SlideShare a Scribd company logo
1 of 21
Download to read offline
Page 1 
Train TTTrrraaaiiinnn LLLLiiiiffffeeee SSSSeeeerrrrvvvviiiicccceeeessss 
AAAA SSSSuuuuppppppppllllyyyy CCCChhhhaaaaiiiinnnn CCCChhhhaaaalllllllleeeennnnggggeeee
Train Life Services 
> 3 areas of expertize dedicated to performance: 
• Maintenance MMMaaaiiinnnttteeennnaaannnccceee sssseeeerrrrvvvviiiicccceeeessss:::: fleet maintenance and train performance optimization 
• PPPPaaaarrrrttttssss ssssuuuuppppppppllllyyyy sssseeeerrrrvvvviiiicccceeeessss:::: day to day support for operators in parts management, repairs and 
technical assistance 
• MMMMooooddddeeeerrrrnnnniiiizzzzaaaattttiiiioooonnnn ssssoooolllluuuuttttiiiioooonnnnssss: life time extension, improvement of performances, energy 
Page 2 
consumption and comfort 
To address specific needs, Alstom can provide a full range of engineering services supported by new 
design and innovations. 
6,000 
EMPLOYEES 
IN 30 COUNTRIES 
90 
SITES 
1B€ 
ANNUAL 
TURNOVER
ALSTOM TLS Footprint 
Page 3 
6,000 
EMPLOYEES 
30 
NATIONALITIES 
25% 
OF OUR STAFF 
TRANSFERRED 
FROM OUR CUSTOMERS 
URBAN 
TRAINS 
MAINTENANCE PARTS SUPPLY MODERNIZATION 
INTERCITY/ 
MAINLINE 
HS/VHS 
TRAINS 
FREIGHT 
LOCO 
PARTS HUB REPAIR 
CENTERS 
MOD. 
PROJECTS 
MOD. 
CENTERS
Key figures 2010/2011 
AT sales 5.8 b€ 
Rolling Stock 
& Other* 
* including Signalling & Systems 
Page 4 
TLS 
16% 
Parts 
31% 
Modern 
14% 
Maintenance 
55% 
Parts 
31% 
Main Line 26% 
Mass Transit 28% 
Freight 
11% 
Regional 6% 
APAC 9% 
France 7% 
NAM 8% 
LAM 12% 
South Europe 22% 
North 
Europe 
41% 
April 2010 to March 11: 900 M€ Sales 
ALSTOM 
Rolling Stock 20% 
ALSTOM Rolling 
Stock 80% 
> Breakdown of 2010-2011 
AT and TLS Sales (%) 
> Breakdown of 2010-2011 TLS Sales 
per type of Rolling Stock & Region
Why reengineer WWWhhhyyy rrreeeeeennngggiiinnneeeeeerrr aaaa gggglllloooobbbbaaaallll SSSSCCCC mmmmooooddddeeeellll ???? 
Page 5
Services to Rolling Stock 
AAAA ggggrrrroooowwwwiiiinnnngggg mmmmaaaarrrrkkkkeeeetttt…………........ 
• Expected 3.3 % growth year on year 
• Maintenance outsourcing trends 
• Diversification of stakeholders 
Page 6 
MMMMaaaaiiiinnnnttttaaaaiiiinnnneeeerrrrssss 
Maintenance costs 
Parts availability 
Obsolescence 
OOOOppppeeeerrrraaaattttoooorrrrssss 
Fleet Availability 
Operational Costs 
Increase Revenues 
FFFFlllleeeeeeeetttt OOOOwwwwnnnneeeerrrrssss 
Fleet Administration 
Fleet Residual Value 
Recycling 
… in a competitive environment 
• Low product captivity 
• Some protected markets
Variation in Customer needs. 
FFFFlllleeeeeeeetttt OOOOwwwwnnnneeeerrrrssss OOOOppppeeeerrrraaaattttoooorrrrssss MMMMaaaaiiiinnnnttttaaaaiiiinnnneeeerrrrssss 
New Regulations 
MMMMooooddddeeeerrrrnnnniiiizzzzaaaattttiiiioooonnnn 
Train Life Extension 
Performance increase 
ECM 
Entity in Charge of Maintenance 
Fleet Administration 
Configuration 
Page 7 
Recycling 
Passenger Care 
Energy Management 
MMMMaaaaiiiinnnntttteeeennnnaaaannnncccceeee 
Franchise 
Technical Full Services 
Accident and Vandalism 
Obsolescence 
management 
Maintenance plan 
optimization 
Train Health Management 
PPPPaaaarrrrttttssss &&&& RRRReeeeppppaaaaiiiirrrrssss 
Material availability 
lead time
The 5 Key constraints for our service footprint 
1. Contractual commitment to Customer on Rolling Stock and/or Material 
Page 8 
availability 
2. Technical know-how on world-wide installed fleet and access to legacy 
technical files on OEM sites 
3. Supplier base and captivity 
4. Supply Chain costs & lead time 
5. Tax & Customs duties
TLS Supply Chain ModelS 
• Parts & Repairs on Quote 
Page 9 
− Sales administration and distribution logistics 
• Material Availability Service Contracts 
− Inventory management and service exchange for repairs 
• Maintenance / Full Material Management long term contracts 
− Trains/Material availability on a price/mileage basis 
− Customized Supply Chain on Customer depots 
− Fleet and material planning for preventive, corrective, on condition 
• Modernization 
− Project driven re-engineering and modernized trainset or kit delivery
The Big Question? 
“Which Supply chain model to best execute ALSTOM Train Life Services current after-sales 
 synergies? 
 lead time reduction ? 
 anticipation of business growth ? 
Page 10 
activities and support business growth successfully in green field zones?
Page 11 
TTTThhhheeee SSSSCCCCOOOORRRREEEE PPPPrrrroooojjjjeeeecccctttt
SCORE Project 
SSSSCCCCOOOORRRREEEE : Supply Chain Organization for RRRREEEEactivity 
• Dedicated team : 1 Supply Chain developer + External assistance 
• 1 year project including extensive data crunching, interviews and self assessment questionnaire over 60 
sites, workshops 
Page 12
SCORE Project challenges 
• 100 facilities 111000000 fffaaaccciiillliiitttiiieeesss ttttoooo bbbbeeee ccccoooonnnnssssiiiiddddeeeerrrreeeedddd :::: from very small to very large, with complex flows between entities and high 
