrete,  Item  No.  806(01) 
Deformed Reinforced Steel and Item No. 804(04)J, Pipe 
Piles;    Failure  to  convert  the  datum  properly  affecting 
Item  No.  805(07),  Class  S  Concrete,  Item  No.  805(02), 
Class  A(m)  Concrete,  Item  No.  806(01)  Deformed 
Reinforced Steel and Item No. 804(04)J, Pipe Piles; Lack 
of  historical  data  for  high  tide  and  low  tide  between 
circa 1975 and 1998 affecting Item No. 805(07), Class S 
Concrete,  Item  No.  805(02),  Class  A(m)  Concrete,  Item 
No.  806(01)  Deformed  Reinforced  Steel  and  Item  No. 
804(04)J, Pipe Piles; Incorrect number of units on Item 
No. 202(02)I, Removal of Existing Timber Fender System; 
Dennis G. Lambert, P.E., MASCE 
 
 
10/11 
 
Unforeseen conditions, such as obstructions and welded 
structural  elements,  to  Item  No.  202(02)J,  Removal  of 
Existing Dolphins. 
DOTD  S.P.  700‐99‐0197;  Bridge  Load  Rating  LFM 
Update contract for District 02 & 07, 1999. Responsible 
for  categorizing  93  existing  steel  and  pre‐stressed 
concreted  bridge  structures  by  District,  Structure  No., 
Route,  Recall  No.,  Type,  Year  and  Design  Load.  Each 
drawing was obtained through DOTD General Files and 
all roll numbers were marked. All data was placed in a 
spreadsheet  to  prioritize  prior  to  running  the  Bridge 
Loading software. 
MUNICIPAL & PUBLIC WORKS/UTILITIES 
Hazard  Mitigation  Plan  for  the  Sewerage  &  Water 
Board  of  New  Orleans,  Sewerage  &  Water  Board  of 
New Orleans Office of Emergency Management and the 
Environmental Affairs Division, New Orleans, LA, 2008‐
2010.  Provided  a  Hazard  Mitigation  Plan  to  include 
vulnerability  analysis  and  hazards  to  critical  facilities, 
identifying  repetitive  losses  and  how  to  reduce  those 
losses  and  decrease  the  response  time  to  a  natural  or 
man‐made  hazards.  The  purpose  of  the  Plan  is  also  to 
integrate  Hazard  Mitigation  strategies  into  the  day‐to‐
day activities and programs of the Sewerage and Water 
Board of New Orleans (S&WB). The plan was prepared 
to meet the Disaster Mitigation Act of 2000 (DMA 2000) 
requirements in order to maintain the S&WB’s eligibility 
for the Federal Emergency Management Agency (FEMA) 
Pre‐Disaster  Mitigation  (PDM)  and  Hazard  Mitigation 
Grant  Programs  (HMGP).  More  importantly,  the  plan 
and  planning  process  lays  out  the  strategy  that  will 
enable  the  S&WB  to  become  less  vulnerable  to  future 
disaster losses. 
Sewer  Improvement  Program  ‐  42nd  &  Illinois  Force 
Main  Design,  City  of  Kenner,  LA,  2009‐2010.  Provide 
design  services  for  the  replacement  of  an  existing  12” 
sewer  force  main  approximately  2  miles  from  42nd 
Street to Illinois Street. The project, which encompasses 
approximately  $800,000  in  construction,  includes 
analysis  of  the  existing  condition  of  the  sewer  force 
main  defined  and  recommendations  (replace  where 
applicable and required). It further includes the design 
of a canal crossing where appropriate (either above or 
below canal cross‐section) and utility conflicts with other 
utilities such as waterlines. 
Iris  Avenue  Waterline  Replacement  Project,  Council 
District 2, Jefferson Parish, LA, 2010‐2012. Provided to 
provide  design  engineering  services  for  this  waterline 
replacement  project  in  Council  District  2  of  Jefferson 
Parish. 
Program  Management  for  Identifying  and  Obtaining 
Funding Sources for New or Rehabilitated Facilities to 
Restore  Infrastructure  damaged  by  Hurricane  Katrina, 
City  of  Gretna,  LA,  2009‐2011.  Services  included 
identifying  and  obtaining  funding  sources  for  new  or 
rehabilitated  facilities  to  restore  infrastructure  of  the 
City of Gretna that was damaged by Hurricane Katrina. 
This  Program  Management  requires  knowledge  of 
policies,  procedures  and  programs  of  the  Federal 
Emergency  Management  Agency  (FEMA),  the 
Governor’s Office of Homeland Security (GOSHEP), and 
the  Louisiana  Recovery  Authority  (LRA)  and  any  other 
agency  that  oversees  Hurricane  Recovery  programs  in 
the State of Louisiana. Reviewed of all waterline related 
PWs. 
Barataria  Waterline  Extension  (McMurtry  Street  to 
Trahan  Street,  Crown  Point),  JPPW  2001‐009‐WR, 
Crown Point, Jefferson Parish, LA, 2005‐2007. Provided 
design and construction administration services for this 
waterline project and resident inspection. 
ENVIRONMENTAL ENGINEERING 
Brownfields  Phase  I,  Phase  II  Environmental  Site 
Assessments,  RECAP  Study  and  QAPP,  Former 
Bennigan’s Restaurant (Corner of Veterans & Severn), 
Jefferson  Parish,  LA,  2010‐2011.  Prepared  Phase  I  & 
Phase II ESA,  QAPP for Brownfields and RECAP Study. 
Brownfields  Phase  I  &  II  Environmental  Site 
Assessment, Old Davis Concrete Plant, Jefferson Parish, 
LA,  2009.  Performed  Phase  I  &  II  ESA  for  Old  Davis 
Concrete  Plant  from  Task  order  from  Res.  105956, 
Miscellaneous Environmental Services. 
Dennis G. Lambert, P.E., MASCE 
 
 
11/11 
 
South  New  Orleans  Subdivision  (Squares  6  &  7), 
Petroleum  Assessment  Grant,  Proj  #EPA‐BFS‐JP‐CS, 
Regional  Planning  Commission  Brown‐fields 
Redevelopment Program, Jefferson Parish, Harvey, LA, 
2007. Provided Phase I ESA 
Brownfields  Phase  II  Environmental  Site  Assessment, 
Midship Marine, Jefferson Parish, LA, 2004. Performed 
Phase II ESA for the old Texaco/Chevron Pipe Laydown 
yard on the Harvey Canal. 
Louisiana  National  Guard,  Camp  Beauregard  Training 
Facility  including  Firing  Ranges,  Pineville,  LA,  2003‐
2005.  Provided  engineering  &  planning  services 
(Environmental  Installation  Management  Plan), 
including  7  firing  ranges  and  various  other  military 
operations  included  noise  modeling  for  firing  ranges, 
roads and airport/heliport facilities. 
Louisiana National Guard, Camp Villere Training Facility 
including Firing Ranges, Slidell, LA, 2003‐2005. Provided 
engineering  &  planning  services  (Environmental 
Installation Management Plan), including 4 firing ranges 
and  various  other  military  operations  included  noise 
modeling for firing ranges, roads and heliport facilities. 
Air  Quality  Technical  Consultant,  Shreveport‐Bossier 
City  MSA  Caddo,  Webster,  and  Bossier  Parishes,  LA, 
2003‐2004.  Responsible  for  inventories  of  marine  and 
stationary  sources  based  on  the  U.S.  EPA  National 
Emission  Inventory,  Version  2  database.  Compiled 
emission inventories for stationary & mobile sources for 
this Early Action Compact Regional Air Quality Modeling 
included seasonal and temporal allocation factors from 
the  top  fifteen  15  nitrogen  oxide  (NOx)  industrial 
emission  point  sources  in  Bossier,  Caddo  and  Webster 
Parishes.  The  plants  included  Minden  Gas  Plant, 
Springhill Compressor Station, ADA Plant and State Line 
Compressor  Station.  Also  responsible  for  input  in 
running  MOBILE6  with  average  in‐use  fleet  emission 
factors for volatile organic compounds (VOC), oxides of 
nitrogen  (NOx)  and  carbon  mon‐oxide  (CO)  for  eight 
categories of vehicles. 
Sempra  Energy  Resources:  Bonnet  Carré  Facility  Gas 
Turbine  Installation  (including  Railroad  ROW  Impact 
Assessment),  St.  John  the  Baptist  Parish,  LA,  2003. 
Provided noise modeling for gas turbine plant including 
rail noise. 
FEMA  Debris  Inspection  for  Hurricanes  Lili  &  Isadore, 
Jefferson Parish, LA, 2002. Provided inspection services 
for debris hauling. 
Churchill  Energy/CVS  Holding,  Starks  Gas  Field  Air 
Emissions Inventories and Title V Permitting, Starks, LA, 
2002‐2003.  Provided  emissions  estimates  for  flare, 
tanks,  glycol  reboilers  and  general  operations  at  the 
Starks Gas Field. 
Old  Matlack  Truck  Wash  (now  managed  by  Quality 
Carriers)  RECAP  Investigation  &  Voluntary  Cleanup 
Program,  St.  Rose,  LA,  2002.  RECAP  Investigation, 
includes  evaluation  of  foundations  (pilings,  reinforced 
concrete,  12‐inch  concrete  slag,  etc.)  surrounded  by 
diesel‐contaminated soils. 
Louisiana DEQ Type III Permitting and Conditional Use 
Permit,  City  of  New  Orleans,  LA,  2002.  Provided 
permitting  of  construction  &  demolition  landfill  and 
supporting plans and drawings. 
Regional  Planning  Commission  ‐  Brownfields 
Redevelopment Initiative (originally for the Parishes of 
Jefferson,  Orleans,  Plaquemines,  St.  Bernard  and  St. 
Tammany, LA, 1999‐2000. Provided Phase I ESAs. 
QAPP for the David Drive Jefferson Parish Incinerator, 
Jefferson, LA, 2000. Provided QAPP for Phase II ESA. 
Landfill Gas Collection Plan & Title V Permitting, Kelvin 
Tract, Waggaman, LA, 1998‐1999. Provided landfill gas 
collection  design  services  and  air  permitting  for 
Jefferson Parish. 

