SlideShare a Scribd company logo
1 of 3
Download to read offline
GLS Optimized Design: Solutions
                                          Improve Application Performance, Operational Efficiency & Reduce Infrastructure Costs

                      Industry Trends                                      Customer Business Problems                                                          GLS Solutions
Data Center Consolidation & Server Virtualization              45-58% of CIOs Report Poor Application                                 Managed WAN Acceleration Services
   Reduced Remote Site Infrastructure                         Performance                                                            Application Monitoring, Reporting, Analysis & Alerts
 Explosion of New Applications on the Wide Area Network       Performance issues inherent to WAN                                     Infrastructure Management
                                                               Complexity of Application Infrastructure                               Deployment Services
Flood on New Technology & Vendors                              Inefficient IT Operations & Costs                                      Application Monitoring, Reports, Analysis & Alerts
   Multi- Service Platforms                                       High Costs associated with the IT Help Desk and other                Riverbed Cascade or Visual APA + NetFlow Platforms
   Complex Security Requirements                                   Functional Areas of Operations                                       Visibility of the application flow across entire network
   WANx, Load Balancers, ASA/Firewall, etc.                       Poor coordination across the entire IT Organization to find and       infrastructure
   SIP/IPT Products and Services                                   fix problems                                                         Monitor End User Response Time and customized by customer
   Ubiquity of Cellular Data, DSL &Cable                          Excessive MTTR and End User Down Time for all events                 Severe event alerting with relevant diagnostics
   Advanced diagnostic tools                                      High Volume & Length of Help Desk Calls                              Continuous Optimization and Monthly review of design & issues
                                                                   High Instance of Application Down Time Events                        Central focus for IT Leadership, Operations & Planning Teams
                                                                   Lack the capability to Isolate and Diagnose Critical Events       Managed Infrastructure Services – 24x7x365
                                                                   Rapidly changing IT staffing and skill requirements                  Network: Router, Switch, Firewall, VPN, Server
                                                                complex & fragmented monitoring & diagnostic tools                      Advanced: IPT, WANx, Security, Data Center
Complex Voice and Data Networks Design                         Network Designs are not Optimized                                      Optimized Design Principles
   CoS and CoS Real Time Requirements                             IT is overwhelmed by exponential increase in the complexity of     Integration of SIP onto the Customer Data Network
   Integration of SIP onto Data Network                            their communications infrastructure                                Access Optimization and Increased Application Performance
   Diverse and Secondary Networks for Voice & Data                Un-Optimized Design                                                Simplified Billing, Processing and Audit of Installed Base Services
   Complex Head End Infrastructure at Host Sites                   o Savings of 20% – 40% in Opportunity Cost                          and Servers
   Reduced IT Staff Resources                                      o Increasing Operational Costs                                     Leverage of IPT End User Productivity Tools
   Limited Existing IT Staff Skills                                o Decreased End User Productivity                                 Managed Infrastructure & Deployment Services
                                                                    o Waste of Network & Server Resources                              Address IT Technical Skills and Staff and repurpose for increased
                                                                    o Inefficient Auditing & Bill Processes                             productivity based on skill set
                                                                    o Excessive costs for current Bandwidth
Economic and Regulatory Environment                            IT must be more Cost Efficient and Effective                           Optimized Design Approach and Benefits
   Management Costs                                               Business Case Decision Making                                     Infrastructure Savings
   Customer Demand for Better Service                              o ROI with High Degree of Confidence                               Reduce costs of 25-40% by Integrating SIP and Data
   Tight CAPEX Budgets                                             o Demands Short Pay Back Period                                    WANx at vital Data Sites - 50%+ Savings on Voice and Data Access
   Competitive Demand for Higher Employee Productivity            Quick Deployment New Applications                                      Costs
    o Security and Reporting Requirements around HIPPA, SOX,       Improve Performance of IT Applications                            Application Performance Improvement
        SAAS 70, PCI, Dodd/Franks                                  Desire to Reduce Operational and CAPEX Costs; Cost of              WANx – App Performance + End User Productivity
                                                                    Services; Cost of Infrastructure                                   Riverbed RSP and Mobile User Productivity
                                                                                                                                       Report, Analysis & Alert: Additional Correlation for Security
                                                                                                                                       IT Resource Efficiency & Cost Improvement
                                                                                                                                       Managed Infrastructure and Deployment Services
                                                                                                                                           o Reduced Costs for Compliance
                                                                                                                                           o Skills, Speed, Cost Effective Deployment
                                                                                                                                           o Riverbed RSP eliminate and simplify infrastructure
                                                                                                                                       Application Monitoring, Reports, Analysis & Alerts
                                                                                                                                           o Isolate & resolve Application Issues promptly with fewer
                                                                                                                                               resource involvement
                                                                                                                                           o Results in Lower Help Desk Costs, MTTR and Call length
                                                                                                                                           o Reduce Waste: Underutilized Bandwidth and Servers
                                                                                                                                           o Influence critical budget decisions around CAPEX vs. OPEX
GLS Optimized Design – Sales Process
                              Optimized Design Acquisition Strategy – Process for Developing a Compelling Value Story


