SlideShare a Scribd company logo
1 of 11
Drew Whitney
Engineering Co-Op
Ohio Refining Division
ORD
Contents
• Background Information
• Goals
• Projects
• Take Away
• Future
Date and Tracking Info Here
2
Date and Tracking Info Here
3
Drew’s Background
• 2nd year student at the University
of Cincinnati
• Mechanical Engineering Major
UCMC, Concrete Canoe
• Founder of Diploma Mulching LLC
• 1st Co-op with Marathon
Date and Tracking Info Here
4
Why Co-op
• Benefits of the Co-op Program
– Extended Interview process
– Communication skills
– Real World Experience
– Independence
– $$
Date and Tracking Info Here
5
Goals
• Gain expertise in Mechanical Engineering design
pertaining to the pertaining to the Petroleum Industry.
• Improve professional communication skills
• Gain engineering project management experience.
• Learn and embrace a good corporate safety culture.
Projects:
RFE# 895 Washer and Dryer Install
Date and Tracking Info Here
6
06-TK-075 Sight Glass
Standard Drawings
City Check valve project + Meridian Update
FWS Pressure gauge Piping
VPP Hazard Mitigation Plan Update
Alky Pipe Support
Stock Request forms
Ladder trip hazard/pipe reroute
FDV Air Piping
RFE#922 30-SA-003 Relocation
Electrical Package for Washer and Dryer
Asphalt Breaker Location Confirmation
LSR pump warming line
RFE#912: 35-LI-026 bleeder modification.
NPT Sight Glass
35-TK-Overfill Safeguard
Mobile Sample Station
Boiler House Demo Package
RFE#887 8-SA-001 Relocation
P&ID Updates
Area Engineer Walk down Confirmations
Heat trace pH Sampler
Piping estiamtes
Date and Tracking Info Here
7
Projects- RFE# 895 (Washer and Dryer
Install project)
• Completed Electrical Drawing Package
– Learned how to route Conduit and Modify Panel Schedules
• Communication
– Communicated with Several departments and contractors
Date and Tracking Info Here
8
Projects- Mobile Sample Station
• Versatile
• Portable
• Safe
• Operator Friendly
Date and Tracking Info Here
9
Projects Boiler House Motor Removal
Conducted a Feasibility study
Researched alternative solutions
Found the best solution
Take Away
• Drawings-
• Read/Write P&ID’s, Pipe Design
• Engineering process-
• Need, Proposal, Budgeted, Design, IFA, IFC, Construction, Final Approval.
• Scope-
• Importance of a Complete and Clear.
• A++ Work
• SAFE, Thorough, Efficient
Date and Tracking Info Here
10
Future
• Begin 2nd year at UC
• Graduating Early 2020
• Looking forward to
heading to Robinson for
Summer ‘17 Co-op
Date and Tracking Info Here
11
Thank you for this opportunity!!
Questions?

More Related Content

What's hot

CBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins PresentationCBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins PresentationDamian Coetzee
 
International Seminar on Roads, Bridges and Tunnels 2018
International Seminar on Roads, Bridges and Tunnels 2018International Seminar on Roads, Bridges and Tunnels 2018
International Seminar on Roads, Bridges and Tunnels 2018SteliosPentheroudaki
 
Process Engineering Consultancy Services in Oil & Gas and Power Generation se...
Process Engineering Consultancy Services in Oil & Gas and Power Generation se...Process Engineering Consultancy Services in Oil & Gas and Power Generation se...
Process Engineering Consultancy Services in Oil & Gas and Power Generation se...Luca Finardi
 
Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)Obi-Ugbo Alex
 
Resume_updated 2014
Resume_updated 2014Resume_updated 2014
Resume_updated 2014J.D. Squire
 
CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15Dave Beveridge
 
Uday Kiran Updated Resume
Uday Kiran Updated ResumeUday Kiran Updated Resume
Uday Kiran Updated ResumeUday Kiran
 
House Shaw Siteplan Final 03
House Shaw Siteplan Final 03House Shaw Siteplan Final 03
House Shaw Siteplan Final 03Terence Botha
 
D Snyder Resume Power Point Presentation
D Snyder Resume Power Point PresentationD Snyder Resume Power Point Presentation
D Snyder Resume Power Point Presentationdennissnyder54
 
CD 2016 March - Advisian Showcase
CD 2016 March - Advisian ShowcaseCD 2016 March - Advisian Showcase
CD 2016 March - Advisian ShowcaseComit Projects Ltd
 
Kalyan Chunchu Resume
Kalyan Chunchu Resume Kalyan Chunchu Resume
Kalyan Chunchu Resume Kalyan Chunchu
 
Shawn Witt Portfolio
Shawn Witt PortfolioShawn Witt Portfolio
Shawn Witt PortfolioShawn Witt
 
Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...
Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...
Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...energytrustor
 

What's hot (20)

CBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins PresentationCBI-electric Renewable Cabins Presentation
CBI-electric Renewable Cabins Presentation
 
