SlideShare a Scribd company logo
1 of 7
CRINER CV UPDATE JULY 2015
CURRICULUM VITAE
NAME Christopher Criner
Title: Project Manager
NATIONALITY American
LANGUAGES English, Basic German, some Spanish
CURRENT LOCATION USA
AVAILABILITY TBD
EXPERIENCE SUMMARY/ CAREER SPECIALIZATION
Countries of Work Experience:
USA, Canada, Singapore, Brazil, Argentina, Netherlands, United Kingdom, Gabon West
Africa, South Korea, China, Vietnam, Mexico, Colombia, Ecuador and Venezuela.
Detailed Tasks Assigned
• Project Manager – MODU Newbuild construction, Modifications and Upgrades
Teams from 3 to 25 personnel.
• Regulatory and Compliance – SPS and Governmental (specific country
regulations) planning, coordination, execution and completion within time frames
outlined by the Agencies.
• Contracts Management – Technical and Commercial Expert for fulfillment of the
project.
• Client Interface – Status updates / Report Author, Meeting Leader, Host and
coordinate Owner and Client visits.
• Quality Management – Quality Assurance and Quality Control.
• HSE – Champion Health, Safety and Environmental issues.
• Shipyard Control – Ensure communications between Builder and Owner remain
stable and secure.
• Gives technical advice on operations or finds support and information whenever
required or deemed necessary by operations or clients
Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned
• Project Manager over a team of 25 Engineering Specialists for the construction of 4,
state of the art MODU’s (simultaneously) in Singapore as well as a state of the art
DP-3 Ultra Deepwater Drillship at Samsung Heavy Industries, Jangpyeong, South
Korea.
• Charged with Project Management and or Project Coordination for Upgrades,
Modification and Repairs for all types of MODU’s owned by both private interests as
well as most of the major offshore drilling contractors in the world.
CRINER CV UPDATE JULY 2015
Recent projects features
• Regulatory and Compliance. SPS (Special Periodic Survey). Review and plan
pre-regulatory requirements prior to actual Agency Surveys. Outline and execute a
full plan to ensure a smooth and action free final inspection is achieved.
Country / Geographic Compliance – Ensure all requirements by Governmental
Agencies in specific countries is known and actioned to ensure smooth inspection
planning and preparation. i.e. Eastern Canadian Offshore Drilling Compliance.
• Expert Consultant / Project Manager over miscellaneous Deepwater drilling rig
projects, Materials, Equipment, Evaluations, Budgets and Document Review.
• Project Manager – Construction of a DP-3 Ultra Deepwater Drillship
• Project Manager over four Newbuild Jackups
• Owners Representative charged to oversee all chief engineering positions and
office staff.
_____________________________
EDUCATION
• Subiaco Academy College Preparatory
• Sea Pines Abroad Salzburg Austria:
Studies: German language, European History and Art History
• University of St Thomas
Studies: Business; Real Estate and Contracts
• University of Houston
Studies: Spanish language
• University of Houston International Trade Center
o Represented the university of Houston, city of Houston, state of Texas and
the U.S. Government throughout Latin America. Developed trade relations.
_____________________________
TRAINING COURSES & OTHER QUALIFICATIONS
• Rig Pass – Gulf of Mexico
• HUET (Helicopter underwater egress training) – Gulf of Mexico
• B.P. License to go offshore Gulf of Mexico
• Level II UT, MP, PT, Radiography
Memberships and Professional Associations
• Project Management Institute – Past Member
• NOMADS – Active Member
• IADC – Past Member
• GCCSAAA (Galveston Citizens Sheriffs Assoc.) – former V.P. Executive Board
• Houston City Club – Ambassador’s Council - Past Chairman
Organizations – Awards
• Exporter of the year U.S. Dept. of Commerce 1999
• Venezuelan American Partnership – Past Director - Business Development
CRINER CV UPDATE JULY 2015
• Appointed to the U.S. Department of Commerce District Export Council
• Galveston County Citizen Sherriff’s Association, V.P, Board of Directors
____________________________
EXPERIENCE
2012-Current
Consultant – Independent Contractor
Project Management
• Current Status: Available for project or postition
• April May 2015 - Current
Independent Contractor to ECL Global of London, England