 Sales Process Step                         Sales Team Actions                                           Sales Team Objectives                                     GLS Provided Aids
                        Sales calls to data gather profiling & qualifying information on     Obtain the following:                                    OD Data Gathering Form
                        every customer based on Optimized Design opportunity criteria.       o    Contract Expiration Voice & Data                    OD Sales Guide
                                                                                             o    Use of WANx, SIP, D/V Integration                   OD Solutions Summary
Prospecting &           Develop an opportunity attack plan that can be used in a meeting     o    D/V Plans and IPT Purchases                         See Qualifying Questions Chart
Developing              with IT Leadership.                                                  o    NxT1 sites, Voice & Data Net Design
Opportunities                                                                                Find the type of customer challenges and problems that
                                                                                             are outlined in the Optimized Design Qualifications.
                        Set appointments with CIO, VP IT, CFO                                Set appointments with IT leadership at each customer     o    3 appointment setting emails
                        Leverage appointment setting story lines                             in the assigned base of accounts.                        o    GLS RSD Support
Setting Appointments
                        o    Cloud Story                                                                                                              o    OD 1 pager
                        o    Application Performance Story                                                                                            o    OD Solutions 1 pager
                        o    Operational Efficiency Improvement                                                                                       o    Go around IT strategy
                        o    Reduce your Voice and Data Costs
                        o    End Run IT Strategy – Hail Mary CEO/CFO Play
                        o    Present appointment setting story                               Gain agreement on OD business problems. Quantify         o    OD Slide Deck
                        o    Deliver OD Story & Approach                                     business case impacts of problem                         o    OD Solutions Summary
                        o    Discuss customer challenges and problems                                                                                 o    GLS RSD or Executive
Initial IT Leadership   o    Quantify pain points in $$ if possible                          Gain agreement to deliver an OD proposal to solve a
Appointment             o    Discuss possible solutions to pain points                       specific pain point.
                        o    Ask to make a proposal to address pain point                                                or
                        o    Agree on next steps: Meeting to deliver proposal or study       Gain agreement to perform further data gathering of
                             path to gain more information for development of proposal       the current design so that an OD proposal can be made
                        o    Discuss High Level Business Case Objectives
                        o    Position Proposal as high level and budgetary
                        Document Current Design:                                             Produce Proposal that can be compared and contrasted     o    GLS OD Proposal Templates
                             o Voice & Data Network – Design and Cost                        to the customers present environment: Objectives of      o    OD Business Case
                             o Document all access inefficiency based on OD                  proposal are:                                            o    GLS RSD or Executive
Optimized Design &           o Application Monitoring, Help Desk tools                       o     25-40% improvement in V/D Network                  o    GLS Design Engineer
Proposal                     o Application Users (incl. Mobile) view of performance          o     Additional Access Optimization Savings             o    GLS Presales Team
                             o Trouble shooting process and issues                           o     Quantifiable IT Operations Savings
                        Develop High Level Business Case Proposal & Design                   o     Demonstrable Application Performance
                             o Integration of Voice & Data using SIP (Incl. Access Opt)            Improvements
                             o Carrier MPLS, SIP, Hosting integrated into Design             o     Help Desk and MTTR Improvements
                             o Application Monitoring & Help Desk Tools                      o     Additional no Quantified Problem/Benefit
                             o Application Performance Impacts (WANx + Mobile)                     Statements i.e. Employee Productivity
                             o Infrastructure & Deployment Services                          o     Get Customer to agree to a roadmap
                             o Business Case to move forward
                        Deliver Proposal & Agree on Next Steps                                o   Gain Trusted Advisor Position                       o    GLS RSD & Executive Team
                             o     Discuss Current versus Proposed Design                     o   Deposition Incumbent Carrier                        o    Custom OD Presentation
Proposing and Closing
                             o     Discuss “How it Works”, SIP, WANx, IPT, Services           o   Move Closer to Closing: Proof on Concept,           o    OD Exhibits
                             o     Discuss Problem/Benefit Statements of New Design               Detailed Proposal
                             o     Discuss Business Case Financial Model                      o   Get tangible next steps to close
                             o     Close throughout discussion, attain next steps to close    o   Close the deal & Position for Next Opportunity
GLS Optimized Design: Qualifying Customers
                                                                   Finding Neglected Customers with Big Problems we can Solve

