SlideShare a Scribd company logo
1 of 41
Goa Shipyard Limited
Passion for Excellence
Best Performing DPSU Shipyard of MoD
 Established 1957. Over 60 years of
Experience in design & construction of
variety of ships
 GSL – One Stop Solution for
shipbuilding
• Ship Design & R&D
• Construction
• After Sales Support
• Refits
 Established ERP, Project monitoring
System & paperless office
 CRISIL Rating of long term “AAA” and
short term “A1+”
 Only DPSU Shipyard consistently
delivering shipbuilding projects ahead
of schedule
Introduction
Govt
51.1%
MDL
47.2%
Others
1.7%
Shareholding
2007
Upgraded to the status of Mini Ratna Category-1 Company
1997
Upgraded to Schedule ‘B’ Company
1967
Started functioning as “Goa Shipyard Limited” under its own Board Of Directors
1957
Established as “Estaleiros Navais De Goa”, by Portuguese
HISTORY OF GSL
SHARE HOLDING PATTERN
SHARE HOLDING
GOVT. OF INDIA &
MAZAGON DOCK LIMITED (fully
owned by Govt of India)
51.09 %
47.21 %
GENERAL PUBLIC & OTHERS 1.70 %
INFRASTRUCTURE
6000T Ship lift
Outfitting Jetties
Construction Berths
Construction Bays
INFRASTRUCTURE
 State-of-art infrastructure for construction of vessels
upto 130 m long & 23 m wide
 Can undertake concurrent construction of 14 steel
hulled ships at various stages
• 08 at hull fabrication stage
• 06 at outfitting stage
 Complemented by state of the art workshops,
material handling and advanced design centre
 Separate outlying units for construction of FRP boats
Capabilities
HUMAN RESOURCE
• Yard enjoys excellent Industrial Relations with the work force
Category Total
Officers 257
Management Trainees 3
Supervisors 190
Employees 1223
TOTAL 1673
90m OPV
105m AOPV
NOPV
SL OPV
102m OPV
CG OPV
Widest Product Profile - OPVs
35 Kn FPV
Missile Crafts
STS Mauritius FPV
Mauritius FIB
Product Profile
Diversified
Products
Damage Control Simulator
SBTF
SSTF
SMB
1000T Barge
COP
12m Boat
Over 20% VoP
from Diversified
Products
PRODUCT PROFILE - DIVERSIFICATION
STERN GEAR SYSTEM
FOR SHIPS
SURVIVAL AT SEA TRAINING
FACILITY
12 T GRP BOATS FOR MHA
5 T GRP BOATS FOR MHA
AIRCRAFT-CARRIER
FLIGHT DECK SIMULATOR
DAMAGE CONTROL
SIMULATOR
PROVEN TRACK RECORD IN SHIPBUILDING
Total Deliveries as on date 370
• Naval Vessels 66
• Coast Guard Vessels 28
• Export 36
• Others 83
• High Speed FRP Interceptor
Boats
157
Only Shipyard in the country with consistent track record of
delivering ships ahead of schedule
Maintenance – Ship Repairs
 Massive repair infrastructure – 6000 T shiplift supported by 11 dry
berths (02 covered) and 06 outfitting jetties
 Comprehensive infrastructure for hull, engineering, electrical and
weapon repairs
 Backed by strong planning and support team for executing
repairs
 More than 100 vessels repaired during the last ten years
Recent Track Record
01
Naval
OPV
11
Intercep
tor
Boats –
Mauriti
us
06
Coast
Guard
OPVs
02 Fast
Patrol
Vessel –
Mauriti
us
02
Damage
Control
Simulato
r
(Myanmar
and IN)
02 OPVs
– Sri
Lanka
04 Fuel
Barges
(1000T)
NBCTF –
Indian
Navy
2014 2015-16 2015-17 2016-17 2016-17 2017-18 2017-18 2018
Project Customer Actual Delivery Delivered ahead
of schedule
06 CG OPV
Project
Indian Coast
Guard
30 Oct 2015
23 Mar 2016
29 Aug 2016
5 Feb 2017
7 July 2017
04 Nov 17
8 days
46 days
70 days
61 days
31 days
34 days
NOPV-4
Indian Navy
16 Jul 14 On Schedule