More Related Content

What's hot

Sequoia Park Pond Retrofit Project
Sequoia Park Pond Retrofit ProjectSequoia Park Pond Retrofit Project
Sequoia Park Pond Retrofit ProjectFairfax County
 
R.sres final
R.sres finalR.sres final
R.sres finalrpsresov
 
Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Fairfax County
 
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingDraft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingFairfax County
 
Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015Fairfax County
 
WISE Products and Services
WISE Products and ServicesWISE Products and Services
WISE Products and ServicesGary Moody
 
BBarton resume
BBarton resumeBBarton resume
BBarton resumeBen Barton
 
Jessop - Example OtterTail Projects_160317
Jessop - Example OtterTail Projects_160317Jessop - Example OtterTail Projects_160317
Jessop - Example OtterTail Projects_160317Mark Jessop
 
Accotink Creek Watershed Project Wakefield Park North
Accotink Creek Watershed Project  Wakefield Park NorthAccotink Creek Watershed Project  Wakefield Park North
Accotink Creek Watershed Project Wakefield Park NorthFairfax County
 
Tripps Run Stream Improvement
Tripps Run Stream ImprovementTripps Run Stream Improvement
Tripps Run Stream ImprovementFairfax County
 
Sept 2015 LRA Lori_Robison
Sept 2015 LRA Lori_Robison Sept 2015 LRA Lori_Robison
Sept 2015 LRA Lori_Robison Lori Robison
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Fairfax County
 
Autumnwood Park Pond Retrofit Project
Autumnwood Park Pond Retrofit ProjectAutumnwood Park Pond Retrofit Project
Autumnwood Park Pond Retrofit ProjectFairfax County
 
Keynote: Science in Large Scale River Restoration - Dahm
Keynote: Science in Large Scale River Restoration - DahmKeynote: Science in Large Scale River Restoration - Dahm
Keynote: Science in Large Scale River Restoration - DahmWillamette River Initiative
 

What's hot (20)

Sequoia Park Pond Retrofit Project
Sequoia Park Pond Retrofit ProjectSequoia Park Pond Retrofit Project
Sequoia Park Pond Retrofit Project
 
R.sres final
R.sres finalR.sres final
R.sres final
 
Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015Dead Run Stream Restoration Public Meeting June 9, 2015
Dead Run Stream Restoration Public Meeting June 9, 2015
 
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public MeetingDraft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
Draft TMDL Action Plans for Sediment, Bacteria, and PCBs Public Meeting
 
Amiya Resume - Apr 2016
Amiya Resume - Apr 2016Amiya Resume - Apr 2016
Amiya Resume - Apr 2016
 
Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015Dead Run Stream Restoration Public Meeting May 19, 2015
Dead Run Stream Restoration Public Meeting May 19, 2015
 
WISE Products and Services
WISE Products and ServicesWISE Products and Services
WISE Products and Services
 
BBarton resume
BBarton resumeBBarton resume
BBarton resume
 
Jessop - Example OtterTail Projects_160317
Jessop - Example OtterTail Projects_160317Jessop - Example OtterTail Projects_160317
Jessop - Example OtterTail Projects_160317
 
Small dams
Small damsSmall dams
Small dams
 
Poope and dean 1986
Poope and dean 1986Poope and dean 1986
Poope and dean 1986
 
Future gen feis_noa_64618
Future gen feis_noa_64618Future gen feis_noa_64618
Future gen feis_noa_64618
 
Accotink Creek Watershed Project Wakefield Park North
Accotink Creek Watershed Project  Wakefield Park NorthAccotink Creek Watershed Project  Wakefield Park North
Accotink Creek Watershed Project Wakefield Park North
 
Tripps Run Stream Improvement
Tripps Run Stream ImprovementTripps Run Stream Improvement
Tripps Run Stream Improvement
 
LP Linked In Resume
LP Linked In ResumeLP Linked In Resume
LP Linked In Resume
 
D Michael Chapin_CV
D Michael Chapin_CVD Michael Chapin_CV
D Michael Chapin_CV
 
Sept 2015 LRA Lori_Robison
Sept 2015 LRA Lori_Robison Sept 2015 LRA Lori_Robison
Sept 2015 LRA Lori_Robison
 
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
Annual Contract for Stream and Water Quality Improvements: Golden Woods Pond ...
 
Autumnwood Park Pond Retrofit Project
Autumnwood Park Pond Retrofit ProjectAutumnwood Park Pond Retrofit Project
Autumnwood Park Pond Retrofit Project
 
Keynote: Science in Large Scale River Restoration - Dahm
Keynote: Science in Large Scale River Restoration - DahmKeynote: Science in Large Scale River Restoration - Dahm
Keynote: Science in Large Scale River Restoration - Dahm
 

Similar to Coastal Engineer's 27 Years of Experience

USACE Galveston: Coastal Project Updates - Sharon Manzella Tirpak
USACE Galveston: Coastal Project Updates - Sharon Manzella TirpakUSACE Galveston: Coastal Project Updates - Sharon Manzella Tirpak
USACE Galveston: Coastal Project Updates - Sharon Manzella TirpakTWCA
 
Mofidi Alex (Full 6 09)
Mofidi Alex (Full 6 09)Mofidi Alex (Full 6 09)
Mofidi Alex (Full 6 09)AlexMofidi
 
110310 Resume
110310 Resume110310 Resume
110310 Resumeafowler
 
Introduction To M Kyte
Introduction To M KyteIntroduction To M Kyte
Introduction To M KyteMichaelKyte
 
Introduction to Biohabitats presentation public meeting number one 02 11-21
Introduction to Biohabitats presentation public meeting number one 02 11-21Introduction to Biohabitats presentation public meeting number one 02 11-21
Introduction to Biohabitats presentation public meeting number one 02 11-21Fairfax County
 
2008 Engineering Excellence Awards
2008 Engineering Excellence Awards 2008 Engineering Excellence Awards
2008 Engineering Excellence Awards ACECSDES
 
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015Fairfax County
 
Max KroschelResume061715
Max KroschelResume061715Max KroschelResume061715
Max KroschelResume061715Max Kroschel
 
Ga presentation - scc capitol lake 10-12-10a
Ga presentation - scc capitol lake 10-12-10aGa presentation - scc capitol lake 10-12-10a
Ga presentation - scc capitol lake 10-12-10aolydert
 

Similar to Coastal Engineer's 27 Years of Experience (20)

Nerrs research for web
Nerrs research for webNerrs research for web
Nerrs research for web
 
Henderson Sess14 101309
Henderson Sess14 101309Henderson Sess14 101309
Henderson Sess14 101309
 
Zemitis_Resume
Zemitis_ResumeZemitis_Resume
Zemitis_Resume
 
Wax lake studio for web
Wax lake studio for webWax lake studio for web
Wax lake studio for web
 
Wax lake studio for web
Wax lake studio for webWax lake studio for web
Wax lake studio for web
 
USACE Galveston: Coastal Project Updates - Sharon Manzella Tirpak
USACE Galveston: Coastal Project Updates - Sharon Manzella TirpakUSACE Galveston: Coastal Project Updates - Sharon Manzella Tirpak
USACE Galveston: Coastal Project Updates - Sharon Manzella Tirpak
 
Mofidi Alex (Full 6 09)
Mofidi Alex (Full 6 09)Mofidi Alex (Full 6 09)
Mofidi Alex (Full 6 09)
 
Fabricating the delta for web
Fabricating the delta for webFabricating the delta for web
Fabricating the delta for web
 
110310 Resume
110310 Resume110310 Resume
110310 Resume
 
Introduction To M Kyte
Introduction To M KyteIntroduction To M Kyte
Introduction To M Kyte
 
Introduction to Biohabitats presentation public meeting number one 02 11-21
Introduction to Biohabitats presentation public meeting number one 02 11-21Introduction to Biohabitats presentation public meeting number one 02 11-21
Introduction to Biohabitats presentation public meeting number one 02 11-21
 
resume 2017
resume 2017resume 2017
resume 2017
 
JM Portfolio 04-2016
JM Portfolio 04-2016JM Portfolio 04-2016
JM Portfolio 04-2016
 
Jason Abendroth Resume_10_2015
Jason Abendroth Resume_10_2015Jason Abendroth Resume_10_2015
Jason Abendroth Resume_10_2015
 
2008 Engineering Excellence Awards
2008 Engineering Excellence Awards 2008 Engineering Excellence Awards
2008 Engineering Excellence Awards
 