          Qualifying Questions – Current Design                                              Findings that can be Optimized                                      Business Case, Proposed Design Implication
Voice & Data Network Design – Site Level or Site Model Level                    Findings that provide good opportunities for Optimization                    Voice & Data Networks not integrated
 To what degree are your Voice & Data Networks integrated?                      Voice & Data networks do not share the same access                          If access isn’t shared 15-40% design savings is probable
 What IPT investments have you made or plan to make?                            Customer has SIP capable phone equipment/IP PBX                             Business Case Design Factors Impacting Savings:
 Do you have SIP in your network? If so what % of call are SIP?                 Create room for Voice/SIP traffic over current MPLS Network                      o Intra Company Calls (free)
 Are SIP calls traveling over your MPLS? If no what type of facility?           Voice & Data using WANx can travel over existing WAN Access                      o Local Calls (free depending on SIP Vendor)
 What does an average site look like? Can we model off that?                    If Customer sites are similar in size then we can model the design               o Switched rate minutes moving to dedicate rates
 Can we move SIP onto MPLS without upgrading MPLS circuits by utilizing         Where are the Switched to Dedicated Optimization Opportunities                   o Large variance in aggregated versus remote site busy hours
   WANx technology?                                                              Rate Optimization if Customer rate structure is out of date                      o Access cost avoidance from using WANx
 Are you currently paying any Local, LD or Internal Toll?                       Gain an understanding of traffic patterns and inventories (Look for         Rate optimization savings (the more out of date the better)
 Rate Structure CPM, Dedicated & Switched, % of traffic for each                  facilities and server waste + design over-engineering )                    Centralized Concurrent Calls versus Remote Site Concurrent Calls
Voice and Data Network Design – Corporate Level                                                                                                               Centralized SIP Session Requirements versus inventory of T1.5 Channels
 % of calls: DID, Intra Company, Toll Free, Inbound, Local                                                                                                    + 1MB and 1FB trunks.
 Sizing Questions: # of PRI, IMB, Local Toll, MPLS Circuits, # of concurrent                                                                                 If you don’t have a good grasp on inventory you have waste 5%+
   calls during busy hour aggregated at corporate?                                                                                                            Known traffic patterns make it easier to model new design
 Total spend broken out across rate elements                                                                                                                 Unknown traffic patterns points to waste + design flaws
Uncovering WANx Needs – Performance & Data Optimization                         Findings that provide good opportunities for WANx                            Improve Application Performance & Optimize Data Network
 Ask Questions around application performance issues                            Application performance is a big issue @ C or IT Leadership Levels          Focus the customer on all the specific negative business impacts and
 End User Productivity: Determine who shares which applications….High           Quantify lost sales, end user productivity, & poor public perception         costs to the company, especially If application performance is an issue
   Cost Resources like Lawyers, Engineers etc.                                     due to poor applications performance as well as network                     at the C & IT Leadership Levels
 Do customers or partners share applications?                                     performance and optimization issues                                        Quantify lost revenue, employee productivity, and damage to the
 What are the business implications of poor performance by application?         Identify the impact on Mobile/Remote users                                   company image due to poor application performance
 Is applications performance a concern at the IT leadership & C level?          Help with planned application growth: Factor in OPEX & CAPEX cost           Application performance problems are much bigger concerns and
 Mobile Users - what applications & # of users? Performance Issues?               avoidance of future network upgrades                                        revenue impacting to C & IT leadership levels than Voice & Data costs
 What are the perceived network issues around slowness or latency?              Optimizing the Data network will produce significant cost savings            savings.
 Find out if the Data Network can be optimized                                  Document all negative business impacts. Get customer too open up            If you are fixing a big problem, V&D savings is an added bonus.
   o How many sites requiring bandwidth upgraded in the next 12 months.            about the impact to their business.                                         Quantify additional savings that come from data bandwidth and voice
   o What are current and future plans for roll out new applications?                                                                                          access optimization and add savings to the Optimized Design Story
   o Understand the impact that V&D access integration can deliver
IT Operational Inefficiencies & Costs                                           Findings providing opportunities for Operational Improvements                Improve Operational Efficiency and Cost Structure
 Focus on Help Desk: % of time help desk knows about an issue before a          Customers with application performance issues have operational              Gain operational efficiencies from an Optimized Design: Fewer bills to
   call is made?                                                                   inefficiencies. Our opportunity rest in our ability to find areas where     process, improved auditing, and better grasp of infrastructure
 Baseline Help Desk Isolation/Diagnostic procedures document time,                we can easily document impact of improvement                                inventories and utilization.
   process & tools?                                                              Help Desk is where application issues are revealed and where the            Get a waste factor % for Business Case
 Document average length of call & MTTR. Baseline application issue               customer has tremendous resource costs.                                    Application up time improvement: Quantify the value for end user
   trouble shooting process, tools and time?                                     Focus on help desk resources and the impact of the impact around             productivity to include mobile Users
 How fast do they isolate issues? How many people are involved? How               reducing MTTR. Target problems are a help desk that is slammed,            Cost improvement: Remember customer will have a loaded cost of
   many are recurring or chronic issues? Are performance issues addressed          with poor tools and is struggling with the inability to isolate issues.     about 1.6x employee salary against the cost of GLS Managed Services
   or simply ignored?                                                            Application down time kills end user productivity. Is it an issue           Impact of Operational improvements for the Help Desk - this will be
 Costs of Managing Infrastructure: What is the customer spending on tool          around skills, design, operations or tools?                                 huge and is a key area for your business case
   and personnel costs to manage their infrastructure? How do they see           Identify the waste factor and impact relative to disparate billing,         Evaluate how RSP services can further reduce operational costs related
   their level of effectiveness relative to MTTR and handling of chronic           poor asset management, utilization of circuits and servers                  to remote site infrastructure
   issues? Are they doing an effective job on managing their current             High cost of resources to support infrastructure and the impact of          Provide IT operational savings from increased efficiency and accurate
   infrastructure? The goal is to find out where they need help.                   missing the mark in critical areas such as design optimization and          diagnostics for application issues
 Does IT always blame the network for their problems?                             application performance                                                    Stability of outsourced solutions: Staffing and skills to provide an
 Skill issues: Where are the most complex parts of the infrastructure and                                                                                     infrastructure that works better, costs less and is better managed
   are they sub-optimized due to a lack of resources and skills?