diversity of contractual commitments. 
• 666600000000 000000000000 references and service specific typology to be taken into account : 
Page 13 
− Demand pattern 
− Commercial : show stopper, passenger comfort.. 
− Maturity : In serial production, after sales, legacy, captivity 
− Valuation 
• EEEExxxxiiiissssttttiiiinnnngggg bbbbeeeelllliiiieeeeffffssss:::: 
− Centralization is cost efficient 
− Synergies are limited to stock
Page 14 
TTTTLLLLSSSS wwwwoooorrrrllllddddwwwwiiiiddddeeee SSSSuuuuppppppppllllyyyy CCCChhhhaaaaiiiinnnn vvvviiiissssiiiioooonnnn
3 Steps towards TLS New SC model 
1/ Definition ppppeeeerrrr bbbbuuuussssiiiinnnneeeessssssss ttttyyyyppppeeee (Maintenance, Parts, Modernization) of : 
Page 15 
− SSSSttttaaaannnnddddaaaarrrrdddd pppprrrroooocccceeeesssssssseeeessss (Demand and Supply management, Planning, Logistics) 
− SSSSttttaaaannnnddddaaaarrrrdddd ssssiiiitttteeeessss ttttyyyyppppoooollllooooggggyyyy 
− SSSSttttaaaannnnddddaaaarrrrdddd kkkkeeeeyyyy ffffuuuunnnnccccttttiiiioooonnnnssss (mission, local/global, skills) 
2/ Definition of standard « SSSSeeeerrrrvvvviiiicccceeee NNNNeeeettttwwwwoooorrrrkkkk OOOOrrrrggggaaaannnniiiizzzzaaaattttiiiioooonnnnssss » for a given contract or new geographic zone. 
3/ Validation of ggggoooollllddddeeeennnn rrrruuuulllleeeessss by senior management to give 
− Simple and shared gggguuuuiiiiddddeeeelllliiiinnnneeeessss ffffoooorrrr aaaaddddddddrrrreeeessssssssiiiinnnngggg nnnneeeewwww bbbbuuuussssiiiinnnneeeessssssss. 
− Standard rrrroooolllleeeessss aaaannnndddd rrrreeeessssppppoooonnnnssssiiiibbbbiiiilllliiiittttiiiieeeessss 
− IIIInnnntttteeeerrrraaaaccccttttiiiioooonnnnssss between entities.
Mapping of the key network actors 
Page 16
Page 17 
SSSSIIIITTTTEEEESSSS TTTTYYYYPPPPOOOOLLLLOOOOGGGGYYYY 
3 Site Typologies
Fleet approach FFFllleeeeeettt aaapppppprrroooaaaccchhh ffffoooorrrr BBBBuuuussssiiiinnnneeeessssssss ggggrrrroooowwwwtttthhhh 
Page 18 
IIIInnnnssssttttaaaalllllllleeeedddd FFFFlllleeeeeeeetttt kkkknnnnoooowwww-hhhhoooowwww 
IIIInnnnssssttttaaaalllllllleeeedddd BBBBaaaasssseeee 
MMMMaaaannnnaaaaggggeeeemmmmeeeennnntttt 
MMMMaaaasssstttteeeerrrr DDDDaaaattttaaaa 
MMMMaaaaiiiinnnntttteeeennnnaaaannnncccceeee BBBBiiiillllllll ooooffff MMMMaaaatttteeeerrrriiiiaaaallll 
MMMMaaaaiiiinnnntttteeeennnnaaaannnncccceeee 
EEEEnnnnggggiiiinnnneeeeeeeerrrriiiinnnngggg,,,, 
OOOObbbbssssoooolllleeeesssscccceeeennnncccceeee,,,, SSSSaaaaffffeeeettttyyyy 
TTTTeeeecccchhhhnnnniiiiccccaaaallll DDDDaaaattttaaaa MMMMaaaannnnaaaaggggeeeemmmmeeeennnntttt 
GGGGlllloooobbbbaaaallll SSSSoooouuuurrrrcccciiiinnnngggg 
 IIIInnnnvvvveeeennnnttttoooorrrryyyy 
MMMMaaaannnnaaaaggggeeeemmmmeeeennnntttt ffffoooorrrr 
ccccoooommmmmmmmoooonnnn////ccccrrrriiiittttiiiiccccaaaallll PPPPaaaarrrrttttssss 
BBBBuuuussssiiiinnnneeeessssssss DDDDeeeevvvveeeellllooooppppmmmmeeeennnntttt 
PPPPllllaaaannnn
Service Network Organization Modeling tool 
FFFFUUUUNNNNCCCCTTTTIIIIOOOONNNNSSSS 
Fleet Planner 
Tender Team 
Page 19 
AAAASSSSSSSSEEEETTTTSSSS 
SSSSIIIITTTTEEEE TTTTYYYYPPPPOOOOLLLLOOOOGGGGIIIIEEEESSSS 
RRRROOOOLLLLEEEESSSS 
Design and implementation of the standard 
Service Network Organization to best serve a 
given new service contract or emerging geographic 
zone 
Trading 
Unit 
Leading 
Unit 
Participative 
Unit 
SSSSiiiitttteeee 1111 
Participative 
Unit 
SSSSiiiitttteeee 2222 
Leading 
Unit 
Material 
Planner 
Procurement 
Repair Loop 
Controller 
Custom 
Clearance 
Maintenance 
Engineers 
Transport 
Sourcing 
Parts Technicians 
Demand 
Planner 
Parts 
Technicians 
Maintenance 
Engineers 
Warehousing/ 
Preparation 
Line 
Sourcing 
replenishment 
Operation 
planning 
DDDDeeeeppppooootttt 
FFFFCCCCooooEEEE 
RRRReeeeggggiiiioooonnnnaaaallll 
HHHHuuuubbbb 
LLLLooooccccaaaallll RRRReeeeppppaaaaiiiirrrr 
CCCCeeeennnntttteeeerrrr 
CCCCuuuussssttttoooommmmeeeerrrr 
HHHHuuuubbbb 
SSSSttttaaaannnndddd aaaalllloooonnnneeee 
ddddeeeeppppooootttt 
LLLLooooccccaaaallll 
SSSSttttoooorrrraaaaggggeeee 
Material 
Planner 
Maintenance 
Engineers 
Tender Team 
Procurement 
Demand 
Planner 
Parts Bid 
Team 
Sales force 
FFFFCCCCooooEEEE 
FFFFCCCCooooEEEE RRRReeeegggg.... HHHHuuuubbbb 
C 
U 
S 
T 
O 
M 
E 
R
Benefits 
Benefits of using ALSTOM TLS “Service Network SSSeeerrrvvviiiccceee NNNeeetttwwwooorrrkkk MMMMooooddddeeeelllliiiinnnngggg TTTToooooooollll “ 
• Demonstrate dedicated Service Network capabilities to prospects 
• Validate tender phase targeted Service Network 
• Align all functions on a clear road map 
ERP set-up and deployment, skills and staffing needs, stock allocation, freight request for quotations, depot hand over 
campaign, interfaces with maintenance operation, Sourcing, Engineering) 
• Maximize global management synergies while securing daily performance commitment 
Page 20
Page 21 
Thanks for your attention…