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
Long Branch Tributary at Long Branch Falls Park Public Meeting 8-20-2015
 
Max KroschelResume061715
Max KroschelResume061715Max KroschelResume061715
Max KroschelResume061715
 
Resume-Vrsalovich 2015
Resume-Vrsalovich 2015Resume-Vrsalovich 2015
Resume-Vrsalovich 2015
 
MindyBrooksResume
MindyBrooksResumeMindyBrooksResume
MindyBrooksResume
 
Ga presentation - scc capitol lake 10-12-10a
Ga presentation - scc capitol lake 10-12-10aGa presentation - scc capitol lake 10-12-10a
Ga presentation - scc capitol lake 10-12-10a
 

Recently uploaded

Motivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdfMotivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdfakankshagupta7348026
 
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)Basil Achie
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@vikas rana
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfhenrik385807
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024eCommerce Institute
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝soniya singh
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...NETWAYS
 
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
LANDMARKS  AND MONUMENTS IN NIGERIA.pptxLANDMARKS  AND MONUMENTS IN NIGERIA.pptx
LANDMARKS AND MONUMENTS IN NIGERIA.pptxBasil Achie
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSebastiano Panichella
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...NETWAYS
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Pooja Nehwal
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptssuser319dad
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AITatiana Gurgel
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxFamilyWorshipCenterD
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringSebastiano Panichella
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...henrik385807
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfhenrik385807
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Kayode Fayemi
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxmavinoikein
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...NETWAYS
 

Recently uploaded (20)

Motivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdfMotivation and Theory Maslow and Murray pdf
Motivation and Theory Maslow and Murray pdf
 
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
NATIONAL ANTHEMS OF AFRICA (National Anthems of Africa)
 
call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@call girls in delhi malviya nagar @9811711561@
call girls in delhi malviya nagar @9811711561@
 
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdfOpen Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
Open Source Strategy in Logistics 2015_Henrik Hankedvz-d-nl-log-conference.pdf
 
George Lever - eCommerce Day Chile 2024
George Lever -  eCommerce Day Chile 2024George Lever -  eCommerce Day Chile 2024
George Lever - eCommerce Day Chile 2024
 
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
Call Girls in Sarojini Nagar Market Delhi 💯 Call Us 🔝8264348440🔝
 
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
Open Source Camp Kubernetes 2024 | Monitoring Kubernetes With Icinga by Eric ...
 
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
LANDMARKS  AND MONUMENTS IN NIGERIA.pptxLANDMARKS  AND MONUMENTS IN NIGERIA.pptx
LANDMARKS AND MONUMENTS IN NIGERIA.pptx
 
SBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation TrackSBFT Tool Competition 2024 -- Python Test Case Generation Track
SBFT Tool Competition 2024 -- Python Test Case Generation Track
 
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
OSCamp Kubernetes 2024 | SRE Challenges in Monolith to Microservices Shift at...
 
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
Navi Mumbai Call Girls Service Pooja 9892124323 Real Russian Girls Looking Mo...
 
Philippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.pptPhilippine History cavite Mutiny Report.ppt
Philippine History cavite Mutiny Report.ppt
 
Microsoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AIMicrosoft Copilot AI for Everyone - created by AI
Microsoft Copilot AI for Everyone - created by AI
 
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptxGenesis part 2 Isaiah Scudder 04-24-2024.pptx
Genesis part 2 Isaiah Scudder 04-24-2024.pptx
 
The 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software EngineeringThe 3rd Intl. Workshop on NL-based Software Engineering
The 3rd Intl. Workshop on NL-based Software Engineering
 
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
CTAC 2024 Valencia - Sven Zoelle - Most Crucial Invest to Digitalisation_slid...
 
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdfCTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
CTAC 2024 Valencia - Henrik Hanke - Reduce to the max - slideshare.pdf
 
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
Governance and Nation-Building in Nigeria: Some Reflections on Options for Po...
 
Work Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptxWork Remotely with Confluence ACE 2.pptx
Work Remotely with Confluence ACE 2.pptx
 
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
OSCamp Kubernetes 2024 | Zero-Touch OS-Infrastruktur für Container und Kubern...
 