More Related Content

What's hot

Corporate Overview
Corporate Overview Corporate Overview
Corporate Overview Bobby Brea
 
Novaroverview 12805227307026 Phpapp01
Novaroverview 12805227307026 Phpapp01Novaroverview 12805227307026 Phpapp01
Novaroverview 12805227307026 Phpapp01stevehamby1
 
Government sector smart_suite_success_story
Government sector smart_suite_success_storyGovernment sector smart_suite_success_story
Government sector smart_suite_success_storyIITSW Company
 
Imax real time data management platform for w ww (1)
Imax real time data management platform for w  ww (1)Imax real time data management platform for w  ww (1)
Imax real time data management platform for w ww (1)ISATECK
 
SM Consulting Services_Presentation_for Social Media
SM Consulting Services_Presentation_for Social MediaSM Consulting Services_Presentation_for Social Media
SM Consulting Services_Presentation_for Social MediaSM Consulting Services Inc
 
OSSera's Approach and Commitment to Green IT
OSSera's Approach and Commitment to Green ITOSSera's Approach and Commitment to Green IT
OSSera's Approach and Commitment to Green ITMingxia Zhang, Ph.D.
 
Panduit Smartzone™ DCIM Solution Details
Panduit Smartzone™ DCIM Solution DetailsPanduit Smartzone™ DCIM Solution Details
Panduit Smartzone™ DCIM Solution DetailsPanduit
 
Become A Best Run Inecom Client - Remote Services Platform
Become A Best Run Inecom Client - Remote Services PlatformBecome A Best Run Inecom Client - Remote Services Platform
Become A Best Run Inecom Client - Remote Services PlatformInecom001
 
Performance Measurement 01
Performance Measurement 01Performance Measurement 01
Performance Measurement 01masteryoda
 
NERC Critical Infrastructure Protection (CIP) and Security for Field Devices
NERC Critical Infrastructure Protection (CIP) and Security for Field DevicesNERC Critical Infrastructure Protection (CIP) and Security for Field Devices
NERC Critical Infrastructure Protection (CIP) and Security for Field DevicesSchneider Electric
 
Panduit DCIM Solution Overview
Panduit DCIM Solution OverviewPanduit DCIM Solution Overview
Panduit DCIM Solution OverviewPanduit
 
Stream 3 - VMware Sponsor Presentation
Stream 3 - VMware Sponsor PresentationStream 3 - VMware Sponsor Presentation
Stream 3 - VMware Sponsor PresentationIBM Business Insight
 
Veritas vision for cloud providers (screenshots)
Veritas vision for cloud providers (screenshots)Veritas vision for cloud providers (screenshots)
Veritas vision for cloud providers (screenshots)Alexschoone
 
F5 network presenation 2013 Q1
F5 network presenation 2013 Q1F5 network presenation 2013 Q1
F5 network presenation 2013 Q1Andrew Wong
 
Science Modernisation Strategy v1 0
Science  Modernisation  Strategy v1 0Science  Modernisation  Strategy v1 0
Science Modernisation Strategy v1 0Salim Sheikh
 

What's hot (19)

Corporate Overview
Corporate Overview Corporate Overview
Corporate Overview
 
For Developers: Why Should I Care about Programmability
For Developers: Why Should I Care about ProgrammabilityFor Developers: Why Should I Care about Programmability
For Developers: Why Should I Care about Programmability
 
Novaroverview 12805227307026 Phpapp01
Novaroverview 12805227307026 Phpapp01Novaroverview 12805227307026 Phpapp01
Novaroverview 12805227307026 Phpapp01
 
Government sector smart_suite_success_story
Government sector smart_suite_success_storyGovernment sector smart_suite_success_story
Government sector smart_suite_success_story
 
Imax real time data management platform for w ww (1)
Imax real time data management platform for w  ww (1)Imax real time data management platform for w  ww (1)
Imax real time data management platform for w ww (1)
 
SM Consulting Services_Presentation_for Social Media
SM Consulting Services_Presentation_for Social MediaSM Consulting Services_Presentation_for Social Media
SM Consulting Services_Presentation_for Social Media
 
OSSera's Approach and Commitment to Green IT
OSSera's Approach and Commitment to Green ITOSSera's Approach and Commitment to Green IT
OSSera's Approach and Commitment to Green IT
 
Panduit Smartzone™ DCIM Solution Details
Panduit Smartzone™ DCIM Solution DetailsPanduit Smartzone™ DCIM Solution Details
Panduit Smartzone™ DCIM Solution Details
 
Become A Best Run Inecom Client - Remote Services Platform
Become A Best Run Inecom Client - Remote Services PlatformBecome A Best Run Inecom Client - Remote Services Platform
Become A Best Run Inecom Client - Remote Services Platform
 
Performance Measurement 01
Performance Measurement 01Performance Measurement 01
Performance Measurement 01
 
NERC Critical Infrastructure Protection (CIP) and Security for Field Devices
NERC Critical Infrastructure Protection (CIP) and Security for Field DevicesNERC Critical Infrastructure Protection (CIP) and Security for Field Devices
NERC Critical Infrastructure Protection (CIP) and Security for Field Devices
 
Integration
IntegrationIntegration
Integration
 
Panduit DCIM Solution Overview
Panduit DCIM Solution OverviewPanduit DCIM Solution Overview
Panduit DCIM Solution Overview
 
Prodapt Overview & Offering
Prodapt Overview & OfferingProdapt Overview & Offering
Prodapt Overview & Offering
 
Stream 3 - VMware Sponsor Presentation
Stream 3 - VMware Sponsor PresentationStream 3 - VMware Sponsor Presentation
Stream 3 - VMware Sponsor Presentation
 