More Related Content

Similar to Magnus Larsson, Alstom presenation at Spare Parts 2014

Modelling supply chain
Modelling supply chainModelling supply chain
Modelling supply chainPaul Franklin
 
Supply chain management
Supply chain managementSupply chain management
Supply chain managementPaul Franklin
 
Supply chain demand estimation and planning
Supply chain demand estimation and planningSupply chain demand estimation and planning
Supply chain demand estimation and planningPaul Franklin
 
IRJET- Design and Development of Centralized Tyre Pressure System
IRJET-  	  Design and Development of Centralized Tyre Pressure SystemIRJET-  	  Design and Development of Centralized Tyre Pressure System
IRJET- Design and Development of Centralized Tyre Pressure SystemIRJET Journal
 
Measuring the performance of your fleet by clearly defining strategy and tactics
Measuring the performance of your fleet by clearly defining strategy and tacticsMeasuring the performance of your fleet by clearly defining strategy and tactics
Measuring the performance of your fleet by clearly defining strategy and tacticsTristan Wiggill
 
applicationof vsm
applicationof vsmapplicationof vsm
applicationof vsmAro Ephrem
 
It's a Bird, It's a Plane, It's a Drone...Innovation at CSCMP
It's a Bird, It's a Plane, It's a Drone...Innovation at CSCMPIt's a Bird, It's a Plane, It's a Drone...Innovation at CSCMP
It's a Bird, It's a Plane, It's a Drone...Innovation at CSCMPMarketing_Kenco
 
Automotive Shifter Manufacturing Process, Machinery Requirements and Project ...
Automotive Shifter Manufacturing Process, Machinery Requirements and Project ...Automotive Shifter Manufacturing Process, Machinery Requirements and Project ...
Automotive Shifter Manufacturing Process, Machinery Requirements and Project ...IMARC Group
 
Road map of development for pull system in thailand small and medium automoti...
Road map of development for pull system in thailand small and medium automoti...Road map of development for pull system in thailand small and medium automoti...
Road map of development for pull system in thailand small and medium automoti...eSAT Publishing House
 
Studying the Advance Maintenance Practice & Computerised Maintenance
Studying the Advance Maintenance Practice & Computerised MaintenanceStudying the Advance Maintenance Practice & Computerised Maintenance
Studying the Advance Maintenance Practice & Computerised MaintenanceIJERA Editor
 
