CEA was hired to lift the dive catamaran Calypso Blue from the water onto a cargo ship at Sri Racha Harbour in Thailand. They assembled modular spreader bars and slings that were attached to the ship's crane. Divers then fastened the slings under the boat and it was slowly lifted into position. A trial lift was performed to check the weight distribution and positioning. Once confirmed, the boat was lifted onto the ship's deck where it was placed on specialist stools and dunnage to prevent hull damage during shipping. CEA secured the boat to the deck with ratchet straps before giving approval for it to be shipped to Australia.
Managerial Accounting 5th Edition by Stacey Whitecotton test bank.docx
Specialized Lifting
1. SPECIALIZEDLIFTING
Location
Sri Racha Harbour, Laem Chabang,
Thailand
Duration
1 Day
Catamaran Specifications
Height8.1m
Length20m
Width8m
Weight24t
SCOPE
CEA were employed to lift the dive catamaran
Calypso Blue from the water on to a waiting cargo
ship, after the boat was secured on the top deck it
would set sail for Port Douglas, Australia to begin
service. CEA had recently performed a beach launch
for the Calypso Blue after which she was sent for sea
trials. After completion of the trials she sailed to the
nearby Sri Racha Harbour.
PROCEDURE
The CEA team arrived and assembled two eight metre modular
spreader bars with the necessary slings, the completed lifting
configuration was attached to the ships crane. The crane lowered
the slings into the water, two specialist underwater divers fastened
the slings together and added a retaining sling.
The boat was slowly moved into position inside the slings, with the
final movements being controlled by the CEA team through use of
the attached tag lines. With the boat in position the divers made
the final checks to ensure slings and load points were correct.
CASE STUDY CS009
Specialized Lifting 1/2
SPECIALIZED LIFTING
CALYPSO BLUE DIVE CATAMARAN
Sri Racha Harbor (SRH), the first private international
and largest deep sea port in Thailand, was established
in 1989 with the intention of building up the economic
capability of Thailand as the gate for global trade
2. CEA PROJECT LOGISTICS
41/13 M1 AO-UDOM ROAD
TUNGSUNGKHLA
SRI RACHA
CHONBURI 20230
THAILAND
+66 38 354 019
www.ceaprojects.com
SPECIALIZEDLIFTING
A trial lift was performed first to ascertain weight distribution and
that the boat was in the correct position within the slings. After a
successful trial the boat was slowly lifted on to the ship’s top deck.
The boat was placed on specialist steel stools and dunnage
fabricated by CEA, this ensured no damage would occur to the
boats hull during shipping.
The CEA rigging team checked the boat was sitting correctly on
the stools and dunnage and applied all ratchet straps from the
boat to the ship’s deck. Final checks were made on all straps and
fastening points. After all checks had been satisfied CEA gave the
all clear to the Captain and deck crew.
CASE STUDY CS009
Specialized Lifting 2/2
CEA ASSEMBLE THE MODULAR BARS
THE BOAT MOVES SLOWLY INTO POSITION
DIVERS ATTACHED THE SLINGS UNDERWATER
FINAL CHECKS ON THE BOAT ARE MADE
SPECIALIST DUNNAGE PROTECTS THE HULL
STRAPPED AND SECURED CALYPSO BLUE READY FOR SHIPPING
CRANE LIFTS THE BOAT ON TO THE TOP DECK
STRAPS SECURED TO THE FASTENING POINTS