SlideShare a Scribd company logo
1 of 4
1. PROPOSED POSITION : Track Manager
2. NAME : D.K.Midha
3. DATE OF BIRTH : 19-04-1950
4. NATIONALITY : Indian
5. PERSONAL ADDRESS : B/3/4 Rail Vihar Indrapuram Ghaziabad, U.P
MOBILE NO. : 07503808095, 9650362682 off. 7024120860
E-MAIL ADDRESS : dkmidha300@gmail.com
6. EDUCATION : B.Tech (Civil)
7. OTHER TRAINING :  Induction Training into P. Way Engineering Western Railway
 Mechanical Relaying and Tie Tamping of Track by Plassers India
Ltd. (Austrian Co.)
 Welding of Points and Crossing, and Resurfacing of Rails Larson
&Tubro of India.
 Ultra Sonic Testing of Rails, Research and Design Organization of
Indian Railways
 Safety Audit of Track 1979 To 2004
 Man and Material Management, Zonal Railway Training
Institute Gorakhpur Jan. 1990
 First Aid, St. John. Ambulance Association of India.
8. LANGUAGE & DEGREE OF
PROFICIENCY
: English – Full Professional Proficiency
Hindi – Full Professional Proficiency
Punjabi – Proficient
Gujarati – Proficient
9. COUNTRIESOF WORK
EXPERIENCE
: India, Srilanka, Mozambique.
10. EMPLOMENTRECORD/
LENGTHOF PROFESSIONAL
SERVICE
:
S.
No
.
From To Employer
Client
Name of
Project
Position
Held
Descriptionof
Duties
DetailedTasks
Assigned
1. May
2015
Till
Date
Nippon
Koei
Gurgaon-
Bawal Metro
Rail Project.
Civil
Engineer
Preparationof
DPRand
Feasibilityreport.
CollectingSitedata
Andverificationwith
Govt. Recordsandfinal
study ofMRTS Project.
2. June
2014
April
2015
RKM/Athe
na Power
Ltd.
Power
Project
Advisor
Railway
Siding
Completelook
after of
Design,Exection,
PMC ofRailway
Siding.
Control ofexecutionas
per designand
Liasoningwith
Railways.
3. Jan.
2014
June
2014
Ferrovia
Transrails
pvt. Ltd./
DFCCIL
DFCCIL
Durgawat-
New
Kharvandia
(Bihar)New
Track
Layingwith
NTC
Machine.
Project
Manager
Executionof
RailwayTrackas
per DFFC
specifications.
TrackLayingwith NTC
Machine.
Flash-ButtWelding for
LWR Panels
(10 Rail Panel).
4. Jan.
2013
Jan.
2014
M/S
Innovative
B2B
logistics
Solutions
Ltd.
Logistic Park
(PFT)with
Rail Linked
Private
Siding
From
Sahanwal
Railway
Station
(Delhi-
Jammu Tawi
) Punjab.
DGM
(Project)
Complete Execution
of Rail Linked
PrivateLogistic
Park, including all
civilworks.
Earth Work.
TrackLaying
Ballast Less Track
Loading/Unloading
Platforms
OHE Execution.
Signalling Link
With I.R. Station.
CRS approval
5. Sept.
2012
Jan.
2013
Ferrovia
Transrails
pvt. Ltd./
DFCCIL
DFCCIL
Durgawat-
New
Kharvandia
(Bihar)New
Track
Layingwith
NTC
Machine.
Project
Manager
Executionof
RailwayTrackas
per DFFC
specifications.
Establishmentof
WeldingPlantforLWR
Panels
(10 Rail Panel).
TrackLayingwith NTC
Machine.
YardLinking
(Semi-Mechanized
Method).
Final CRS Approval
6. April.
2012
Sept.
2012
M/S
Aarvee
associates
Pvt.Ltd.
Design,
Project
Managemen
t ofPower
Project
Sidingof
GVKat
Consultant Design,
preparationof
ESP,DPRof
RailwayPrivate
SidingsforLogistic
Parksand Power
Plants.
Preparationof
Drawings,
Feasibilityreport,
DetailedProject
