SlideShare a Scribd company logo
1 of 43
Table of Contents
1 Purpose 2
2 Prerequisites 3
2.1 System Access 3
2.2 Roles 3
2.3 Master Data, Organizational Data, and Other Data 3
2.4 Business Conditions 5
3 Overview Table 6
4 Test Procedures 7
4.1 Create Change Master 7
4.2 Create Manufacturing Bill of Material as Copy of Engineering Bill of Material 8
4.3 Rework Manufacturing BOM 10
4.4 Release Manufacturing BOM 11
4.5 Set Status of Change Master to Inactive 12
5 Appendix 14
5.1 Process Integration 14
5.1.1 Preceding Processes 14
5.1.2 Succeeding Processes 14
Test Script
SAP S/4HANA - 29-09-22
Basic Handover of Bill of Material (1ZI_US)
PUBLIC
Basic Handover of Bill of Material (1ZI_US)
Purpose PUBLIC 2
1 Purpose
Handover to Manufacturing allows the user to create a Manufacturing Bill of Material from an Engineering Bill of Material within one step. The manufacturing Bill of Material is initially being
created as a copy of the Engineering Bill of Material. With this step the system automatically generates a linkage between both Bill of Materials. As an optional step this newly created
Manufacturing Bill of Material can be reworked with Change Management technology. Finally this Bill of Material will be release for productive use.
This document provides a detailed procedure for testing this scope item after solution activation, reflecting the predefined scope of the solution. Each process step, report, or item is covered in its
own section, providing the system interactions (test steps) in a table view. Steps that are not in scope of the process but are needed for testing are marked accordingly. Project-specific steps must
be added.
Note Values in this test script (decimal notation, date formats, and so on) are presented in U.S. standard notation. If your test system is set up to use a different notation, enter values as
appropriate.
Basic Handover of Bill of Material (1ZI_US)
Prerequisites PUBLIC 3
2 Prerequisites
This section summarizes all the prerequisites for conducting the test in terms of systems, users, master data, organizational data, other test data and business conditions.
2.1 System Access
System Details
System Accessible via SAP Fiori launchpad. Your system administrator provides you with the URL to access the various apps assigned to your role.
2.2 Roles
Assign the following business roles to your individual test users. Alternatively, if available, you can create business roles using the following spaces with pages and predefined apps for the SAP Fiori
launchpad and assign the business roles to your individual test users.
Note These roles or spaces are examples provided by SAP. You can use them as templates to create your own roles or spaces.
For more information about business roles, refer to Assigning business roles to a user in the Administration Guide to Implementation of SAP S/4HANA with SAP Best Practices .
Name (Role) ID (Role) Name (Launchpad Space) ID (Launchpad Space) Log
On
â—Ź Production Engineer - Discrete Manufacturing
Maintains manufacturing-relevant master data such as bill of materials.
Coordinates with engineering department, production supervisors, and others relevant for
manufacturing.
SAP_BR_PRODN_ENG_DISC Production Engineer - Discrete
Manufacturing
SAP_BR_PRODN_ENG_DISC
2.3 Master Data, Organizational Data, and Other Data
Released FG126 Material BOM as Engineering BOM (see detail 1R3).
Basic Handover of Bill of Material (1ZI_US)
Prerequisites PUBLIC 4
Data Sample Value Details Comments
Plant 1710 Plant 1 US
Material FG126 FIN126,MTS-DI,PD,Batch-Fifo,SerialNo
Material RM129 RAW129,PD Additional Manufacturing Material
E-BOM BOM structure for FG126
Material FG126 FIN126,MTS-DI,PD,Batch-Fifo,SerialNo
Material SG21 SEMI21,PD,RepetitiveManuf.
Material SG22 SEMI22,PD,Phantom
Material RM122 RAW122,PD,Batch-Fifo,ProcureImport
Material RM128 RAW128,PD,Consignment
Material RM120 RAW120,PD,QualityManaged
Material SG23 SEMI23,PD,Subcontracting
Material SG25 SEMI25,PD,ExternalProcurement
Material SG124 SEMI124,PD,Subassembly
Material RM20 RAW20,PD
Material RM27 RAW27,PD,PackagingBox
For more information on creating master data objects, see the following Master Data Scripts (MDS)
Table 1: Master Data Script Reference
Master Data ID Description
BNR Create Product Master of Type "Raw Material"
BNS Create Product Master of Type "Semi-Finished Good"
BNT Create Product Master of Type "Finished Good"
Basic Handover of Bill of Material (1ZI_US)
Prerequisites PUBLIC 5
2.4 Business Conditions
Before this scope item can be tested, the following business conditions must be met.
Scope Item Business Condition
1R3 – Engineering Bill of Material - Change Master Management Engineering BOM FG126 is created.
For testing purposes, the objects listed in Overview Table [page ] 6 are already created in your system.
Basic Handover of Bill of Material (1ZI_US)
Overview Table PUBLIC 6
3 Overview Table
This scope item consists of several process steps, provided in the table below.
Note If your system administrator has enabled spaces and pages on the SAP Fiori launchpad, the homepage will only contain the essential apps for performing the typical tasks of a business
role.
You can find all other apps not included on the homepage using the search bar.
If you want to personalize the homepage and include the hidden apps, navigate to your user profile and choose App Finder.
Process Step Business Role App/Transaction Expected Results
Create Change Master [page ] 7 Production Engineer - Discrete
Manufacturing
Manage Change Masters (F2212) Change Master is created.
Create Manufacturing Bill of Material as Copy of Engineering Bill of
Material [page ] 8
Production Engineer - Discrete
Manufacturing
Maintain Bill Of Material - Create, change & display BOMs
(F1813)
M-BOM is created.
Rework Manufacturing BOM [page ] 10 Production Engineer - Discrete
Manufacturing
Maintain Bill Of Material - Create, change & display BOMs
(F1813)
M-BOM is reworked.
Release Manufacturing BOM [page ] 11 Production Engineer - Discrete
Manufacturing
Maintain Bill Of Material - Create, change & display BOMs
(F1813)
M-BOM is released.
Set Status of Change Master to Inactive [page ] 12 Production Engineer - Discrete
Manufacturing
Manage Change Masters (F2212) Change master status is set to
inactive.
Basic Handover of Bill of Material (1ZI_US)
Test Procedures PUBLIC 7
4 Test Procedures
