SlideShare a Scribd company logo
1 of 2
CALIESE E. SMITH
Flower Mound, Texas 75028
214-476-8301 caliese.smith@yahoo.com
www.linkedin.com/in/caliesesmith
Summary
Extensive experience in the Aerospace and Defense industries, in procurement, supply chain
management and manufacturing. Systems expertise includes: SAP, ERP/MRP, FP, Visiprise
(CAMS), Enovia, Excel, Access, Business Objects, Legacy and BAAN. APICS certification held
while working for Boeing. Experience with Material requirements planning (MRPII)
Implementation, Lean Manufacturing Leadership, Time Management and Critical Path
Methodology.
Professional Experience
Bell Helicopter TEXTRON, Grand Prairie TX 2005 – 2014
Senior Manufacturing Resource Specialist
• Verified schedule accuracy of all programs where delivery to external customers was the
objective.
• Identified and resolved all issues hindering release of a production order (exceptions,
shortages, planning changes in progress).
• Coordinated and managed special projects upon request.
• Created and submitted Progress Based Payments (PBP) upon ship deliveries.
• Created AXON shortage reports for ease in identifying pacing detail and communicating
concerns to the appropriate departments.
• Tracked work in progress (WIP) via Line of Balance (LOB) and reported weekly to upper
level Management.
• Created Unplanned Rework Orders (URO) as required by Customer return or Manufacturing
kick out.
• Created Stock Transfer Order (STO) to receive or deliver a detail from one COE to another.
• Created, updated, and reviewed Product Groups in SAP for Production Control & Logistics
(PC&L) and Procurement.
• Created and reviewed Build Plans in SAP to assist in WIP manipulation to avoid Capacity
constraints within flow of any given order.
• Business conditions changed in 2014, resulting in numerous positions being eliminated.
Agilis Benefit Services, Highland Village TX 2002 – 2005
New Business and Licensing Coordinator
• LLC designed around the patent pending concepts with many influential organizations and
individuals such as Wealth Protection Alliance, for the purpose of asset protection using life
insurance products.
• Company headquarters relocated to the US Virgin Islands in 2005, did not move to new HQ.
Boeing Airplane Company, Corinth TX 1996 – 2002
Supply Chain Management Analyst, Procurement “Grief” Coordinator
• Led development and control of procurement inventory tracking system, which provided a
timely and accurate account of those products purchased and manufactured held in non
Consumable inventory locations like Return to Vendor (RTV), Discrepancy Control Area
(DCA), and Inspection.
• Allowed preliminary inspection in Quality Assurance (QA) of procured components prior to
receipt of those components into inventory, those items failing would be RTV’d without any
disruption to SAP/MRP.
• Created purchase orders for items rejected during manufacturing that required Material
Review Board (MRB) and were placed in the DCA; these assets would require similar
facilitation with internal and external vendors.
• Direct point of contact with all vendors regarding product failure.
• Managed a timely turn around of replacement hardware, which meets all required
specifications.
• Managed vendor accuracy data tracking submitted for continuous improvement.
• Interfaced with all departments involved in the control and distribution of materials
(Procurement, Quality, Engineering and Production Control); kept focus on commitment to
provide a quality product in a timely manner to all customers, internal and external.
• Business conditions changed in 2002, resulting in numerous positions being eliminated.
Boeing Airplane Company, Irving TX 1981 – 1993
Requirements Analyst Level 5
• Managed 737, 757, and 777 production plans to achieve optimum factory performance.
Developed and monitored the production schedule in Baan/ERP, balancing factory capacity
with high customer service levels consistent with division objectives.
• Developed Capacity Requirements Plan (CRP) to aid in managing production schedule.
• Highlighted and resolved resource constraints whenever possible and maximized lead-time
provided in an effort to establish an estimated completion date (ECD).
• Managed exceptions, which would impact the plan by communicating issues with the
appropriate organization: Manufacturing, Quality, Inventory Control, and Engineering.
• Complied with company proprietary processes, procedures and instructions (PPI)
within/outside the United States.
• Held a number of roles over this time including: AOG Coordinator, Warranty Repair and
Overhaul Coordinator, Change Board Analyst, Master Scheduler, Spare Parts/Requirements
Analyst, Material Handler (Dispatch) and Electronic Assembler.
• Business conditions changed in 1993, resulting in numerous positions being eliminated.
Education
Graduate of Bayside High School, Virginia Beach Va.