Seconded to Grand Bahama Shipyard, Freeport Grand Bahamas
Short term evaluation. Project complete
• July 2014
Project Manager, Singapore (Dietswell Factorig) (Independent Contractor)
Project Manager over a small team for the evaluation of a Tender Assisted Drilling rig in
Singapore. Review and confirm all Regulatory SPS items and develop the scope of
work. Assemble a package for the client to include an independent survey as well as
compilation of all pricing from shipyards and equipment vendors. Upon presentation to
the client a determination can then be made as to whether or not it is financially feasible
for the client to purchase this asset. Phase I completed.
• 2014
Project Manager, Newfoundland, Canada. (Independent Contractor)
The scope of work to ensure the admittance of a state of the art semi-submersible into
Eastern Canadian waters to drill for an International Oil concern. Tasked with ensuring
that all regulatory and Compliance requirements are met for ABS and The Canadian
Newfoundland and Labrador Oil Ministry to drill immediately without delay upon arrival.
• 2013
Project Manager Drillship entering the Gulf of Mexico (independent Contractor)
Regulatory and Compliance upgrades and modifications to a state of the art newbuild
drillship entering US Waters.
Ensure all outstanding scopes of work are completed per ABS, US Coast Guard as well
as the Operators requirements.
• 2013 Consultant (Independent Contractor)
Supervision and Planning
Manage SPS requirement modifications; Owner and Operator upgrades of newbuild
drilling rigs entering the Gulf of Mexico prior to going on contract.
Material takeoffs, preparation of job scopes and execution.
Consulting on sales and marketing and purchasing of OCTG and equipment for
distributors and purchase by end users.
Evaluation and compilations of HSE programs for offshore and shore based operations.
CRINER CV UPDATE JULY 2015
• 2009- 2012
Forum Services (Staff)
Sr. Project Manager – Etesco VIII Drillship Project
Samsung Heavy Industries, Geoje Island South Korea
Project Manager over the construction of DP3 Drillship Etesco Takatsuga J.
Project Value approximately USD900 million
Vessel delivered 45 days ahead of schedule with minimal punch items.
Responsible for the management of the overall construction project and all Discipline
Engineering Team and Support Personnel.
• Involved in final negotiations between Samsung (builder) and Etesco / J-4 (owner)
prior to signing of contract.
• Ensured the vessel would be constructed per the contact and ensured it would be
built to the Brazilian specifications.
• Opened project office and hired all Korean local content
• Made all preparations for arrival of Project Team
• Prepared Project Execution Manual
• Visited any and all outside contractors, fabricators and etc., for evaluation.
• All Factory Acceptance Tests (FAT) and Inspections we coordinated by the Project
team.
• Worked closely with shipyard on commissioning
• Implemented Safety Program and arranged for bridging documents where the
shipyard safety fell short.
• Participated in Shipyard safety meetings as well as project meetings.
• Daily monitoring of senior staff as well as office personnel
• Daily meetings with Shipyard Project Manager
• Compiled and issued monthly progress report
• Arranged monthly meeting with shipyard and oversaw all guest arrival ie owner,
potential client (oil company) and etc.
• 2007-2009
Forum Services
Project Manager Offshore Jackup Rigs Project
PPL Yard, Singapore
• Project Manager over the construction of four (4) Baker Pacific Class 375 state of the
art Jack-up rigs. Project Value approximately One Billion US Dollars
$1,000,000,000.00
All four jackups were delivered ahead of schedule.
Owner was originally TMT out of Taiwan and eventually the vessels were acquired by
Vantage Drilling, a then start-up Drilling Contractor from Houston, Texas
A number of items were manufactured and fabricated in both China and Thailand
yards.
All outsourcing facilities and workmanship were inspected by the Project Manager
personally on a regular basis. All rigs were delivered ahead of schedule and within
cost constraints.
CRINER CV UPDATE JULY 2015
• Implemented Safety Program and arranged for bridging documents where the