This section describes test procedures for each process step that belongs to this scope item.
4.1 Create Change Master
Test Administration
Customer project: Fill in the project-specific parts.
Test Case ID <X.XX> Testing Date:
Tester Name: Duration:
Business Role(s): Responsibility: <State the Service Provider, Customer or Joint Service Provider and Customer>
Purpose
In this process step, you create the change master that is used to create the manufacturing BOM.
Procedure
Test Step
#
Test Step Name Instructions Expected Result Comments
1 Log on Log on to the SAP Fiori launchpad as Production Engineer - Discrete Manufacturing. The SAP Fiori launchpad displays.
2 Access the app Open the Manage Change Masters (F2212) app.
In the Manage Change Masters screen, choose Create.
The Create Change Master: Initial Screen screen is
displayed.
3 Enter Change Number In the Create Change Master: Initial Screen screen, enter data as provided in the following example and
press Enter .
Basic Handover of Bill of Material (1ZI_US)
Test Procedures PUBLIC 8
Test Step
#
Test Step Name Instructions Expected Result Comments
Example Change Number: CN001
Leave default values in other fields.
4 Enter Change Master data In the Create Change Master: Change Header screen, enter data as provided in the following example
and press Enter :
Example Field beside Change Number: Change Master for BOM FG126.
Valid From: Today
Change no. status: 01 Active
5 Select Checkboxes for Bill of
Material
In the Create Change Master: Object Types screen, Object types table, Bill of Material row, select the
following checkboxes:
Actv.
Object
MgtRec
6 Save the change master Choose Save. The change master is created.
4.2 Create Manufacturing Bill of Material as Copy of Engineering Bill of Material
Test Administration
Customer project: Fill in the project-specific parts.
Test Case ID <X.XX> Testing Date:
Tester Name: Duration:
Business Role(s): Responsibility: <State the Service Provider, Customer or Joint Service Provider and Customer>
Basic Handover of Bill of Material (1ZI_US)
Test Procedures PUBLIC 9
Purpose
In this process, you create a new manufacturing bill of material (MBOM) as a copy of an engineering bill of material (EBOM).
Procedure
Test
Step #
Test Step Name Instruction Expected Result Comments
1 Log on Log on to the SAP Fiori launchpad as Production Engineer - Discrete Manufacturing. The SAP Fiori launchpad is displayed.
2 Access the app Open the Maintain Bill Of Material - Create, change & display BOMs (F1813) app. The Maintain Bill of Material screen is
displayed.
3 Find the EBOM Make the following entries, and choose Go:
â—Ź Material: FG126
â—Ź BOM Usage: Engineering/Design
The EBOM is displayed in the search
results.
4 Hand over the EBOM to
manufacturing
1. Select the BOM FG126, and then choose Handover to Manufacturing.
If the Handover Engineering Product Structures (3NE) scope item is activated, a dialog box displays prompting you to
choose whether to hand over from the current app or from the Hand Over Engineering Bill of Material (EBOM) (F3056)
app.
2. If the prompt displays, select From Current App, and choose OK.
3. On the Handover to Manufacturing dialog box, make the following entries:
• Plant:1710
• Change Number:CN003
4. Select the Copy Components check box. (Selected by default)
5. Choose OK.
The EBOM is copied over to a new
MBOM, which displays in the draft
mode.
5 Save the MBOM Choose Create. The MBOM is created.
Basic Handover of Bill of Material (1ZI_US)
Test Procedures PUBLIC 10
4.3 Rework Manufacturing BOM
Test Administration
Customer project: Fill in the project-specific parts.
Test Case ID <X.XX> Testing Date:
Tester Name: Duration:
Business Role(s): Responsibility: <State the Service Provider, Customer or Joint Service Provider and Customer>
Purpose
In this process step, you add a new component to the BOM.
Procedure
Test
Step #
Test Step Name Instruction Expected Result Comments
1 Log on Log on to the SAP Fiori Launchpad as Production Engineer - Discrete
Manufacturing.
Note If you are already logged on and the BOM details are
already displayed, then skip to test step 7.
The SAP Fiori Launchpad displays.
2 Access the app Open the Maintain Bill Of Material - Create, change & display BOMs
(F1813) app.
The Maintain Bill of Material screen is displayed.
3 Find BOM Make the following entries and choose Go:
â—Ź Material: FG126
â—Ź Plant: 1710
â—Ź BOM Usage: Production
BOM is displayed in the result list.
4 Open BOM Select the BOM in the result list. The BOM details are displayed.
Basic Handover of Bill of Material (1ZI_US)
Test Procedures PUBLIC 11
Test
Step #
Test Step Name Instruction Expected Result Comments
5 Choose Edit Choose Edit.
Tip If the Edit button is not visible, then choose More options and
then choose Edit.
BOM can be edited now.
6 Enter BOM Item Category, Component,
and Component quantity
Make the following entries in the top row:
Item Category: Stock item (default)
Component: RM129
Component quantity: 2 PC
BOM Item Number, Component, Component Description, and Component
quantity are displayed in the top row in the table.
7 Save BOM In the Maintain Bill of Materia screen, choose Save.
The Material BOM saved message appears. Choose Close.
BOM is saved.
4.4 Release Manufacturing BOM
Test Administration
Customer project: Fill in the project-specific parts.
Test Case ID <X.XX> Testing Date:
Tester Name: Duration:
Business Role(s): Responsibility: <State the Service Provider, Customer or Joint Service Provider and Customer>
Purpose
In this process step, you release the BOM.
Basic Handover of Bill of Material (1ZI_US)
Test Procedures PUBLIC 12
Procedure
Test Step # Test Step Name Instruction Expected Result Comments
1 Log On Log on to the SAP Fiori Launchpad as Production Engineer - Discrete Manufacturing.
Note If you are already logged on and the BOM details are already displayed, then skip to test step 6.
The SAP Fiori Launchpad displays.
2 Access the App Open the Maintain Bill Of Material - Create, change & display BOMs (F1813) app. The Maintain Bill of Material app is launched.
3 Find BOM On the Maintain Bill of Material screen, make the following entries and choose Go:
â—Ź Material: FG126
â—Ź Plant: 1710
â—Ź BOM Usage: Production
BOM is displayed in the result list.
4 Open BOM Select the BOM FG126 in the result list. The BOM details are displayed.
5 Choose Edit Choose Edit. BOM can be edited now.