More Related Content

What's hot (20)

Irpad's,CV
Irpad's,CVIrpad's,CV
Irpad's,CV
 
MarcusMarshallResume2016
MarcusMarshallResume2016MarcusMarshallResume2016
MarcusMarshallResume2016
 
Michael_Kelley_Resume_0215
Michael_Kelley_Resume_0215Michael_Kelley_Resume_0215
Michael_Kelley_Resume_0215
 
Resume4
Resume4Resume4
Resume4
 
Laverdiere,Chris-ResumeOriginal-
Laverdiere,Chris-ResumeOriginal-Laverdiere,Chris-ResumeOriginal-
Laverdiere,Chris-ResumeOriginal-
 
Connie schulz final 16
Connie schulz final 16Connie schulz final 16
Connie schulz final 16
 
MichaelClarkResume
MichaelClarkResumeMichaelClarkResume
MichaelClarkResume
 
HPoole_Resume-10-2015
HPoole_Resume-10-2015HPoole_Resume-10-2015
HPoole_Resume-10-2015
 
Young, Peter- Modis
Young, Peter- ModisYoung, Peter- Modis
Young, Peter- Modis
 
James_Yi_Resume_2016.10.13
James_Yi_Resume_2016.10.13James_Yi_Resume_2016.10.13
James_Yi_Resume_2016.10.13
 
Mir Mohammed Raza CV
Mir Mohammed Raza CVMir Mohammed Raza CV
Mir Mohammed Raza CV
 
Leo-Resume
Leo-ResumeLeo-Resume
Leo-Resume
 
T. Keith Bishop 18
T. Keith Bishop 18T. Keith Bishop 18
T. Keith Bishop 18
 
Pravy SC
Pravy SCPravy SC
Pravy SC
 
Fred Duchow Resume 2015
Fred Duchow Resume 2015Fred Duchow Resume 2015
Fred Duchow Resume 2015
 
Whitlow, Edward Resume
Whitlow, Edward ResumeWhitlow, Edward Resume
Whitlow, Edward Resume
 
Gregory_Hawkins-3-3 doc
Gregory_Hawkins-3-3 docGregory_Hawkins-3-3 doc
Gregory_Hawkins-3-3 doc
 
Den Resume 040116
Den Resume 040116Den Resume 040116
Den Resume 040116
 
Melissa Parr Resume
Melissa Parr ResumeMelissa Parr Resume
Melissa Parr Resume
 
Supply chain imporvement
Supply chain imporvementSupply chain imporvement
Supply chain imporvement
 

Viewers also liked

Carta de satanás
Carta de satanásCarta de satanás
Carta de satanáshjonilton
 
資訊分享
資訊分享資訊分享
資訊分享ny94126
 
Self recommendation PPT
Self recommendation PPTSelf recommendation PPT
Self recommendation PPTmike wang
 
What does It Take To Become Wealthy And Financially Independent?
What does It Take To Become Wealthy And Financially Independent?What does It Take To Become Wealthy And Financially Independent?
What does It Take To Become Wealthy And Financially Independent?scientificcuff635
 
dianvs.blogspot.com manajemen bisnis mengelola suber daya manusia
dianvs.blogspot.com manajemen bisnis mengelola suber daya manusiadianvs.blogspot.com manajemen bisnis mengelola suber daya manusia
dianvs.blogspot.com manajemen bisnis mengelola suber daya manusiasuleman ganteng
 
Presentation of Atomic bombs
Presentation of Atomic bombsPresentation of Atomic bombs
Presentation of Atomic bombsattique1960
 
