SlideShare a Scribd company logo
1 of 27
Download to read offline
3
SPECIFICATIONS
Length 62.3m
Beam 10.8m
Draft 3.3m
Builder Feadship
Year 2000
REFIT
Naval Architect Azure
Designer Steve Howard / Chahan Interior Design
Duration 6 months / 6 months
Exterior: Complete remodelling of sun deck including installation of
new carbon fibre swimming pool and sunbeds forward, lowering of aft
deck level, complete with new bar and furniture and a custom liferaft
launching system
Interior: Complete replacement of major guest areas including
salon, dining and owner’s areas as well as upgrade of major interior
systems
4 5
9
10 11
12 13
after
before
14 15
SPECIFICATIONS
Length before / after 65.6m / 68.7m
Beam 9.7m
Draft 3.7m
Builder Feadship
Year 1983
REFIT
Naval Architect Olesinski Design
Designer Olesinski Design
Duration 7 months
Exterior: Total remodelling of superstructure forward and aft on
every deck. 3m+ transom extension, 1m high modification to forward
sheerline up to bow, modifications to fashion plates, wing stations,
bulwarks and other superstructure details to totally modernise the
vessels profile leaving it complete unrecognisable from it’s previous
guises.
Interior: Replacement of VIP flooring, installation of beach club in
lazarette.
16 17
19
24 25
SPECIFICATIONS
Length 138.4m
Beam 18.5m
Draft 5m
Builder Lurssen
Year 2004
REFIT
Naval Architect Azure
Designer Beiderbeck
Duration 3 months
Exterior: Design, manufacture and installation of a self supporting
carbon fibre swimming pool to grace one of the worlds best know mega
yachts. With strict heating, water storage and pumping requirements
and a very short project duration it was a challenge described by
Lurssen themselves as impossible.....
26 27
30 31
32 33
SPECIFICATIONS
Length before / after 30m / 35.8m
Beam 7.3m
Draft 2.5m
Builder Inace
Year 2009
REFIT
Naval Architect Azure
Designer Stefano Pastrovich
Duration 5 months / 5 months
Exterior: Hull extension at stern area of yacht over 6m in length to
create a large aft deck dining/bar area, spacious swim platform and
new interior engineering and toy storage area complete with additional
ensuite crew cabin
Interior: Removal and replacement of all major guest areas with
modern African themed Pastrovich masterpiece. All exterior areas
modernised and co-ordinate with new interior
34 35
afterbefore
36 37
40 41
45
Compositeworks   recent major projects

More Related Content

Viewers also liked

dj placement - 2015 - sept
dj placement - 2015 - septdj placement - 2015 - sept
dj placement - 2015 - sept
Khushi Thakkar
 
DABBL media pack v9
DABBL media pack v9DABBL media pack v9
DABBL media pack v9
Tim Goode
 
Aktiivinen_ja_hyvinvoiva_ikaihminen_loppuraportti_KL-Kustannus
Aktiivinen_ja_hyvinvoiva_ikaihminen_loppuraportti_KL-KustannusAktiivinen_ja_hyvinvoiva_ikaihminen_loppuraportti_KL-Kustannus
Aktiivinen_ja_hyvinvoiva_ikaihminen_loppuraportti_KL-Kustannus
Jari Latvalahti
 

Viewers also liked (10)

Male gaze
Male gazeMale gaze
Male gaze
 
Presentation1 jaju
Presentation1 jajuPresentation1 jaju
Presentation1 jaju
 
Aniekan Archibong Resume
Aniekan Archibong ResumeAniekan Archibong Resume
Aniekan Archibong Resume
 
150921 UBS workshop - Taking control of your career with ME+®
150921 UBS workshop - Taking control of your career with ME+®150921 UBS workshop - Taking control of your career with ME+®
150921 UBS workshop - Taking control of your career with ME+®
 
Tindy gourd Insects A Lecture By Allah Dad Khan Provincial Coordinator IPM MI...
Tindy gourd Insects A Lecture By Allah Dad Khan Provincial Coordinator IPM MI...Tindy gourd Insects A Lecture By Allah Dad Khan Provincial Coordinator IPM MI...
Tindy gourd Insects A Lecture By Allah Dad Khan Provincial Coordinator IPM MI...
 