6 Check the status of the BOM On the Header Attributes, set the BOM status to 1(Active). Status is set to Active.
7 Save BOM Choose Save. BOM is saved.
4.5 Set Status of Change Master to Inactive
Test Administration
Customer project: Fill in the project-specific parts.
Test Case ID <X.XX> Testing Date:
Tester Name: Duration:
Business Role(s): Responsibility: <State the Service Provider, Customer or Joint Service Provider and Customer>
Basic Handover of Bill of Material (1ZI_US)
Test Procedures PUBLIC 13
Purpose
In this process step, you set the Change Master Status to Inactive so that this specific Change Master cannot be used anymore for managing further changes.
Procedure
Test Step
#
Test Step Name Instruction Expected Result Comments
1 Log On Log on to the SAP Fiori launchpad as Production Engineer - Discrete Manufacturing. The SAP Fiori launchpad displays.
2 Access the Fiori App Open Manage Change Masters (F2212) app.
In the Manage Change Masters screen, search for CN001 and choose CN001 from
the search table.
The Change Master screen is displayed..
3 Enter Change Number In the Change Master screen, choose Edit.
Example Change Number: CN001
4 Set Change Master
Status
In the Change Change Master: Change Header screen, set the status as 02-
Inactive
The Change Master Status is set to Inactive; this way the Change Master cannot be
used anymore.
5 Choose Save The Change Master is saved
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 14
5 Appendix
5.1 Process Integration
The process to be tested in this test script is part of a chain of integrated processes.
5.1.1 Preceding Processes
You may first have completed the following processes and conditions before you start with the test steps:
Process Business Condition
Engineering Bill of Material – Change Master Management(1R3)
5.1.2 Succeeding Processes
After completing the activities in this test script, you can continue testing the following business processes:
Process Business Condition
Make-to-Stock Production - Discrete Manufacturing (BJ5) The production order is created and processed.
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 15
Typographic Conventions
Type Style Description
Example Words or characters quoted from the screen. These include field names, screen titles, pushbuttons labels, menu names, menu paths, and menu options.
Textual cross-references to other documents.
Example Emphasized words or expressions.
EXAMPLE Technical names of system objects. These include report names, program names, transaction codes, table names, and key concepts of a programming language when they
are surrounded by body text, for example, SELECT and INCLUDE.
Example Output on the screen. This includes file and directory names and their paths, messages, names of variables and parameters, source text, and names of installation,
upgrade and database tools.
Example Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation.
<Example> Variable user entry. Angle brackets indicate that you replace these words and characters with appropriate entries to make entries in the system.
EXAMPLE Keys on the keyboard, for example, F2 or ENTER .
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 16
Screen Shot for Step 4.1 (Create Change Master)
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 17
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 18
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 19
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 20
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 21
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 22
Screen Shot for Step 4.2 (Create Manufacturing Bill of Material as Copy of Engineering Bill of Material)
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 23
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 24
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 25
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 26
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 27
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 28
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 29
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 30
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 31
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 32
Screen Shot for Step 4.3 (Rework Manufacturing BOM)
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 33
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 34
Scrreen Shot for Step 4.4 (Release Manufacturing BOM)
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 35
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 36
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 37
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 38
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 39
Screen Shot for Step 4.5 (Set Status of Change Master to Inactive)
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 40
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 41
Basic Handover of Bill of Material (1ZI_US)
Appendix PUBLIC 42
www.sap.com/contactsap
© 2022 SAP SE or an SAP affiliate company. All rights reserved.
No part of this publication may be reproduced or transmitted in any form or
for any purpose without the express permission of SAP SE or an SAP affiliate
company. The information contained herein may be changed without prior
notice.
Some software products marketed by SAP SE and its distributors contain
proprietary software components of other software vendors. National
product specifications may vary.
These materials are provided by SAP SE or an SAP affiliate company for
informational purposes only, without representation or warranty of any
kind, and SAP or its affiliated companies shall not be liable for errors or
omissions with respect to the materials. The only warranties for SAP or SAP
affiliate company products and services are those that are set forth in the
express warranty statements accompanying such products and services, if
any. Nothing herein should be construed as constituting an additional
warranty.
SAP and other SAP products and services mentioned herein as well as their
respective logos are trademarks or registered trademarks of SAP SE (or an
SAP affiliate company) in Germany and other countries. All other product
and service names mentioned are the trademarks of their respective
companies.
See www.sap.com/copyright for additional trademark
information and notices.