Business Intelligence in Upstream-Downstream
Business Intelligence in Upstream-DownstreamBusiness Intelligence in Upstream-Downstream
Business Intelligence in Upstream-DownstreamNirav Modh
 
Impact of_automation_on_industries
Impact of_automation_on_industriesImpact of_automation_on_industries
Impact of_automation_on_industriesLokesh Sharma
 
Study on Improving Throughput Time through Value Stream Mapping
Study on Improving Throughput Time through Value Stream MappingStudy on Improving Throughput Time through Value Stream Mapping
Study on Improving Throughput Time through Value Stream MappingAlwin Thomas
 
Optimizing Logistics Chains with Simulation Modelling
Optimizing Logistics Chains with Simulation ModellingOptimizing Logistics Chains with Simulation Modelling
Optimizing Logistics Chains with Simulation ModellingAusenco
 
Aeronautical MRO - Using Critical Chain to boost performance - Embraer confer...
Aeronautical MRO - Using Critical Chain to boost performance - Embraer confer...Aeronautical MRO - Using Critical Chain to boost performance - Embraer confer...
Aeronautical MRO - Using Critical Chain to boost performance - Embraer confer...MARRIS Consulting
 
Rolling Stock Maintenance Summit 2016
Rolling Stock Maintenance Summit 2016Rolling Stock Maintenance Summit 2016
Rolling Stock Maintenance Summit 2016marketinglbcg
 

Similar to Magnus Larsson, Alstom presenation at Spare Parts 2014 (20)

Modelling supply chain
Modelling supply chainModelling supply chain
Modelling supply chain
 
Supply chain management
Supply chain managementSupply chain management
Supply chain management
 
Supply chain demand estimation and planning
Supply chain demand estimation and planningSupply chain demand estimation and planning
Supply chain demand estimation and planning
 
IRJET- Design and Development of Centralized Tyre Pressure System
IRJET-  	  Design and Development of Centralized Tyre Pressure SystemIRJET-  	  Design and Development of Centralized Tyre Pressure System
IRJET- Design and Development of Centralized Tyre Pressure System
 
Measuring the performance of your fleet by clearly defining strategy and tactics
Measuring the performance of your fleet by clearly defining strategy and tacticsMeasuring the performance of your fleet by clearly defining strategy and tactics
Measuring the performance of your fleet by clearly defining strategy and tactics
 
Feasibility study of an Automobile Repair & Service Workshop
Feasibility study of an Automobile Repair & Service Workshop Feasibility study of an Automobile Repair & Service Workshop
Feasibility study of an Automobile Repair & Service Workshop
 
applicationof vsm
applicationof vsmapplicationof vsm
applicationof vsm
 
It's a Bird, It's a Plane, It's a Drone...Innovation at CSCMP
It's a Bird, It's a Plane, It's a Drone...Innovation at CSCMPIt's a Bird, It's a Plane, It's a Drone...Innovation at CSCMP
It's a Bird, It's a Plane, It's a Drone...Innovation at CSCMP
 
Supply Chain Basic
Supply Chain BasicSupply Chain Basic
Supply Chain Basic
 
Automotive Shifter Manufacturing Process, Machinery Requirements and Project ...
Automotive Shifter Manufacturing Process, Machinery Requirements and Project ...Automotive Shifter Manufacturing Process, Machinery Requirements and Project ...
Automotive Shifter Manufacturing Process, Machinery Requirements and Project ...
 
Road map of development for pull system in thailand small and medium automoti...
Road map of development for pull system in thailand small and medium automoti...Road map of development for pull system in thailand small and medium automoti...
Road map of development for pull system in thailand small and medium automoti...
 
Studying the Advance Maintenance Practice & Computerised Maintenance
Studying the Advance Maintenance Practice & Computerised MaintenanceStudying the Advance Maintenance Practice & Computerised Maintenance
Studying the Advance Maintenance Practice & Computerised Maintenance
 
Business Intelligence in Upstream-Downstream
Business Intelligence in Upstream-DownstreamBusiness Intelligence in Upstream-Downstream
Business Intelligence in Upstream-Downstream
 
Impact of_automation_on_industries
Impact of_automation_on_industriesImpact of_automation_on_industries
Impact of_automation_on_industries
 
Study on Improving Throughput Time through Value Stream Mapping
Study on Improving Throughput Time through Value Stream MappingStudy on Improving Throughput Time through Value Stream Mapping
Study on Improving Throughput Time through Value Stream Mapping
 
Sip
SipSip
Sip
 
M2M_eng_mailing
M2M_eng_mailingM2M_eng_mailing
M2M_eng_mailing
 
Optimizing Logistics Chains with Simulation Modelling
Optimizing Logistics Chains with Simulation ModellingOptimizing Logistics Chains with Simulation Modelling
Optimizing Logistics Chains with Simulation Modelling
 
Aeronautical MRO - Using Critical Chain to boost performance - Embraer confer...
Aeronautical MRO - Using Critical Chain to boost performance - Embraer confer...Aeronautical MRO - Using Critical Chain to boost performance - Embraer confer...
Aeronautical MRO - Using Critical Chain to boost performance - Embraer confer...
 