Coastal Engineer's 27 Years of Experience

  • 1.   Dennis G. Lambert, P.E., MASCE       POSITION:    Chief Market Manager, COWI Marine North America    SPECIALIZATION:  Coastal, Marine and Environmental Engineering     YEARS EXPERIENCE:  27    EDUCATION:                2000          M.S., Environmental Engineering: Numerical Modeling, Tulane  University          1996           B.S., Civil Engineering: Structural Emphasis, Tulane University  1996           B.S., Environmental Engineering: Numerical Modeling, Tulane  University (Dean's List, 1995)    REGISTRATIONS:                     Registered Civil Engineer, 2000, LA PE.0029326  Registered Environmental Engineer, 2000, LA PE.0029326    MEMBER:                     Member of the American Society of Civil Engineers (1988)    Member of the ASCE Coasts, Oceans Ports, & Rivers Institute (2001)  ASCE T&DI Louisiana Chapter Executive Committee (2008)  ASCE COPRI Louisiana Chapter Executive Committee (2012)  ASCE COPRI Waterways Committee (2014)  ASCE COPRI Ports & Harbors Committee (2014)  ASCE COPRI P3 for Waterways Chair (2014)   Louisiana Civil Engineering Conference & Show Committee Member  Tulane School of Science & Engineering Council  Louisiana Engineering Society  Construction Specifications Institute   Prestressed Concrete Institute   Society of Tulane Engineers / Tulane Engineering Forum Planning Committee   American Consulting Engineering Council's Environmental Committee   NCEES Environmental Engineering PE Exam Committee Member    Louisiana Coastal Sand Management Working Group    KEY QUALIFICATIONS  Mr.  Lambert's  work  has  focused  on  coastal,  marine  &  environmental  engineering  including the interface between navigation and ecosystem restoration, navigation and  flood protection, marine design, basin‐wide modeling and barrier island restoration.  His  marine  experience  includes  marine  terminals,  marinas,  boat  launches  and  bulkheads,  docks  and  wharfs,  dredging,  barge  loading  and  unloading,  barge  traffic  analysis and vessel collision.       
  • 2. Dennis G. Lambert, P.E., MASCE      2/11    DIVERSIONS,  ECOSYSTEM  RESTORATION,  FLOOD  PROTECTION & HYDRAULIC ENGINEERING   Lower  Mississippi  River  Diversion,  Mid  Barataria  Sediment  Diversion,  BA‐153,  Plaquemines  Parish,  LA,  2014  ‐  Date.  Independent  Technical  Review  Team  Member  responsible  for  reviewing  and  optimizing  design  for  this  keystone  ecosystem  restoration  project  including  hydraulic  modeling  and  ship  simulation  modeling.  Lower  Mississippi  River  Diversion,  Mid  Breton,  Lower  Barataria  and  Lower  Breton  Sediment  Diversion,  BA‐ 153, Plaquemines Parish, LA, 2014 ‐ Date. Independent  Technical  Review  Team  Member  responsible  for  reviewing  and  optimizing  design  for  this  keystone  ecosystem  restoration  project  including  hydraulic  modeling and ship simulation modeling.  Lower  Mississippi  River  Diversion,  Delta  Building  at  Myrtle  Grove,  BA‐33,  LaFourche,  Jefferson  and  Plaquemines Parishes, LA, 2005. Project Team Member  and  coordinated  NEPA  EIS  scoping  for  this  large  civil  works  ecosystem  restoration  project  and  basin  wide  modeling under LCA including navigation impacts.  Lower  Mississippi  River  Diversion,  Small  Freshwater  Diversion to the Northwestern Barataria Basin (BA‐34,  PPL10)  Project  Area  and  Vicinity,  St.  James  and  Lafourche  Parishes,  LA,  2005.  Project  Team  Member  and  coordinated  initial  surveying  and  data  collection  efforts to restore and maintain selected cypress‐tupelo  swamp tracts in the upper Barataria Basin.  Barataria  Bay,  Basin  Hydrodynamic  Model  Review  &  Development  of  New  Model,  LaFourche,  Jefferson,  &  Plaquemines  Parishes,  LA,  2003‐2005.  Project  Team  Member and coordinated with the USACE on exchange  of  Bathymetric  Data  included  meetings  with  the  Hydraulic  Branch  of  the  New  Orleans  District  and  collaboration  between  the  Donaldsonville  to  the  Gulf  and Morganza to the Gulf levee projects and LCA.  Design  and  Construction  of  Improvements  to  the  Bonnabel  Canal,  Jefferson  Parish,  LA,  2008‐2012.  Project  Team  Member  and  provided  engineering  support  services  on  the  project,  which  includes  the  construction  of  concrete  box  culverts/concrete  flume,  design of two off‐system bridge replacements, road‐way  replacement,  and  miscellaneous  public  utilities  (water  and  sewer)  from  the  south  end  of  Veterans  Blvd.  to  West  Esplanade  Ave.  Additional  project  elements  include  surveying,  geotechnical,  electrical  (street  lighting), preparation of right‐of‐way plans (as required),  and traffic engineering related services. The box culvert  is within tight drainage servitude across various private  utility  and  State  R/Ws.  The  conveyances  are  approx.  1  mile.  Flood Risk Assessment and Hazard Mitigation Plan for  the Sewerage & Water Board of New Orleans (S&WB),  New  Orleans,  LA,  2008‐2012.  Project  Manager  –  provided  a  Hazard  Mitigation  Plan  to  include  vulnerability  assessments,  risk  analysis  and  identifications of hazards to critical facilities, identifying  repetitive  losses  and  how  to  reduce  those  losses  and  decrease  the  response  time to  a natural  or  man‐made  hazards. The purpose of the plan was also to integrate  risk and hazard mitigation strategies into the day‐to‐day  activities.  The  plan  was  prepared  to  meet  the  Disaster  Mitigation  Act  of  2000  (DMA  2000)  requirements  in  order to maintain the S&WB’s eligibility for the Federal  Emergency  Management  Agency  (FEMA)  Pre‐Disaster  Mitigation (PDM) and Hazard Mitigation Grant Programs  (HMGP). The review included the Emergency Operation  Plan, the Operation and Maintenance Plan, the Orleans  Parish  Hazard  Mitigation  Plan,  the  Louisiana  Hazard  Mitigation  Plan,  Storm  proofing  Pumping  Stations  to  improve  resiliency  of  pump  stations  during  and  after  hazard  occurrences,  reduce  the  impact  of  flood  and  flood related hazards on critical pumping infrastructure,  retrofit  pump  stations  to  protect  components  from  damage,  Enhance/Expand  Power  Generation  including  expanded  power  generation  capability  ensuring  continuous  operating  capability  of  pump  and  drainage  facilities, as well as water and sewer operations, reduce  the risk of hazard caused power outages that interrupt  critical  operations  and  protect  critical  network  components to implement specific protective measures  to  fortify  critical  facilities,  reduce  the  risk  of  flood  related  hazards  and  ensure  continued  operation.  The 
  • 3. Dennis G. Lambert, P.E., MASCE      3/11    plan ultimately assisted the S&WB in securing $141M in  hazard  mitigation  grant  funds  for  the  Retrofit  Power  Plant Hazard Mitigation Grant Project.  Canal Bank Rehabilitation (Hurricane Gustav) District 5,  Jefferson  Parish,  LA,  2010.  Project  Manager,  provided  design  engineering  services  to  prepare  plans  and  specifications,  including  topographic  survey,  geotechnical  and  resident  inspection  for  repairs  and  restoration of certain canal banks and waterways from  damage caused by Hurricane Gustav. The restoration of  these  banks  is  being  funded  by  the  USDA‐NCRSEWP,  whereby Damage Survey Reports (DSRs) were generated  identifying said banks. The DSRs included in this scope  are  DSR  Nos.  051‐08‐042G,  051‐08‐008G  and  051‐08‐ 001G.   Lake  Cataouatche  Levee  Basin,  Jefferson  Parish,  LA,  2005‐2007.  Project  Manager,  responsible  for  Watershed/Master 404 Services for 9,500+ acres, which  includes  hydraulic  and  hydrodynamic  modeling,  storm  surge  modeling  and  wetland  delineations.  Master  404  Services  for  9500+  acres  which  includes  hydraulic  &  hydrodynamic modeling, storm surge modeling, wetland  delineations, soil identification, plant identification, base  flood  elevations,  topographical  interpolation/LIDAR,  borrow pit coordination with USACE, geotechnical data  analysis,  coordination  with  USACE  HTRW  studies  and  coordination with cultural resource studies.  Terrebonne  Bay,  Whiskey  Island  West  Flank  Restoration; Terrebonne Parish, LA, 2004‐2005. Project  Manager,  providing  coastal  engineering  support  for  a  study to restore the west flank of Whiskey Island (one of  five barrier islands comprising Louisiana’s Isles Dernieres  barrier  island  chain).  The  chain  of  barrier  islands  is  experiencing continued land loss and fragmentation as a  result  of  both  natural  processes  and  human  activity.  Coastal  engineering,  modeling,  and  design  framework  based  on  the  adaptive  management  approach  as  recommended is the recently released LCA Report was  developed. This framework incorporated lessons learned  from  the  design,  construction  and  monitoring  of  previous  coastal  restoration  projects  in  Louisiana,  including coastal modeling efforts, restoration template  designs,  and  construction  methodologies.  A  suite  of  analytical and numerical modeling tools (using the DELFT  morphological  model)  to  investigate  a  number  of  important  coastal  processes,  including:  morphological  evolution,  overwash,  dune  “rollover”  and  island  breaching  during  extreme  events,  sea  level  rise,  sediment  losses  to  adjacent  channels  and  shoals,  and  cross‐shore profile equilibration was adapted.  