More Related Content

Similar to Basic Handover of Bill of Material(2).docx

1QM_S4HANA2021_BPD_EN_IT.docx
1QM_S4HANA2021_BPD_EN_IT.docx1QM_S4HANA2021_BPD_EN_IT.docx
1QM_S4HANA2021_BPD_EN_IT.docxMarioHernandez309914
 
Ashwin J-resume
Ashwin J-resumeAshwin J-resume
Ashwin J-resumeAshwin J
 
Production Module & Report Completion Sub-Module. .pptx
Production Module & Report Completion Sub-Module. .pptxProduction Module & Report Completion Sub-Module. .pptx
Production Module & Report Completion Sub-Module. .pptxLamees EL- Ghazoly
 
J11_S4CLD2208_BPD_EN_US.docx
J11_S4CLD2208_BPD_EN_US.docxJ11_S4CLD2208_BPD_EN_US.docx
J11_S4CLD2208_BPD_EN_US.docxArun Obilisetty
 
The Pennsylvania State University: Modernizing and Standardizing the Penn Sta...
The Pennsylvania State University: Modernizing and Standardizing the Penn Sta...The Pennsylvania State University: Modernizing and Standardizing the Penn Sta...
The Pennsylvania State University: Modernizing and Standardizing the Penn Sta...Software AG
 
Fi enhancement technique how-to-guide on the usage of business transaction ...
Fi enhancement technique   how-to-guide on the usage of business transaction ...Fi enhancement technique   how-to-guide on the usage of business transaction ...
Fi enhancement technique how-to-guide on the usage of business transaction ...Rajeev Kumar
 
Fi enhancement technique how-to-guide on the usage of business transaction ...
Fi enhancement technique   how-to-guide on the usage of business transaction ...Fi enhancement technique   how-to-guide on the usage of business transaction ...
Fi enhancement technique how-to-guide on the usage of business transaction ...Kranthi Kumar
 
IRJET- Enhancement of Enterprise Resource Planning (ERP) for Construction Imp...
IRJET- Enhancement of Enterprise Resource Planning (ERP) for Construction Imp...IRJET- Enhancement of Enterprise Resource Planning (ERP) for Construction Imp...
IRJET- Enhancement of Enterprise Resource Planning (ERP) for Construction Imp...IRJET Journal
 
List of mandatory IATF 16949 documents
List of mandatory IATF 16949 documents List of mandatory IATF 16949 documents
List of mandatory IATF 16949 documents Global Manager Group
 
Creating attachments to work items or to user decisions in workflows
Creating attachments to work items or to user decisions in workflowsCreating attachments to work items or to user decisions in workflows
Creating attachments to work items or to user decisions in workflowsHicham Khallouki
 
How to improve user experience via roles
How to improve user experience via rolesHow to improve user experience via roles
How to improve user experience via rolesSiva Pradeep Bolisetti
 
Function Point Analysis
Function Point AnalysisFunction Point Analysis
Function Point AnalysisAraf Karsh Hamid
 
FS for FICO
FS for FICOFS for FICO
FS for FICOsadasivab
 
Dynamics gp insights to manufacturing
Dynamics gp insights to manufacturingDynamics gp insights to manufacturing
Dynamics gp insights to manufacturingSteve Chapman
 
Resume Manoj Kumar M
Resume Manoj Kumar MResume Manoj Kumar M
Resume Manoj Kumar MManoj Kumar
 
GRUG 2.0 8 Digital Guerrilla - shared parameters 20181025
GRUG 2.0 8 Digital Guerrilla - shared parameters 20181025GRUG 2.0 8 Digital Guerrilla - shared parameters 20181025
GRUG 2.0 8 Digital Guerrilla - shared parameters 20181025Glasgow Revit User Group
 

Similar to Basic Handover of Bill of Material(2).docx (20)

Sap pp-user-manual
Sap pp-user-manualSap pp-user-manual
Sap pp-user-manual
 
1QM_S4HANA2021_BPD_EN_IT.docx
1QM_S4HANA2021_BPD_EN_IT.docx1QM_S4HANA2021_BPD_EN_IT.docx
1QM_S4HANA2021_BPD_EN_IT.docx
 