Why You Should Move to the Cloud
Why You Should Move to the CloudWhy You Should Move to the Cloud
Why You Should Move to the Cloud
 
Veritas vision for cloud providers (screenshots)
Veritas vision for cloud providers (screenshots)Veritas vision for cloud providers (screenshots)
Veritas vision for cloud providers (screenshots)
 
F5 network presenation 2013 Q1
F5 network presenation 2013 Q1F5 network presenation 2013 Q1
F5 network presenation 2013 Q1
 
Science Modernisation Strategy v1 0
Science  Modernisation  Strategy v1 0Science  Modernisation  Strategy v1 0
Science Modernisation Strategy v1 0
 

Similar to GLS Optimized Design Summary

Bobby.german
Bobby.germanBobby.german
Bobby.germanNASAPMC
 
Gateway RIMS (Remote Infrastructure Management Services)
Gateway RIMS (Remote Infrastructure Management Services)Gateway RIMS (Remote Infrastructure Management Services)
Gateway RIMS (Remote Infrastructure Management Services)sonnysonare
 
Core Network Optimization: The Control Plane, Data Plane & Beyond
Core Network Optimization: The Control Plane, Data Plane & BeyondCore Network Optimization: The Control Plane, Data Plane & Beyond
Core Network Optimization: The Control Plane, Data Plane & BeyondRadisys Corporation
 
Ensuring Privacy & Transparency within Hybrid Clouds
Ensuring  Privacy & Transparency within Hybrid Clouds Ensuring  Privacy & Transparency within Hybrid Clouds
Ensuring Privacy & Transparency within Hybrid Clouds Marcin Kotlarski
 
Go Bigger! Manage Data Center Technologies
Go Bigger! Manage Data Center TechnologiesGo Bigger! Manage Data Center Technologies
Go Bigger! Manage Data Center Technologiesdoan_slideshares
 
Building and Managing Cloud Applications and Infrastructure
Building and Managing Cloud Applications and InfrastructureBuilding and Managing Cloud Applications and Infrastructure
Building and Managing Cloud Applications and InfrastructureDarren Cunningham
 
360is Capabilities
360is Capabilities360is Capabilities
360is Capabilitiesnickhutton
 
De-Risk Data Center Projects With Cisco Services
De-Risk Data Center Projects With Cisco ServicesDe-Risk Data Center Projects With Cisco Services
De-Risk Data Center Projects With Cisco ServicesCisco Canada
 
BIG-IP Policy Enforcement Manager
BIG-IP Policy Enforcement ManagerBIG-IP Policy Enforcement Manager
BIG-IP Policy Enforcement ManagerF5 Networks
 
Securing Your Infrastructure: Identity Management and Data Protection
Securing Your Infrastructure: Identity Management and Data ProtectionSecuring Your Infrastructure: Identity Management and Data Protection
Securing Your Infrastructure: Identity Management and Data ProtectionLumension
 
Datacenter
DatacenterDatacenter
Datacenterjayconde
 
Network Programmability for Developers: Why It's Time to Care
Network Programmability for Developers: Why It's Time to CareNetwork Programmability for Developers: Why It's Time to Care
Network Programmability for Developers: Why It's Time to CareLauren Cooney
 
IBM consolidation and relocation webinar
IBM consolidation and relocation webinarIBM consolidation and relocation webinar
IBM consolidation and relocation webinarHerb Hernandez
 
F5 Value For Virtualization
F5 Value For VirtualizationF5 Value For Virtualization
F5 Value For VirtualizationPatricio Campos
 
Five best practices for ensuring uptime with Data Center Infrastructure Manag...
Five best practices for ensuring uptime with Data Center Infrastructure Manag...Five best practices for ensuring uptime with Data Center Infrastructure Manag...
Five best practices for ensuring uptime with Data Center Infrastructure Manag...CA Nimsoft
 
2 roberto - mining - presentation-v3
2   roberto  - mining - presentation-v32   roberto  - mining - presentation-v3
2 roberto - mining - presentation-v3GE_Energy
 
Cloud computing
Cloud computingCloud computing
Cloud computingRazib M
 

Similar to GLS Optimized Design Summary (20)

Bobby.german
Bobby.germanBobby.german
Bobby.german
 
Gateway RIMS (Remote Infrastructure Management Services)
Gateway RIMS (Remote Infrastructure Management Services)Gateway RIMS (Remote Infrastructure Management Services)
Gateway RIMS (Remote Infrastructure Management Services)
 
Core Network Optimization: The Control Plane, Data Plane & Beyond
Core Network Optimization: The Control Plane, Data Plane & BeyondCore Network Optimization: The Control Plane, Data Plane & Beyond
Core Network Optimization: The Control Plane, Data Plane & Beyond
 
Ensuring Privacy & Transparency within Hybrid Clouds
Ensuring  Privacy & Transparency within Hybrid Clouds Ensuring  Privacy & Transparency within Hybrid Clouds
Ensuring Privacy & Transparency within Hybrid Clouds
 
Go Bigger! Manage Data Center Technologies
Go Bigger! Manage Data Center TechnologiesGo Bigger! Manage Data Center Technologies
Go Bigger! Manage Data Center Technologies
 
