6. Mixing Tub & Measuring Tank
Two compartment 8 bbl oval
shaped aluminum mix tub
5 barrel pre-mix compartment
3 barrel d. h. compartment
Separate agitator speed
controls; pre-mix & d.h.
20 barrel aluminum
measuring tank with sump
3” low pressure mud fill line
Exterior mixing pump and
down hole pump suction
valves (no inner tank butterfly
valves with valve extensions)
7. Mixing System
RCM IIE with rotary jet water
valve
Low profile bulk throttling valve
Automatic Density Control with
ACE 2500 unit controller
Both automatic control and two
levels of manual control
Serial and ethernet data output
Removable tub covers and mixer
sheath for dust and splash
reduction
Increased mixing energy with
high velocity rotary jet water
valve
8. Control Stand - Elite Cementing Trailer
Aluminum control stand
Shock mounted on rubber
isolators
Removable panels on all
sides for maintenance access
Contains ACE 2500 unit
controller with Windows NT
operating system
Contains associated CAN
modules & wiring
Air heater standard; all units
Houses control valves for air
actuated butterfly valves
Includes low pressure piping
flow diagram
9. Weights & Dimensions Elite Cementing Trailer
Length: 426 inches (10,820 mm) Width: 96 inches (2,439 mm)
Height: 156.25 inches (397 mm) Weight: * 51,640 lbs (23,424 kg)
* Weight includes 3/4 full fuel tank, two densometers, and no iron or suction hoses.
* Trailer is DOT legal with suction hoses & a full compliment of iron.
10. Ergonomic Features - Elite Cementing Trailer
Rear work platform
60º stairways w/handrails
Increased platforms/work space
Rear mounted nipple boxes
Rear access ladder over bumper
Walkway entry chain restraints
Reduced cement dusting
Greater number of floodlights
11. Production/Implementation
Elite Cementing Trailer
All trailers built in 2000 will be twin pump.
First trailer complete; destined Rock Springs, WY.
Second trailer in assembly; destined to CA.
Three additional trailers to be built in 2000,
destinations presently unknown.
2001 production status is unknown.