Ashwin J-resume
Ashwin J-resumeAshwin J-resume
Ashwin J-resume
 
Production Module & Report Completion Sub-Module. .pptx
Production Module & Report Completion Sub-Module. .pptxProduction Module & Report Completion Sub-Module. .pptx
Production Module & Report Completion Sub-Module. .pptx
 
J11_S4CLD2208_BPD_EN_US.docx
J11_S4CLD2208_BPD_EN_US.docxJ11_S4CLD2208_BPD_EN_US.docx
J11_S4CLD2208_BPD_EN_US.docx
 
The Pennsylvania State University: Modernizing and Standardizing the Penn Sta...
The Pennsylvania State University: Modernizing and Standardizing the Penn Sta...The Pennsylvania State University: Modernizing and Standardizing the Penn Sta...
The Pennsylvania State University: Modernizing and Standardizing the Penn Sta...
 
Fi enhancement technique how-to-guide on the usage of business transaction ...
Fi enhancement technique   how-to-guide on the usage of business transaction ...Fi enhancement technique   how-to-guide on the usage of business transaction ...
Fi enhancement technique how-to-guide on the usage of business transaction ...
 
Fi enhancement technique how-to-guide on the usage of business transaction ...
Fi enhancement technique   how-to-guide on the usage of business transaction ...Fi enhancement technique   how-to-guide on the usage of business transaction ...
Fi enhancement technique how-to-guide on the usage of business transaction ...
 
IRJET- Enhancement of Enterprise Resource Planning (ERP) for Construction Imp...
IRJET- Enhancement of Enterprise Resource Planning (ERP) for Construction Imp...IRJET- Enhancement of Enterprise Resource Planning (ERP) for Construction Imp...
IRJET- Enhancement of Enterprise Resource Planning (ERP) for Construction Imp...
 
List of mandatory IATF 16949 documents
List of mandatory IATF 16949 documents List of mandatory IATF 16949 documents
List of mandatory IATF 16949 documents
 
Creating attachments to work items or to user decisions in workflows
Creating attachments to work items or to user decisions in workflowsCreating attachments to work items or to user decisions in workflows
Creating attachments to work items or to user decisions in workflows
 
Bte
BteBte
Bte
 
Bte
BteBte
Bte
 
1656654300995.pdf
1656654300995.pdf1656654300995.pdf
1656654300995.pdf
 
How to improve user experience via roles
How to improve user experience via rolesHow to improve user experience via roles
How to improve user experience via roles
 
Function Point Analysis
Function Point AnalysisFunction Point Analysis
Function Point Analysis
 
FS for FICO
FS for FICOFS for FICO
FS for FICO
 
Dynamics gp insights to manufacturing
Dynamics gp insights to manufacturingDynamics gp insights to manufacturing
Dynamics gp insights to manufacturing
 
Resume Manoj Kumar M
Resume Manoj Kumar MResume Manoj Kumar M
Resume Manoj Kumar M
 
GRUG 2.0 8 Digital Guerrilla - shared parameters 20181025
GRUG 2.0 8 Digital Guerrilla - shared parameters 20181025GRUG 2.0 8 Digital Guerrilla - shared parameters 20181025
GRUG 2.0 8 Digital Guerrilla - shared parameters 20181025
 

Recently uploaded

Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaVirag Sontakke
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfadityarao40181
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxAnaBeatriceAblay2
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsanshu789521
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...Marc Dusseiller Dusjagr
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 

Recently uploaded (20)

Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
Painted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of IndiaPainted Grey Ware.pptx, PGW Culture of India
Painted Grey Ware.pptx, PGW Culture of India
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Bikash Puri  Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Bikash Puri Delhi reach out to us at 🔝9953056974🔝
 
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
 
Biting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdfBiting mechanism of poisonous snakes.pdf
Biting mechanism of poisonous snakes.pdf
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptxENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
ENGLISH5 QUARTER4 MODULE1 WEEK1-3 How Visual and Multimedia Elements.pptx
 
Presiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha electionsPresiding Officer Training module 2024 lok sabha elections
Presiding Officer Training module 2024 lok sabha elections
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
“Oh GOSH! Reflecting on Hackteria's Collaborative Practices in a Global Do-It...
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 

