2
TABLE OF CONTENTS
Abstract……………………………………………………………………..……...3
Introduction…………………………………………………………………..…….4
Procedure……………………………………………………………….…….…….5
Results & Discussion……………………………………………………….…....6-9
Conclusion…………………………...……………………………………….…...10
References…………………………...………...……………………………….…11
3
HEATING, VENTILATING AND AIR CONDITIONING PROJECT
Avery Augborne, Donell Hubbard, Darryl Hollis, Asim Manual, Tyrin Thurmon
Tuskegee University
Mechanical Engineering Department
ABSTRACT
The purpose of this project was to design a two story office building with a fully
functional Heating, Ventilation and Air Conditional (HVAC) system located in Auburn, Alabama.
The system was designed to be cost effective while still being efficient in the amount of energy
that’s produced and used. E-Quest was the required software that computed the energy’s
utilization, monthly peak, and peak by end use. The simulation results showed that the electric
demand for the year would be 2442.5 kW and the gas demand would be 426.43 (
Btu
h
*000). The
building’s electric consumption amount was (58329.45 kWh*000) and the gas consumption
amount was 112.23 (Btu*000,000). Depending on the time of the year, the monthly utility bills
will range anywhere from $3,000.00 to $8,000.00. Along with the time of the year, the system’s
location should be an important component when designing it. Different sites will be equipped
with different standard conditions due to the fact that the weather is different all over the world.
Therefore, each design should be made specifically for the location of the system.
4
INTRODUCTION
From residential to commercial, every building is designed with heating, ventilation, and
air conditioning (HVAC) components. For every building in order for individuals to feel
comfortable inside a building, HVAC components should be a necessity. Working on a location
in Auburn Alabama, a modern two story office building had to be design on E-Quest software.
The building had to be modeled as a single space environment with 20,000 sq∙ft. of area. The
front building face must face the west. While designing the office building, key concepts taught
in the class (Sensible heat, Latent heat, Heat transfer through composite walls, etc.) was revisited
and assisted in calculations. In e-Quest we were able to design our building through various
questions and commands that generated the general building specifications. Other required
specifications included the insulation type and the floor-to-floor height. When all the
specification was inputted, the software calculated the output through a simulation of the yearly
usage. Simulations included the plant energy utilization summary, monthly peak and total energy
use, monthly energy by end use, and energy peak breakdown by end use. Some of the
calculations that were used by the software were sensible and latent heat equations, where;
Sensible heat - hs= 1.1 q dt
Latent heat - hl= 4840 q dwlb
These equations determined the various factors the building needed in order to be
designed properly. For example, the total amount of energy used needed to be calculated for the
heating and cooling of the interior space. Keeping in mind the location of the system and the
time of year it was being designed, the software was able to generate cost and consumption of
the system.
5
PROCEDURE
The following procedures were taken for inputs and criteria for the HVAC system in the
e-QUEST software. First the building structure settings were set to a two-story office type of
building that was set to be located in Auburn, Alabama. The building was set to 20,000 sq. ft.
and the building faced in the west direction. The building was then set as a single zone model.
The floor-to-floor height was set to 13 ft and the R-11 Mass roof was set to have a suspended
ceiling with a 4 ft plenum. The roof surface was set to 24 in OC and R-11 Batt insulation was
used. The ground floor was the over crawl space with 4 inch polystyrene insulation with a vinyl
tile finish. The floor was set to 6 in concrete and 4 sliding atrium doors were set and used with
appropriate dimensions. Then exterior windows were selected along with the suitable activity
area allocation scheduling. The cooling design temperature was designed for 72° F with a supply
of 66° F while the heating design temperature was set to 70° F with a supply of 110° F. The
heating/cooling system was then set to be a water loop heat pump and an economizer. Then one
electric chiller and one fuel boiler was selected for what the central plant utilized. The water
heating system was then set to use a 10 hp circulating –pump and was set to being off during
holidays and weekends. Using the software, the computation of the Plant Energy Utilization
Summary, monthly peak and total energy use, monthly energy by end use, and energy peak
breakdown by end use was conducted.
6
RESULTS & DISCUSSION
Figure 1: The graphs and charts above shows the difference between the electric demand and the
gas demand throughout the year. Electric demand is highest in the summer time around July.
Inversely, the gas demand is lowest in the summer time around July, August and September.
7
Figure 2: The graphs and charts above shows the difference between the electric demand and the
gas demand throughout the year. Although the graphs vary throughout the year, the electric
consumption is low in the beginning and end of the year and high in the middle of the year. The
gas consumption seems to stay steady throughout the year.
8
Figure 3: the annual energy consumption by end use is displayed above. The graphs show the
difference between the electric use and fuel use. Although the water heating is only used only by
the fuel, more components are used by electric uses.
9
Figure 4: The system that was designed using the E-Quest software. The building was a two
story office with a door on each side of the building.
10
CONCLUSION
A building’s material, shape, amount of insulation, number of people, changes in energy
use during various times of year and a plethora of additional factors are all important when
creating a simulation of an HVAC system for a fully function building. The group was able to
apply key concepts learned during the course of the semester, including sensible heat, latent heat,
and theoretical calculations. The results show that electricity is used more during the summer
while gas is used more during the winter; which will result in higher utilities bills during the
summer versus the winter because the air conditioning system uses more electricity and costs
more than in the winter where both gas and electricity is being use. The charts for energy
demand and gas demand is similar to the charts for energy consumption and gas consumption.
Differences arise in the winter months were the electricity for space cooling in the electricity
consumption is a lot lower than what was in demand. The gas consumption particularly for water
heating in the summer months was higher than what is demanded for water heating in the
summer months. The energy responsive design is a creative process of integrating the
performance of interfacing systems. Therefore, the final analysis of the simulation’s
consequences of the building must consider the interactions between comprehensive and
affordable.
11
REFERENCES
1. MENG 0418 – Heating, Ventilation, and Air Conditioning (HVAC)
2. https://tuskegee.blackboard.com/bbcswebdav/pid-611652-dt-content-rid-
754687_1/courses/MENG.0418.01.15FA/Introductory%20Tutorial_E-Quest.pdf
3. http://buildingsdatabook.eren.doe.gov/docs%5CDataBooks%5C2010_BEDB.pdf
4. https://www.nationalgridus.com/non_html/shared_energyeff_office.pdf