Report,
ESPforsubmission
and approval
Goindwal
Punjab.Pre
Bid
Documentati
onfor DFCC
eastern
corridor.
Project
Management.
fromRailways
Site Project
Management,
documentationofall
Checklistsof
Inspectionsasper
Railwayspecifications.
7. Jan.
2011
Marc
h201
2
M/sArshiya
Internation
al Ltd
Execution of
Railway ICD
from Client
Side at
Khurja.
Consultant
/Manager
Supervision, Billing
of Contractor’s
Trackworks as per
I.R.Specifications.
Earth Work.
Minor Bridges,
Manned
Level Crossings,
TrackLaying,
Ballast Less Track
Loading/Unloading
Platformsand all
Related Civil works,
OHE Execution.
Signalling Link
With I.R. Station.
CRS approval
8. Aug.
2010
Jan
2011
M/S Goel
Brothers
Rail Infra
India at
SRILANKA
construction
of New
structure ,
New Track
with 45kg
rails,
construction
of yards,
laying &
assembling of
Track&
commissioni
n for IRCON
in SRI lanka
(fromStation
Galle To
Matara)
Project
Manager
Executionof
RailwayTrackas
per Sri Lanka
Railways
Specifications from
Contractor Side.
Dismantling of
Old Railway Track
And Laying of New
Railway Track
by Mechanized
Method (42 Kms.)
From Galle to Matara
9. Oct
2009
Aug.
2010
M/s Arshiya
Internation
al Ltd
Execution of
Railway ICD
from Client
Side
Manager,
Permanent
Way
Supervision, Billing
ofContractor’s
Trackworksas
per
I.R.Specifications.
Earth Work.
Minor Bridges,
Manned
Level Crossings,
TrackLaying,
Ballast Less Track
Loading/Unloading
Platformsand all
Related Civil works,
OHE Execution.
Signalling Link with
I.R. Station.
10. Marc
h.
Oct
2009
Kalindee
Rail Nirman
Palwal-
Mathura
Site
Manager
Execution of Track
Laying from Palwal
Linking of Railway
Track as per RVNL
2009 Engineers
ltd/RVNL
section –
construction
of 3rd line
(Track) to Mathura (RVNL
Project).from
Contractor side.
specifications by
Mechanized Method.
11. Oct.
2008
Marc
h.
2009
M/s
Railtech
TrackLaying
by
Mechanised
Method for
Sena Line
from Donoto
Moatiz.
IRCON
Mozambique
Project
Project
Manager
Welding,Track
Laying,Yard
Linking
35 KM. By
Machines.
Welding by
Flash Butt welding
Plant.
TrackLinking by
Mechanized Method.
12. Jan.
2008
Oct.
2008
M/s
Shivakriti
Internation
al Jaipur
Execution of
Railway ICD
from Client
Side at
Baroda (W.R)
Project
Leader
Execution of Private
RailwaySidingfor
BombardierMetro
Coach Factory at
Baroda(W.R)from
Contractor side.
Surveying, Earth Work
Minor Bridge
Construction,
TrackLaying
Linking with
IR Station.
13. April.
1977
Jan.
2008
North
Eastern
Railway
Maintenance
and
Construction
ofIndian
Railway
Track.
Senior
Section
Engineer
( P.Way)
Managementof
Maintenance,
Constructionof
RailwayTrack.
Managementof
Maintenance
Organisationof
Assignedarea
Railway
Trackas perIR
Manuals.
14. Sept.
1971
April
.
1977
Western
Railway
Maintenance
and
Construction
of Indian
Railway
Track.
Junior
Engineer(
P.Way)
Management of
Maintenance,
Construction of
Railway Track
Management of
Maintenance
Organisation of
Assigned area
Railway
Trackas per IR
Manuals.
D.K.Midha