Basic Handover of Bill of Material(2).docx

  • 1. Table of Contents 1 Purpose 2 2 Prerequisites 3 2.1 System Access 3 2.2 Roles 3 2.3 Master Data, Organizational Data, and Other Data 3 2.4 Business Conditions 5 3 Overview Table 6 4 Test Procedures 7 4.1 Create Change Master 7 4.2 Create Manufacturing Bill of Material as Copy of Engineering Bill of Material 8 4.3 Rework Manufacturing BOM 10 4.4 Release Manufacturing BOM 11 4.5 Set Status of Change Master to Inactive 12 5 Appendix 14 5.1 Process Integration 14 5.1.1 Preceding Processes 14 5.1.2 Succeeding Processes 14 Test Script SAP S/4HANA - 29-09-22 Basic Handover of Bill of Material (1ZI_US) PUBLIC
  • 2. Basic Handover of Bill of Material (1ZI_US) Purpose PUBLIC 2 1 Purpose Handover to Manufacturing allows the user to create a Manufacturing Bill of Material from an Engineering Bill of Material within one step. The manufacturing Bill of Material is initially being created as a copy of the Engineering Bill of Material. With this step the system automatically generates a linkage between both Bill of Materials. As an optional step this newly created Manufacturing Bill of Material can be reworked with Change Management technology. Finally this Bill of Material will be release for productive use. This document provides a detailed procedure for testing this scope item after solution activation, reflecting the predefined scope of the solution. Each process step, report, or item is covered in its own section, providing the system interactions (test steps) in a table view. Steps that are not in scope of the process but are needed for testing are marked accordingly. Project-specific steps must be added. Note Values in this test script (decimal notation, date formats, and so on) are presented in U.S. standard notation. If your test system is set up to use a different notation, enter values as appropriate.
  • 3. Basic Handover of Bill of Material (1ZI_US) Prerequisites PUBLIC 3 2 Prerequisites This section summarizes all the prerequisites for conducting the test in terms of systems, users, master data, organizational data, other test data and business conditions. 2.1 System Access System Details System Accessible via SAP Fiori launchpad. Your system administrator provides you with the URL to access the various apps assigned to your role. 2.2 Roles Assign the following business roles to your individual test users. Alternatively, if available, you can create business roles using the following spaces with pages and predefined apps for the SAP Fiori launchpad and assign the business roles to your individual test users. Note These roles or spaces are examples provided by SAP. You can use them as templates to create your own roles or spaces. For more information about business roles, refer to Assigning business roles to a user in the Administration Guide to Implementation of SAP S/4HANA with SAP Best Practices . Name (Role) ID (Role) Name (Launchpad Space) ID (Launchpad Space) Log On â—Ź Production Engineer - Discrete Manufacturing Maintains manufacturing-relevant master data such as bill of materials. Coordinates with engineering department, production supervisors, and others relevant for manufacturing. SAP_BR_PRODN_ENG_DISC Production Engineer - Discrete Manufacturing SAP_BR_PRODN_ENG_DISC 2.3 Master Data, Organizational Data, and Other Data Released FG126 Material BOM as Engineering BOM (see detail 1R3).
  • 4. Basic Handover of Bill of Material (1ZI_US) Prerequisites PUBLIC 4 Data Sample Value Details Comments Plant 1710 Plant 1 US Material FG126 FIN126,MTS-DI,PD,Batch-Fifo,SerialNo Material RM129 RAW129,PD Additional Manufacturing Material E-BOM BOM structure for FG126 Material FG126 FIN126,MTS-DI,PD,Batch-Fifo,SerialNo Material SG21 SEMI21,PD,RepetitiveManuf. Material SG22 SEMI22,PD,Phantom Material RM122 RAW122,PD,Batch-Fifo,ProcureImport Material RM128 RAW128,PD,Consignment Material RM120 RAW120,PD,QualityManaged Material SG23 SEMI23,PD,Subcontracting Material SG25 SEMI25,PD,ExternalProcurement Material SG124 SEMI124,PD,Subassembly Material RM20 RAW20,PD Material RM27 RAW27,PD,PackagingBox For more information on creating master data objects, see the following Master Data Scripts (MDS) Table 1: Master Data Script Reference Master Data ID Description BNR Create Product Master of Type "Raw Material" BNS Create Product Master of Type "Semi-Finished Good" BNT Create Product Master of Type "Finished Good"
  • 5. Basic Handover of Bill of Material (1ZI_US) Prerequisites PUBLIC 5 2.4 Business Conditions Before this scope item can be tested, the following business conditions must be met. Scope Item Business Condition 1R3 – Engineering Bill of Material - Change Master Management Engineering BOM FG126 is created. For testing purposes, the objects listed in Overview Table [page ] 6 are already created in your system.
  • 6. Basic Handover of Bill of Material (1ZI_US) Overview Table PUBLIC 6 3 Overview Table This scope item consists of several process steps, provided in the table below. Note If your system administrator has enabled spaces and pages on the SAP Fiori launchpad, the homepage will only contain the essential apps for performing the typical tasks of a business role. You can find all other apps not included on the homepage using the search bar. If you want to personalize the homepage and include the hidden apps, navigate to your user profile and choose App Finder. Process Step Business Role App/Transaction Expected Results Create Change Master [page ] 7 Production Engineer - Discrete Manufacturing Manage Change Masters (F2212) Change Master is created. Create Manufacturing Bill of Material as Copy of Engineering Bill of Material [page ] 8 Production Engineer - Discrete Manufacturing Maintain Bill Of Material - Create, change & display BOMs (F1813) M-BOM is created. Rework Manufacturing BOM [page ] 10 Production Engineer - Discrete Manufacturing Maintain Bill Of Material - Create, change & display BOMs (F1813) M-BOM is reworked. Release Manufacturing BOM [page ] 11 Production Engineer - Discrete Manufacturing Maintain Bill Of Material - Create, change & display BOMs (F1813) M-BOM is released. Set Status of Change Master to Inactive [page ] 12 Production Engineer - Discrete Manufacturing Manage Change Masters (F2212) Change master status is set to inactive.