More Related Content

What's hot

Cfd 02 underhood_flow_analysis_mahindra
Cfd 02 underhood_flow_analysis_mahindraCfd 02 underhood_flow_analysis_mahindra
Cfd 02 underhood_flow_analysis_mahindra
Anand Kumar Chinni
 
Eart air tunnel heat exchanger latest ppt
Eart air tunnel heat exchanger latest pptEart air tunnel heat exchanger latest ppt
Eart air tunnel heat exchanger latest ppt
vikas mahala
 

What's hot (20)

HVAC for Data Centers
HVAC for Data CentersHVAC for Data Centers
HVAC for Data Centers
 
Air conditioning system
Air conditioning system Air conditioning system
Air conditioning system
 
Cfd 02 underhood_flow_analysis_mahindra
Cfd 02 underhood_flow_analysis_mahindraCfd 02 underhood_flow_analysis_mahindra
Cfd 02 underhood_flow_analysis_mahindra
 
Project on HVACR
Project on HVACRProject on HVACR
Project on HVACR
 
Eart air tunnel heat exchanger latest ppt
Eart air tunnel heat exchanger latest pptEart air tunnel heat exchanger latest ppt
Eart air tunnel heat exchanger latest ppt
 
Tdp 201 psychrometrics level 1 fundamentals
Tdp 201 psychrometrics level 1 fundamentalsTdp 201 psychrometrics level 1 fundamentals
Tdp 201 psychrometrics level 1 fundamentals
 
Heating & Cooling Loads Calculations and HVAC Equipment Sizing
Heating & Cooling Loads Calculations  and HVAC Equipment SizingHeating & Cooling Loads Calculations  and HVAC Equipment Sizing
Heating & Cooling Loads Calculations and HVAC Equipment Sizing
 
Chapter4.pdf
Chapter4.pdfChapter4.pdf
Chapter4.pdf
 
Heat Load Calculation
Heat Load CalculationHeat Load Calculation
Heat Load Calculation
 
Cooling load calculations
Cooling load calculationsCooling load calculations
Cooling load calculations
 
HVAC Presentation.pptx
HVAC Presentation.pptxHVAC Presentation.pptx
HVAC Presentation.pptx
 
Design, Installation and Testing of the VRF System
Design, Installation and Testing of the VRF SystemDesign, Installation and Testing of the VRF System
Design, Installation and Testing of the VRF System
 
Load estimation in Air Conditioning
Load estimation in Air ConditioningLoad estimation in Air Conditioning
Load estimation in Air Conditioning
 