Rolling Stock Maintenance Summit 2016
Rolling Stock Maintenance Summit 2016Rolling Stock Maintenance Summit 2016
Rolling Stock Maintenance Summit 2016
 

More from Copperberg

Field Service Forum 2016
Field Service Forum 2016Field Service Forum 2016
Field Service Forum 2016Copperberg
 
TOP5 facts about Mobile Payments
TOP5 facts about Mobile PaymentsTOP5 facts about Mobile Payments
TOP5 facts about Mobile PaymentsCopperberg
 
Meet Nordic IT Security Advisory board, David Jacoby
Meet Nordic IT Security Advisory board, David JacobyMeet Nordic IT Security Advisory board, David Jacoby
Meet Nordic IT Security Advisory board, David JacobyCopperberg
 
Nordic IT Security Forum 2015 Agenda
Nordic IT Security Forum 2015 AgendaNordic IT Security Forum 2015 Agenda
Nordic IT Security Forum 2015 AgendaCopperberg
 
I-Gaming Forum 2015 Post Event Report
I-Gaming Forum 2015 Post Event ReportI-Gaming Forum 2015 Post Event Report
I-Gaming Forum 2015 Post Event ReportCopperberg
 
The wonderous quest of Prince Wonderful
The wonderous quest of Prince WonderfulThe wonderous quest of Prince Wonderful
The wonderous quest of Prince WonderfulCopperberg
 
Enterprise Digital Transformation Survey report 2015
Enterprise Digital Transformation Survey report 2015Enterprise Digital Transformation Survey report 2015
Enterprise Digital Transformation Survey report 2015Copperberg
 
Orphan Drugs Summit 2015
Orphan Drugs Summit 2015Orphan Drugs Summit 2015
Orphan Drugs Summit 2015Copperberg
 
National Lottery Forum 2015 agenda
National Lottery Forum 2015 agendaNational Lottery Forum 2015 agenda
National Lottery Forum 2015 agendaCopperberg
 
Manufacturing Pricing Excellence 2015 agenda
Manufacturing Pricing Excellence 2015 agendaManufacturing Pricing Excellence 2015 agenda
Manufacturing Pricing Excellence 2015 agendaCopperberg
 
Field Service Forum 2015 agenda
Field Service Forum 2015 agendaField Service Forum 2015 agenda
Field Service Forum 2015 agendaCopperberg
 
European Decision Support Days 2015 agenda
European Decision Support Days 2015 agendaEuropean Decision Support Days 2015 agenda
European Decision Support Days 2015 agendaCopperberg
 
"Electric Vehicles 2020" conference agenda
"Electric Vehicles 2020" conference agenda"Electric Vehicles 2020" conference agenda
"Electric Vehicles 2020" conference agendaCopperberg
 
I-Gaming Forum 2015 agenda
I-Gaming Forum 2015 agendaI-Gaming Forum 2015 agenda
I-Gaming Forum 2015 agendaCopperberg
 
Aftermarket Business Platform 2014 Post Event Report
Aftermarket Business Platform 2014 Post Event ReportAftermarket Business Platform 2014 Post Event Report
Aftermarket Business Platform 2014 Post Event ReportCopperberg
 
Spare Parts Business Platform 2015
Spare Parts Business Platform 2015Spare Parts Business Platform 2015
Spare Parts Business Platform 2015Copperberg
 
Tomas Wennerstein, Syncron presenation at Spare Parts 2013
Tomas Wennerstein, Syncron presenation at Spare Parts 2013Tomas Wennerstein, Syncron presenation at Spare Parts 2013
Tomas Wennerstein, Syncron presenation at Spare Parts 2013Copperberg
 
Johan Östlin, Syncron presentation at Spare Parts 2013
Johan Östlin, Syncron presentation at Spare Parts 2013Johan Östlin, Syncron presentation at Spare Parts 2013
Johan Östlin, Syncron presentation at Spare Parts 2013Copperberg
 
Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013Copperberg
 
Axel Bühler, Nordex presenatation at Spare Parts 2013
Axel Bühler, Nordex presenatation at Spare Parts 2013Axel Bühler, Nordex presenatation at Spare Parts 2013
Axel Bühler, Nordex presenatation at Spare Parts 2013Copperberg
 

More from Copperberg (20)

Field Service Forum 2016
Field Service Forum 2016Field Service Forum 2016
Field Service Forum 2016
 
TOP5 facts about Mobile Payments
TOP5 facts about Mobile PaymentsTOP5 facts about Mobile Payments
TOP5 facts about Mobile Payments
 
Meet Nordic IT Security Advisory board, David Jacoby
Meet Nordic IT Security Advisory board, David JacobyMeet Nordic IT Security Advisory board, David Jacoby
Meet Nordic IT Security Advisory board, David Jacoby
 
Nordic IT Security Forum 2015 Agenda
Nordic IT Security Forum 2015 AgendaNordic IT Security Forum 2015 Agenda
Nordic IT Security Forum 2015 Agenda
 
I-Gaming Forum 2015 Post Event Report
I-Gaming Forum 2015 Post Event ReportI-Gaming Forum 2015 Post Event Report
I-Gaming Forum 2015 Post Event Report
 
The wonderous quest of Prince Wonderful
The wonderous quest of Prince WonderfulThe wonderous quest of Prince Wonderful
The wonderous quest of Prince Wonderful
 
Enterprise Digital Transformation Survey report 2015
Enterprise Digital Transformation Survey report 2015Enterprise Digital Transformation Survey report 2015
Enterprise Digital Transformation Survey report 2015
 