  • 7. Basic Handover of Bill of Material (1ZI_US) Test Procedures PUBLIC 7 4 Test Procedures This section describes test procedures for each process step that belongs to this scope item. 4.1 Create Change Master Test Administration Customer project: Fill in the project-specific parts. Test Case ID <X.XX> Testing Date: Tester Name: Duration: Business Role(s): Responsibility: <State the Service Provider, Customer or Joint Service Provider and Customer> Purpose In this process step, you create the change master that is used to create the manufacturing BOM. Procedure Test Step # Test Step Name Instructions Expected Result Comments 1 Log on Log on to the SAP Fiori launchpad as Production Engineer - Discrete Manufacturing. The SAP Fiori launchpad displays. 2 Access the app Open the Manage Change Masters (F2212) app. In the Manage Change Masters screen, choose Create. The Create Change Master: Initial Screen screen is displayed. 3 Enter Change Number In the Create Change Master: Initial Screen screen, enter data as provided in the following example and press Enter .
  • 8. Basic Handover of Bill of Material (1ZI_US) Test Procedures PUBLIC 8 Test Step # Test Step Name Instructions Expected Result Comments Example Change Number: CN001 Leave default values in other fields. 4 Enter Change Master data In the Create Change Master: Change Header screen, enter data as provided in the following example and press Enter : Example Field beside Change Number: Change Master for BOM FG126. Valid From: Today Change no. status: 01 Active 5 Select Checkboxes for Bill of Material In the Create Change Master: Object Types screen, Object types table, Bill of Material row, select the following checkboxes: Actv. Object MgtRec 6 Save the change master Choose Save. The change master is created. 4.2 Create Manufacturing Bill of Material as Copy of Engineering Bill of Material Test Administration Customer project: Fill in the project-specific parts. Test Case ID <X.XX> Testing Date: Tester Name: Duration: Business Role(s): Responsibility: <State the Service Provider, Customer or Joint Service Provider and Customer>
  • 9. Basic Handover of Bill of Material (1ZI_US) Test Procedures PUBLIC 9 Purpose In this process, you create a new manufacturing bill of material (MBOM) as a copy of an engineering bill of material (EBOM). Procedure Test Step # Test Step Name Instruction Expected Result Comments 1 Log on Log on to the SAP Fiori launchpad as Production Engineer - Discrete Manufacturing. The SAP Fiori launchpad is displayed. 2 Access the app Open the Maintain Bill Of Material - Create, change & display BOMs (F1813) app. The Maintain Bill of Material screen is displayed. 3 Find the EBOM Make the following entries, and choose Go: â—Ź Material: FG126 â—Ź BOM Usage: Engineering/Design The EBOM is displayed in the search results. 4 Hand over the EBOM to manufacturing 1. Select the BOM FG126, and then choose Handover to Manufacturing. If the Handover Engineering Product Structures (3NE) scope item is activated, a dialog box displays prompting you to choose whether to hand over from the current app or from the Hand Over Engineering Bill of Material (EBOM) (F3056) app. 2. If the prompt displays, select From Current App, and choose OK. 3. On the Handover to Manufacturing dialog box, make the following entries: • Plant:1710 • Change Number:CN003 4. Select the Copy Components check box. (Selected by default) 5. Choose OK. The EBOM is copied over to a new MBOM, which displays in the draft mode. 5 Save the MBOM Choose Create. The MBOM is created.
  • 10. Basic Handover of Bill of Material (1ZI_US) Test Procedures PUBLIC 10 4.3 Rework Manufacturing BOM Test Administration Customer project: Fill in the project-specific parts. Test Case ID <X.XX> Testing Date: Tester Name: Duration: Business Role(s): Responsibility: <State the Service Provider, Customer or Joint Service Provider and Customer> Purpose In this process step, you add a new component to the BOM. Procedure Test Step # Test Step Name Instruction Expected Result Comments 1 Log on Log on to the SAP Fiori Launchpad as Production Engineer - Discrete Manufacturing. Note If you are already logged on and the BOM details are already displayed, then skip to test step 7. The SAP Fiori Launchpad displays. 2 Access the app Open the Maintain Bill Of Material - Create, change & display BOMs (F1813) app. The Maintain Bill of Material screen is displayed. 3 Find BOM Make the following entries and choose Go: â—Ź Material: FG126 â—Ź Plant: 1710 â—Ź BOM Usage: Production BOM is displayed in the result list. 4 Open BOM Select the BOM in the result list. The BOM details are displayed.
  • 11. Basic Handover of Bill of Material (1ZI_US) Test Procedures PUBLIC 11 Test Step # Test Step Name Instruction Expected Result Comments 5 Choose Edit Choose Edit. Tip If the Edit button is not visible, then choose More options and then choose Edit. BOM can be edited now. 6 Enter BOM Item Category, Component, and Component quantity Make the following entries in the top row: Item Category: Stock item (default) Component: RM129 Component quantity: 2 PC BOM Item Number, Component, Component Description, and Component quantity are displayed in the top row in the table. 7 Save BOM In the Maintain Bill of Materia screen, choose Save. The Material BOM saved message appears. Choose Close. BOM is saved. 4.4 Release Manufacturing BOM Test Administration Customer project: Fill in the project-specific parts. Test Case ID <X.XX> Testing Date: Tester Name: Duration: Business Role(s): Responsibility: <State the Service Provider, Customer or Joint Service Provider and Customer> Purpose In this process step, you release the BOM.
  • 12. Basic Handover of Bill of Material (1ZI_US) Test Procedures PUBLIC 12 Procedure Test Step # Test Step Name Instruction Expected Result Comments 1 Log On Log on to the SAP Fiori Launchpad as Production Engineer - Discrete Manufacturing. Note If you are already logged on and the BOM details are already displayed, then skip to test step 6. The SAP Fiori Launchpad displays. 2 Access the App Open the Maintain Bill Of Material - Create, change & display BOMs (F1813) app. The Maintain Bill of Material app is launched. 3 Find BOM On the Maintain Bill of Material screen, make the following entries and choose Go: â—Ź Material: FG126 â—Ź Plant: 1710 â—Ź BOM Usage: Production BOM is displayed in the result list. 4 Open BOM Select the BOM FG126 in the result list. The BOM details are displayed. 5 Choose Edit Choose Edit. BOM can be edited now. 6 Check the status of the BOM On the Header Attributes, set the BOM status to 1(Active). Status is set to Active. 7 Save BOM Choose Save. BOM is saved. 4.5 Set Status of Change Master to Inactive Test Administration Customer project: Fill in the project-specific parts. Test Case ID <X.XX> Testing Date: Tester Name: Duration: Business Role(s): Responsibility: <State the Service Provider, Customer or Joint Service Provider and Customer>