Energy efficient hvac
Energy efficient hvac Energy efficient hvac
Energy efficient hvac
 
Chapter 1 hvac
Chapter 1 hvacChapter 1 hvac
Chapter 1 hvac
 
AIR CONDITIONING SYSTEM DESINGING
AIR CONDITIONING SYSTEM DESINGINGAIR CONDITIONING SYSTEM DESINGING
AIR CONDITIONING SYSTEM DESINGING
 
HVAC Cooling Load Calculation
HVAC Cooling Load CalculationHVAC Cooling Load Calculation
HVAC Cooling Load Calculation
 
Duct sizing methods and filter types
Duct sizing methods and filter typesDuct sizing methods and filter types
Duct sizing methods and filter types
 
Air washer
Air washerAir washer
Air washer
 
Hvac basics
Hvac basicsHvac basics
Hvac basics
 

Similar to Hvac course project

HVAC_Annual Operating Cost
HVAC_Annual Operating CostHVAC_Annual Operating Cost
HVAC_Annual Operating Cost
Nate Lee
 
Energy modelling of a three-story primary school building located in Phoenix,...
Energy modelling of a three-story primary school building located in Phoenix,...Energy modelling of a three-story primary school building located in Phoenix,...
Energy modelling of a three-story primary school building located in Phoenix,...
Kirtan Gohel
 
Estimation of HVAC energy saving potential in San Diego apartment units throu...
Estimation of HVAC energy saving potential in San Diego apartment units throu...Estimation of HVAC energy saving potential in San Diego apartment units throu...
Estimation of HVAC energy saving potential in San Diego apartment units throu...
Colin Moynihan
 
Air Water System Design using Revit Mep for a Residential Building
Air Water System Design using Revit Mep for a Residential BuildingAir Water System Design using Revit Mep for a Residential Building
Air Water System Design using Revit Mep for a Residential Building
ijtsrd
 
Final Report Project A
Final Report Project AFinal Report Project A
Final Report Project A
Austin Bonnes
 

Similar to Hvac course project (20)

HVAC_Annual Operating Cost
HVAC_Annual Operating CostHVAC_Annual Operating Cost
HVAC_Annual Operating Cost
 
Intelligent home heating system
Intelligent home heating systemIntelligent home heating system
Intelligent home heating system
 
Intelligent home heating system
Intelligent home heating systemIntelligent home heating system
Intelligent home heating system
 
Building Energy Simulation project by using eQuest
Building Energy Simulation project by using eQuestBuilding Energy Simulation project by using eQuest
Building Energy Simulation project by using eQuest
 
Energy modelling of a three-story primary school building located in Phoenix,...
Energy modelling of a three-story primary school building located in Phoenix,...Energy modelling of a three-story primary school building located in Phoenix,...
Energy modelling of a three-story primary school building located in Phoenix,...
 
Financial Evaluation of Solar Powered Absorption Cooling System for Computer ...
Financial Evaluation of Solar Powered Absorption Cooling System for Computer ...Financial Evaluation of Solar Powered Absorption Cooling System for Computer ...
Financial Evaluation of Solar Powered Absorption Cooling System for Computer ...
 
Estimation of HVAC energy saving potential in San Diego apartment units throu...
Estimation of HVAC energy saving potential in San Diego apartment units throu...Estimation of HVAC energy saving potential in San Diego apartment units throu...
Estimation of HVAC energy saving potential in San Diego apartment units throu...
 
IRJET- Experimental Model Design and Simulation of Air Conditioning System fo...
IRJET- Experimental Model Design and Simulation of Air Conditioning System fo...IRJET- Experimental Model Design and Simulation of Air Conditioning System fo...
IRJET- Experimental Model Design and Simulation of Air Conditioning System fo...
 
Air Water System Design using Revit Mep for a Residential Building
Air Water System Design using Revit Mep for a Residential BuildingAir Water System Design using Revit Mep for a Residential Building
Air Water System Design using Revit Mep for a Residential Building
 
V01 i030602
V01 i030602V01 i030602
V01 i030602
 
Net Zero Energy Project
Net Zero Energy Project Net Zero Energy Project
Net Zero Energy Project
 
Final Report Project A
Final Report Project AFinal Report Project A
Final Report Project A
 
Load Shifting Assessment of Residential Heat Pump System in Japan
Load Shifting Assessment of Residential Heat Pump System in JapanLoad Shifting Assessment of Residential Heat Pump System in Japan
Load Shifting Assessment of Residential Heat Pump System in Japan
 