Resume - Christopher Neil, PE
Resume - Christopher Neil, PEResume - Christopher Neil, PE
Resume - Christopher Neil, PE
 
resume'2016.docx
resume'2016.docxresume'2016.docx
resume'2016.docx
 
International Seminar on Roads, Bridges and Tunnels 2018
International Seminar on Roads, Bridges and Tunnels 2018International Seminar on Roads, Bridges and Tunnels 2018
International Seminar on Roads, Bridges and Tunnels 2018
 
CWood-Resume
CWood-ResumeCWood-Resume
CWood-Resume
 
Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]Resume_[Sr. Estimator - Sr. QS]
Resume_[Sr. Estimator - Sr. QS]
 
Process Engineering Consultancy Services in Oil & Gas and Power Generation se...
Process Engineering Consultancy Services in Oil & Gas and Power Generation se...Process Engineering Consultancy Services in Oil & Gas and Power Generation se...
Process Engineering Consultancy Services in Oil & Gas and Power Generation se...
 
Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)Power Point Presentation for (Advance Project Management)
Power Point Presentation for (Advance Project Management)
 
Resume (pdf file)
Resume (pdf file)Resume (pdf file)
Resume (pdf file)
 
Resume_updated 2014
Resume_updated 2014Resume_updated 2014
Resume_updated 2014
 
2016 CBresume
2016 CBresume2016 CBresume
2016 CBresume
 
CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15CV DAVE BEVERIDGE 12.04.15
CV DAVE BEVERIDGE 12.04.15
 
Uday Kiran Updated Resume
Uday Kiran Updated ResumeUday Kiran Updated Resume
Uday Kiran Updated Resume
 
House Shaw Siteplan Final 03
House Shaw Siteplan Final 03House Shaw Siteplan Final 03
House Shaw Siteplan Final 03
 
D Snyder Resume Power Point Presentation
D Snyder Resume Power Point PresentationD Snyder Resume Power Point Presentation
D Snyder Resume Power Point Presentation
 
RichmondApande PM
RichmondApande PMRichmondApande PM
RichmondApande PM
 
CD 2016 March - Advisian Showcase
CD 2016 March - Advisian ShowcaseCD 2016 March - Advisian Showcase
CD 2016 March - Advisian Showcase
 
Kalyan Chunchu Resume
Kalyan Chunchu Resume Kalyan Chunchu Resume
Kalyan Chunchu Resume
 
Shawn Witt Portfolio
Shawn Witt PortfolioShawn Witt Portfolio
Shawn Witt Portfolio
 
Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...
Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...
Stay Ahead of Advancing Energy Codes with the Advanced Buildings New Construc...
 

Viewers also liked (19)

AATF 10Anniv Proof1
AATF 10Anniv Proof1AATF 10Anniv Proof1
AATF 10Anniv Proof1
 
2 articulaciones
2 articulaciones2 articulaciones
2 articulaciones
 
USAID-AnnualReport-2009 B
USAID-AnnualReport-2009 BUSAID-AnnualReport-2009 B
USAID-AnnualReport-2009 B
 
Licencias creative commons 1
Licencias creative commons 1Licencias creative commons 1
Licencias creative commons 1
 
desarrollo de la creatividad infantil
desarrollo de la creatividad infantil desarrollo de la creatividad infantil
desarrollo de la creatividad infantil
 
Clase tejido conectivo
Clase tejido conectivoClase tejido conectivo
Clase tejido conectivo
 
DRCIHP_IB_HBB_PrintvFinal
DRCIHP_IB_HBB_PrintvFinalDRCIHP_IB_HBB_PrintvFinal
DRCIHP_IB_HBB_PrintvFinal
 
BILLION TREE LOW RES 2
BILLION TREE LOW RES 2BILLION TREE LOW RES 2
BILLION TREE LOW RES 2
 
4 sistema muscular
4  sistema muscular4  sistema muscular
4 sistema muscular
 
Heart Speak
Heart SpeakHeart Speak
Heart Speak
 
Webside assess speaking
Webside assess speakingWebside assess speaking
Webside assess speaking
 
La economía y su relación con otras ciencias
La economía y su relación con otras cienciasLa economía y su relación con otras ciencias
La economía y su relación con otras ciencias
 
Catalyst Project Presentation
Catalyst Project PresentationCatalyst Project Presentation
Catalyst Project Presentation
 
List of projects .
List of projects .List of projects .
List of projects .
 