1000T Fuel
Barge
17 Aug 17
02 Dec17
14 May 18
23 Jul 2018
02 days
33 days
52 days
134 days
DCS 22 Mar 2017 112 days
1st & 2nd lot
of 5 & 6 FIB
Mauritius
07 Oct 2015
19 Jan 2016
90 days
51 days
FPV
26 Sep 2016
30 Apr 2017
43 days
100 days
DCS Myanmar Mar 2016 30 days
SLN OPV
Project
Sri Lanka July 2017
Mar 18
86 days
25 days
Timely Delivery of All Projects : 2014 -18
• 29 deliveries in 04 yrs
• 27 ahead of schedule
• 02 on schedule
EXECUTION - SHIPS DELIVERED
Fin Year Deliveries
2017-18 02 SLOPVs
02 CG OPVs
01 FPV
04 FUEL BARGES (1000T)
2016-17 02 CGOPVs
01 FPV
01 DCS
01 Fishing survey vessel
2015-16 02 CGOPVs
01 DCS
11 FIBs
2014-15 01 NOPV
01 SBTF
4402
7663
7890
12000
0 5000 10000 15000
2014-
15
2015-
16
2016-
17
2017-
18
Gross Tonnage
Year
ANNUAL DELIVERY ( GROSS TONNAGE)
Highest amongst shipyards in India
 2 X 50 m, 35 Kn FAC (Delivered)
 11 Fast Interceptor Boats
(Delivered)
Mauritius
Myanmar
One Damage Control Simulator
(Delivered)
2 X 105 m AOPV
(Both delivered ahead of schedule 2017-18)
Sri Lanka
Project 2014 - 18
Project 2014 –17- Completed
Project 2014-16 : Completed
Export of Defence Products
EXPORTS IN LAST 3 YEARS
• Emerged as the largest exporter of ships/vessels, with around 44% of
Turnover coming from Exports.
• Awarded RM’s award for ‘Best performance in Exports amongst DPSUs’
for 2014-15
200 227
400
608
0
100
200
300
400
500
600
700
2014-15 2015-16 2016-17 2017-18
EXPORT( ₹ Cr)
Export Accomplishments
Mauritius Prime Minister, along with Hon’ble
RM commissions CGS Victory
Commissioning of CGS Victory by Hon’ble
PM of Mauritius
Hon’ble President of Sri Lanka commissions
SLNS Sayurala , in Sri Lanka Navy
Mauritius
Sri Lanka
Delivery by High Commissioner of Sri Lanka
SLNS Sindhurala
PROJECT CONTRACTUAL
DELIVERY
STATUS
New 5 CGOPVs
CGOPV 1-5
Jan 2020 to Jun
2021
Production commenced on 13 Nov 2016
23
ONGOING PROJECTS
508
569
725
1030
1343
0 200 400 600 800 1000 1200 1400 1600
2013-14
2014-15
2015-16
2016-17
2017-18
VoP in Rs Cr
Financial
Year
Value of production
25
Financial Performance
Highest in
history of
GSL & 2nd
amongst
shipyards
after MDL
-100
-50
0
50
100
150
200
250
300
350
400
FY 13-14 FY 14-15 FY 15-16 FY 16-17 FY 17-18
Operating Profit PBT
Rs 331 Cr
Rs 251Cr
Financial Performance - Profit
FY
13-14
FY
14-15
FY
15-16
FY
16-17
FY
17-18
PBT -63 53 111 177 331
Operating
Profit
-29 15 68 131 251
Return on
Equity(%)
-210% 269% 214% 202% 373%
Div Payout
(% on paid
up capital)
0 60% 64% 70% 215%
CMD took over
01 Feb 2014
All figures in Crore Rs
PBT CAGR 83.9%
-62Cr
Stabilizer Steering Gear
Heli Grid
Gear Box
05 CG OPV
Gearbox - Walchandnagar
Industries Ltd, Pune
Steering Gear - Geeta Engg
Works (GEW), Thane
Steel from Essar Steel
Gemini Boats from Aquarius
Shipyard, Goa
Other Projects
Heli Grid – Production by GSL in
collaboration with FHS Germany
MCMV Low Magnetic DAs –
Indigenised through KOEL, Pune
Oily Water Separator Through
Vacman in collaboration with
EPE Greece
Water tight and Weather tight
Doors from ACGL, Goa & Zuari Engg
Services
Recent Initiatives - ‘Make In India’
Fin Stabiliser
Steering Gear
Gear Box
Heli Grid
GSL’s Indigenization Efforts
Ongoing 05 CG OPV Project
• Major critical equipment indigenised for ongoing 05 CG OPV
Project
• Indigenous content increased from 60% to 70%
Multiple Collaborations with World