More Related Content

What's hot

A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...Rajesh Prasad
 
Ryan Lowman Resume
Ryan Lowman ResumeRyan Lowman Resume
Ryan Lowman ResumeRyan Lowman
 
CV of Yogesh Final
CV of Yogesh FinalCV of Yogesh Final
CV of Yogesh FinalYogesh V.K
 
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_TienDuong Nguyen
 
Understanding the railway recruitment board exam
Understanding the railway recruitment board examUnderstanding the railway recruitment board exam
Understanding the railway recruitment board examJaro education
 
Resume of Ashwani Tyagi
Resume of Ashwani TyagiResume of Ashwani Tyagi
Resume of Ashwani TyagiAshwani Tyagi
 
Resume- of Adil for AFL
Resume- of Adil for AFLResume- of Adil for AFL
Resume- of Adil for AFLadil muhammad
 
Company Profile of ECO-COACH & TOURS (M) SDN BHD
Company Profile of ECO-COACH & TOURS (M) SDN BHDCompany Profile of ECO-COACH & TOURS (M) SDN BHD
Company Profile of ECO-COACH & TOURS (M) SDN BHDMarzieh Fallah, PhD
 

What's hot (20)

Resume for Sr.Land Surveyor
Resume for Sr.Land SurveyorResume for Sr.Land Surveyor
Resume for Sr.Land Surveyor
 
cover 1 (1).docx
cover 1 (1).docxcover 1 (1).docx
cover 1 (1).docx
 
sumit pandey
sumit pandeysumit pandey
sumit pandey
 
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
A Coffee Table Book cum handbook on Cable Stayed Bridge with the 4 approaches...
 
Ryan Lowman Resume
Ryan Lowman ResumeRyan Lowman Resume
Ryan Lowman Resume
 
CV.Doc
CV.DocCV.Doc
CV.Doc
 
C.V.
C.V.C.V.
C.V.
 
CV of Yogesh Final
CV of Yogesh FinalCV of Yogesh Final
CV of Yogesh Final
 
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
 
Understanding the railway recruitment board exam
Understanding the railway recruitment board examUnderstanding the railway recruitment board exam
Understanding the railway recruitment board exam
 
Eg in 049912
Eg in 049912Eg in 049912
Eg in 049912
 
Biswajit Das_Resume
Biswajit Das_ResumeBiswajit Das_Resume
Biswajit Das_Resume
 
Resume of Ashwani Tyagi
Resume of Ashwani TyagiResume of Ashwani Tyagi
Resume of Ashwani Tyagi
 
Resume- of Adil for AFL
Resume- of Adil for AFLResume- of Adil for AFL
Resume- of Adil for AFL
 
metro rail test driver
metro rail test drivermetro rail test driver
metro rail test driver
 
Company Profile of ECO-COACH & TOURS (M) SDN BHD
Company Profile of ECO-COACH & TOURS (M) SDN BHDCompany Profile of ECO-COACH & TOURS (M) SDN BHD
Company Profile of ECO-COACH & TOURS (M) SDN BHD
 
TABLE OF CONTENTS
TABLE OF CONTENTSTABLE OF CONTENTS
TABLE OF CONTENTS
 
REPORT
REPORTREPORT
REPORT
 
CV PETROLEUM
CV PETROLEUMCV PETROLEUM
CV PETROLEUM
 
CAREER LAND MARKS
CAREER LAND MARKSCAREER LAND MARKS
CAREER LAND MARKS
 

Similar to CV Latest DKM (3)

Similar to CV Latest DKM (3) (20)

MCS Reddy 22.05.16
MCS Reddy 22.05.16MCS Reddy 22.05.16
MCS Reddy 22.05.16
 
RESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years ExpRESUME-Piping Design Engineer - 13+Years Exp
RESUME-Piping Design Engineer - 13+Years Exp
 
DPS - Copy
DPS - CopyDPS - Copy
DPS - Copy
 
CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016CV-Basu Sujit 6th July 2016
CV-Basu Sujit 6th July 2016
 
subhash__cv
subhash__cvsubhash__cv
subhash__cv
 
Rajiv C Suthar CV
Rajiv C Suthar CVRajiv C Suthar CV
Rajiv C Suthar CV
 
Bilal_CV_CareerHistory
Bilal_CV_CareerHistoryBilal_CV_CareerHistory
Bilal_CV_CareerHistory
 
Vocational Training Report on Indian Railway System and Operation
Vocational Training Report on Indian Railway System and OperationVocational Training Report on Indian Railway System and Operation
Vocational Training Report on Indian Railway System and Operation
 
Naresh Cherukuri_CV_May-2016
Naresh Cherukuri_CV_May-2016Naresh Cherukuri_CV_May-2016
Naresh Cherukuri_CV_May-2016
 