shipyard safety fell short. Participated in Shipyard safety meetings as well as project
meetings.
• Responsible for management of the overall project, all Discipline Managers and
Support
Personnel.
• Daily meetings with Shipyard Project Mgt. Team and all regulatory bodies, i.e. ABS,
Lloyds, DNV.
• Authored monthly progress report
• Arrange all guest arrival i.e. Owner & Client
Controls Manager – Stateside Support – Drillship Aban Abraham (Full upgrade including
latest technology DP System, Power Management System, Power Generation System,
Drilling Systems, Hull upgrade)
• Company liaison between all vendors and manufacturers of engineered products
• Critical diagnosis of contracts and purchase orders.
• Track & ensure all equipment / material are delivered per the required specifications
• Manage the Marine, Subsea and Drilling equipment purchases by the owner.
• Attend Factory Acceptance Tests. Coordinated logistics for air and ocean freight
2000 – 2007
MacGregor Energy Services, Incorporated
Executive Vice President
• Quality Services Vendor Inspection of Engineered Products, Drillships, Semi
Submersibles and Jackups
• Provision of Engineering and Technical Personnel to the Energy Sector
• Support construction, repairs and upgrades to Drillships, Semi-submersible and
Jackup drilling vessels.
• Project Manager of MODU upgrades, modifications, inspections and repairs to all
areas of offshore drilling industry. Utilizing our company owned facilities in Northern
Scotland and with our project teams in shipyards in Holland, USA and West Africa.
1993-2000
Criner Worldwide, Incorporated
President and CEO
• Provided Consulting Engineering services and Management for all types of oilfield
equipment in manufacturing facilities and mills throughout the world.
• Supplier of Quality Engineers and Technical Personnel.
• Owner of RBC International (a Criner subsidiary) providing purchasing and logistics.
Upgrade and modification project management coordination of numerous Drillships,
Semisubmersibles and Jackups for all the major offshore drilling contractors.
• Owner’s representative for all engineered product in fabrication and manufacturing
facilities worldwide. Clients; super-majors, majors and large independent Oil
Operators. Provided Inspection services for a variety of international projects in the
offshore Drilling sector.
CRINER CV UPDATE JULY 2015
1989-1992
DrilPro-Houston
Project Coordinator
• Modification, Repair and Upgrade of offshore drilling vessels.
• Manager of purchasing, logistics, project coordination for domestic and international
projects.
• Recruited and managed personnel i.e. electricians, welders and quality inspectors.
• Developed Quality control procedures for company fabrication facilities.
1985-1989
Blue Wolf Café
Owner / Manager
• Duties included management of all personnel, kitchen and bar.
• Cost control and ordering of food and supplies.
• Marketing and sales for events.
• Implementation of per glass sales of hi-end wines and champagnes.
1980-1985
Maurice Pincoffs Company
OCTG & Line-Pipe Sales
• Sales of downhole and line pipe (OCTG) for direct mill purchase and importation.
This company is the oldest and most respected of international steel trading houses
on the Gulf Coast.
• Identified client needs for future drilling and line pipe programs as well as using
market data in evaluating what quantity, sizes and grades of material should be
ordered.
• Placed orders with the pipe manufacturers around the world and then upon ocean
delivery took receipt of materials.
• Selected companies to perform quench and temper and end finishing services,
preparing the finished product for immediate drilling use.
• Sales of A-106 tubulars. Purchased mill direct shipload quantities and maintained
warehouse quantities for local sales in one ton lift sizes.
1978-1980
PA Incorporated / Baker International
Operations Manager
• Responsible for multiple mobile pipe inspection operations, equipment and
personnel.
• Company assigned DOT (U.S. Department of transportation) manager. In charge of
testing and training as well as compliance related to the professional drivers.
• Acquired Level II Certification for UT, PT, MT, RT & Used Drill Pipe.
Contact Information:
CRINER CV UPDATE JULY 2015
USA Telephone: 713-252-2048
Email: christophercriner@yahoo.com