FEMA/USACE  Riverine  Flood  Insurance  Studies,  Orleans,  Jefferson,  Rapides,  Calcasieu,  Ascension  and  St.  Tammany  Parishes,  LA,  2003‐2005.  Project  Team  Member  and  coordinated  with  FEMA  Region  VI  for  FEMA’s  Map  Modernization  Program.  Storm  surge  modeling  includes  Lake  Pontchartrain,  Lake  Borgne,  Barataria  Bay  and  Calcasieu  Lake  and  compiled  SELA  hydraulic  models  for  Orleans  &  Jefferson  Parishes  including  SWMM,  HEC  models  and  previously  UNET  models.  Ormond  Lakes  Hydraulic  Analysis,  St.  Charles  Parish  Project  No.  P030305;  St.  Charles  Parish,  LA,  2004.  Project  Manager,  performed  hydraulic  analysis  of  the  Lake Drainage System and Pumping Station included an  evaluation of the hydrological and hydraulic features of  the Lake Drainage System. Accompanying the evaluation  is a recommendation for improvements which included  dredging  as  alternative  and  those  elements  of  the  system that will have the greatest positive effect on the  system, while minimizing capital outlay.  Barataria/Plaquemines  Barrier  Shoreline  Restoration,  Peer  Review  for  the  National  Oceanic  &  Atmospheric  Administration  (NOAA),  Lafourche,  Jefferson  and  Plaquemines  Parish,  LA,  2003.  Project  Team  Member  and  coordinated  performance  assessment  of  two  modeling  projects  which  included  Project  Area  #1:  Chaland  Headland  –  Pass  La  Mer  to  Chaland  Pass  and  Project  Area  #2:  Pelican  Island  –  Pass  Fontanelle  to  Scofield Pass.  Lower  Mississippi  River  Siphon,  LDNR  2503‐01‐03,  Plaquemines  Parish,  LA,  2001‐2003.  Project  Team  Member and coordinated engineering evaluation for the  Naomi  Siphon  (BA‐03)  and  West  Point  A  La  Hache  Siphon (BA‐04) in Plaquemines Parish. 
  • 4. Dennis G. Lambert, P.E., MASCE      4/11    MARINE, WATERWAYS, PORTS & HARBORS  Lower  Mississippi  River,  Port  of  New  Orleans,  Fender  Piling  Feasibility  Study,  Poland‐Pauline  Wharfs,  New  Orleans,  LA,  2014.  Project  Manager,  prepared  a  feasibility  report  for  fender  piling  and  the  Poland‐ Pauline Wharfs. The facility consists of five berths within  the  Poland  Street  Wharf  and  one  berth  referred  to  as  Pauline  Street  which  were  all  built  at  different  times  (1923‐1940). Berths 1, 2, and 3 are the permanent lay  berth for the Cape Kennedy and Cape Knox RRF vessels.  These  vessels  are  moored  IA  W  Navy  Heavy  Weather  Mooring Service Type III requirements and do not sortie  from the berth during severe weather. The Port of New  Orleans is currently designing a third cruise terminal at  the  Poland‐Pauline  Wharfs  for  the  AIDA  Cruise  Line  to  berth the ship VITA for several port of call cruises to be  berthed  at  Poland  Avenue  Berths  4  and  5.  The  VITA  carries  1,266  passengers,  is  42,289  GT,  is  665  ft.  long,  and needs at least 21 ft. of draft. In its present condition,  due to barge traffic and tug boats in the area, about 58  out of 133 fender piles are missing in this 800 linear feet  berth. The VITA berth has many fender piles are missing,  leaving the wharf substructure vulnerable to damage by  vessel  collisions.  Pilings  are  to  be  embedded  in  the  riverbed  varying  between  El.  ‐35  ft.  and  El  ‐65  ft.  Evaluation  of  inspection  reports  were  performed  in  accordance  with  "American  Society  of  Civil  Engineers  (ASCE) Manuals and Reports on Engineering Practice No.  101,  Underwater  Investigations  and  Standard  Practice  Manual"  and  Department  of  Defense  Handbook  MOORING DESIGN MIL‐HDBK‐1026/4.  Lower Mississippi River & Inland Waterway Navigation  Study,  New  Orleans,  LA,  2013.  Project  Team  Member  and coordinated with shallow draft vessel fleet through  Greater  New  Orleans  area  and  assisted  in  design  guidance  for  application  to  mooring  facilities  and  anchorages intended to secure vessels during hurricane  events  along  the  Lower  Mississippi  River,  IHNC  and  Harvey/Algiers  Canals.  Coordination  included  the  Greater New Orleans Barge Fleet Association, American  Waterways  Operators,  Gulf  Intercoastal  Waterway  Association, US Coast Guard, Port of New Orleans, Canal  Barge, Ingram Barge, Kirby Inland Marine, Turn Services  / Associated Terminals and various marine terminals and  barge  fleeting  operators  utilizing  dead  man  moored  vessels. Mooring criteria evaluated included TN N‐1628  (1982)  Wind‐Induced  Steady  Loads  on  Ships;  DM  26.4  (1986) Fixed Moorings; DM 26.5 (1985) Fleet Moorings;  TR‐6003‐OCN (1997) Wind and Current Forces/Moments  on  Multi‐ple  Ships;  UFC  4‐159‐03  (2005)  Design:  Moorings;  OCIMF  (1992,  1997,  2008).  Mooring  Equipment Guidelines; BS 6349‐1 (1989) Part 1: Code of  practice  for  general  criteria;  BS  6349‐6  (1989)  Part  6:  Design  of  inshore  moorings  and  floating  structures;  DNV‐RP‐C205  (2010)  Environmental  Conditions  and  Environ‐mental  Loads;  PrEN  1991‐1‐4.  Eurocode  1:  Actions  on  structures  –  Wind  actions;  PIANC  (1995)  Criteria  for  Movements  of  Moored  Ships  in  Harbours;  API  RP  2SK  (2005)  Stationkeeping  Systems  for  Floating  Structures.  Lake  Pontchartrain,  New  Orleans  Municipal  Yacht  Harbor, FEMA PW(s) 11698, 11803, 11841, 11160, 7208,  7393  &  7396  Orleans  Parish,  LA,  2009‐2010.  Project  Manager,  including  sediment  sampling,  bathymetry,  tidal  data,  topographical  surveys,  applications  for  Section 404, Section 10 and Coastal Use Permits, dredge  design  including  all  cross‐sections,  structural  pier  assessments in accordance with PIANC, UFC, USACE and  ASCE  (Report  50)  standards.  The  undertaking  included  development  of  three  Preliminary  Design  Alternatives,  Hydrodynamic  and  Storm  Surge  Modeling  and  Coastal  Engineering,  producing  Final  Deliverable,  Plans  &  Specifications,  providing  Inland  Testing  Manuel  Tier  II  Sampling & Analysis and Recap in accordance with the  USEPA,  LDEQ  and  USACE  guidelines,  providing  all  permitting  services  for  LDNR,  LDEQ  and  USACE,  providing  oversight  of  the  geotechnical,  hazard,  bathymetric  and  land‐side  surveying  services.  Also  performed a Phase II ESA on the New Orleans Municipal  Yacht Harbor (MYH) sediments where the sediment was  tested  and  compared  to  risk  assessment  (RECAP)  standards.  A  total  of  18  boreholes  were  advanced.  Samples  were  collected  at  established  intervals.  Field  boring  logs  and  office  generated  boring  logs  for  the  same  boreholes  were  checked  where  a  QA/QC  was  performed between the two field geologist logs. 
  • 5. Dennis G. Lambert, P.E., MASCE      5/11    Lower  Mississippi  River  Sand  Mining  /  Scofield  Island  Restoration  (BA‐40),  Scoping  Phase,  Plaquemines  Parish, LA, 2006. Project Team Member and coordinated  the scoping of the design & permitting of this proposed  sand  mining  operation  located  in  Plaquemines  Parish.  The  volume  of  the  sand  to  be  mined  is  estimated  between  3Mcy  and  4Mcy.  The  Limits  of  Permissible  Excavation  in  the  river  will  be  compliant  with  MVN  Standard Drawing File No. H‐8‐45755. Further, all access  to the batture near the borrow site will be proposed by  levee ramps complaint with MVN Standard Drawing File  No. H‐18‐24854. All anchorages and barge fleeting areas  along with riverbank revetments were identified.  Lower  Mississippi  River,  Marine  Terminal  and  Dock,  Vopak Terminal, Westwego, LA, 2006. Project Manager,  dredge design for marine terminal and dock. The Limits  of  Permissible  Excavation  in  the  river  were  compliant  with  MVN  Standard  Drawing  File  No.  H‐8‐45755.  Further, all access to the marine terminal and dock via  levee  ramps  were  designed  complaint  with  MVN  Standard  Drawing  File  No.  H‐18‐24854.  All  anchorages  and  barge  fleeting  areas  along  with  riverbank  revetments were identified.  Empire Water Way Boat Hoist, Pier and Bulkhead with  Incidental  Dredging,  EN‐20‐010‐2415  &  P20001891;  Plaquemines  Parish,  LA,  2005.  Project  Manager,  responsible  for  the  design  &  permitting  of  a  proposed  pier  and  bulk‐head  on  the  Empire  Waterway  that  included  dredging.  Task(s)  included  super‐imposing the  right‐of‐way maps of the Empire Waterway onto the site  survey and cross‐sections. Design included 8” steel pipe  and decking.  Lower  Mississippi  River  Sand  Mining  Design  &  Permitting  –  Westwego  Facility  (EI‐20‐020‐0695),  Jefferson  Parish,  LA,  2001  &  2006.  Project  Manager,  responsible  for  the  design  &  permitting  of  these  sand  mining operation located in Westwego. The capacity of  the stockpile is 200,000 cubic yards at West‐wego and  pumped twice a year. The capacity of the borrow area is  1,500,000  cubic  yards  at  Westwego.  The  Limits  of  Permissible  Stockpile  on  the  riverbank  were  compliant  with  MVN  Standard  Drawing  File  No.  H‐8‐45756.  The  Limits  of  Permissible  Excavation  in  the  river  were  compliant  with  MVN  Standard  Drawing  File  No.  H‐8‐ 45755. Further, all access to the batture by levee ramps  were  designed  complaint  with  MVN  Standard  Drawing  File  No.  