Sharad_Jagtap_Resume
Sharad_Jagtap_ResumeSharad_Jagtap_Resume
Sharad_Jagtap_Resume
 
Sinchan halder cv
Sinchan halder cvSinchan halder cv
Sinchan halder cv
 
Leelachandra marathe
Leelachandra marathe Leelachandra marathe
Leelachandra marathe
 
Up date Cv of Tokon Khan
Up date Cv of Tokon KhanUp date Cv of Tokon Khan
Up date Cv of Tokon Khan
 
LEELACHANDRA MARATHE new
LEELACHANDRA MARATHE newLEELACHANDRA MARATHE new
LEELACHANDRA MARATHE new
 
Resume_of_Chandan_Das
Resume_of_Chandan_DasResume_of_Chandan_Das
Resume_of_Chandan_Das
 
JITENDER CV
JITENDER CVJITENDER CV
JITENDER CV
 
Jey Prakash_Resume_Nov_2014
Jey Prakash_Resume_Nov_2014 Jey Prakash_Resume_Nov_2014
Jey Prakash_Resume_Nov_2014
 
Resume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D KulkarniResume - Structural Engineer - Prasad D Kulkarni
Resume - Structural Engineer - Prasad D Kulkarni
 
Rahul Resume
Rahul ResumeRahul Resume
Rahul Resume
 
Curriculum Vitae-Zuber
Curriculum Vitae-ZuberCurriculum Vitae-Zuber
Curriculum Vitae-Zuber
 

CV Latest DKM (3)