Leaders In Line with ‘Make In India’
Initiative of Govt of India
COLLABORATIONS SIGNED UP WITH WORLD
LEADERS FOR ‘MAKE IN INDIA’
• Shore Based Test
Facility (SBTF) for
Training /
certification of
Naval Combat
Aircraft Pilots
Nevskoe Design
Bureau Russia
• Hovercrafts
Griffon Hover
Works Ltd, UK
• Indigenous
manufacture of
Fin Stabilizers.
NAIAD, UK
•Submarine Escape
Training Tower (SETT)
•Integrated Platform
Management System
•Combat Management
System
Naval Group,
France
• CPP Stern Gears
Wartsila
France SAS
• Pollution Control
Vessels (PCVs)
DAMEN
Shipyards,
Gorinchem
• MTU 8000 series
Engines
• 07 to 10 MW
capacity
MTU,
Germany
• Mine Counter
Measure
Systems
Thales DMS
France
Indigenous Manufacturing under ‘Make In India’
Hovercrafts
• Partnership
with Griffon,
UK for
indigenous
prod with 60%
local content
• Model I - Recce
& Patrol
• Model II - Troop
Carrier
Shore Based
Test Facility
(SBTF)
• Utilised for
Training /
certification of
Naval Pilots
• Partnership
with NDB,
Russia
Scorpene
Submarine
Simulators
• Partnership with
Naval Group
• Combat
Management
System (CMS)
• Integrated Platform
Management
System (IPMS)
• Submarine Escape
Training Tower
(SETT)
CPP Stern
Gears
• Indigenous
manufacture with
60% local content,
in partnership with
Wartsila France
SAS
• Successfully
supplied / supplying
stern gear for
multiple projects
1st shipyard in India to be recognised by Dept of
Scientific & Industrial Research (DSIR), Ministry of
Science & Technology
FY 14-15
FY 15-16
FY 16-17
FY 17-18
8.95
8.09 9.68 10.09
115 m Platform
• World class R&D centre with AVEVA Marine & state of art Softwares for
modeling with in-house design capability
• Strong domain expertise in design & construction of Naval Surface Vessels
including OPVs & FACs
• Expertise in FORAN being developed for 1135.6 Ships
Modernised Shipyard
Transfer Area Shiplift
Ship Assembly Workshop Outfitting Jetty
FY 14-15
FY 15-16
FY 16-17
FY 17-18
109.92
105.81
111.17
116.46
Consistent high CAPEX Expenditure
Infrastructure Modernisation
Phase 3A Inaugurated by Hon’ble PM on
13TH Nov 2016
Modern Shipbuilding infrastructure
created at ≈ ₹ 750 Cr
• Ship lift & transfer system
• Ship Assembly Bays
• Dry berths & jetties
• FRP Construction facilities
Phase 4 – ₹ 167 Cr
•GRP Complex
•Transfer system
for GRP ships
•60 T LL Crane
Phase 3B – ₹ 286 Cr
• Steel workshop
• Block Assembly
shop
₹ 400 Cr CAPEX WIP with EDC –mid 2020
Future Projects - Import Substitute
MCMV
1135.6 Frigates
Hovercrafts
Technology
Advanced Future
Projects
Make in
India
AIR CUSHION VEHICLES (HOVERCRAFT)
TROOP CARRIER
RECCE & PATROLLING
 Joint production with M/s Griffon, UK - 60% indigenisation
content in line with Buy Indian (IDDM) requirements
 Actively participating in ongoing acquisition case by ICG for 12
ACVs
FIN YEAR RATING
2011-12,
2012-13 &
2013-14
GOOD
2014-15 VERY GOOD
2015-16 EXCELLENT
2016-17
EXCELLENT WITH 100% MARKS FOR
02 CONSECUTIVE YEARS
A UNIQUE DISTINCTION BY ANY
DPSU
2017-18
MOU RATING WITH GOVT
38
Recognitions and Awards
SCOPE INSTITUTIONAL CATEGORY AWARD
FINANCIAL TURNAROUND 2014-15
Conferred on 11 Apr 2017
Best Performing Shipyard
2015-16
Design efforts
2014-15
Best Performance in Exports
2014-15
Goa Shipyard Limited
Passion for Excellence
FY17 Dividend @70%
FY18 Dividend @ 215%

