Finalcad is a mobile platform that uses predictive analysis to help construction teams anticipate and solve issues during projects. It allows teams to access drawings, record observations, and use integrated tools from the construction site. The platform provides centralized monitoring of activities and issues across projects. It has helped save over 250 hours on one residential tower project in London through reduced time spent on site and clearer communication. Finalcad currently has over 100,000 users on more than 10,000 construction projects globally.
2. WHAT IS FINALCAD ?
« Mobile platform and predictive analysis that allows to anticipate & solve the issues you face all the
construction phase along. »
PRODUCTIVITY ON
FIELD
SMART DATA
TOOLS
Confidential • FINALCAD SAS
7
4. PAPER BASED PROCESSES ARE NOT SUFFICIENT
Heavy to bring, manual annotations, softwares…
Confidential • FINALCAD SAS
Drawings Observations Softwares…
3
6. « FINALCAD is the first ever used solution until the
end of a massive project »
Frederic Ferré, Sports Hub Project Director
Confidential • FINALCAD SAS
FEEDBACK FROM CLIENT
16
7. Confidential • FINALCAD SAS
Key figures :
• 13,000 sqm
• 400+ areas
• 17,000+ issues
• 15,000+ photos
• 107 units
13,000 SQM • LONDON • MOUNT ANVIL
Business Case n°3, Lexicon Residential Tower
FINALCAD ’s ROI: 250+ hours
• 70% time gain every day = 6 hours
• 2 engineers on site daily
• Stops conversation, because it’s very
clear
• 40 weeks of use
28
« Fantastic system »
« It stops any conversation, because it’s very clear »
8. STRONG REFERENCES
France & international
Bordeaux Stadium, France
42 000 sits
Changi General Hospital,
Singapore. 40 000 sqm
Brickell City Center, Miami
500 000 sqm
Matrade Exhibition Center
Kuala Lumpur
Sports Hub, Singapour
55 000 sits
Marina Bay Sands
Singapore
15 Confidential • FINALCAD SAS
10. Confidentiel • FINALCAD • Knowledge Corp SAS
1. Reduce costs of construction • ROI in few months
Time savings + defect reduction + more control over risk
2. Monitor your activities with precision
Centralized vision of projects
3. Capitalize learnings and best practices of all your projects
CONCLUSION
FINALCAD facts & figures : +100.000 users worldwide in 30 countries, +10.000 projects deployed
11. #MOBILE #SMARTDATA #BIM #CONSTRUCTION#GLOBAL
C h a n g e t h e w a y w e b u i l d
Tristan Lesaffre
Business Development Manager UK
tristan@finalcad.com
+4478 7159 0754
www.finalcad.com
Editor's Notes
Thank you for watching. What comes on my mind when I watch this video is: the construction industry is being the least digitized worldwide. We’re still under paper process, walking around sites taking notes manually, coming back at office retyping and compiling everything, trying to read notes and losing time and energy. This lead me to my story
My name is Tristan I am french, nobody is perfect. As I live in London are tend to improve myself. 2 years ago before joining FINALCAD I was an assistant project manager. We were building a 50 units building.
At some point my boss asked me an accurate progress of the site. I realized I was not capable of giving him a precise answer. What he wanted was a global view of the operation to report to the client.
It is hard to deny, that we have this bad reputation in the construction industry, we are late really often…
What I could give him
..was excel spread sheets, excel spread sheets and annotated drawings.
How could I communicate the right informations ?
How can I be accurate without spending days on extracting all the informations from all the different tables and drawings ?
Problem is how to plan the site correctly when you don’t have the right info at the right time ? Pause
And you know what other problem will appear when we are facing issue with time? Money (penalties delay redo ect…) I bet you already experimented it yourself ?
Sometimes, people are lucky to have internal systems however, rarely we see that they hardly save up to 1, 2 hours a day. Ergonomic design is always missing.
Our clients are happy and recognize benefits of using FINALCAD. Here is the feedback of a world class project director, managing over 4,000 people onsite at peak time. According to him, FINALCAD is the first solution used until the end of a massive project.
In London, we’re seeing similar feedback. Estimates goes up to 70% of time saved a day.
2 UK references
Few references showing off successful delivery with Finalcad. Any type of projects. Worldwide.
Brickell city center. Biggest ongoing project in the US east coast. (Miami)
Sports Hub - Biggest PPP worldwide. Over 1B budget each.
This picture speak by itself. It’s not only about saving time and cost. It’s also about analyse data to be more productive continual improvement !
As a conclusion this the feedback we received across the years
1/ Cost is reduce between 4 to 7%
2/ Monitor all your projects in one platform
3/ Capitalize learnings and improvement