More Related Content

What's hot

CV Peter Storey Construction Lead-Manager
CV Peter Storey Construction Lead-ManagerCV Peter Storey Construction Lead-Manager
CV Peter Storey Construction Lead-ManagerPeter Storey
 
Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton
 
QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.Vijay Sekaran
 
CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...Azhar Niazi
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae limFilemon Lim
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013psmuga9
 
Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013psmuga9
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013psmuga9
 
WHYTE-Jan2016 Final
WHYTE-Jan2016 FinalWHYTE-Jan2016 Final
WHYTE-Jan2016 FinalGary Whyte
 
CV E. Viner Updated
CV E. Viner UpdatedCV E. Viner Updated
CV E. Viner UpdatedEric Viner
 
Asselin Resume Dec 2015 Final
Asselin Resume Dec 2015 FinalAsselin Resume Dec 2015 Final
Asselin Resume Dec 2015 FinalRob Asselin, MPM
 

What's hot (19)

Nadeem kumar cv
Nadeem kumar cvNadeem kumar cv
Nadeem kumar cv
 
CV Peter Storey Construction Lead-Manager
CV Peter Storey Construction Lead-ManagerCV Peter Storey Construction Lead-Manager
CV Peter Storey Construction Lead-Manager
 
Psm Cv Presentation 3 2012
Psm Cv Presentation 3  2012Psm Cv Presentation 3  2012
Psm Cv Presentation 3 2012
 
Structural Engineer
Structural EngineerStructural Engineer
Structural Engineer
 
Cameron Punton - CV December 2016
Cameron Punton - CV December 2016Cameron Punton - CV December 2016
Cameron Punton - CV December 2016
 
Kal resume
Kal resumeKal resume
Kal resume
 
QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.QC_INSPECTION_ENGINEER.
QC_INSPECTION_ENGINEER.
 
CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...CV_ Azhar. (Civil_ Engr)...
CV_ Azhar. (Civil_ Engr)...
 
Ravi's CV
Ravi's CVRavi's CV
Ravi's CV
 
Curriculum Vitae lim
Curriculum Vitae limCurriculum Vitae lim
Curriculum Vitae lim
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
Vivencio pachoro cv 2016
Vivencio pachoro cv 2016Vivencio pachoro cv 2016
Vivencio pachoro cv 2016
 
151109 Faez A.Molla CV
151109 Faez A.Molla CV151109 Faez A.Molla CV
151109 Faez A.Molla CV
 
Jeff Cartwright CV May 2016
Jeff Cartwright CV May 2016Jeff Cartwright CV May 2016
Jeff Cartwright CV May 2016
 
Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013Psm cv presentation jan17, 2013
Psm cv presentation jan17, 2013
 
Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013Psm cv presentation jan15, 2013
Psm cv presentation jan15, 2013
 
WHYTE-Jan2016 Final
WHYTE-Jan2016 FinalWHYTE-Jan2016 Final
WHYTE-Jan2016 Final
 
CV E. Viner Updated
CV E. Viner UpdatedCV E. Viner Updated
CV E. Viner Updated
 
Asselin Resume Dec 2015 Final
Asselin Resume Dec 2015 FinalAsselin Resume Dec 2015 Final
Asselin Resume Dec 2015 Final
 

Viewers also liked

Teorias del pensamiento campo laboral v2
Teorias del pensamiento campo laboral v2Teorias del pensamiento campo laboral v2
Teorias del pensamiento campo laboral v2a_g_meza
 
Lgbt weddings email
Lgbt weddings emailLgbt weddings email
Lgbt weddings emailadehilster
 
The Current State of OAuth 2
The Current State of OAuth 2The Current State of OAuth 2
The Current State of OAuth 2Aaron Parecki
 
