5. PI SHEET
In General there are two types of PI sheets in Normal SAP
1. ABAP based PI sheets
2. Browser based PI sheets
We shall concentrate on the later version that is browser based PI sheets
1.Configuration Requirements
i.O23c-Transport Predefined characteristics, to transfer process instruction characteristics or
process message characteristics from the SAP reference client (000) to your client.
6. ii.O22c-Transport Predefined Message Categories – to transfer or copy all the process message
characteristics from the SAP plant to your plant; when you carry out this configuration, you need to
enter the plant and press execute button and then press the copy button in the next screen to copy
the process messages.
iii.CO60_VM-transport the display variants for PI Sheets predefined by SAP from the SAP
reference client to your logon client. Press the save button while exiting.
7. 2.Control Recipes and Control Recipe Destinations
Control recipes are used to transfer the control data defined in the process order by
the user to the process control. The control data like process instructions
assigned to the phase are transferred to their respective destinations assigned
in the phase.
Control Recipe Destinations: SAP standard has Four types of recipe destinations
defined
1. Transfer to ABAP list based PI sheet
2. Download to ext. system, initiated by
SAP process management
3. Download to ext. system, initiated by
ext. process control
4. Transfer to browser-based PI sheet
12. 6. Releasing Control Recipes
Create process order first ( TCODE-COR1 )
RELEASE THE ORDER
13. once you release the order the ‘Generate Control Recipe’ indicator
gets enabled, click on this indicator to release the recipes and save the order.
Upon successful release of control recipes go to T code CO53 to convert the recipes to PI sheets
In the initial screen enter the order number and press ‘display’
14. Now go to T code CO60 and open the PI sheet which has been generated for this order
Here enter the plant, order number and execute(F8)
17. 3.NOW CONVERT PLAN ORDER TO PRODUCTION ORDER FOR INHOUSE MATERIAL( FG & SFG) AND
TO PURCHASE REQUISITION FOR EXTERNAL LY PROCURED MATERIAL (ROH)
FOR RAW MATERIAL : R1TEST
R2TEST
For semi finished material : STEST