Load Shifting Assessment of Residential Heat Pump System in Japan
Load Shifting Assessment of Residential Heat Pump System in JapanLoad Shifting Assessment of Residential Heat Pump System in Japan
Load Shifting Assessment of Residential Heat Pump System in Japan
 
Senior Design Project
Senior Design ProjectSenior Design Project
Senior Design Project
 
Thermal Characterization and Performance Evaluation of CPU Heat Sink Design
Thermal Characterization and Performance Evaluation of CPU Heat Sink DesignThermal Characterization and Performance Evaluation of CPU Heat Sink Design
Thermal Characterization and Performance Evaluation of CPU Heat Sink Design
 
Hancock academy 1 Energy modeling for different housing types
Hancock academy 1   Energy modeling for different housing typesHancock academy 1   Energy modeling for different housing types
Hancock academy 1 Energy modeling for different housing types
 
IRJET- AC Room Design on HVAC
IRJET- AC Room Design on HVACIRJET- AC Room Design on HVAC
IRJET- AC Room Design on HVAC
 
IRJET- Design and Development of a Waste Heat Recovery Unit for Household Ref...
IRJET- Design and Development of a Waste Heat Recovery Unit for Household Ref...IRJET- Design and Development of a Waste Heat Recovery Unit for Household Ref...
IRJET- Design and Development of a Waste Heat Recovery Unit for Household Ref...
 
IRJET- Heat Exchanger based on Nano Fluid
IRJET- Heat Exchanger based on Nano FluidIRJET- Heat Exchanger based on Nano Fluid
IRJET- Heat Exchanger based on Nano Fluid
 

Recently uploaded

Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
HenryBriggs2
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 

Recently uploaded (20)

8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using PipesLinux Systems Programming: Inter Process Communication (IPC) using Pipes
Linux Systems Programming: Inter Process Communication (IPC) using Pipes
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)Introduction to Artificial Intelligence ( AI)
Introduction to Artificial Intelligence ( AI)
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
Convergence of Robotics and Gen AI offers excellent opportunities for Entrepr...
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
scipt v1.pptxcxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 

