1. INDUSTRIALBUILDING
Client/owner
ASGHAL - QATAR
Developer
Keppel Seghers Engineering
Singapore PTE LTD
Contract amount
58 million QAR
Execution time
14 months
Execution by
CFE Middle East
P.O. Box: 55862 Doha, Qatar, Regency Business Center, 8th Floor, Al Baladiya St.
Tel: +974 4427 0986 Fax: +974 4427 0987 - www.cfe.be
CFE Middle East is a branch office of the CFE Group.
Lagoon 1 is part of the landmark project that will be the largest
greenfield wastewater treatment, water reuse and sludge treatment plant
in Qatar when completed. With a peak design capacity to treat
wastewater of up to 439,000m3 per day, the Doha North Sewage
Treatment Works will serve a projected population of over 900,000. This
modern facility will feature advanced biological treatment processes as
well as membrane and ultra-violet technologies to produce high quality
reclaimed water for reuse in agriculture. The facility will also be equipped
with thermal drying processes to treat wastewater sludge. The dried and
pelletized sludge will be used as soil conditioners or refuse-derived fuel.
The scope of works of CFE included:
- Site preparation
- Leveling and compaction
- Concrete works 35 000 c.m. + 5 000 ton steel
- Waterproofing works
- Backfilling works
Photos:
Doha North Sewege Treatment Works
LAGOON 1
Building type
Lagoon concrete tank.
Capacity 500 000 c.m.
Project name
Construction of Lagoon1 and
Pump Station 3 at Doha North
Sewerage Treatment Plant