More Related Content

Similar to 9.GSL_AVRAVIPRAKASH.pptx

Transnet who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
Transnet  who we are- by Transnet Port Terminals Chief Executive, Karl SocikwaTransnet  who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
Transnet who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
Transnet Port Terminals
 
fgp-wpmp-overview
fgp-wpmp-overviewfgp-wpmp-overview
fgp-wpmp-overview
Jeremy Ball
 
Competitiveness Of Indian Ports
Competitiveness Of Indian PortsCompetitiveness Of Indian Ports
Competitiveness Of Indian Ports
jansowri
 
Rayomand Munchershaw Mistry_original12
Rayomand Munchershaw Mistry_original12Rayomand Munchershaw Mistry_original12
Rayomand Munchershaw Mistry_original12
raymond mistry
 
Cargo Talk JUNE -2015 Low res 22
Cargo Talk JUNE -2015 Low res 22Cargo Talk JUNE -2015 Low res 22
Cargo Talk JUNE -2015 Low res 22
Abeer Ray
 
ABIODUN AKALA- CV 2015 rev2
ABIODUN AKALA- CV 2015 rev2ABIODUN AKALA- CV 2015 rev2
ABIODUN AKALA- CV 2015 rev2
Abiodun Akala
 
DeesideSeaways MPSS Presentation Ver 3
DeesideSeaways MPSS  Presentation Ver 3DeesideSeaways MPSS  Presentation Ver 3
DeesideSeaways MPSS Presentation Ver 3
Craig Lang
 

Similar to 9.GSL_AVRAVIPRAKASH.pptx (20)

Transnet who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
Transnet  who we are- by Transnet Port Terminals Chief Executive, Karl SocikwaTransnet  who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
Transnet who we are- by Transnet Port Terminals Chief Executive, Karl Socikwa
 
INTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORTINTERNSHIP/ INDUSTRIAL TRAINING REPORT
INTERNSHIP/ INDUSTRIAL TRAINING REPORT
 
KMOC ASIA Ltd.
KMOC ASIA Ltd.KMOC ASIA Ltd.
KMOC ASIA Ltd.
 
Cochin Shipyard and Business environment.
Cochin Shipyard and Business environment.Cochin Shipyard and Business environment.
Cochin Shipyard and Business environment.
 
fgp-wpmp-overview
fgp-wpmp-overviewfgp-wpmp-overview
fgp-wpmp-overview
 
Competitiveness Of Indian Ports
Competitiveness Of Indian PortsCompetitiveness Of Indian Ports
Competitiveness Of Indian Ports
 
Eye on Defense March 2015
Eye on Defense March 2015Eye on Defense March 2015
Eye on Defense March 2015
 
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
PowerLogistics Asia 2014 - Challenging Infrastructure & Constraints - Project...
 
Asia days Oslo 2013 - Market opportunities in South & South East Asia - Energy
Asia days Oslo 2013 - Market opportunities in South & South East Asia - EnergyAsia days Oslo 2013 - Market opportunities in South & South East Asia - Energy
Asia days Oslo 2013 - Market opportunities in South & South East Asia - Energy
 
Bourbon Media
Bourbon MediaBourbon Media
Bourbon Media
 
Oil & Gas opportunities in Southeast Asia
Oil & Gas opportunities in Southeast AsiaOil & Gas opportunities in Southeast Asia
Oil & Gas opportunities in Southeast Asia
 
Rayomand Munchershaw Mistry_original12
Rayomand Munchershaw Mistry_original12Rayomand Munchershaw Mistry_original12
Rayomand Munchershaw Mistry_original12
 
LNG Cap - Jan 2016
LNG Cap - Jan 2016LNG Cap - Jan 2016
LNG Cap - Jan 2016
 
HINDUSTHAN SHIPYARD INTERNSHIP REPORT
HINDUSTHAN SHIPYARD INTERNSHIP REPORTHINDUSTHAN SHIPYARD INTERNSHIP REPORT
HINDUSTHAN SHIPYARD INTERNSHIP REPORT
 
Cargo Talk JUNE -2015 Low res 22
Cargo Talk JUNE -2015 Low res 22Cargo Talk JUNE -2015 Low res 22
Cargo Talk JUNE -2015 Low res 22
 
ABIODUN AKALA- CV 2015 rev2
ABIODUN AKALA- CV 2015 rev2ABIODUN AKALA- CV 2015 rev2
ABIODUN AKALA- CV 2015 rev2
 
Offshore toimialan mahdollisuudet Kaakkois Aasiassa
Offshore toimialan mahdollisuudet Kaakkois AasiassaOffshore toimialan mahdollisuudet Kaakkois Aasiassa
Offshore toimialan mahdollisuudet Kaakkois Aasiassa
 
Liquefied Natural Gas Report 2015: Part 3
Liquefied Natural Gas Report 2015: Part 3Liquefied Natural Gas Report 2015: Part 3
Liquefied Natural Gas Report 2015: Part 3
 
Gas entec ppt for_gis 2016_distribution
Gas entec ppt for_gis 2016_distributionGas entec ppt for_gis 2016_distribution
Gas entec ppt for_gis 2016_distribution
 
DeesideSeaways MPSS Presentation Ver 3
DeesideSeaways MPSS  Presentation Ver 3DeesideSeaways MPSS  Presentation Ver 3
DeesideSeaways MPSS Presentation Ver 3
 

Recently uploaded

如何办理(Columbia毕业证书)哥伦比亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(Columbia毕业证书)哥伦比亚大学毕业证成绩单本科硕士学位证留信学历认证如何办理(Columbia毕业证书)哥伦比亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(Columbia毕业证书)哥伦比亚大学毕业证成绩单本科硕士学位证留信学历认证
epyhpep
 
b-sc-agri-course-curriculum.pdf for Karnataka state board
b-sc-agri-course-curriculum.pdf for Karnataka state boardb-sc-agri-course-curriculum.pdf for Karnataka state board
b-sc-agri-course-curriculum.pdf for Karnataka state board
ramyaul734
 