Hvac course project

  • 1. MENG 0418 Heating, Ventilating and Air Conditioning Fall 2015 Department: Mechanical Engineering College of Engineering and Physical Sciences Tuskegee University Design of HVAC for a Modern Two-story Office Building Group Members: Avery Augborne, Darryl Hollis, Donell Hubbard, Asim Manual, Tyrin Thurmon, Date: December 7, 2015
  • 2. 2 TABLE OF CONTENTS Abstract……………………………………………………………………..……...3 Introduction…………………………………………………………………..…….4 Procedure……………………………………………………………….…….…….5 Results & Discussion……………………………………………………….…....6-9 Conclusion…………………………...……………………………………….…...10 References…………………………...………...……………………………….…11
  • 3. 3 HEATING, VENTILATING AND AIR CONDITIONING PROJECT Avery Augborne, Donell Hubbard, Darryl Hollis, Asim Manual, Tyrin Thurmon Tuskegee University Mechanical Engineering Department ABSTRACT The purpose of this project was to design a two story office building with a fully functional Heating, Ventilation and Air Conditional (HVAC) system located in Auburn, Alabama. The system was designed to be cost effective while still being efficient in the amount of energy that’s produced and used. E-Quest was the required software that computed the energy’s utilization, monthly peak, and peak by end use. The simulation results showed that the electric demand for the year would be 2442.5 kW and the gas demand would be 426.43 ( Btu h *000). The building’s electric consumption amount was (58329.45 kWh*000) and the gas consumption amount was 112.23 (Btu*000,000). Depending on the time of the year, the monthly utility bills will range anywhere from $3,000.00 to $8,000.00. Along with the time of the year, the system’s location should be an important component when designing it. Different sites will be equipped with different standard conditions due to the fact that the weather is different all over the world. Therefore, each design should be made specifically for the location of the system.
  • 4. 4 INTRODUCTION From residential to commercial, every building is designed with heating, ventilation, and air conditioning (HVAC) components. For every building in order for individuals to feel comfortable inside a building, HVAC components should be a necessity. Working on a location in Auburn Alabama, a modern two story office building had to be design on E-Quest software. The building had to be modeled as a single space environment with 20,000 sq∙ft. of area. The front building face must face the west. While designing the office building, key concepts taught in the class (Sensible heat, Latent heat, Heat transfer through composite walls, etc.) was revisited and assisted in calculations. In e-Quest we were able to design our building through various questions and commands that generated the general building specifications. Other required specifications included the insulation type and the floor-to-floor height. When all the specification was inputted, the software calculated the output through a simulation of the yearly usage. Simulations included the plant energy utilization summary, monthly peak and total energy use, monthly energy by end use, and energy peak breakdown by end use. Some of the calculations that were used by the software were sensible and latent heat equations, where; Sensible heat - hs= 1.1 q dt Latent heat - hl= 4840 q dwlb These equations determined the various factors the building needed in order to be designed properly. For example, the total amount of energy used needed to be calculated for the heating and cooling of the interior space. Keeping in mind the location of the system and the time of year it was being designed, the software was able to generate cost and consumption of the system.
  • 5. 5 PROCEDURE The following procedures were taken for inputs and criteria for the HVAC system in the e-QUEST software. First the building structure settings were set to a two-story office type of building that was set to be located in Auburn, Alabama. The building was set to 20,000 sq. ft. and the building faced in the west direction. The building was then set as a single zone model. The floor-to-floor height was set to 13 ft and the R-11 Mass roof was set to have a suspended ceiling with a 4 ft plenum. The roof surface was set to 24 in OC and R-11 Batt insulation was used. The ground floor was the over crawl space with 4 inch polystyrene insulation with a vinyl tile finish. The floor was set to 6 in concrete and 4 sliding atrium doors were set and used with appropriate dimensions. Then exterior windows were selected along with the suitable activity area allocation scheduling. The cooling design temperature was designed for 72° F with a supply of 66° F while the heating design temperature was set to 70° F with a supply of 110° F. The heating/cooling system was then set to be a water loop heat pump and an economizer. Then one electric chiller and one fuel boiler was selected for what the central plant utilized. The water heating system was then set to use a 10 hp circulating –pump and was set to being off during holidays and weekends. Using the software, the computation of the Plant Energy Utilization Summary, monthly peak and total energy use, monthly energy by end use, and energy peak breakdown by end use was conducted.
  • 6. 6 RESULTS & DISCUSSION Figure 1: The graphs and charts above shows the difference between the electric demand and the gas demand throughout the year. Electric demand is highest in the summer time around July. Inversely, the gas demand is lowest in the summer time around July, August and September.
  • 7. 7 Figure 2: The graphs and charts above shows the difference between the electric demand and the gas demand throughout the year. Although the graphs vary throughout the year, the electric consumption is low in the beginning and end of the year and high in the middle of the year. The gas consumption seems to stay steady throughout the year.
  • 8. 8 Figure 3: the annual energy consumption by end use is displayed above. The graphs show the difference between the electric use and fuel use. Although the water heating is only used only by the fuel, more components are used by electric uses.
  • 9. 9 Figure 4: The system that was designed using the E-Quest software. The building was a two story office with a door on each side of the building.
  • 10. 10 CONCLUSION A building’s material, shape, amount of insulation, number of people, changes in energy use during various times of year and a plethora of additional factors are all important when creating a simulation of an HVAC system for a fully function building. The group was able to apply key concepts learned during the course of the semester, including sensible heat, latent heat, and theoretical calculations. The results show that electricity is used more during the summer while gas is used more during the winter; which will result in higher utilities bills during the summer versus the winter because the air conditioning system uses more electricity and costs more than in the winter where both gas and electricity is being use. The charts for energy demand and gas demand is similar to the charts for energy consumption and gas consumption. Differences arise in the winter months were the electricity for space cooling in the electricity consumption is a lot lower than what was in demand. The gas consumption particularly for water heating in the summer months was higher than what is demanded for water heating in the summer months. The energy responsive design is a creative process of integrating the performance of interfacing systems. Therefore, the final analysis of the simulation’s consequences of the building must consider the interactions between comprehensive and affordable.
  • 11. 11 REFERENCES 1. MENG 0418 – Heating, Ventilation, and Air Conditioning (HVAC) 2. https://tuskegee.blackboard.com/bbcswebdav/pid-611652-dt-content-rid- 754687_1/courses/MENG.0418.01.15FA/Introductory%20Tutorial_E-Quest.pdf 3. http://buildingsdatabook.eren.doe.gov/docs%5CDataBooks%5C2010_BEDB.pdf 4. https://www.nationalgridus.com/non_html/shared_energyeff_office.pdf