H‐18‐24854. All  anchorages  and  barge  fleeting  areas along with riverbank revetments were identified.  Lower  Mississippi  River  Sand  Mining  Design  &  Permitting  –  Lower  Coast  Algiers  (EI‐20‐020‐0693),  Algiers, LA, 2001 & 2006. Project Manager, responsible  for  the  design  &  permitting  of  these  sand  mining  operation located in Lower Coast Algiers. The capacity of  the stockpile at Lower Coast Algiers area was calculated  to be 195,000 cubic yards and the pit is pumped twice a  year. The capacity of the borrow area for Lower Coast  Algiers was calculated to be 3,300,000 cubic yards. The  Limits  of  Permissible  Stockpile  on  the  riverbank  were  compliant  with  MVN  Standard  Drawing  File  No.  H‐8‐ 45756. The Limits of Permissible Excavation in the river  were compliant with MVN Standard Drawing File No. H‐ 8‐45755.  Further,  all  access  to  the  batture  by  levee  ramps  were  designed  complaint  with  MVN  Standard  Drawing File No. H‐18‐24854. All anchorages and barge  fleeting  areas  along  with  riverbank  revetments  were  identified.  Inland Bay Oil Platform / Marine Terminal SPCC/NPDES  Evaluation,  June  Energy,  Inc./TORCH,  Grand  Coquille  Bay and Empire, LA, 1998.  Project Manager, regulatory  Evaluation  of  offshore  platform  including  dock  and  closure of 29‐B Production Operations.  Marine  Terminal  Evaluation  with  Hazardous  Waste  Above‐ground  Storage  Tanks,  Solid  Waste  Management  Units  and  Wastewater  Treatment  Unit,  Exxon  Chemical  (USA),  Inc.,  Baton  Rouge,  LA,  1992.  Project  Team  Member  and  coordinated  regulatory  Evaluation  of  Hazardous  Waste  Above‐ground  Storage  Tanks, Solid Waste Management Units and Wastewater  Treatment Unit  Marine  Oil  Terminal  Assessment  with  Bulk  Liquid  Storage,  BP  Oil,  Port  Sulphur,  LA,  1991.  Project  Team  Member  and  coordinated  regulatory  Evaluation  of  Hazardous  and  Solid  Waste  Management  and  Marine  Terminal Operations. 
  • 6. Dennis G. Lambert, P.E., MASCE      6/11    Marine  Terminal  Evaluation  with  Bulk  Liquid  Storage  and  Magnesium  Ox‐ide  Solids  Centrifuge  Rejects,  WITCO  Corporation,  Gretna,  LA,  1991.  Project  Team  Member  and  coordinated  regulatory  Evaluation  of  Magnesium Oxide Solids Centrifuge Rejects and Marine  Terminal Operations.  Marine  Terminal  Evaluation  of  Barge,  Rail  and  Truck  Loading/Unloading  Operations,  Westlake  Styrene,  Sulphur,  LA,  1990.  Project  Team  Member  and  coordinated  regulatory  Evaluation  of  Barge,  Rail  and  Truck Loading Operations.  Marine  Terminal  Evaluation  for  NEPA  EIS  of  Formosa  Plastics  $1.5B  Plant  Expansion  including  Waterway  Impacts,  Pointe  Comfort,  TX,  1990.  Project  Team  Member  and  coordinated  evaluation  of  Sodium  Hydroxide  Accidental  Release  (by  rail,  truck  and  barge/ship) as part of a NEPA EIS in conjunction with a  NPDES  permit(s)  application  and  included  barge  operations along the GIWW and berthing facility.  Marine  Oil  Terminal  with  Bulk  Liquid  Storage  and  Remedial  RCRA  Investigation/Feasibility  Study,  Delta  Commodities,  Inc.,  Harvey,  LA,  1988.  Project  Team  Member and coordinated soil sampling and monitoring  well  installation  in  tank  farm  serviced  by  marine  terminal loading/off‐loading.  Marine  Oil  Terminal  with  Bulk  Liquid  Rail  and  Tank  Farm,  Southern  Pacific  Railroad,  Avondale,  LA,  1988.  Project  Manager  at  Leaking  Oilfield  Tank  Battery  near  Bayou Sauvage National Wildlife Refuge.  VESSEL COLLISION AND WATERWAY CROSSING OF  HYDRAULIC STRUCTURES  Bayou St. John (Park Island) Bridge, Orleans Parish, LA,  2010‐2012.  Project  Manager,  providing  construction  &  inspection services for the bridge crossing over Bayou St.  John,  a  designated  Louisiana  Historic  and  Scenic  River  (Act 267, Enacted by the Legislature of Louisiana July 18,  1982)  Florida Avenue Bridge – Poland Avenue/Alvar Streetto  Tupelo  Street,  Orleans  Parish,  LA,  2005‐2007.  Project  Manager,  peer  review  of preliminary  &  final  plans  and  specifications for the Florida Ave Bridge over the Inner  Harbor Navigational Canal. Tasks include constructability  review  and  research,  use  of  Accelerated  Construction  Technology  Transfer  (ACTT)  techniques,  and  investigation/preparation  to  reduce  impact  on  traffic  disruptions  on  rehabilitation  segments  along  with  identifying all utilities such as a 48" water main. Vessel  collisions  guidelines  considered  under  AASHTO  Guide  Specifications  and  Commentary  for  Vessel  Collision  Design  of  Highway  Bridges,  2nd  Edition,  with  2010  Interim Revisions.  Bayou Dularge Bridge Pier Protection System (includes  Bridge  Hydraulic  Analysis,  Marine  Structural  Assessment/Vessel  Collision)  Terrebonne  Parish,  LA,  2000‐2001.  Project  Team  Member  and  coordinated  preparation  of  a  Claim  for  Equitable  Adjustment  on  behalf of the contractor. The basis of the claim was due  to a gross benchmark error in hydraulic data discovered  during  construction  oversight.  The  DOTD  reported  the  benchmark as the vertical control point at elevation +9.0  NAVD  88.  Subsequent  surveys  by  CMC  and  LDOTD  proved the correct elevation to be at +7.3 NAVD 88, an  error of 1.7 feet. Claim included:  Significant error in the  vertical  control  point  elevation  affecting  Item  No.  805(07), Class S Concrete, Item No. 805(02), Class A(m)  Concrete, Item No. 806(01) Deformed Reinforced Steel  and Item No. 804(04)J, Pipe Piles;  Failure to convert the  datum  properly  affecting  Item  No.  805(07),  Class  S  Concrete,  Item  No.  805(02),  Class  A(m)  Concrete,  Item  No.  806(01)  Deformed  Reinforced  Steel  and  Item  No.  804(04)J, Pipe Piles; Lack of historical data for high tide  and  low  tide  between  circa  1975  and  1998  affecting  Item  No.  805(07),  Class  S  Concrete,  Item  No.  805(02),  Class  A(m)  Concrete,  Item  No.  806(01)  Deformed  Reinforced  Steel  and  Item  No.  804(04)J,  Pipe  Piles;  In‐ correct number of units on Item No. 202(02)I, Removal  of  Existing  Timber  Fender  System;  Unforeseen  conditions,  such  as  obstructions  and  welded  structural  elements,  to  Item  No.  202(02)J,  Removal  of  Existing  Dolphins.  Vessel  collision  guidelines  considered  under  1991 AASHTO Guide Specifications and Commentary for  Vessel. 
  • 7. Dennis G. Lambert, P.E., MASCE      7/11    Bridge Load Rating LFM Update contract for District 02  & 07, LA, 1999. Project Team Member and coordinated  categorizing 93 existing steel and pre‐stressed concreted  bridge structures by District, Structure No., Route, Recall  No.,  Type,  Year  and  Design  Load.  Each  drawing  was  obtained  through  DOTD  General  Files  and  all  roll  numbers  were  marked.  All  data  was  placed  in  a  spreadsheet  to  prioritize  prior  to  running  the  Bridge  Loading software. Vessel collision guidelines considered  under  1991  AASHTO  Guide  Specifications  and  Commentary for Vessel.  Bayou  Segnette  ‐  Lapalco  Blvd.  Bridge  (US90  to  Westwood Dr.), Jefferson Parish, LA, 1998‐1999. Project  Manager,  provided  impact  modeling  and  Section  4(f)  Evaluation  including  new  Bridge  over  navigable  waterway,  Bayou  Segnette  for  Section  10  permitting  through  the  Bayou  Segnette  State  Park  of  a  two‐lane  widening  and  navigable  canal  crossing  using  1991  AASHTO  Guide  Specifications  and  Commentary  for  Vessel.  NEPA  AND  DESIGN  OF  TRANSPORTATION  &  TRANSIT SYSTEMS   DOTD  S.P.  700‐26‐0289,  NEPA  Environmental  Assessment,  Veterans  Memorial  Boulevard  Widening,  Jefferson Parish, LA, 2009‐2011. Provided NEPA EA for  this  road  improvement  under  the  Urban  Systems  Program  for  the  DOTD  and  the  Regional  Planning  Commission.  Includes  a  Phase  I  ESA,  Wet‐land  Delineation, Noise Study and familiarity with 24 CFR Part  58, and other federal laws and authorities, including the  National  Historic  Preservation  Act,  Executive  Order  11988 (Floodplain Management), Executive Order 11990  (Wetland  Protection),  Clean  Air  Act,  24  CFR  Part  51,  Executive Order 12898 (Environmental Justice), Coastal  Zone  Management  Act  of  1972,  Coastal  Barrier  Resources Act of 1982, Endangered Species Act of 1973,  and Wild and Scenic Rivers Act of 1968.  DOTD  S.P.  736‐26‐0001,  NEPA  Environmental  Assessment,  Earhart  Expressway/Causeway  Interchange, Route LA 3139, Jefferson Parish, LA, 2005‐ 2007.  Preparation  of  NEPA  documentation  to  support  LADOTD’s  Feasibility  Study  for  interchange  to  connect  the two highways included noise & air quality modeling.  DOTD  S.P.  700‐26‐0254,  NEPA  Environmental  Assessment,  Harvey  Boulevard  (Wall  Boulevard  to  Peters Road), Jefferson Parish, LA, 2003‐2006. Provided  NEPA  EA  for  this  road  improvement  under  the  Urban  Systems  Pro‐gram  for  the  DOTD  and  the  Regional  Planning  Commission.  Includes  a  Phase  I  ESA,  Wetland  Delineation, Noise Study and familiarity with 24 CFR Part  58, and other federal laws and authorities, including the  National  Historic  Preservation  Act,  Executive  Order  11988 (Floodplain Management), Executive Order 11990  (Wetland  Protection),  Clean  Air  Act,  24  CFR  Part  51,  Executive Order 12898 (Environmental Justice), Coastal  Zone  Management  Act  of  1972,  Coastal  Barrier  Resources Act of 1982, Endangered Species Act of 1973,  and Wild and Scenic Rivers Act of 1968.  DOTD  S.P.  700‐08‐0123,  NEPA  Environmental  Assessment,  Hamilton  Road  (I‐20  to  Benton  Road),  Bossier  Parish,  LA,  2004‐2006.  Provide  air  quality  and  noise  modeling  as  part  of  preparation  of  EA  during  project  planning.  Examined  multiple  alignments  and  various  types  of  roadways  (divided,  curb‐and‐gutter,  etc.)   DOTD  S.P.  700‐52‐0124  (TIMED);  NEPA  Environmental  Impact Statement (EIS); I‐12 to Bush, Route LA 3241, St.  Tammany  Parish,  LA,  2003‐2006.  Preparation  of  Environmental  Assessment  during  project  planning.  Examined  multiple  alignments  and  various  types  of  roadways (divided, curb and gutter, etc.) included noise  and air quality modeling.  DOTD  S.P.  700‐10‐0139,  NEPA  Environmental  Assessment,  Relocated  LA  1138‐2,  Route  LA  1138‐2,  Calcasieu,  LA,  2004‐2006.  Preparation  of  NEPA  documentation  to  support  DOTD’s  Feasibility  Study  for  interchange to connect the two highways included noise  and air quality modeling.  DOTD  S.P.  700‐26‐0078,  NEPA  Environmental  Assessment,  Jones  Creek  Road,  East  Baton  Rouge  Parish, LA, 2004‐2005. Preparation of the Environmental  Assessment. Project involved widening an existing urban 