一比一定(购)南昆士兰大学毕业证(USQ毕业证)成绩单学位证
一比一定(购)南昆士兰大学毕业证(USQ毕业证)成绩单学位证一比一定(购)南昆士兰大学毕业证(USQ毕业证)成绩单学位证
一比一定(购)南昆士兰大学毕业证(USQ毕业证)成绩单学位证
eqaqen
 
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Menggugurkan Kandungan 087776558899
 
如何办理(NEU毕业证书)东北大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(NEU毕业证书)东北大学毕业证成绩单本科硕士学位证留信学历认证如何办理(NEU毕业证书)东北大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(NEU毕业证书)东北大学毕业证成绩单本科硕士学位证留信学历认证
gakamzu
 
Prest Reed Portfolio revamp Full Sail Presentation 2
Prest Reed Portfolio revamp Full Sail Presentation 2Prest Reed Portfolio revamp Full Sail Presentation 2
Prest Reed Portfolio revamp Full Sail Presentation 2
5203records
 
K Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CVK Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CV
K VENKAT NAVEEN KUMAR
 
如何办理(TMU毕业证书)多伦多都会大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(TMU毕业证书)多伦多都会大学毕业证成绩单本科硕士学位证留信学历认证如何办理(TMU毕业证书)多伦多都会大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(TMU毕业证书)多伦多都会大学毕业证成绩单本科硕士学位证留信学历认证
gkyvm
 

Recently uploaded (20)

如何办理(Columbia毕业证书)哥伦比亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(Columbia毕业证书)哥伦比亚大学毕业证成绩单本科硕士学位证留信学历认证如何办理(Columbia毕业证书)哥伦比亚大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(Columbia毕业证书)哥伦比亚大学毕业证成绩单本科硕士学位证留信学历认证
 
b-sc-agri-course-curriculum.pdf for Karnataka state board
b-sc-agri-course-curriculum.pdf for Karnataka state boardb-sc-agri-course-curriculum.pdf for Karnataka state board
b-sc-agri-course-curriculum.pdf for Karnataka state board
 
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
Specialize in a MSc within Biomanufacturing, and work part-time as Process En...
 
一比一定(购)南昆士兰大学毕业证(USQ毕业证)成绩单学位证
一比一定(购)南昆士兰大学毕业证(USQ毕业证)成绩单学位证一比一定(购)南昆士兰大学毕业证(USQ毕业证)成绩单学位证
一比一定(购)南昆士兰大学毕业证(USQ毕业证)成绩单学位证
 
B.tech Civil Engineering Major Project by Deepak Kumar ppt.pdf
B.tech Civil Engineering Major Project by Deepak Kumar ppt.pdfB.tech Civil Engineering Major Project by Deepak Kumar ppt.pdf
B.tech Civil Engineering Major Project by Deepak Kumar ppt.pdf
 
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
Cara Gugurkan Kandungan Awal Kehamilan 1 bulan (087776558899)
 
Rachel_Ochsenschlager_Resume_May_2024.docx
Rachel_Ochsenschlager_Resume_May_2024.docxRachel_Ochsenschlager_Resume_May_2024.docx
Rachel_Ochsenschlager_Resume_May_2024.docx
 
Crafting an effective CV for AYUSH Doctors.pdf
Crafting an effective CV for AYUSH Doctors.pdfCrafting an effective CV for AYUSH Doctors.pdf
Crafting an effective CV for AYUSH Doctors.pdf
 
Fracture design PowerPoint presentations
Fracture design PowerPoint presentationsFracture design PowerPoint presentations
Fracture design PowerPoint presentations
 
Ascension Brown - Internship Resume 2024
Ascension Brown -  Internship Resume 2024Ascension Brown -  Internship Resume 2024
Ascension Brown - Internship Resume 2024
 
如何办理(NEU毕业证书)东北大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(NEU毕业证书)东北大学毕业证成绩单本科硕士学位证留信学历认证如何办理(NEU毕业证书)东北大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(NEU毕业证书)东北大学毕业证成绩单本科硕士学位证留信学历认证
 
B.tech civil major project by Deepak Kumar
B.tech civil major project by Deepak KumarB.tech civil major project by Deepak Kumar
B.tech civil major project by Deepak Kumar
 
Ochsen Screenplay Coverage - JACOB - 10.16.23.pdf
Ochsen Screenplay Coverage - JACOB - 10.16.23.pdfOchsen Screenplay Coverage - JACOB - 10.16.23.pdf
Ochsen Screenplay Coverage - JACOB - 10.16.23.pdf
 
Prest Reed Portfolio revamp Full Sail Presentation 2
Prest Reed Portfolio revamp Full Sail Presentation 2Prest Reed Portfolio revamp Full Sail Presentation 2
Prest Reed Portfolio revamp Full Sail Presentation 2
 
TEST BANK For Growth and Development Across the Lifespan, 3rd Edition By Glor...
TEST BANK For Growth and Development Across the Lifespan, 3rd Edition By Glor...TEST BANK For Growth and Development Across the Lifespan, 3rd Edition By Glor...
TEST BANK For Growth and Development Across the Lifespan, 3rd Edition By Glor...
 
K Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CVK Venkat Naveen Kumar | GCP Data Engineer | CV
K Venkat Naveen Kumar | GCP Data Engineer | CV
 
We’re looking for a junior patent engineer to join our Team!
We’re looking for a junior patent engineer to join our Team!We’re looking for a junior patent engineer to join our Team!
We’re looking for a junior patent engineer to join our Team!
 
Launch Your Research Career: A Beginner's Guide
Launch Your Research Career: A Beginner's GuideLaunch Your Research Career: A Beginner's Guide
Launch Your Research Career: A Beginner's Guide
 
Ganga Path Project (marine drive project) Patna ,Bihar .pdf
Ganga Path Project (marine drive project) Patna ,Bihar .pdfGanga Path Project (marine drive project) Patna ,Bihar .pdf
Ganga Path Project (marine drive project) Patna ,Bihar .pdf
 
如何办理(TMU毕业证书)多伦多都会大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(TMU毕业证书)多伦多都会大学毕业证成绩单本科硕士学位证留信学历认证如何办理(TMU毕业证书)多伦多都会大学毕业证成绩单本科硕士学位证留信学历认证
如何办理(TMU毕业证书)多伦多都会大学毕业证成绩单本科硕士学位证留信学历认证
 

9.GSL_AVRAVIPRAKASH.pptx

  • 1. Goa Shipyard Limited Passion for Excellence Best Performing DPSU Shipyard of MoD
  • 2.  Established 1957. Over 60 years of Experience in design & construction of variety of ships  GSL – One Stop Solution for shipbuilding • Ship Design & R&D • Construction • After Sales Support • Refits  Established ERP, Project monitoring System & paperless office  CRISIL Rating of long term “AAA” and short term “A1+”  Only DPSU Shipyard consistently delivering shipbuilding projects ahead of schedule Introduction Govt 51.1% MDL 47.2% Others 1.7% Shareholding
  • 3. 2007 Upgraded to the status of Mini Ratna Category-1 Company 1997 Upgraded to Schedule ‘B’ Company 1967 Started functioning as “Goa Shipyard Limited” under its own Board Of Directors 1957 Established as “Estaleiros Navais De Goa”, by Portuguese HISTORY OF GSL
  • 4. SHARE HOLDING PATTERN SHARE HOLDING GOVT. OF INDIA & MAZAGON DOCK LIMITED (fully owned by Govt of India) 51.09 % 47.21 % GENERAL PUBLIC & OTHERS 1.70 %
  • 6. 6000T Ship lift Outfitting Jetties Construction Berths Construction Bays INFRASTRUCTURE
  • 7.  State-of-art infrastructure for construction of vessels upto 130 m long & 23 m wide  Can undertake concurrent construction of 14 steel hulled ships at various stages • 08 at hull fabrication stage • 06 at outfitting stage  Complemented by state of the art workshops, material handling and advanced design centre  Separate outlying units for construction of FRP boats Capabilities
  • 8. HUMAN RESOURCE • Yard enjoys excellent Industrial Relations with the work force Category Total Officers 257 Management Trainees 3 Supervisors 190 Employees 1223 TOTAL 1673
  • 9.
  • 10. 90m OPV 105m AOPV NOPV SL OPV 102m OPV CG OPV Widest Product Profile - OPVs
  • 11. 35 Kn FPV Missile Crafts STS Mauritius FPV Mauritius FIB Product Profile
  • 12. Diversified Products Damage Control Simulator SBTF SSTF SMB 1000T Barge COP 12m Boat Over 20% VoP from Diversified Products
  • 13. PRODUCT PROFILE - DIVERSIFICATION STERN GEAR SYSTEM FOR SHIPS SURVIVAL AT SEA TRAINING FACILITY 12 T GRP BOATS FOR MHA 5 T GRP BOATS FOR MHA AIRCRAFT-CARRIER FLIGHT DECK SIMULATOR DAMAGE CONTROL SIMULATOR
  • 14. PROVEN TRACK RECORD IN SHIPBUILDING Total Deliveries as on date 370 • Naval Vessels 66 • Coast Guard Vessels 28 • Export 36 • Others 83 • High Speed FRP Interceptor Boats 157 Only Shipyard in the country with consistent track record of delivering ships ahead of schedule
  • 15. Maintenance – Ship Repairs  Massive repair infrastructure – 6000 T shiplift supported by 11 dry berths (02 covered) and 06 outfitting jetties  Comprehensive infrastructure for hull, engineering, electrical and weapon repairs  Backed by strong planning and support team for executing repairs  More than 100 vessels repaired during the last ten years