ICPC 2015, Tsukuba : Unofficial Commentary
ICPC 2015, Tsukuba: Unofficial CommentaryICPC 2015, Tsukuba: Unofficial Commentary
ICPC 2015, Tsukuba : Unofficial Commentaryirrrrr
 
未出現事象の出現確率
未出現事象の出現確率未出現事象の出現確率
未出現事象の出現確率Hiroshi Nakagawa
 
Lisp meetup #29 cl-online-learningの紹介
Lisp meetup #29 cl-online-learningの紹介Lisp meetup #29 cl-online-learningの紹介
Lisp meetup #29 cl-online-learningの紹介Satoshi imai
 

Viewers also liked (6)

Teorias del pensamiento campo laboral v2
Teorias del pensamiento campo laboral v2Teorias del pensamiento campo laboral v2
Teorias del pensamiento campo laboral v2
 
Lgbt weddings email
Lgbt weddings emailLgbt weddings email
Lgbt weddings email
 
The Current State of OAuth 2
The Current State of OAuth 2The Current State of OAuth 2
The Current State of OAuth 2
 
ICPC 2015, Tsukuba : Unofficial Commentary
ICPC 2015, Tsukuba: Unofficial CommentaryICPC 2015, Tsukuba: Unofficial Commentary
ICPC 2015, Tsukuba : Unofficial Commentary
 
未出現事象の出現確率
未出現事象の出現確率未出現事象の出現確率
未出現事象の出現確率
 
Lisp meetup #29 cl-online-learningの紹介
Lisp meetup #29 cl-online-learningの紹介Lisp meetup #29 cl-online-learningの紹介
Lisp meetup #29 cl-online-learningの紹介
 

Similar to CVF-CHRIS CRINER-PM with contact info July 2015

Similar to CVF-CHRIS CRINER-PM with contact info July 2015 (20)

Donald Wilkinson-Resume
Donald Wilkinson-ResumeDonald Wilkinson-Resume
Donald Wilkinson-Resume
 
Rohit Resume
Rohit ResumeRohit Resume
Rohit Resume
 
Phil hoggett cv 19-aug16
Phil hoggett cv 19-aug16Phil hoggett cv 19-aug16
Phil hoggett cv 19-aug16
 
Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012Psm Cv Presentation Aug 16, 2012
Psm Cv Presentation Aug 16, 2012
 
Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'Allen Schmitgen pushkar resume'
Allen Schmitgen pushkar resume'
 
Phil Hoggett-CV_24-Jun-15
Phil Hoggett-CV_24-Jun-15Phil Hoggett-CV_24-Jun-15
Phil Hoggett-CV_24-Jun-15
 
dean resume (1)
dean resume (1)dean resume (1)
dean resume (1)
 
Rayomand Munchershaw Mistry_original12
Rayomand Munchershaw Mistry_original12Rayomand Munchershaw Mistry_original12
Rayomand Munchershaw Mistry_original12
 
R mayers_CV 2302
R mayers_CV 2302R mayers_CV 2302
R mayers_CV 2302
 
Jack Oldrin RS2
Jack Oldrin RS2Jack Oldrin RS2
Jack Oldrin RS2
 
Chad Carpenter Resume
Chad Carpenter ResumeChad Carpenter Resume
Chad Carpenter Resume
 
Jeffrey Wood
Jeffrey WoodJeffrey Wood
Jeffrey Wood
 
Allwyn Leo CV
Allwyn Leo CVAllwyn Leo CV
Allwyn Leo CV
 
Allwyn-PE-CV
Allwyn-PE-CVAllwyn-PE-CV
Allwyn-PE-CV
 
TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015TCF Resume UPDATED 05 APRIL, 2015
TCF Resume UPDATED 05 APRIL, 2015
 
Resume (Sarawut Pakthong)
Resume (Sarawut Pakthong)Resume (Sarawut Pakthong)
Resume (Sarawut Pakthong)
 
