1. Endplate
Endplate
Max Projection
PLAN
2640
Motor
Side
INTERNAL ELEVATION SECTION
FFL
1000
Isolator
60
100
Structural Opening Width
Between Door Guides
10
40 35
3610
10
600
Concrete Plynth
(Low Level)
3665180 180
4035
5 5
Overall Endplates
400
StructuralOpeningHeightHeadroom
Dry Riser Pipe
Shown Dotted
200
500
350
800
OverallDoorHeight
350All Dimensions Shown In Millimeters If In Doubt Ask!
NOTES FOR CONTRACTOR:
Contractor to provide a flush fixing face
for installation of the door. Jambs and
lintels to be flush, plumb and in the same
plane & clear of projections.
Also please take into account the head &
side room clearances required to
accommodate the door.
We remind you that its the clients
responsibility to ensure the structure is
suitable to accept the weight of the door,
components & fixings.
For the approximate door weight please
consult our offices.
Rev Description Date
02/07/2014
001
K.Crook DO NOT
SCALE !
.
-
Drawn
Date
Chk'd
Drg No.
Date
Rev
.
Renaker Build
Kennedy Building
Murray Street
Manchester.
Quantity:
Operation:
Finish:
Options Included:
1 Nr As Drawn
3 Phase Electric
PPC Colour TBC.
Perforated Lath
Safety Bottom Edge
2 No Safety Beams
100mm Split Guide Angle
Door Type: Steel Roller Shutter
Winnington Avenue, Winnington, Northwich
Cheshire, CW8 4EQ
TEL: 01606 871832 FAX : 01606 871482
EMAIL: SALES@INDUSTRIAL-DOOR-ENG.CO.UK
Electrical Requirements:
3 Phase Operation:
The client must provide a surface mounted
415V 16 amp mains wired 5 pin socket within
1mtr of the intended control panel location.
Door Operation:
Via internal control panel
Radio handsets and receiver by site (volt free
signal)
Radio handsets
Timer self close after pre set timer delay
Emergency operation via floor level emergency
hauling chain
2590
3040
DoorOpeningHeight
100
Waste Pipe
Shown Dotted
500
Clearance