The SDN Opportunity
The SDN OpportunityThe SDN Opportunity
The SDN Opportunity
 
Building and Managing Cloud Applications and Infrastructure
Building and Managing Cloud Applications and InfrastructureBuilding and Managing Cloud Applications and Infrastructure
Building and Managing Cloud Applications and Infrastructure
 
360is Capabilities
360is Capabilities360is Capabilities
360is Capabilities
 
De-Risk Data Center Projects With Cisco Services
De-Risk Data Center Projects With Cisco ServicesDe-Risk Data Center Projects With Cisco Services
De-Risk Data Center Projects With Cisco Services
 
BIG-IP Policy Enforcement Manager
BIG-IP Policy Enforcement ManagerBIG-IP Policy Enforcement Manager
BIG-IP Policy Enforcement Manager
 
Securing Your Infrastructure: Identity Management and Data Protection
Securing Your Infrastructure: Identity Management and Data ProtectionSecuring Your Infrastructure: Identity Management and Data Protection
Securing Your Infrastructure: Identity Management and Data Protection
 
Datacenter
DatacenterDatacenter
Datacenter
 
Network Programmability for Developers: Why It's Time to Care
Network Programmability for Developers: Why It's Time to CareNetwork Programmability for Developers: Why It's Time to Care
Network Programmability for Developers: Why It's Time to Care
 
IBM consolidation and relocation webinar
IBM consolidation and relocation webinarIBM consolidation and relocation webinar
IBM consolidation and relocation webinar
 
F5 Value For Virtualization
F5 Value For VirtualizationF5 Value For Virtualization
F5 Value For Virtualization
 
Five best practices for ensuring uptime with Data Center Infrastructure Manag...
Five best practices for ensuring uptime with Data Center Infrastructure Manag...Five best practices for ensuring uptime with Data Center Infrastructure Manag...
Five best practices for ensuring uptime with Data Center Infrastructure Manag...
 
2 roberto - mining - presentation-v3
2   roberto  - mining - presentation-v32   roberto  - mining - presentation-v3
2 roberto - mining - presentation-v3
 
Verve Nms
Verve NmsVerve Nms
Verve Nms
 
Digital Transformation of LAN Infrastructure
Digital Transformation of  LAN InfrastructureDigital Transformation of  LAN Infrastructure
Digital Transformation of LAN Infrastructure
 