Vinculacion de la familia ensst Dario Fonseca
Vinculacion de la familia ensst Dario FonsecaVinculacion de la familia ensst Dario Fonseca
Vinculacion de la familia ensst Dario FonsecaDäRiö Fonsek
 
ICDS- Income tax Computation and Disclosure Standards
ICDS- Income tax Computation and Disclosure StandardsICDS- Income tax Computation and Disclosure Standards
ICDS- Income tax Computation and Disclosure StandardsSai Youdhister
 
인터넷 경매
인터넷 경매인터넷 경매
인터넷 경매bazaar88
 
El violonchelo el instrumento (una introduccion)
El violonchelo   el instrumento (una introduccion)El violonchelo   el instrumento (una introduccion)
El violonchelo el instrumento (una introduccion)teresasoriano26
 

Viewers also liked (17)

Carta de satanás
Carta de satanásCarta de satanás
Carta de satanás
 
資訊分享
資訊分享資訊分享
資訊分享
 
Test
TestTest
Test
 
Self recommendation PPT
Self recommendation PPTSelf recommendation PPT
Self recommendation PPT
 
What does It Take To Become Wealthy And Financially Independent?
What does It Take To Become Wealthy And Financially Independent?What does It Take To Become Wealthy And Financially Independent?
What does It Take To Become Wealthy And Financially Independent?
 
CURRICULUM VITAE
CURRICULUM VITAECURRICULUM VITAE
CURRICULUM VITAE
 
MOHD DANISH
MOHD DANISHMOHD DANISH
MOHD DANISH
 
Arte na grecia
Arte na greciaArte na grecia
Arte na grecia
 
Boletin yorkis
Boletin yorkisBoletin yorkis
Boletin yorkis
 
dianvs.blogspot.com manajemen bisnis mengelola suber daya manusia
dianvs.blogspot.com manajemen bisnis mengelola suber daya manusiadianvs.blogspot.com manajemen bisnis mengelola suber daya manusia
dianvs.blogspot.com manajemen bisnis mengelola suber daya manusia
 
Presentation of Atomic bombs
Presentation of Atomic bombsPresentation of Atomic bombs
Presentation of Atomic bombs
 
Vinculacion de la familia ensst Dario Fonseca
Vinculacion de la familia ensst Dario FonsecaVinculacion de la familia ensst Dario Fonseca
Vinculacion de la familia ensst Dario Fonseca
 
McLean Engineering Case Study
McLean Engineering Case StudyMcLean Engineering Case Study
McLean Engineering Case Study
 
ICDS- Income tax Computation and Disclosure Standards
ICDS- Income tax Computation and Disclosure StandardsICDS- Income tax Computation and Disclosure Standards
ICDS- Income tax Computation and Disclosure Standards
 
인터넷 경매
인터넷 경매인터넷 경매
인터넷 경매
 
El violonchelo el instrumento (una introduccion)
El violonchelo   el instrumento (una introduccion)El violonchelo   el instrumento (una introduccion)
El violonchelo el instrumento (una introduccion)
 
i 聯網系列之1:物聯網概論
i 聯網系列之1:物聯網概論i 聯網系列之1:物聯網概論
i 聯網系列之1:物聯網概論
 

Similar to Caliese Smith Resume 012115

Resume- Courtney Morris 3-15-16
Resume- Courtney Morris 3-15-16Resume- Courtney Morris 3-15-16
Resume- Courtney Morris 3-15-16Courtney Morris
 
Rasor Resume 2012
Rasor Resume 2012Rasor Resume 2012
Rasor Resume 2012rickrasor
 
Brian McGill_Resume
Brian McGill_ResumeBrian McGill_Resume
Brian McGill_ResumeBrian McGill
 
Steve Larson Resume
Steve Larson ResumeSteve Larson Resume
Steve Larson Resumelarsonweaver
 
Thomas_Wall_Resume_
Thomas_Wall_Resume_Thomas_Wall_Resume_
Thomas_Wall_Resume_Thomas Wall
 