Orphan Drugs Summit 2015
Orphan Drugs Summit 2015Orphan Drugs Summit 2015
Orphan Drugs Summit 2015
 
National Lottery Forum 2015 agenda
National Lottery Forum 2015 agendaNational Lottery Forum 2015 agenda
National Lottery Forum 2015 agenda
 
Manufacturing Pricing Excellence 2015 agenda
Manufacturing Pricing Excellence 2015 agendaManufacturing Pricing Excellence 2015 agenda
Manufacturing Pricing Excellence 2015 agenda
 
Field Service Forum 2015 agenda
Field Service Forum 2015 agendaField Service Forum 2015 agenda
Field Service Forum 2015 agenda
 
European Decision Support Days 2015 agenda
European Decision Support Days 2015 agendaEuropean Decision Support Days 2015 agenda
European Decision Support Days 2015 agenda
 
"Electric Vehicles 2020" conference agenda
"Electric Vehicles 2020" conference agenda"Electric Vehicles 2020" conference agenda
"Electric Vehicles 2020" conference agenda
 
I-Gaming Forum 2015 agenda
I-Gaming Forum 2015 agendaI-Gaming Forum 2015 agenda
I-Gaming Forum 2015 agenda
 
Aftermarket Business Platform 2014 Post Event Report
Aftermarket Business Platform 2014 Post Event ReportAftermarket Business Platform 2014 Post Event Report
Aftermarket Business Platform 2014 Post Event Report
 
Spare Parts Business Platform 2015
Spare Parts Business Platform 2015Spare Parts Business Platform 2015
Spare Parts Business Platform 2015
 
Tomas Wennerstein, Syncron presenation at Spare Parts 2013
Tomas Wennerstein, Syncron presenation at Spare Parts 2013Tomas Wennerstein, Syncron presenation at Spare Parts 2013
Tomas Wennerstein, Syncron presenation at Spare Parts 2013
 
Johan Östlin, Syncron presentation at Spare Parts 2013
Johan Östlin, Syncron presentation at Spare Parts 2013Johan Östlin, Syncron presentation at Spare Parts 2013
Johan Östlin, Syncron presentation at Spare Parts 2013
 
Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013Giacomo Squintani, PTC presenation at Spare Parts 2013
Giacomo Squintani, PTC presenation at Spare Parts 2013
 
Axel Bühler, Nordex presenatation at Spare Parts 2013
Axel Bühler, Nordex presenatation at Spare Parts 2013Axel Bühler, Nordex presenatation at Spare Parts 2013
Axel Bühler, Nordex presenatation at Spare Parts 2013
 

Recently uploaded

The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesFatimaKhan178732
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptxPoojaSen20
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon AUnboundStockton
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991RKavithamani
 

Recently uploaded (20)

Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Separation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and ActinidesSeparation of Lanthanides/ Lanthanides and Actinides
Separation of Lanthanides/ Lanthanides and Actinides
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Staff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSDStaff of Color (SOC) Retention Efforts DDSD
Staff of Color (SOC) Retention Efforts DDSD
 
PSYCHIATRIC History collection FORMAT.pptx
PSYCHIATRIC   History collection FORMAT.pptxPSYCHIATRIC   History collection FORMAT.pptx
PSYCHIATRIC History collection FORMAT.pptx
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Crayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon ACrayon Activity Handout For the Crayon A
Crayon Activity Handout For the Crayon A
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
Industrial Policy - 1948, 1956, 1973, 1977, 1980, 1991
 