Cloud computing
Cloud computingCloud computing
Cloud computing
 

GLS Optimized Design Summary

  • 1. GLS Optimized Design: Solutions Improve Application Performance, Operational Efficiency & Reduce Infrastructure Costs Industry Trends Customer Business Problems GLS Solutions Data Center Consolidation & Server Virtualization 45-58% of CIOs Report Poor Application Managed WAN Acceleration Services  Reduced Remote Site Infrastructure Performance Application Monitoring, Reporting, Analysis & Alerts  Explosion of New Applications on the Wide Area Network Performance issues inherent to WAN Infrastructure Management Complexity of Application Infrastructure Deployment Services Flood on New Technology & Vendors Inefficient IT Operations & Costs Application Monitoring, Reports, Analysis & Alerts  Multi- Service Platforms  High Costs associated with the IT Help Desk and other  Riverbed Cascade or Visual APA + NetFlow Platforms  Complex Security Requirements Functional Areas of Operations  Visibility of the application flow across entire network  WANx, Load Balancers, ASA/Firewall, etc.  Poor coordination across the entire IT Organization to find and infrastructure  SIP/IPT Products and Services fix problems  Monitor End User Response Time and customized by customer  Ubiquity of Cellular Data, DSL &Cable  Excessive MTTR and End User Down Time for all events  Severe event alerting with relevant diagnostics  Advanced diagnostic tools  High Volume & Length of Help Desk Calls  Continuous Optimization and Monthly review of design & issues  High Instance of Application Down Time Events  Central focus for IT Leadership, Operations & Planning Teams  Lack the capability to Isolate and Diagnose Critical Events Managed Infrastructure Services – 24x7x365  Rapidly changing IT staffing and skill requirements  Network: Router, Switch, Firewall, VPN, Server  complex & fragmented monitoring & diagnostic tools  Advanced: IPT, WANx, Security, Data Center Complex Voice and Data Networks Design Network Designs are not Optimized Optimized Design Principles  CoS and CoS Real Time Requirements  IT is overwhelmed by exponential increase in the complexity of  Integration of SIP onto the Customer Data Network  Integration of SIP onto Data Network their communications infrastructure  Access Optimization and Increased Application Performance  Diverse and Secondary Networks for Voice & Data  Un-Optimized Design  Simplified Billing, Processing and Audit of Installed Base Services  Complex Head End Infrastructure at Host Sites o Savings of 20% – 40% in Opportunity Cost and Servers  Reduced IT Staff Resources o Increasing Operational Costs  Leverage of IPT End User Productivity Tools  Limited Existing IT Staff Skills o Decreased End User Productivity Managed Infrastructure & Deployment Services o Waste of Network & Server Resources  Address IT Technical Skills and Staff and repurpose for increased o Inefficient Auditing & Bill Processes productivity based on skill set o Excessive costs for current Bandwidth Economic and Regulatory Environment IT must be more Cost Efficient and Effective Optimized Design Approach and Benefits  Management Costs  Business Case Decision Making Infrastructure Savings  Customer Demand for Better Service o ROI with High Degree of Confidence  Reduce costs of 25-40% by Integrating SIP and Data  Tight CAPEX Budgets o Demands Short Pay Back Period  WANx at vital Data Sites - 50%+ Savings on Voice and Data Access  Competitive Demand for Higher Employee Productivity  Quick Deployment New Applications Costs o Security and Reporting Requirements around HIPPA, SOX,  Improve Performance of IT Applications Application Performance Improvement SAAS 70, PCI, Dodd/Franks  Desire to Reduce Operational and CAPEX Costs; Cost of  WANx – App Performance + End User Productivity Services; Cost of Infrastructure  Riverbed RSP and Mobile User Productivity  Report, Analysis & Alert: Additional Correlation for Security IT Resource Efficiency & Cost Improvement  Managed Infrastructure and Deployment Services o Reduced Costs for Compliance o Skills, Speed, Cost Effective Deployment o Riverbed RSP eliminate and simplify infrastructure  Application Monitoring, Reports, Analysis & Alerts o Isolate & resolve Application Issues promptly with fewer resource involvement o Results in Lower Help Desk Costs, MTTR and Call length o Reduce Waste: Underutilized Bandwidth and Servers o Influence critical budget decisions around CAPEX vs. OPEX
  • 2. GLS Optimized Design – Sales Process Optimized Design Acquisition Strategy – Process for Developing a Compelling Value Story Sales Process Step Sales Team Actions Sales Team Objectives GLS Provided Aids Sales calls to data gather profiling & qualifying information on Obtain the following: OD Data Gathering Form every customer based on Optimized Design opportunity criteria. o Contract Expiration Voice & Data OD Sales Guide o Use of WANx, SIP, D/V Integration OD Solutions Summary Prospecting & Develop an opportunity attack plan that can be used in a meeting o D/V Plans and IPT Purchases See Qualifying Questions Chart Developing with IT Leadership. o NxT1 sites, Voice & Data Net Design Opportunities Find the type of customer challenges and problems that are outlined in the Optimized Design Qualifications. Set appointments with CIO, VP IT, CFO Set appointments with IT leadership at each customer o 3 appointment setting emails Leverage appointment setting story lines in the assigned base of accounts. o GLS RSD Support Setting Appointments o Cloud Story o OD 1 pager o Application Performance Story o OD Solutions 1 pager o Operational Efficiency Improvement o Go around IT strategy o Reduce your Voice and Data Costs o End Run IT Strategy – Hail Mary CEO/CFO Play o Present appointment setting story Gain agreement on OD business problems. Quantify o OD Slide Deck o Deliver OD Story & Approach business case impacts of problem o OD Solutions Summary o Discuss customer challenges and problems o GLS RSD or Executive Initial IT Leadership o Quantify pain points in $$ if possible Gain agreement to deliver an OD proposal to solve a Appointment o Discuss possible solutions to pain points specific pain point. o Ask to make a proposal to address pain point or o Agree on next steps: Meeting to deliver proposal or study Gain agreement to perform further data gathering of path to gain more information for development of proposal the current design so that an OD proposal can be made o Discuss High Level Business Case Objectives o Position Proposal as high level and budgetary Document Current Design: Produce Proposal that can be compared and contrasted o GLS OD Proposal Templates o Voice & Data Network – Design and Cost to the customers present environment: Objectives of o OD Business Case o Document all access inefficiency based on OD proposal are: o GLS RSD or Executive Optimized Design & o Application Monitoring, Help Desk tools o 25-40% improvement in V/D Network o GLS Design Engineer Proposal o Application Users (incl. Mobile) view of performance o Additional Access Optimization Savings o GLS Presales Team o Trouble shooting process and issues o Quantifiable IT Operations Savings Develop High Level Business Case Proposal & Design o Demonstrable Application Performance o Integration of Voice & Data using SIP (Incl. Access Opt) Improvements o Carrier MPLS, SIP, Hosting integrated into Design o Help Desk and MTTR Improvements o Application Monitoring & Help Desk Tools o Additional no Quantified Problem/Benefit o Application Performance Impacts (WANx + Mobile) Statements i.e. Employee Productivity o Infrastructure & Deployment Services o Get Customer to agree to a roadmap o Business Case to move forward Deliver Proposal & Agree on Next Steps o Gain Trusted Advisor Position o GLS RSD & Executive Team o Discuss Current versus Proposed Design o Deposition Incumbent Carrier o Custom OD Presentation Proposing and Closing o Discuss “How it Works”, SIP, WANx, IPT, Services o Move Closer to Closing: Proof on Concept, o OD Exhibits o Discuss Problem/Benefit Statements of New Design Detailed Proposal o Discuss Business Case Financial Model o Get tangible next steps to close o Close throughout discussion, attain next steps to close o Close the deal & Position for Next Opportunity