Slideshow foto's Seminar samen pesten stoppen
Slideshow  foto's Seminar samen pesten stoppenSlideshow  foto's Seminar samen pesten stoppen
Slideshow foto's Seminar samen pesten stoppen
 
dj placement - 2015 - sept
dj placement - 2015 - septdj placement - 2015 - sept
dj placement - 2015 - sept
 
Mengukur sudahkah kita mengajar efektif
Mengukur sudahkah kita mengajar efektifMengukur sudahkah kita mengajar efektif
Mengukur sudahkah kita mengajar efektif
 
DABBL media pack v9
DABBL media pack v9DABBL media pack v9
DABBL media pack v9
 
Aktiivinen_ja_hyvinvoiva_ikaihminen_loppuraportti_KL-Kustannus
Aktiivinen_ja_hyvinvoiva_ikaihminen_loppuraportti_KL-KustannusAktiivinen_ja_hyvinvoiva_ikaihminen_loppuraportti_KL-Kustannus
Aktiivinen_ja_hyvinvoiva_ikaihminen_loppuraportti_KL-Kustannus
 

Similar to Compositeworks recent major projects

Marina barrage (09/10s2)
Marina barrage (09/10s2)Marina barrage (09/10s2)
Marina barrage (09/10s2)
gn022010sem1
 
R Baldwin - 2015 pdf
R Baldwin - 2015 pdfR Baldwin - 2015 pdf
R Baldwin - 2015 pdf
Rusty Baldwin
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
Dominic Holder
 
Structural estimateROOF SAILSPODIUMUNDER GROUN.docx
Structural estimateROOF SAILSPODIUMUNDER GROUN.docxStructural estimateROOF SAILSPODIUMUNDER GROUN.docx
Structural estimateROOF SAILSPODIUMUNDER GROUN.docx
cpatriciarpatricia
 
LR1 75348 burger2005
LR1 75348 burger2005LR1 75348 burger2005
LR1 75348 burger2005
Katie Ross
 
Yacht for sale - GrandBanks 76 Longrange Yacht Dolcenera
Yacht for sale - GrandBanks 76 Longrange Yacht DolceneraYacht for sale - GrandBanks 76 Longrange Yacht Dolcenera
Yacht for sale - GrandBanks 76 Longrange Yacht Dolcenera
East Coast Yacht Brokers
 

Similar to Compositeworks recent major projects (20)

The story of a breakthrough yard, Baltic Yachts - PG Johansson - HSS Classic ...
The story of a breakthrough yard, Baltic Yachts - PG Johansson - HSS Classic ...The story of a breakthrough yard, Baltic Yachts - PG Johansson - HSS Classic ...
The story of a breakthrough yard, Baltic Yachts - PG Johansson - HSS Classic ...
 
Marina barrage (09/10s2)
Marina barrage (09/10s2)Marina barrage (09/10s2)
Marina barrage (09/10s2)
 
Gherkin london
Gherkin londonGherkin london
Gherkin london
 
R Baldwin - 2015 pdf
R Baldwin - 2015 pdfR Baldwin - 2015 pdf
R Baldwin - 2015 pdf
 
DESSERTATION PRESENTATION.pptx
DESSERTATION PRESENTATION.pptxDESSERTATION PRESENTATION.pptx
DESSERTATION PRESENTATION.pptx
 
Dominic Holder Portfolio
Dominic Holder PortfolioDominic Holder Portfolio
Dominic Holder Portfolio
 
Literature Study on sports pavilion
Literature Study on sports pavilionLiterature Study on sports pavilion
Literature Study on sports pavilion
 
BURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural SystemBURJ AL ARAB Presentation on Structural System
BURJ AL ARAB Presentation on Structural System
 
Holly Nichols Portfolio \'07-\'09
Holly Nichols Portfolio \'07-\'09Holly Nichols Portfolio \'07-\'09
Holly Nichols Portfolio \'07-\'09
 
Structural estimateROOF SAILSPODIUMUNDER GROUN.docx
Structural estimateROOF SAILSPODIUMUNDER GROUN.docxStructural estimateROOF SAILSPODIUMUNDER GROUN.docx
Structural estimateROOF SAILSPODIUMUNDER GROUN.docx
 
Storm water storage tank
Storm water storage tankStorm water storage tank
Storm water storage tank
 
Burj al arab
Burj al arabBurj al arab
Burj al arab
 
burj khalifa
burj khalifaburj khalifa
burj khalifa
 
Refurbishment
RefurbishmentRefurbishment
Refurbishment
 
Burj Al Arab
Burj Al ArabBurj Al Arab
Burj Al Arab
 
114271970 a-civil-engg-final-year-training-report-on-residential-building-con...
114271970 a-civil-engg-final-year-training-report-on-residential-building-con...114271970 a-civil-engg-final-year-training-report-on-residential-building-con...
114271970 a-civil-engg-final-year-training-report-on-residential-building-con...
 