Kent Weeks - Resume - QC
Kent Weeks - Resume - QCKent Weeks - Resume - QC
Kent Weeks - Resume - QCKent Weeks
 
Sagendorf.Roland.resume.v02(2)
Sagendorf.Roland.resume.v02(2)Sagendorf.Roland.resume.v02(2)
Sagendorf.Roland.resume.v02(2)Roland Sagendorf
 
Michael J. Barton
Michael J. BartonMichael J. Barton
Michael J. Bartonmbarton2009
 
Musiel Jodi Resume Materials Planning (2)
Musiel Jodi Resume Materials Planning (2)Musiel Jodi Resume Materials Planning (2)
Musiel Jodi Resume Materials Planning (2)jmusiel
 
Jason Kitchenham Mhighlights
Jason Kitchenham MhighlightsJason Kitchenham Mhighlights
Jason Kitchenham MhighlightsJason Kitchenham
 

Similar to Caliese Smith Resume 012115 (20)

Resume- Courtney Morris 3-15-16
Resume- Courtney Morris 3-15-16Resume- Courtney Morris 3-15-16
Resume- Courtney Morris 3-15-16
 
Rasor Resume 2012
Rasor Resume 2012Rasor Resume 2012
Rasor Resume 2012
 
Hawkersmith Dec 2015 Resume
Hawkersmith Dec 2015 ResumeHawkersmith Dec 2015 Resume
Hawkersmith Dec 2015 Resume
 
Brian McGill_Resume
Brian McGill_ResumeBrian McGill_Resume
Brian McGill_Resume
 
Steve Larson Resume
Steve Larson ResumeSteve Larson Resume
Steve Larson Resume
 
Robert - Resume - modified
Robert - Resume - modifiedRobert - Resume - modified
Robert - Resume - modified
 
Polasik_Resume_061316
Polasik_Resume_061316Polasik_Resume_061316
Polasik_Resume_061316
 
Thomas_Wall_Resume_
Thomas_Wall_Resume_Thomas_Wall_Resume_
Thomas_Wall_Resume_
 
Ruthgehrmann
RuthgehrmannRuthgehrmann
Ruthgehrmann
 
Resume margaret plass - 2016
Resume   margaret plass - 2016Resume   margaret plass - 2016
Resume margaret plass - 2016
 
Resume - Margaret Plass - 2016
Resume - Margaret Plass - 2016Resume - Margaret Plass - 2016
Resume - Margaret Plass - 2016
 
Kent Weeks - Resume - QC
Kent Weeks - Resume - QCKent Weeks - Resume - QC
Kent Weeks - Resume - QC
 
Sagendorf.Roland.resume.v02(2)
Sagendorf.Roland.resume.v02(2)Sagendorf.Roland.resume.v02(2)
Sagendorf.Roland.resume.v02(2)
 
Revised.SOOFI_2016.A
Revised.SOOFI_2016.ARevised.SOOFI_2016.A
Revised.SOOFI_2016.A
 
Revised.SOOFI_2016.A
Revised.SOOFI_2016.ARevised.SOOFI_2016.A
Revised.SOOFI_2016.A
 
Michael J. Barton
Michael J. BartonMichael J. Barton
Michael J. Barton
 
Musiel Jodi Resume Materials Planning (2)
Musiel Jodi Resume Materials Planning (2)Musiel Jodi Resume Materials Planning (2)
Musiel Jodi Resume Materials Planning (2)
 
Jason Kitchenham Mhighlights
Jason Kitchenham MhighlightsJason Kitchenham Mhighlights
Jason Kitchenham Mhighlights
 
2015 - Manning resume
2015 - Manning resume2015 - Manning resume
2015 - Manning resume
 