RS Darwent pdf
RS Darwent pdfRS Darwent pdf
RS Darwent pdf
 
Shabeer Resume
Shabeer ResumeShabeer Resume
Shabeer Resume
 
Resume
ResumeResume
Resume
 
Resume
ResumeResume
Resume
 

CVF-CHRIS CRINER-PM with contact info July 2015

  • 1. CRINER CV UPDATE JULY 2015 CURRICULUM VITAE NAME Christopher Criner Title: Project Manager NATIONALITY American LANGUAGES English, Basic German, some Spanish CURRENT LOCATION USA AVAILABILITY TBD EXPERIENCE SUMMARY/ CAREER SPECIALIZATION Countries of Work Experience: USA, Canada, Singapore, Brazil, Argentina, Netherlands, United Kingdom, Gabon West Africa, South Korea, China, Vietnam, Mexico, Colombia, Ecuador and Venezuela. Detailed Tasks Assigned • Project Manager – MODU Newbuild construction, Modifications and Upgrades Teams from 3 to 25 personnel. • Regulatory and Compliance – SPS and Governmental (specific country regulations) planning, coordination, execution and completion within time frames outlined by the Agencies. • Contracts Management – Technical and Commercial Expert for fulfillment of the project. • Client Interface – Status updates / Report Author, Meeting Leader, Host and coordinate Owner and Client visits. • Quality Management – Quality Assurance and Quality Control. • HSE – Champion Health, Safety and Environmental issues. • Shipyard Control – Ensure communications between Builder and Owner remain stable and secure. • Gives technical advice on operations or finds support and information whenever required or deemed necessary by operations or clients Work Undertaken that Best Illustrates Capability to Handle the Tasks Assigned • Project Manager over a team of 25 Engineering Specialists for the construction of 4, state of the art MODU’s (simultaneously) in Singapore as well as a state of the art DP-3 Ultra Deepwater Drillship at Samsung Heavy Industries, Jangpyeong, South Korea. • Charged with Project Management and or Project Coordination for Upgrades, Modification and Repairs for all types of MODU’s owned by both private interests as well as most of the major offshore drilling contractors in the world.
  • 2. CRINER CV UPDATE JULY 2015 Recent projects features • Regulatory and Compliance. SPS (Special Periodic Survey). Review and plan pre-regulatory requirements prior to actual Agency Surveys. Outline and execute a full plan to ensure a smooth and action free final inspection is achieved. Country / Geographic Compliance – Ensure all requirements by Governmental Agencies in specific countries is known and actioned to ensure smooth inspection planning and preparation. i.e. Eastern Canadian Offshore Drilling Compliance. • Expert Consultant / Project Manager over miscellaneous Deepwater drilling rig projects, Materials, Equipment, Evaluations, Budgets and Document Review. • Project Manager – Construction of a DP-3 Ultra Deepwater Drillship • Project Manager over four Newbuild Jackups • Owners Representative charged to oversee all chief engineering positions and office staff. _____________________________ EDUCATION • Subiaco Academy College Preparatory • Sea Pines Abroad Salzburg Austria: Studies: German language, European History and Art History • University of St Thomas Studies: Business; Real Estate and Contracts • University of Houston Studies: Spanish language • University of Houston International Trade Center o Represented the university of Houston, city of Houston, state of Texas and the U.S. Government throughout Latin America. Developed trade relations. _____________________________ TRAINING COURSES & OTHER QUALIFICATIONS • Rig Pass – Gulf of Mexico • HUET (Helicopter underwater egress training) – Gulf of Mexico • B.P. License to go offshore Gulf of Mexico • Level II UT, MP, PT, Radiography Memberships and Professional Associations • Project Management Institute – Past Member • NOMADS – Active Member • IADC – Past Member • GCCSAAA (Galveston Citizens Sheriffs Assoc.) – former V.P. Executive Board • Houston City Club – Ambassador’s Council - Past Chairman Organizations – Awards • Exporter of the year U.S. Dept. of Commerce 1999 • Venezuelan American Partnership – Past Director - Business Development