Magnus Larsson, Alstom presenation at Spare Parts 2014

  • 1. Page 1 Train TTTrrraaaiiinnn LLLLiiiiffffeeee SSSSeeeerrrrvvvviiiicccceeeessss AAAA SSSSuuuuppppppppllllyyyy CCCChhhhaaaaiiiinnnn CCCChhhhaaaalllllllleeeennnnggggeeee
  • 2. Train Life Services > 3 areas of expertize dedicated to performance: • Maintenance MMMaaaiiinnnttteeennnaaannnccceee sssseeeerrrrvvvviiiicccceeeessss:::: fleet maintenance and train performance optimization • PPPPaaaarrrrttttssss ssssuuuuppppppppllllyyyy sssseeeerrrrvvvviiiicccceeeessss:::: day to day support for operators in parts management, repairs and technical assistance • MMMMooooddddeeeerrrrnnnniiiizzzzaaaattttiiiioooonnnn ssssoooolllluuuuttttiiiioooonnnnssss: life time extension, improvement of performances, energy Page 2 consumption and comfort To address specific needs, Alstom can provide a full range of engineering services supported by new design and innovations. 6,000 EMPLOYEES IN 30 COUNTRIES 90 SITES 1B€ ANNUAL TURNOVER
  • 3. ALSTOM TLS Footprint Page 3 6,000 EMPLOYEES 30 NATIONALITIES 25% OF OUR STAFF TRANSFERRED FROM OUR CUSTOMERS URBAN TRAINS MAINTENANCE PARTS SUPPLY MODERNIZATION INTERCITY/ MAINLINE HS/VHS TRAINS FREIGHT LOCO PARTS HUB REPAIR CENTERS MOD. PROJECTS MOD. CENTERS
  • 4. Key figures 2010/2011 AT sales 5.8 b€ Rolling Stock & Other* * including Signalling & Systems Page 4 TLS 16% Parts 31% Modern 14% Maintenance 55% Parts 31% Main Line 26% Mass Transit 28% Freight 11% Regional 6% APAC 9% France 7% NAM 8% LAM 12% South Europe 22% North Europe 41% April 2010 to March 11: 900 M€ Sales ALSTOM Rolling Stock 20% ALSTOM Rolling Stock 80% > Breakdown of 2010-2011 AT and TLS Sales (%) > Breakdown of 2010-2011 TLS Sales per type of Rolling Stock & Region
  • 5. Why reengineer WWWhhhyyy rrreeeeeennngggiiinnneeeeeerrr aaaa gggglllloooobbbbaaaallll SSSSCCCC mmmmooooddddeeeellll ???? Page 5
  • 6. Services to Rolling Stock AAAA ggggrrrroooowwwwiiiinnnngggg mmmmaaaarrrrkkkkeeeetttt…………........ • Expected 3.3 % growth year on year • Maintenance outsourcing trends • Diversification of stakeholders Page 6 MMMMaaaaiiiinnnnttttaaaaiiiinnnneeeerrrrssss Maintenance costs Parts availability Obsolescence OOOOppppeeeerrrraaaattttoooorrrrssss Fleet Availability Operational Costs Increase Revenues FFFFlllleeeeeeeetttt OOOOwwwwnnnneeeerrrrssss Fleet Administration Fleet Residual Value Recycling … in a competitive environment • Low product captivity • Some protected markets
  • 7. Variation in Customer needs. FFFFlllleeeeeeeetttt OOOOwwwwnnnneeeerrrrssss OOOOppppeeeerrrraaaattttoooorrrrssss MMMMaaaaiiiinnnnttttaaaaiiiinnnneeeerrrrssss New Regulations MMMMooooddddeeeerrrrnnnniiiizzzzaaaattttiiiioooonnnn Train Life Extension Performance increase ECM Entity in Charge of Maintenance Fleet Administration Configuration Page 7 Recycling Passenger Care Energy Management MMMMaaaaiiiinnnntttteeeennnnaaaannnncccceeee Franchise Technical Full Services Accident and Vandalism Obsolescence management Maintenance plan optimization Train Health Management PPPPaaaarrrrttttssss &&&& RRRReeeeppppaaaaiiiirrrrssss Material availability lead time
  • 8. The 5 Key constraints for our service footprint 1. Contractual commitment to Customer on Rolling Stock and/or Material Page 8 availability 2. Technical know-how on world-wide installed fleet and access to legacy technical files on OEM sites 3. Supplier base and captivity 4. Supply Chain costs & lead time 5. Tax & Customs duties
  • 9. TLS Supply Chain ModelS • Parts & Repairs on Quote Page 9 − Sales administration and distribution logistics • Material Availability Service Contracts − Inventory management and service exchange for repairs • Maintenance / Full Material Management long term contracts − Trains/Material availability on a price/mileage basis − Customized Supply Chain on Customer depots − Fleet and material planning for preventive, corrective, on condition • Modernization − Project driven re-engineering and modernized trainset or kit delivery
  • 10. The Big Question? “Which Supply chain model to best execute ALSTOM Train Life Services current after-sales synergies? lead time reduction ? anticipation of business growth ? Page 10 activities and support business growth successfully in green field zones?
  • 11. Page 11 TTTThhhheeee SSSSCCCCOOOORRRREEEE PPPPrrrroooojjjjeeeecccctttt
  • 12. SCORE Project SSSSCCCCOOOORRRREEEE : Supply Chain Organization for RRRREEEEactivity • Dedicated team : 1 Supply Chain developer + External assistance • 1 year project including extensive data crunching, interviews and self assessment questionnaire over 60 sites, workshops Page 12