  • 3. GLS Optimized Design: Qualifying Customers Finding Neglected Customers with Big Problems we can Solve Qualifying Questions – Current Design Findings that can be Optimized Business Case, Proposed Design Implication Voice & Data Network Design – Site Level or Site Model Level Findings that provide good opportunities for Optimization Voice & Data Networks not integrated  To what degree are your Voice & Data Networks integrated?  Voice & Data networks do not share the same access  If access isn’t shared 15-40% design savings is probable  What IPT investments have you made or plan to make?  Customer has SIP capable phone equipment/IP PBX  Business Case Design Factors Impacting Savings:  Do you have SIP in your network? If so what % of call are SIP?  Create room for Voice/SIP traffic over current MPLS Network o Intra Company Calls (free)  Are SIP calls traveling over your MPLS? If no what type of facility?  Voice & Data using WANx can travel over existing WAN Access o Local Calls (free depending on SIP Vendor)  What does an average site look like? Can we model off that?  If Customer sites are similar in size then we can model the design o Switched rate minutes moving to dedicate rates  Can we move SIP onto MPLS without upgrading MPLS circuits by utilizing  Where are the Switched to Dedicated Optimization Opportunities o Large variance in aggregated versus remote site busy hours WANx technology?  Rate Optimization if Customer rate structure is out of date o Access cost avoidance from using WANx  Are you currently paying any Local, LD or Internal Toll?  Gain an understanding of traffic patterns and inventories (Look for  Rate optimization savings (the more out of date the better)  Rate Structure CPM, Dedicated & Switched, % of traffic for each facilities and server waste + design over-engineering )  Centralized Concurrent Calls versus Remote Site Concurrent Calls Voice and Data Network Design – Corporate Level  Centralized SIP Session Requirements versus inventory of T1.5 Channels  % of calls: DID, Intra Company, Toll Free, Inbound, Local + 1MB and 1FB trunks.  Sizing Questions: # of PRI, IMB, Local Toll, MPLS Circuits, # of concurrent  If you don’t have a good grasp on inventory you have waste 5%+ calls during busy hour aggregated at corporate?  Known traffic patterns make it easier to model new design  Total spend broken out across rate elements  Unknown traffic patterns points to waste + design flaws Uncovering WANx Needs – Performance & Data Optimization Findings that provide good opportunities for WANx Improve Application Performance & Optimize Data Network  Ask Questions around application performance issues  Application performance is a big issue @ C or IT Leadership Levels  Focus the customer on all the specific negative business impacts and  End User Productivity: Determine who shares which applications….High  Quantify lost sales, end user productivity, & poor public perception costs to the company, especially If application performance is an issue Cost Resources like Lawyers, Engineers etc. due to poor applications performance as well as network at the C & IT Leadership Levels  Do customers or partners share applications? performance and optimization issues  Quantify lost revenue, employee productivity, and damage to the  What are the business implications of poor performance by application?  Identify the impact on Mobile/Remote users company image due to poor application performance  Is applications performance a concern at the IT leadership & C level?  Help with planned application growth: Factor in OPEX & CAPEX cost  Application performance problems are much bigger concerns and  Mobile Users - what applications & # of users? Performance Issues? avoidance of future network upgrades revenue impacting to C & IT leadership levels than Voice & Data costs  What are the perceived network issues around slowness or latency?  Optimizing the Data network will produce significant cost savings savings.  Find out if the Data Network can be optimized  Document all negative business impacts. Get customer too open up  If you are fixing a big problem, V&D savings is an added bonus. o How many sites requiring bandwidth upgraded in the next 12 months. about the impact to their business. Quantify additional savings that come from data bandwidth and voice o What are current and future plans for roll out new applications? access optimization and add savings to the Optimized Design Story o Understand the impact that V&D access integration can deliver IT Operational Inefficiencies & Costs Findings providing opportunities for Operational Improvements Improve Operational Efficiency and Cost Structure  Focus on Help Desk: % of time help desk knows about an issue before a  Customers with application performance issues have operational  Gain operational efficiencies from an Optimized Design: Fewer bills to call is made? inefficiencies. Our opportunity rest in our ability to find areas where process, improved auditing, and better grasp of infrastructure  Baseline Help Desk Isolation/Diagnostic procedures document time, we can easily document impact of improvement inventories and utilization. process & tools?  Help Desk is where application issues are revealed and where the  Get a waste factor % for Business Case  Document average length of call & MTTR. Baseline application issue customer has tremendous resource costs.  Application up time improvement: Quantify the value for end user trouble shooting process, tools and time?  Focus on help desk resources and the impact of the impact around productivity to include mobile Users  How fast do they isolate issues? How many people are involved? How reducing MTTR. Target problems are a help desk that is slammed,  Cost improvement: Remember customer will have a loaded cost of many are recurring or chronic issues? Are performance issues addressed with poor tools and is struggling with the inability to isolate issues. about 1.6x employee salary against the cost of GLS Managed Services or simply ignored?  Application down time kills end user productivity. Is it an issue  Impact of Operational improvements for the Help Desk - this will be  Costs of Managing Infrastructure: What is the customer spending on tool around skills, design, operations or tools? huge and is a key area for your business case and personnel costs to manage their infrastructure? How do they see  Identify the waste factor and impact relative to disparate billing,  Evaluate how RSP services can further reduce operational costs related their level of effectiveness relative to MTTR and handling of chronic poor asset management, utilization of circuits and servers to remote site infrastructure issues? Are they doing an effective job on managing their current  High cost of resources to support infrastructure and the impact of  Provide IT operational savings from increased efficiency and accurate infrastructure? The goal is to find out where they need help. missing the mark in critical areas such as design optimization and diagnostics for application issues  Does IT always blame the network for their problems? application performance  Stability of outsourced solutions: Staffing and skills to provide an  Skill issues: Where are the most complex parts of the infrastructure and infrastructure that works better, costs less and is better managed are they sub-optimized due to a lack of resources and skills?