  • 16.
  • 17. Recent Track Record 01 Naval OPV 11 Intercep tor Boats – Mauriti us 06 Coast Guard OPVs 02 Fast Patrol Vessel – Mauriti us 02 Damage Control Simulato r (Myanmar and IN) 02 OPVs – Sri Lanka 04 Fuel Barges (1000T) NBCTF – Indian Navy 2014 2015-16 2015-17 2016-17 2016-17 2017-18 2017-18 2018
  • 18. Project Customer Actual Delivery Delivered ahead of schedule 06 CG OPV Project Indian Coast Guard 30 Oct 2015 23 Mar 2016 29 Aug 2016 5 Feb 2017 7 July 2017 04 Nov 17 8 days 46 days 70 days 61 days 31 days 34 days NOPV-4 Indian Navy 16 Jul 14 On Schedule 1000T Fuel Barge 17 Aug 17 02 Dec17 14 May 18 23 Jul 2018 02 days 33 days 52 days 134 days DCS 22 Mar 2017 112 days 1st & 2nd lot of 5 & 6 FIB Mauritius 07 Oct 2015 19 Jan 2016 90 days 51 days FPV 26 Sep 2016 30 Apr 2017 43 days 100 days DCS Myanmar Mar 2016 30 days SLN OPV Project Sri Lanka July 2017 Mar 18 86 days 25 days Timely Delivery of All Projects : 2014 -18 • 29 deliveries in 04 yrs • 27 ahead of schedule • 02 on schedule
  • 19. EXECUTION - SHIPS DELIVERED Fin Year Deliveries 2017-18 02 SLOPVs 02 CG OPVs 01 FPV 04 FUEL BARGES (1000T) 2016-17 02 CGOPVs 01 FPV 01 DCS 01 Fishing survey vessel 2015-16 02 CGOPVs 01 DCS 11 FIBs 2014-15 01 NOPV 01 SBTF 4402 7663 7890 12000 0 5000 10000 15000 2014- 15 2015- 16 2016- 17 2017- 18 Gross Tonnage Year ANNUAL DELIVERY ( GROSS TONNAGE) Highest amongst shipyards in India
  • 20.  2 X 50 m, 35 Kn FAC (Delivered)  11 Fast Interceptor Boats (Delivered) Mauritius Myanmar One Damage Control Simulator (Delivered) 2 X 105 m AOPV (Both delivered ahead of schedule 2017-18) Sri Lanka Project 2014 - 18 Project 2014 –17- Completed Project 2014-16 : Completed Export of Defence Products
  • 21. EXPORTS IN LAST 3 YEARS • Emerged as the largest exporter of ships/vessels, with around 44% of Turnover coming from Exports. • Awarded RM’s award for ‘Best performance in Exports amongst DPSUs’ for 2014-15 200 227 400 608 0 100 200 300 400 500 600 700 2014-15 2015-16 2016-17 2017-18 EXPORT( ₹ Cr)
  • 22. Export Accomplishments Mauritius Prime Minister, along with Hon’ble RM commissions CGS Victory Commissioning of CGS Victory by Hon’ble PM of Mauritius Hon’ble President of Sri Lanka commissions SLNS Sayurala , in Sri Lanka Navy Mauritius Sri Lanka Delivery by High Commissioner of Sri Lanka SLNS Sindhurala
  • 23. PROJECT CONTRACTUAL DELIVERY STATUS New 5 CGOPVs CGOPV 1-5 Jan 2020 to Jun 2021 Production commenced on 13 Nov 2016 23 ONGOING PROJECTS
  • 24.
  • 25. 508 569 725 1030 1343 0 200 400 600 800 1000 1200 1400 1600 2013-14 2014-15 2015-16 2016-17 2017-18 VoP in Rs Cr Financial Year Value of production 25 Financial Performance Highest in history of GSL & 2nd amongst shipyards after MDL
  • 26. -100 -50 0 50 100 150 200 250 300 350 400 FY 13-14 FY 14-15 FY 15-16 FY 16-17 FY 17-18 Operating Profit PBT Rs 331 Cr Rs 251Cr Financial Performance - Profit FY 13-14 FY 14-15 FY 15-16 FY 16-17 FY 17-18 PBT -63 53 111 177 331 Operating Profit -29 15 68 131 251 Return on Equity(%) -210% 269% 214% 202% 373% Div Payout (% on paid up capital) 0 60% 64% 70% 215% CMD took over 01 Feb 2014 All figures in Crore Rs PBT CAGR 83.9% -62Cr
  • 28. 05 CG OPV Gearbox - Walchandnagar Industries Ltd, Pune Steering Gear - Geeta Engg Works (GEW), Thane Steel from Essar Steel Gemini Boats from Aquarius Shipyard, Goa Other Projects Heli Grid – Production by GSL in collaboration with FHS Germany MCMV Low Magnetic DAs – Indigenised through KOEL, Pune Oily Water Separator Through Vacman in collaboration with EPE Greece Water tight and Weather tight Doors from ACGL, Goa & Zuari Engg Services Recent Initiatives - ‘Make In India’