CormanV5dates
CormanV5datesCormanV5dates
CormanV5dates
 

Caliese Smith Resume 012115

  • 1. CALIESE E. SMITH Flower Mound, Texas 75028 214-476-8301 caliese.smith@yahoo.com www.linkedin.com/in/caliesesmith Summary Extensive experience in the Aerospace and Defense industries, in procurement, supply chain management and manufacturing. Systems expertise includes: SAP, ERP/MRP, FP, Visiprise (CAMS), Enovia, Excel, Access, Business Objects, Legacy and BAAN. APICS certification held while working for Boeing. Experience with Material requirements planning (MRPII) Implementation, Lean Manufacturing Leadership, Time Management and Critical Path Methodology. Professional Experience Bell Helicopter TEXTRON, Grand Prairie TX 2005 – 2014 Senior Manufacturing Resource Specialist • Verified schedule accuracy of all programs where delivery to external customers was the objective. • Identified and resolved all issues hindering release of a production order (exceptions, shortages, planning changes in progress). • Coordinated and managed special projects upon request. • Created and submitted Progress Based Payments (PBP) upon ship deliveries. • Created AXON shortage reports for ease in identifying pacing detail and communicating concerns to the appropriate departments. • Tracked work in progress (WIP) via Line of Balance (LOB) and reported weekly to upper level Management. • Created Unplanned Rework Orders (URO) as required by Customer return or Manufacturing kick out. • Created Stock Transfer Order (STO) to receive or deliver a detail from one COE to another. • Created, updated, and reviewed Product Groups in SAP for Production Control & Logistics (PC&L) and Procurement. • Created and reviewed Build Plans in SAP to assist in WIP manipulation to avoid Capacity constraints within flow of any given order. • Business conditions changed in 2014, resulting in numerous positions being eliminated. Agilis Benefit Services, Highland Village TX 2002 – 2005 New Business and Licensing Coordinator • LLC designed around the patent pending concepts with many influential organizations and individuals such as Wealth Protection Alliance, for the purpose of asset protection using life insurance products. • Company headquarters relocated to the US Virgin Islands in 2005, did not move to new HQ. Boeing Airplane Company, Corinth TX 1996 – 2002 Supply Chain Management Analyst, Procurement “Grief” Coordinator • Led development and control of procurement inventory tracking system, which provided a timely and accurate account of those products purchased and manufactured held in non
  • 2. Consumable inventory locations like Return to Vendor (RTV), Discrepancy Control Area (DCA), and Inspection. • Allowed preliminary inspection in Quality Assurance (QA) of procured components prior to receipt of those components into inventory, those items failing would be RTV’d without any disruption to SAP/MRP. • Created purchase orders for items rejected during manufacturing that required Material Review Board (MRB) and were placed in the DCA; these assets would require similar facilitation with internal and external vendors. • Direct point of contact with all vendors regarding product failure. • Managed a timely turn around of replacement hardware, which meets all required specifications. • Managed vendor accuracy data tracking submitted for continuous improvement. • Interfaced with all departments involved in the control and distribution of materials (Procurement, Quality, Engineering and Production Control); kept focus on commitment to provide a quality product in a timely manner to all customers, internal and external. • Business conditions changed in 2002, resulting in numerous positions being eliminated. Boeing Airplane Company, Irving TX 1981 – 1993 Requirements Analyst Level 5 • Managed 737, 757, and 777 production plans to achieve optimum factory performance. Developed and monitored the production schedule in Baan/ERP, balancing factory capacity with high customer service levels consistent with division objectives. • Developed Capacity Requirements Plan (CRP) to aid in managing production schedule. • Highlighted and resolved resource constraints whenever possible and maximized lead-time provided in an effort to establish an estimated completion date (ECD). • Managed exceptions, which would impact the plan by communicating issues with the appropriate organization: Manufacturing, Quality, Inventory Control, and Engineering. • Complied with company proprietary processes, procedures and instructions (PPI) within/outside the United States. • Held a number of roles over this time including: AOG Coordinator, Warranty Repair and Overhaul Coordinator, Change Board Analyst, Master Scheduler, Spare Parts/Requirements Analyst, Material Handler (Dispatch) and Electronic Assembler. • Business conditions changed in 1993, resulting in numerous positions being eliminated. Education Graduate of Bayside High School, Virginia Beach Va.