  • 8. Dennis G. Lambert, P.E., MASCE      8/11    two‐lane facility to five‐lane facility included noise & air  quality modeling.  DOTD  S.P.  700‐26‐0258,  NEPA  Environmental  Assessment,  Peters  Road  Widening,  Jefferson  Parish,  LA,  2004‐2006.  Preparation  of  Environmental  Assessment during project planning. Examined multiple  alignments and various types of roadways (divided, curb  and gutter, etc.) included noise and air quality modeling.  DOTD  S.P.  700‐17‐0169,  NEPA  Environmental  Assessment, Central Thruway, East Baton Rouge Parish,  LA,  2002‐2003.  Noise  modeling  for  new  four‐lane,  divided facility.  DOTD  S.P.  742‐26‐0030,  NEPA  Environmental  Assessment,  Lapalco  Blvd.  Extension  (US90  to  Westwood  Dr.),  Jefferson  Parish,  LA,  1998‐1999.  Provided  air,  noise  and  hydrologic  impact  modeling,  Phase  I  ESAs,  oversaw  wet‐land  and  historical/cultural  resources surveys, traffic projects, line & grade, Section  4(f)  Evaluation  including  new  Bridge  over  Bayou  Segnette (Section 10) through the Bayou Segnette State  Park and two‐lane widening, etc.  DOTD  S.P.  742‐26‐0029,  NEPA  Environmental  Assessment, Lapalco Blvd. Extension (Westwood Dr. to  Barataria  Boulevard),  Jefferson  Parish,  LA,  1998‐1999.  Provided  air,  noise  and  hydrologic  impact  modeling,  Phase  I  ESAs,  oversaw  wetland  and  historical/cultural  resources surveys, traffic projections, line & grade, for a  two‐lane widening, etc.  Canal Street Streetcar (Redline) Emergency Installation  of  a  Portable  Electric  Substation  provide  by  the  Massachusetts  Bay  Transportation  Authority  (MBTA),  Regional Transit Authority, Orleans Parish, LA, 2006. A  22‐year‐old  portable  electric  substation  contained  in  a  60ft tractor trailer was loaned by the MBTA to the RTA  to  run  the  Redline  along  Canal  Street.  The  station  contained  rectifiers  that  converted  alternating‐current  electricity  into  the  direct  current.  Provided  permitting  and oversight for the installation of the unit adjacent to  the RTA Canal Street Facility along N. White Street.   Canal Boulevard Streetcar & Bus Terminal, Fatal Flaws  and  FTA  Categorical  Exclusion  Checklist,  LA030072.1065.1372102T4, Regional Transit Authority,  Orleans  Parish,  LA,  2005. Review of conceptual design  for  the  terminal;  Review  of  the  NEPA  Environmental  Impact  Statement  for  the  Canal  Street  Streetcar  prepared  in  July  of  1997;  Review  of  the  Major  Investment Study and the Canal Street Corridor Project  prepared in March of 1995; Review of Geotechnical Data  obtained for evaluation with respect to the conceptual  design; Review of the funding sources for the extension  project  and  its  compliance  under  Section 303(a)(51)  of  TEA‐21, the Full Funding Grant Agreement and Section  5309  New  Starts  funding  requirements;  Reviewed  the  System  Linkage,  Streetcar  Capacity,  Transportation  Demand, and Governmental  Authority and  Funding  (as  discussed  above);  Prepared  the  Environmental  Fatal  Flaws  Analysis  of  the  project;  Prepared  the  Technical  Feasibility  of  the  project;  and  Prepared  the  Financial  Implications of the project. Prepared the Supplement to  the Categorical Exclusion Checklist (Section 771.117(d))  which  included:  Detailed  Project  Description;  Location;  Metropolitan  Planning  and  Air  Quality  Conformity;  Zoning;  Traffic  Impacts;  CO  Hot  Spots;  Historic  Resources; Noise; Vibration; Acquisitions & Relocations;  Hazardous  Materials;  Community  Disruption  and  Environmental  Justice;  Use  of  Public  Parkland  and  Recreation  Areas;  Impact  on  Wetlands;  Floodplain  Impacts;  Impacts  on  Water  Quality,  Navigable  Waterways  &  Coastal  Zone;  Impacts  on  Ecologically‐ Sensitive  Areas  and  Endangered  Species;  Impacts  on  Safety  and  Security;  and  Impacts  Caused  by  Construction.   NOAB  15‐07‐01,  North  Perimeter  Road  Improvements  and  Runway  6‐24  Conversion  Design  Services,  Louis  Armstrong  International  Airport,  2009‐2011.  Provided  design  engineering  services  for  North  Perimeter  Road  and the conversion of Runway 6‐24 to a Taxiway.  DPW 2005‐E02, Design of Old Spanish Trail, City of New  Orleans, LA, 2008‐2012. Provided design services for the  project,  which  involved  total  reconstruction,  concrete  and asphalt and all utilities (water, sewer and drainage).  DOTD  S.P.  H.007213,  Veterans  Memorial  Boulevard  Expansion,  City  of  Kenner,  LA,  2008‐2012.  Provide 
  • 9. Dennis G. Lambert, P.E., MASCE      9/11    design services for the widening of Veterans Memorial  Boulevard  (four‐lane  Boulevard)  from  Loyola  Drive  to  the  St.  Charles  Parish  line.  The  project  also  includes  bridge replacement.  DOTD  S.P.  742‐26‐0056,  Lapalco  Boulevard  Overlay  (Murphy  Canal  to  Brooklyn Avenue),  Jefferson  Parish,  LA,  2005‐2007.  Provided  design  services  for  asphalt  overlay and curb & gutter reconstruction.  DOTD S.P. 713‐36‐0100 [Construction Inspection]; Off‐ System Highway Bridge Program, Bayou St. John (Park  Island),  Orleans  Parish,  LA,  2010‐2012.  Providing  construction & inspection services for the project.  DOTD S.P. 742‐36‐0116 [Construction Inspection], FAP  No.  STE‐3602(512);  Fleur  de  Lis  Drive  Improvements,  Phase  I;  Orleans  Parish,  LA,  2007‐2009.  Provided  construction inspection services for this project.  DOTD S.P. 700‐92‐0016 (TIMED); Florida Avenue Bridge  – Poland Avenue/Alvar Streetto Tupelo Street, Orleans  Parish,  LA,  2005‐2007.  Preliminary  &  final  plans  and  specifications peer review & constructability review for  the  Florida  Ave  Bridge  over  the  Inner  Harbor  Navigational  Canal.  Tasks  include  constructability  research,  use  of  Accelerated  Construction  Technology  Transfer (ACTT), and investigation/preparation to reduce  impact on traffic disruptions on rehabilitation segments  along  with  identifying  all  utilities  such  as  a  48"  water  main.  I‐49 Alignment Coordination for Jefferson Parish, Bayou  Segnette/Lake  Cataouatche  Study  Area,  Jefferson  Parish, LA, 2005‐2007. Alignment review: future street,  sewer, drainage, and water evaluation.  31st  Street  Design  –  Overlay  &  Total  Reconstruction  Design/Construction Engineering & Inspection Services,  City  of  Kenner,  LA,  2002‐2003.  Design  the  overlay  &  total reconstruct segments of 31st Street which includes  an analysis of the drainage System and pumping Station  present.  The  analysis  consisted  of  an  evaluation  of  all  utilities  including  waterlines.  Features  of  the  drainage  system  and  subsequent  evaluation  recommended  the  need  for  improvements  which  included  waterlines  &  other utilities with the greatest impact/positive effect on  the  system,  while  minimizing  capital  outlay.  Recommendations were made for improvements to the  Drainage  System  using  StormCAD  and  checked  against  the  Rational  Method.  Also  provided  construction  administration.  Rio Vista Subdivision Design, Jefferson Parish, LA, 2005‐ 2007. Designed a 34 Lot Subdivision which includes an  analysis of new drainage, water and sewer infrastructure  and  tie‐in.  Analysis  consisted  of  an  evaluation  of  the  hydrological and hydraulic features of the three systems.  Accompanying the evaluation is a recommendation for  the  improvement  which  included  elements  of  the  system that will have the greatest positive effect on the  system, while minimizing capital investment.  DOTD  S.P.  744‐52‐0020;  Tammany  Trace  Bicycle  Tunnel,  St.  Tammany  Parish,  LA,  2001‐2002.  Prepared  the Tammany Trace Bicycle Tunnel Traffic Plan.  DOTD S.P. 245‐90‐0051; Bayou Dularge Pier Protection  System  (includes  Bridge  Hydraulic  Analysis,  Marine  Structural  Assessment/Vessel  Collision)  Terrebonne  Parish,  LA,  2000‐2001.  Prepared  a  Claim  for  Equitable  Adjustment on behalf of the contractor. The basis of the  claim was due to a gross benchmark error in hydraulic  data  discovered  during  construction  oversight.  The  DOTD  reported  the  benchmark  as  the  vertical  control  point at elevation +9.0 NAVD 88. Subsequent surveys by  CMC and LDOTD proved the correct elevation to be at  +7.3  NAVD  88,  an  error  of  1.7  feet.  Claim  included:   Significant  error  in  the  vertical  control  point  elevation  affecting  Item  No.  805(07),  Class  S  Concrete,  Item  No.  805(02),  Class  A(m)  Concrete,  Item  No.  806(01)  Deformed Reinforced Steel and Item No. 804(04)J, Pipe  Piles;    Failure  to  convert  the  datum  properly  affecting  Item  No.  805(07),  Class  S  Concrete,  Item  No.  805(02),  Class  A(m)  Concrete,  Item  No.  806(01)  Deformed  Reinforced Steel and Item No. 804(04)J, Pipe Piles; Lack  of  historical  data  for  high  tide  and  low  tide  between  circa 1975 and 1998 affecting Item No. 805(07), Class S  Concrete,  Item  No.  805(02),  Class  A(m)  Concrete,  Item  No.  806(01)  Deformed  Reinforced  Steel  and  Item  No.  804(04)J, Pipe Piles; Incorrect number of units on Item  No. 202(02)I, Removal of Existing Timber Fender System; 