  • 29. Fin Stabiliser Steering Gear Gear Box Heli Grid GSL’s Indigenization Efforts Ongoing 05 CG OPV Project • Major critical equipment indigenised for ongoing 05 CG OPV Project • Indigenous content increased from 60% to 70%
  • 30. Multiple Collaborations with World Leaders In Line with ‘Make In India’ Initiative of Govt of India
  • 31. COLLABORATIONS SIGNED UP WITH WORLD LEADERS FOR ‘MAKE IN INDIA’ • Shore Based Test Facility (SBTF) for Training / certification of Naval Combat Aircraft Pilots Nevskoe Design Bureau Russia • Hovercrafts Griffon Hover Works Ltd, UK • Indigenous manufacture of Fin Stabilizers. NAIAD, UK •Submarine Escape Training Tower (SETT) •Integrated Platform Management System •Combat Management System Naval Group, France • CPP Stern Gears Wartsila France SAS • Pollution Control Vessels (PCVs) DAMEN Shipyards, Gorinchem • MTU 8000 series Engines • 07 to 10 MW capacity MTU, Germany • Mine Counter Measure Systems Thales DMS France
  • 32. Indigenous Manufacturing under ‘Make In India’ Hovercrafts • Partnership with Griffon, UK for indigenous prod with 60% local content • Model I - Recce & Patrol • Model II - Troop Carrier Shore Based Test Facility (SBTF) • Utilised for Training / certification of Naval Pilots • Partnership with NDB, Russia Scorpene Submarine Simulators • Partnership with Naval Group • Combat Management System (CMS) • Integrated Platform Management System (IPMS) • Submarine Escape Training Tower (SETT) CPP Stern Gears • Indigenous manufacture with 60% local content, in partnership with Wartsila France SAS • Successfully supplied / supplying stern gear for multiple projects
  • 33. 1st shipyard in India to be recognised by Dept of Scientific & Industrial Research (DSIR), Ministry of Science & Technology FY 14-15 FY 15-16 FY 16-17 FY 17-18 8.95 8.09 9.68 10.09 115 m Platform • World class R&D centre with AVEVA Marine & state of art Softwares for modeling with in-house design capability • Strong domain expertise in design & construction of Naval Surface Vessels including OPVs & FACs • Expertise in FORAN being developed for 1135.6 Ships
  • 34. Modernised Shipyard Transfer Area Shiplift Ship Assembly Workshop Outfitting Jetty FY 14-15 FY 15-16 FY 16-17 FY 17-18 109.92 105.81 111.17 116.46 Consistent high CAPEX Expenditure
  • 35. Infrastructure Modernisation Phase 3A Inaugurated by Hon’ble PM on 13TH Nov 2016 Modern Shipbuilding infrastructure created at ≈ ₹ 750 Cr • Ship lift & transfer system • Ship Assembly Bays • Dry berths & jetties • FRP Construction facilities Phase 4 – ₹ 167 Cr •GRP Complex •Transfer system for GRP ships •60 T LL Crane Phase 3B – ₹ 286 Cr • Steel workshop • Block Assembly shop ₹ 400 Cr CAPEX WIP with EDC –mid 2020
  • 36. Future Projects - Import Substitute MCMV 1135.6 Frigates Hovercrafts Technology Advanced Future Projects Make in India
  • 37. AIR CUSHION VEHICLES (HOVERCRAFT) TROOP CARRIER RECCE & PATROLLING  Joint production with M/s Griffon, UK - 60% indigenisation content in line with Buy Indian (IDDM) requirements  Actively participating in ongoing acquisition case by ICG for 12 ACVs
  • 38. FIN YEAR RATING 2011-12, 2012-13 & 2013-14 GOOD 2014-15 VERY GOOD 2015-16 EXCELLENT 2016-17 EXCELLENT WITH 100% MARKS FOR 02 CONSECUTIVE YEARS A UNIQUE DISTINCTION BY ANY DPSU 2017-18 MOU RATING WITH GOVT 38
  • 39.
  • 40. Recognitions and Awards SCOPE INSTITUTIONAL CATEGORY AWARD FINANCIAL TURNAROUND 2014-15 Conferred on 11 Apr 2017 Best Performing Shipyard 2015-16 Design efforts 2014-15 Best Performance in Exports 2014-15
  • 41. Goa Shipyard Limited Passion for Excellence FY17 Dividend @70% FY18 Dividend @ 215%