  • 1. 1. PROPOSED POSITION : Track Manager 2. NAME : D.K.Midha 3. DATE OF BIRTH : 19-04-1950 4. NATIONALITY : Indian 5. PERSONAL ADDRESS : B/3/4 Rail Vihar Indrapuram Ghaziabad, U.P MOBILE NO. : 07503808095, 9650362682 off. 7024120860 E-MAIL ADDRESS : dkmidha300@gmail.com 6. EDUCATION : B.Tech (Civil) 7. OTHER TRAINING :  Induction Training into P. Way Engineering Western Railway  Mechanical Relaying and Tie Tamping of Track by Plassers India Ltd. (Austrian Co.)  Welding of Points and Crossing, and Resurfacing of Rails Larson &Tubro of India.  Ultra Sonic Testing of Rails, Research and Design Organization of Indian Railways  Safety Audit of Track 1979 To 2004  Man and Material Management, Zonal Railway Training Institute Gorakhpur Jan. 1990  First Aid, St. John. Ambulance Association of India. 8. LANGUAGE & DEGREE OF PROFICIENCY : English – Full Professional Proficiency Hindi – Full Professional Proficiency Punjabi – Proficient Gujarati – Proficient 9. COUNTRIESOF WORK EXPERIENCE : India, Srilanka, Mozambique. 10. EMPLOMENTRECORD/ LENGTHOF PROFESSIONAL SERVICE :
  • 2. S. No . From To Employer Client Name of Project Position Held Descriptionof Duties DetailedTasks Assigned 1. May 2015 Till Date Nippon Koei Gurgaon- Bawal Metro Rail Project. Civil Engineer Preparationof DPRand Feasibilityreport. CollectingSitedata Andverificationwith Govt. Recordsandfinal study ofMRTS Project. 2. June 2014 April 2015 RKM/Athe na Power Ltd. Power Project Advisor Railway Siding Completelook after of Design,Exection, PMC ofRailway Siding. Control ofexecutionas per designand Liasoningwith Railways. 3. Jan. 2014 June 2014 Ferrovia Transrails pvt. Ltd./ DFCCIL DFCCIL Durgawat- New Kharvandia (Bihar)New Track Layingwith NTC Machine. Project Manager Executionof RailwayTrackas per DFFC specifications. TrackLayingwith NTC Machine. Flash-ButtWelding for LWR Panels (10 Rail Panel). 4. Jan. 2013 Jan. 2014 M/S Innovative B2B logistics Solutions Ltd. Logistic Park (PFT)with Rail Linked Private Siding From Sahanwal Railway Station (Delhi- Jammu Tawi ) Punjab. DGM (Project) Complete Execution of Rail Linked PrivateLogistic Park, including all civilworks. Earth Work. TrackLaying Ballast Less Track Loading/Unloading Platforms OHE Execution. Signalling Link With I.R. Station. CRS approval 5. Sept. 2012 Jan. 2013 Ferrovia Transrails pvt. Ltd./ DFCCIL DFCCIL Durgawat- New Kharvandia (Bihar)New Track Layingwith NTC Machine. Project Manager Executionof RailwayTrackas per DFFC specifications. Establishmentof WeldingPlantforLWR Panels (10 Rail Panel). TrackLayingwith NTC Machine. YardLinking (Semi-Mechanized Method). Final CRS Approval 6. April. 2012 Sept. 2012 M/S Aarvee associates Pvt.Ltd. Design, Project Managemen t ofPower Project Sidingof GVKat Consultant Design, preparationof ESP,DPRof RailwayPrivate SidingsforLogistic Parksand Power Plants. Preparationof Drawings, Feasibilityreport, DetailedProject Report, ESPforsubmission and approval
  • 3. Goindwal Punjab.Pre Bid Documentati onfor DFCC eastern corridor. Project Management. fromRailways Site Project Management, documentationofall Checklistsof Inspectionsasper Railwayspecifications. 7. Jan. 2011 Marc h201 2 M/sArshiya Internation al Ltd Execution of Railway ICD from Client Side at Khurja. Consultant /Manager Supervision, Billing of Contractor’s Trackworks as per I.R.Specifications. Earth Work. Minor Bridges, Manned Level Crossings, TrackLaying, Ballast Less Track Loading/Unloading Platformsand all Related Civil works, OHE Execution. Signalling Link With I.R. Station. CRS approval 8. Aug. 2010 Jan 2011 M/S Goel Brothers Rail Infra India at SRILANKA construction of New structure , New Track with 45kg rails, construction of yards, laying & assembling of Track& commissioni n for IRCON in SRI lanka (fromStation Galle To Matara) Project Manager Executionof RailwayTrackas per Sri Lanka Railways Specifications from Contractor Side. Dismantling of Old Railway Track And Laying of New Railway Track by Mechanized Method (42 Kms.) From Galle to Matara 9. Oct 2009 Aug. 2010 M/s Arshiya Internation al Ltd Execution of Railway ICD from Client Side Manager, Permanent Way Supervision, Billing ofContractor’s Trackworksas per I.R.Specifications. Earth Work. Minor Bridges, Manned Level Crossings, TrackLaying, Ballast Less Track Loading/Unloading Platformsand all Related Civil works, OHE Execution. Signalling Link with I.R. Station. 10. Marc h. Oct 2009 Kalindee Rail Nirman Palwal- Mathura Site Manager Execution of Track Laying from Palwal Linking of Railway Track as per RVNL
  • 4. 2009 Engineers ltd/RVNL section – construction of 3rd line (Track) to Mathura (RVNL Project).from Contractor side. specifications by Mechanized Method. 11. Oct. 2008 Marc h. 2009 M/s Railtech TrackLaying by Mechanised Method for Sena Line from Donoto Moatiz. IRCON Mozambique Project Project Manager Welding,Track Laying,Yard Linking 35 KM. By Machines. Welding by Flash Butt welding Plant. TrackLinking by Mechanized Method. 12. Jan. 2008 Oct. 2008 M/s Shivakriti Internation al Jaipur Execution of Railway ICD from Client Side at Baroda (W.R) Project Leader Execution of Private RailwaySidingfor BombardierMetro Coach Factory at Baroda(W.R)from Contractor side. Surveying, Earth Work Minor Bridge Construction, TrackLaying Linking with IR Station. 13. April. 1977 Jan. 2008 North Eastern Railway Maintenance and Construction ofIndian Railway Track. Senior Section Engineer ( P.Way) Managementof Maintenance, Constructionof RailwayTrack. Managementof Maintenance Organisationof Assignedarea Railway Trackas perIR Manuals. 14. Sept. 1971 April . 1977 Western Railway Maintenance and Construction of Indian Railway Track. Junior Engineer( P.Way) Management of Maintenance, Construction of Railway Track Management of Maintenance Organisation of Assigned area Railway Trackas per IR Manuals. D.K.Midha