  • 13. Basic Handover of Bill of Material (1ZI_US) Test Procedures PUBLIC 13 Purpose In this process step, you set the Change Master Status to Inactive so that this specific Change Master cannot be used anymore for managing further changes. Procedure Test Step # Test Step Name Instruction Expected Result Comments 1 Log On Log on to the SAP Fiori launchpad as Production Engineer - Discrete Manufacturing. The SAP Fiori launchpad displays. 2 Access the Fiori App Open Manage Change Masters (F2212) app. In the Manage Change Masters screen, search for CN001 and choose CN001 from the search table. The Change Master screen is displayed.. 3 Enter Change Number In the Change Master screen, choose Edit. Example Change Number: CN001 4 Set Change Master Status In the Change Change Master: Change Header screen, set the status as 02- Inactive The Change Master Status is set to Inactive; this way the Change Master cannot be used anymore. 5 Choose Save The Change Master is saved
  • 14. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 14 5 Appendix 5.1 Process Integration The process to be tested in this test script is part of a chain of integrated processes. 5.1.1 Preceding Processes You may first have completed the following processes and conditions before you start with the test steps: Process Business Condition Engineering Bill of Material – Change Master Management(1R3) 5.1.2 Succeeding Processes After completing the activities in this test script, you can continue testing the following business processes: Process Business Condition Make-to-Stock Production - Discrete Manufacturing (BJ5) The production order is created and processed.
  • 15. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 15 Typographic Conventions Type Style Description Example Words or characters quoted from the screen. These include field names, screen titles, pushbuttons labels, menu names, menu paths, and menu options. Textual cross-references to other documents. Example Emphasized words or expressions. EXAMPLE Technical names of system objects. These include report names, program names, transaction codes, table names, and key concepts of a programming language when they are surrounded by body text, for example, SELECT and INCLUDE. Example Output on the screen. This includes file and directory names and their paths, messages, names of variables and parameters, source text, and names of installation, upgrade and database tools. Example Exact user entry. These are words or characters that you enter in the system exactly as they appear in the documentation. <Example> Variable user entry. Angle brackets indicate that you replace these words and characters with appropriate entries to make entries in the system. EXAMPLE Keys on the keyboard, for example, F2 or ENTER .
  • 16. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 16 Screen Shot for Step 4.1 (Create Change Master)
  • 17. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 17
  • 18. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 18
  • 19. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 19
  • 20. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 20
  • 21. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 21
  • 22. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 22 Screen Shot for Step 4.2 (Create Manufacturing Bill of Material as Copy of Engineering Bill of Material)
  • 23. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 23
  • 24. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 24
  • 25. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 25
  • 26. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 26
  • 27. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 27
  • 28. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 28
  • 29. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 29
  • 30. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 30
  • 31. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 31
  • 32. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 32 Screen Shot for Step 4.3 (Rework Manufacturing BOM)
  • 33. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 33
  • 34. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 34 Scrreen Shot for Step 4.4 (Release Manufacturing BOM)
  • 35. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 35
  • 36. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 36
  • 37. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 37
  • 38. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 38
  • 39. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 39 Screen Shot for Step 4.5 (Set Status of Change Master to Inactive)
  • 40. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 40
  • 41. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 41
  • 42. Basic Handover of Bill of Material (1ZI_US) Appendix PUBLIC 42
  • 43. www.sap.com/contactsap © 2022 SAP SE or an SAP affiliate company. All rights reserved. No part of this publication may be reproduced or transmitted in any form or for any purpose without the express permission of SAP SE or an SAP affiliate company. The information contained herein may be changed without prior notice. Some software products marketed by SAP SE and its distributors contain proprietary software components of other software vendors. National product specifications may vary. These materials are provided by SAP SE or an SAP affiliate company for informational purposes only, without representation or warranty of any kind, and SAP or its affiliated companies shall not be liable for errors or omissions with respect to the materials. The only warranties for SAP or SAP affiliate company products and services are those that are set forth in the express warranty statements accompanying such products and services, if any. Nothing herein should be construed as constituting an additional warranty. SAP and other SAP products and services mentioned herein as well as their respective logos are trademarks or registered trademarks of SAP SE (or an SAP affiliate company) in Germany and other countries. All other product and service names mentioned are the trademarks of their respective companies. See www.sap.com/copyright for additional trademark information and notices.