  • 10. Dennis G. Lambert, P.E., MASCE      10/11    Unforeseen conditions, such as obstructions and welded  structural  elements,  to  Item  No.  202(02)J,  Removal  of  Existing Dolphins.  DOTD  S.P.  700‐99‐0197;  Bridge  Load  Rating  LFM  Update contract for District 02 & 07, 1999. Responsible  for  categorizing  93  existing  steel  and  pre‐stressed  concreted  bridge  structures  by  District,  Structure  No.,  Route,  Recall  No.,  Type,  Year  and  Design  Load.  Each  drawing was obtained through DOTD General Files and  all roll numbers were marked. All data was placed in a  spreadsheet  to  prioritize  prior  to  running  the  Bridge  Loading software.  MUNICIPAL & PUBLIC WORKS/UTILITIES  Hazard  Mitigation  Plan  for  the  Sewerage  &  Water  Board  of  New  Orleans,  Sewerage  &  Water  Board  of  New Orleans Office of Emergency Management and the  Environmental Affairs Division, New Orleans, LA, 2008‐ 2010.  Provided  a  Hazard  Mitigation  Plan  to  include  vulnerability  analysis  and  hazards  to  critical  facilities,  identifying  repetitive  losses  and  how  to  reduce  those  losses  and  decrease  the  response  time  to  a  natural  or  man‐made  hazards.  The  purpose  of  the  Plan  is  also  to  integrate  Hazard  Mitigation  strategies  into  the  day‐to‐ day activities and programs of the Sewerage and Water  Board of New Orleans (S&WB). The plan was prepared  to meet the Disaster Mitigation Act of 2000 (DMA 2000)  requirements in order to maintain the S&WB’s eligibility  for the Federal Emergency Management Agency (FEMA)  Pre‐Disaster  Mitigation  (PDM)  and  Hazard  Mitigation  Grant  Programs  (HMGP).  More  importantly,  the  plan  and  planning  process  lays  out  the  strategy  that  will  enable  the  S&WB  to  become  less  vulnerable  to  future  disaster losses.  Sewer  Improvement  Program  ‐  42nd  &  Illinois  Force  Main  Design,  City  of  Kenner,  LA,  2009‐2010.  Provide  design  services  for  the  replacement  of  an  existing  12”  sewer  force  main  approximately  2  miles  from  42nd  Street to Illinois Street. The project, which encompasses  approximately  $800,000  in  construction,  includes  analysis  of  the  existing  condition  of  the  sewer  force  main  defined  and  recommendations  (replace  where  applicable and required). It further includes the design  of a canal crossing where appropriate (either above or  below canal cross‐section) and utility conflicts with other  utilities such as waterlines.  Iris  Avenue  Waterline  Replacement  Project,  Council  District 2, Jefferson Parish, LA, 2010‐2012. Provided to  provide  design  engineering  services  for  this  waterline  replacement  project  in  Council  District  2  of  Jefferson  Parish.  Program  Management  for  Identifying  and  Obtaining  Funding Sources for New or Rehabilitated Facilities to  Restore  Infrastructure  damaged  by  Hurricane  Katrina,  City  of  Gretna,  LA,  2009‐2011.  Services  included  identifying  and  obtaining  funding  sources  for  new  or  rehabilitated  facilities  to  restore  infrastructure  of  the  City of Gretna that was damaged by Hurricane Katrina.  This  Program  Management  requires  knowledge  of  policies,  procedures  and  programs  of  the  Federal  Emergency  Management  Agency  (FEMA),  the  Governor’s Office of Homeland Security (GOSHEP), and  the  Louisiana  Recovery  Authority  (LRA)  and  any  other  agency  that  oversees  Hurricane  Recovery  programs  in  the State of Louisiana. Reviewed of all waterline related  PWs.  Barataria  Waterline  Extension  (McMurtry  Street  to  Trahan  Street,  Crown  Point),  JPPW  2001‐009‐WR,  Crown Point, Jefferson Parish, LA, 2005‐2007. Provided  design and construction administration services for this  waterline project and resident inspection.  ENVIRONMENTAL ENGINEERING  Brownfields  Phase  I,  Phase  II  Environmental  Site  Assessments,  RECAP  Study  and  QAPP,  Former  Bennigan’s Restaurant (Corner of Veterans & Severn),  Jefferson  Parish,  LA,  2010‐2011.  Prepared  Phase  I  &  Phase II ESA,  QAPP for Brownfields and RECAP Study.  Brownfields  Phase  I  &  II  Environmental  Site  Assessment, Old Davis Concrete Plant, Jefferson Parish,  LA,  2009.  Performed  Phase  I  &  II  ESA  for  Old  Davis  Concrete  Plant  from  Task  order  from  Res.  105956,  Miscellaneous Environmental Services. 
  • 11. Dennis G. Lambert, P.E., MASCE      11/11    South  New  Orleans  Subdivision  (Squares  6  &  7),  Petroleum  Assessment  Grant,  Proj  #EPA‐BFS‐JP‐CS,  Regional  Planning  Commission  Brown‐fields  Redevelopment Program, Jefferson Parish, Harvey, LA,  2007. Provided Phase I ESA  Brownfields  Phase  II  Environmental  Site  Assessment,  Midship Marine, Jefferson Parish, LA, 2004. Performed  Phase II ESA for the old Texaco/Chevron Pipe Laydown  yard on the Harvey Canal.  Louisiana  National  Guard,  Camp  Beauregard  Training  Facility  including  Firing  Ranges,  Pineville,  LA,  2003‐ 2005.  Provided  engineering  &  planning  services  (Environmental  Installation  Management  Plan),  including  7  firing  ranges  and  various  other  military  operations  included  noise  modeling  for  firing  ranges,  roads and airport/heliport facilities.  Louisiana National Guard, Camp Villere Training Facility  including Firing Ranges, Slidell, LA, 2003‐2005. Provided  engineering  &  planning  services  (Environmental  Installation Management Plan), including 4 firing ranges  and  various  other  military  operations  included  noise  modeling for firing ranges, roads and heliport facilities.  Air  Quality  Technical  Consultant,  Shreveport‐Bossier  City  MSA  Caddo,  Webster,  and  Bossier  Parishes,  LA,  2003‐2004.  Responsible  for  inventories  of  marine  and  stationary  sources  based  on  the  U.S.  EPA  National  Emission  Inventory,  Version  2  database.  Compiled  emission inventories for stationary & mobile sources for  this Early Action Compact Regional Air Quality Modeling  included seasonal and temporal allocation factors from  the  top  fifteen  15  nitrogen  oxide  (NOx)  industrial  emission  point  sources  in  Bossier,  Caddo  and  Webster  Parishes.  The  plants  included  Minden  Gas  Plant,  Springhill Compressor Station, ADA Plant and State Line  Compressor  Station.  Also  responsible  for  input  in  running  MOBILE6  with  average  in‐use  fleet  emission  factors for volatile organic compounds (VOC), oxides of  nitrogen  (NOx)  and  carbon  mon‐oxide  (CO)  for  eight  categories of vehicles.  Sempra  Energy  Resources:  Bonnet  Carré  Facility  Gas  Turbine  Installation  (including  Railroad  ROW  Impact  Assessment),  St.  John  the  Baptist  Parish,  LA,  2003.  Provided noise modeling for gas turbine plant including  rail noise.  FEMA  Debris  Inspection  for  Hurricanes  Lili  &  Isadore,  Jefferson Parish, LA, 2002. Provided inspection services  for debris hauling.  Churchill  Energy/CVS  Holding,  Starks  Gas  Field  Air  Emissions Inventories and Title V Permitting, Starks, LA,  2002‐2003.  Provided  emissions  estimates  for  flare,  tanks,  glycol  reboilers  and  general  operations  at  the  Starks Gas Field.  Old  Matlack  Truck  Wash  (now  managed  by  Quality  Carriers)  RECAP  Investigation  &  Voluntary  Cleanup  Program,  St.  Rose,  LA,  2002.  RECAP  Investigation,  includes  evaluation  of  foundations  (pilings,  reinforced  concrete,  12‐inch  concrete  slag,  etc.)  surrounded  by  diesel‐contaminated soils.  Louisiana DEQ Type III Permitting and Conditional Use  Permit,  City  of  New  Orleans,  LA,  2002.  Provided  permitting  of  construction  &  demolition  landfill  and  supporting plans and drawings.  Regional  Planning  Commission  ‐  Brownfields  Redevelopment Initiative (originally for the Parishes of  Jefferson,  Orleans,  Plaquemines,  St.  Bernard  and  St.  Tammany, LA, 1999‐2000. Provided Phase I ESAs.  QAPP for the David Drive Jefferson Parish Incinerator,  Jefferson, LA, 2000. Provided QAPP for Phase II ESA.  Landfill Gas Collection Plan & Title V Permitting, Kelvin  Tract, Waggaman, LA, 1998‐1999. Provided landfill gas  collection  design  services  and  air  permitting  for  Jefferson Parish.