  • 13. SCORE Project challenges • 100 facilities 111000000 fffaaaccciiillliiitttiiieeesss ttttoooo bbbbeeee ccccoooonnnnssssiiiiddddeeeerrrreeeedddd :::: from very small to very large, with complex flows between entities and high diversity of contractual commitments. • 666600000000 000000000000 references and service specific typology to be taken into account : Page 13 − Demand pattern − Commercial : show stopper, passenger comfort.. − Maturity : In serial production, after sales, legacy, captivity − Valuation • EEEExxxxiiiissssttttiiiinnnngggg bbbbeeeelllliiiieeeeffffssss:::: − Centralization is cost efficient − Synergies are limited to stock
  • 14. Page 14 TTTTLLLLSSSS wwwwoooorrrrllllddddwwwwiiiiddddeeee SSSSuuuuppppppppllllyyyy CCCChhhhaaaaiiiinnnn vvvviiiissssiiiioooonnnn
  • 15. 3 Steps towards TLS New SC model 1/ Definition ppppeeeerrrr bbbbuuuussssiiiinnnneeeessssssss ttttyyyyppppeeee (Maintenance, Parts, Modernization) of : Page 15 − SSSSttttaaaannnnddddaaaarrrrdddd pppprrrroooocccceeeesssssssseeeessss (Demand and Supply management, Planning, Logistics) − SSSSttttaaaannnnddddaaaarrrrdddd ssssiiiitttteeeessss ttttyyyyppppoooollllooooggggyyyy − SSSSttttaaaannnnddddaaaarrrrdddd kkkkeeeeyyyy ffffuuuunnnnccccttttiiiioooonnnnssss (mission, local/global, skills) 2/ Definition of standard « SSSSeeeerrrrvvvviiiicccceeee NNNNeeeettttwwwwoooorrrrkkkk OOOOrrrrggggaaaannnniiiizzzzaaaattttiiiioooonnnnssss » for a given contract or new geographic zone. 3/ Validation of ggggoooollllddddeeeennnn rrrruuuulllleeeessss by senior management to give − Simple and shared gggguuuuiiiiddddeeeelllliiiinnnneeeessss ffffoooorrrr aaaaddddddddrrrreeeessssssssiiiinnnngggg nnnneeeewwww bbbbuuuussssiiiinnnneeeessssssss. − Standard rrrroooolllleeeessss aaaannnndddd rrrreeeessssppppoooonnnnssssiiiibbbbiiiilllliiiittttiiiieeeessss − IIIInnnntttteeeerrrraaaaccccttttiiiioooonnnnssss between entities.
  • 16. Mapping of the key network actors Page 16
  • 17. Page 17 SSSSIIIITTTTEEEESSSS TTTTYYYYPPPPOOOOLLLLOOOOGGGGYYYY 3 Site Typologies
  • 18. Fleet approach FFFllleeeeeettt aaapppppprrroooaaaccchhh ffffoooorrrr BBBBuuuussssiiiinnnneeeessssssss ggggrrrroooowwwwtttthhhh Page 18 IIIInnnnssssttttaaaalllllllleeeedddd FFFFlllleeeeeeeetttt kkkknnnnoooowwww-hhhhoooowwww IIIInnnnssssttttaaaalllllllleeeedddd BBBBaaaasssseeee MMMMaaaannnnaaaaggggeeeemmmmeeeennnntttt MMMMaaaasssstttteeeerrrr DDDDaaaattttaaaa MMMMaaaaiiiinnnntttteeeennnnaaaannnncccceeee BBBBiiiillllllll ooooffff MMMMaaaatttteeeerrrriiiiaaaallll MMMMaaaaiiiinnnntttteeeennnnaaaannnncccceeee EEEEnnnnggggiiiinnnneeeeeeeerrrriiiinnnngggg,,,, OOOObbbbssssoooolllleeeesssscccceeeennnncccceeee,,,, SSSSaaaaffffeeeettttyyyy TTTTeeeecccchhhhnnnniiiiccccaaaallll DDDDaaaattttaaaa MMMMaaaannnnaaaaggggeeeemmmmeeeennnntttt GGGGlllloooobbbbaaaallll SSSSoooouuuurrrrcccciiiinnnngggg IIIInnnnvvvveeeennnnttttoooorrrryyyy MMMMaaaannnnaaaaggggeeeemmmmeeeennnntttt ffffoooorrrr ccccoooommmmmmmmoooonnnn////ccccrrrriiiittttiiiiccccaaaallll PPPPaaaarrrrttttssss BBBBuuuussssiiiinnnneeeessssssss DDDDeeeevvvveeeellllooooppppmmmmeeeennnntttt PPPPllllaaaannnn
  • 19. Service Network Organization Modeling tool FFFFUUUUNNNNCCCCTTTTIIIIOOOONNNNSSSS Fleet Planner Tender Team Page 19 AAAASSSSSSSSEEEETTTTSSSS SSSSIIIITTTTEEEE TTTTYYYYPPPPOOOOLLLLOOOOGGGGIIIIEEEESSSS RRRROOOOLLLLEEEESSSS Design and implementation of the standard Service Network Organization to best serve a given new service contract or emerging geographic zone Trading Unit Leading Unit Participative Unit SSSSiiiitttteeee 1111 Participative Unit SSSSiiiitttteeee 2222 Leading Unit Material Planner Procurement Repair Loop Controller Custom Clearance Maintenance Engineers Transport Sourcing Parts Technicians Demand Planner Parts Technicians Maintenance Engineers Warehousing/ Preparation Line Sourcing replenishment Operation planning DDDDeeeeppppooootttt FFFFCCCCooooEEEE RRRReeeeggggiiiioooonnnnaaaallll HHHHuuuubbbb LLLLooooccccaaaallll RRRReeeeppppaaaaiiiirrrr CCCCeeeennnntttteeeerrrr CCCCuuuussssttttoooommmmeeeerrrr HHHHuuuubbbb SSSSttttaaaannnndddd aaaalllloooonnnneeee ddddeeeeppppooootttt LLLLooooccccaaaallll SSSSttttoooorrrraaaaggggeeee Material Planner Maintenance Engineers Tender Team Procurement Demand Planner Parts Bid Team Sales force FFFFCCCCooooEEEE FFFFCCCCooooEEEE RRRReeeegggg.... HHHHuuuubbbb C U S T O M E R
  • 20. Benefits Benefits of using ALSTOM TLS “Service Network SSSeeerrrvvviiiccceee NNNeeetttwwwooorrrkkk MMMMooooddddeeeelllliiiinnnngggg TTTToooooooollll “ • Demonstrate dedicated Service Network capabilities to prospects • Validate tender phase targeted Service Network • Align all functions on a clear road map ERP set-up and deployment, skills and staffing needs, stock allocation, freight request for quotations, depot hand over campaign, interfaces with maintenance operation, Sourcing, Engineering) • Maximize global management synergies while securing daily performance commitment Page 20
  • 21. Page 21 Thanks for your attention…