Floating Technology
Floating TechnologyFloating Technology
Floating Technology
 
ABTS 4th year pdf
ABTS 4th year pdfABTS 4th year pdf
ABTS 4th year pdf
 
LR1 75348 burger2005
LR1 75348 burger2005LR1 75348 burger2005
LR1 75348 burger2005
 
Yacht for sale - GrandBanks 76 Longrange Yacht Dolcenera
Yacht for sale - GrandBanks 76 Longrange Yacht DolceneraYacht for sale - GrandBanks 76 Longrange Yacht Dolcenera
Yacht for sale - GrandBanks 76 Longrange Yacht Dolcenera
 

More from Christopher Sardo - Superyacht Refit (6)

Compositeworks technical revolution
Compositeworks  technical revolution Compositeworks  technical revolution
Compositeworks technical revolution
 
Compositeworks recent major projects
Compositeworks   recent major projectsCompositeworks   recent major projects
Compositeworks recent major projects
 
Compositeworks - recent major projects
Compositeworks - recent major projectsCompositeworks - recent major projects
Compositeworks - recent major projects
 
Compositeworks-BUILD-brochure
Compositeworks-BUILD-brochureCompositeworks-BUILD-brochure
Compositeworks-BUILD-brochure
 
Compositeworks-FACILITIES-brochure
Compositeworks-FACILITIES-brochureCompositeworks-FACILITIES-brochure
Compositeworks-FACILITIES-brochure
 
CW refit brochure 2015
CW refit brochure 2015 CW refit brochure 2015
CW refit brochure 2015
 

Recently uploaded

Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
chumtiyababu
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
jaanualu31
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Verification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptxVerification of thevenin's theorem for BEEE Lab (1).pptx
Verification of thevenin's theorem for BEEE Lab (1).pptx
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
Call Girls in South Ex (delhi) call me [🔝9953056974🔝] escort service 24X7
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 

Compositeworks recent major projects

  • 1.
  • 2.
  • 3.
  • 4.
  • 5. 3 SPECIFICATIONS Length 62.3m Beam 10.8m Draft 3.3m Builder Feadship Year 2000 REFIT Naval Architect Azure Designer Steve Howard / Chahan Interior Design Duration 6 months / 6 months Exterior: Complete remodelling of sun deck including installation of new carbon fibre swimming pool and sunbeds forward, lowering of aft deck level, complete with new bar and furniture and a custom liferaft launching system Interior: Complete replacement of major guest areas including salon, dining and owner’s areas as well as upgrade of major interior systems
  • 6. 4 5
  • 7.
  • 8. 9
  • 11. 14 15 SPECIFICATIONS Length before / after 65.6m / 68.7m Beam 9.7m Draft 3.7m Builder Feadship Year 1983 REFIT Naval Architect Olesinski Design Designer Olesinski Design Duration 7 months Exterior: Total remodelling of superstructure forward and aft on every deck. 3m+ transom extension, 1m high modification to forward sheerline up to bow, modifications to fashion plates, wing stations, bulwarks and other superstructure details to totally modernise the vessels profile leaving it complete unrecognisable from it’s previous guises. Interior: Replacement of VIP flooring, installation of beach club in lazarette.
  • 12. 16 17
  • 13. 19
  • 14.
  • 15.
  • 16. 24 25 SPECIFICATIONS Length 138.4m Beam 18.5m Draft 5m Builder Lurssen Year 2004 REFIT Naval Architect Azure Designer Beiderbeck Duration 3 months Exterior: Design, manufacture and installation of a self supporting carbon fibre swimming pool to grace one of the worlds best know mega yachts. With strict heating, water storage and pumping requirements and a very short project duration it was a challenge described by Lurssen themselves as impossible.....
  • 17. 26 27
  • 18.
  • 19. 30 31
  • 20. 32 33 SPECIFICATIONS Length before / after 30m / 35.8m Beam 7.3m Draft 2.5m Builder Inace Year 2009 REFIT Naval Architect Azure Designer Stefano Pastrovich Duration 5 months / 5 months Exterior: Hull extension at stern area of yacht over 6m in length to create a large aft deck dining/bar area, spacious swim platform and new interior engineering and toy storage area complete with additional ensuite crew cabin Interior: Removal and replacement of all major guest areas with modern African themed Pastrovich masterpiece. All exterior areas modernised and co-ordinate with new interior
  • 22. 36 37
  • 23.
  • 24. 40 41
  • 25.
  • 26. 45