1 musculos
1 musculos1 musculos
1 musculos
 
3 tejido oseo y cartilaginoso
3 tejido oseo y cartilaginoso3 tejido oseo y cartilaginoso
3 tejido oseo y cartilaginoso
 
Regulacion mecanismo de acido base 3
Regulacion mecanismo de  acido   base 3Regulacion mecanismo de  acido   base 3
Regulacion mecanismo de acido base 3
 
Axila y plexo braquial1
Axila y plexo braquial1Axila y plexo braquial1
Axila y plexo braquial1
 
Margaret Wynne - CV
Margaret Wynne - CVMargaret Wynne - CV
Margaret Wynne - CV
 

Similar to Drew Whitney Final Presentation

Similar to Drew Whitney Final Presentation (20)

Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15Bill Rogers CV 19-01-15
Bill Rogers CV 19-01-15
 
Planning for Substation Maintenance and Reliability
Planning for Substation Maintenance and ReliabilityPlanning for Substation Maintenance and Reliability
Planning for Substation Maintenance and Reliability
 
R K MISHRA CV
R K MISHRA CVR K MISHRA CV
R K MISHRA CV
 
Jasim_CV_-_2016_W_MEP
Jasim_CV_-_2016_W_MEPJasim_CV_-_2016_W_MEP
Jasim_CV_-_2016_W_MEP
 
P._Perehinec_3-30-16
P._Perehinec_3-30-16P._Perehinec_3-30-16
P._Perehinec_3-30-16
 
Kerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum VitaeKerry Ow Buland - Curriculum Vitae
Kerry Ow Buland - Curriculum Vitae
 
Watlow Malaysia - Monthly 4 BR September 2023.pptx
Watlow Malaysia - Monthly 4 BR September 2023.pptxWatlow Malaysia - Monthly 4 BR September 2023.pptx
Watlow Malaysia - Monthly 4 BR September 2023.pptx
 
Fady samir cv
Fady samir cvFady samir cv
Fady samir cv
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.doc
 
Oil & Gas Engineering
Oil & Gas EngineeringOil & Gas Engineering
Oil & Gas Engineering
 
curr. vitae
curr. vitaecurr. vitae
curr. vitae
 
resume piping
resume pipingresume piping
resume piping
 
Enrico S. Simon
Enrico S. SimonEnrico S. Simon
Enrico S. Simon
 
CV_Shabeer
CV_ShabeerCV_Shabeer
CV_Shabeer
 
RashidFaruqi_Resume_Current
RashidFaruqi_Resume_CurrentRashidFaruqi_Resume_Current
RashidFaruqi_Resume_Current
 
Resume
ResumeResume
Resume
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
 
Rocky Nash Resume A
Rocky Nash Resume ARocky Nash Resume A
Rocky Nash Resume A
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 

Drew Whitney Final Presentation

  • 1. Drew Whitney Engineering Co-Op Ohio Refining Division ORD
  • 2. Contents • Background Information • Goals • Projects • Take Away • Future Date and Tracking Info Here 2
  • 3. Date and Tracking Info Here 3 Drew’s Background • 2nd year student at the University of Cincinnati • Mechanical Engineering Major UCMC, Concrete Canoe • Founder of Diploma Mulching LLC • 1st Co-op with Marathon
  • 4. Date and Tracking Info Here 4 Why Co-op • Benefits of the Co-op Program – Extended Interview process – Communication skills – Real World Experience – Independence – $$
  • 5. Date and Tracking Info Here 5 Goals • Gain expertise in Mechanical Engineering design pertaining to the pertaining to the Petroleum Industry. • Improve professional communication skills • Gain engineering project management experience. • Learn and embrace a good corporate safety culture.
  • 6. Projects: RFE# 895 Washer and Dryer Install Date and Tracking Info Here 6 06-TK-075 Sight Glass Standard Drawings City Check valve project + Meridian Update FWS Pressure gauge Piping VPP Hazard Mitigation Plan Update Alky Pipe Support Stock Request forms Ladder trip hazard/pipe reroute FDV Air Piping RFE#922 30-SA-003 Relocation Electrical Package for Washer and Dryer Asphalt Breaker Location Confirmation LSR pump warming line RFE#912: 35-LI-026 bleeder modification. NPT Sight Glass 35-TK-Overfill Safeguard Mobile Sample Station Boiler House Demo Package RFE#887 8-SA-001 Relocation P&ID Updates Area Engineer Walk down Confirmations Heat trace pH Sampler Piping estiamtes
  • 7. Date and Tracking Info Here 7 Projects- RFE# 895 (Washer and Dryer Install project) • Completed Electrical Drawing Package – Learned how to route Conduit and Modify Panel Schedules • Communication – Communicated with Several departments and contractors
  • 8. Date and Tracking Info Here 8 Projects- Mobile Sample Station • Versatile • Portable • Safe • Operator Friendly
  • 9. Date and Tracking Info Here 9 Projects Boiler House Motor Removal Conducted a Feasibility study Researched alternative solutions Found the best solution
  • 10. Take Away • Drawings- • Read/Write P&ID’s, Pipe Design • Engineering process- • Need, Proposal, Budgeted, Design, IFA, IFC, Construction, Final Approval. • Scope- • Importance of a Complete and Clear. • A++ Work • SAFE, Thorough, Efficient Date and Tracking Info Here 10
  • 11. Future • Begin 2nd year at UC • Graduating Early 2020 • Looking forward to heading to Robinson for Summer ‘17 Co-op Date and Tracking Info Here 11 Thank you for this opportunity!! Questions?