  • 3. CRINER CV UPDATE JULY 2015 • Appointed to the U.S. Department of Commerce District Export Council • Galveston County Citizen Sherriff’s Association, V.P, Board of Directors ____________________________ EXPERIENCE 2012-Current Consultant – Independent Contractor Project Management • Current Status: Available for project or postition • April May 2015 - Current Independent Contractor to ECL Global of London, England Seconded to Grand Bahama Shipyard, Freeport Grand Bahamas Short term evaluation. Project complete • July 2014 Project Manager, Singapore (Dietswell Factorig) (Independent Contractor) Project Manager over a small team for the evaluation of a Tender Assisted Drilling rig in Singapore. Review and confirm all Regulatory SPS items and develop the scope of work. Assemble a package for the client to include an independent survey as well as compilation of all pricing from shipyards and equipment vendors. Upon presentation to the client a determination can then be made as to whether or not it is financially feasible for the client to purchase this asset. Phase I completed. • 2014 Project Manager, Newfoundland, Canada. (Independent Contractor) The scope of work to ensure the admittance of a state of the art semi-submersible into Eastern Canadian waters to drill for an International Oil concern. Tasked with ensuring that all regulatory and Compliance requirements are met for ABS and The Canadian Newfoundland and Labrador Oil Ministry to drill immediately without delay upon arrival. • 2013 Project Manager Drillship entering the Gulf of Mexico (independent Contractor) Regulatory and Compliance upgrades and modifications to a state of the art newbuild drillship entering US Waters. Ensure all outstanding scopes of work are completed per ABS, US Coast Guard as well as the Operators requirements. • 2013 Consultant (Independent Contractor) Supervision and Planning Manage SPS requirement modifications; Owner and Operator upgrades of newbuild drilling rigs entering the Gulf of Mexico prior to going on contract. Material takeoffs, preparation of job scopes and execution. Consulting on sales and marketing and purchasing of OCTG and equipment for distributors and purchase by end users. Evaluation and compilations of HSE programs for offshore and shore based operations.
  • 4. CRINER CV UPDATE JULY 2015 • 2009- 2012 Forum Services (Staff) Sr. Project Manager – Etesco VIII Drillship Project Samsung Heavy Industries, Geoje Island South Korea Project Manager over the construction of DP3 Drillship Etesco Takatsuga J. Project Value approximately USD900 million Vessel delivered 45 days ahead of schedule with minimal punch items. Responsible for the management of the overall construction project and all Discipline Engineering Team and Support Personnel. • Involved in final negotiations between Samsung (builder) and Etesco / J-4 (owner) prior to signing of contract. • Ensured the vessel would be constructed per the contact and ensured it would be built to the Brazilian specifications. • Opened project office and hired all Korean local content • Made all preparations for arrival of Project Team • Prepared Project Execution Manual • Visited any and all outside contractors, fabricators and etc., for evaluation. • All Factory Acceptance Tests (FAT) and Inspections we coordinated by the Project team. • Worked closely with shipyard on commissioning • Implemented Safety Program and arranged for bridging documents where the shipyard safety fell short. • Participated in Shipyard safety meetings as well as project meetings. • Daily monitoring of senior staff as well as office personnel • Daily meetings with Shipyard Project Manager • Compiled and issued monthly progress report • Arranged monthly meeting with shipyard and oversaw all guest arrival ie owner, potential client (oil company) and etc. • 2007-2009 Forum Services Project Manager Offshore Jackup Rigs Project PPL Yard, Singapore • Project Manager over the construction of four (4) Baker Pacific Class 375 state of the art Jack-up rigs. Project Value approximately One Billion US Dollars $1,000,000,000.00 All four jackups were delivered ahead of schedule. Owner was originally TMT out of Taiwan and eventually the vessels were acquired by Vantage Drilling, a then start-up Drilling Contractor from Houston, Texas A number of items were manufactured and fabricated in both China and Thailand yards. All outsourcing facilities and workmanship were inspected by the Project Manager personally on a regular basis. All rigs were delivered ahead of schedule and within cost constraints.
  • 5. CRINER CV UPDATE JULY 2015 • Implemented Safety Program and arranged for bridging documents where the shipyard safety fell short. Participated in Shipyard safety meetings as well as project meetings. • Responsible for management of the overall project, all Discipline Managers and Support Personnel. • Daily meetings with Shipyard Project Mgt. Team and all regulatory bodies, i.e. ABS, Lloyds, DNV. • Authored monthly progress report • Arrange all guest arrival i.e. Owner & Client Controls Manager – Stateside Support – Drillship Aban Abraham (Full upgrade including latest technology DP System, Power Management System, Power Generation System, Drilling Systems, Hull upgrade) • Company liaison between all vendors and manufacturers of engineered products • Critical diagnosis of contracts and purchase orders. • Track & ensure all equipment / material are delivered per the required specifications • Manage the Marine, Subsea and Drilling equipment purchases by the owner. • Attend Factory Acceptance Tests. Coordinated logistics for air and ocean freight 2000 – 2007 MacGregor Energy Services, Incorporated Executive Vice President • Quality Services Vendor Inspection of Engineered Products, Drillships, Semi Submersibles and Jackups • Provision of Engineering and Technical Personnel to the Energy Sector • Support construction, repairs and upgrades to Drillships, Semi-submersible and Jackup drilling vessels. • Project Manager of MODU upgrades, modifications, inspections and repairs to all areas of offshore drilling industry. Utilizing our company owned facilities in Northern Scotland and with our project teams in shipyards in Holland, USA and West Africa. 1993-2000 Criner Worldwide, Incorporated President and CEO • Provided Consulting Engineering services and Management for all types of oilfield equipment in manufacturing facilities and mills throughout the world. • Supplier of Quality Engineers and Technical Personnel. • Owner of RBC International (a Criner subsidiary) providing purchasing and logistics. Upgrade and modification project management coordination of numerous Drillships, Semisubmersibles and Jackups for all the major offshore drilling contractors. • Owner’s representative for all engineered product in fabrication and manufacturing facilities worldwide. Clients; super-majors, majors and large independent Oil Operators. Provided Inspection services for a variety of international projects in the offshore Drilling sector.
  • 6. CRINER CV UPDATE JULY 2015 1989-1992 DrilPro-Houston Project Coordinator • Modification, Repair and Upgrade of offshore drilling vessels. • Manager of purchasing, logistics, project coordination for domestic and international projects. • Recruited and managed personnel i.e. electricians, welders and quality inspectors. • Developed Quality control procedures for company fabrication facilities. 1985-1989 Blue Wolf Café Owner / Manager • Duties included management of all personnel, kitchen and bar. • Cost control and ordering of food and supplies. • Marketing and sales for events. • Implementation of per glass sales of hi-end wines and champagnes. 1980-1985 Maurice Pincoffs Company OCTG & Line-Pipe Sales • Sales of downhole and line pipe (OCTG) for direct mill purchase and importation. This company is the oldest and most respected of international steel trading houses on the Gulf Coast. • Identified client needs for future drilling and line pipe programs as well as using market data in evaluating what quantity, sizes and grades of material should be ordered. • Placed orders with the pipe manufacturers around the world and then upon ocean delivery took receipt of materials. • Selected companies to perform quench and temper and end finishing services, preparing the finished product for immediate drilling use. • Sales of A-106 tubulars. Purchased mill direct shipload quantities and maintained warehouse quantities for local sales in one ton lift sizes. 1978-1980 PA Incorporated / Baker International Operations Manager • Responsible for multiple mobile pipe inspection operations, equipment and personnel. • Company assigned DOT (U.S. Department of transportation) manager. In charge of testing and training as well as compliance related to the professional drivers. • Acquired Level II Certification for UT, PT, MT, RT & Used Drill Pipe. Contact Information:
  • 7. CRINER CV UPDATE JULY 2015 USA Telephone: 713-252-2048 Email: christophercriner@yahoo.com