Pepco Energy Services (customer) partnered with Thermo Systems, a
Rockwell Automation Solution Partner, to design, build, deploy and
commission a turnkey replacement of its aging DCS system serving the
district energy system in Midtown Atlantic City. The successful migration
included zero customer downtime, ease of service, increased operational
efficiency, billing accuracy, and expansion possibilities moving forward.
DCS Replacement in a 24/7 Critical District
Energy Facility
Site Profile
PES In Atlantic City, NJ
• Fourteen (14) Chillers – 16,000 ton capacity
• Three (3) Saturated Steam Boilers – 210,000 Lb/hr capacity
• Combined Heat and Power – 5.5MW w/ 50,000 Lb/hr waste
heat recovery (2011 Project)
• Thirteen (13) Customers on District Energy Loop
• Energy Transfer Stations with dedicated metering PACs
Midtown Thermal Control Center (MTCC)
Profile - PES In Atlantic City, NJ
• Remote Locations
• Golden Nugget Plant
• Convention Center Thermal Plant
• Convention Center Solar System
• Wilmington, DE Loop
MTCC
ACCC
2.4Mw PV
GN
• MTCC Overview
• Cogen Plant
• Boiler Plant
• Chiller Plant
• District Customers
Energy Distribution System
• 4 miles of steam & chilled water piping
• Fiber optic controls throughout system
• Steam Header leaving the plant – 20”
• Chilled water header leaving the plant – 42”
Energy Transfer Stations – ETS’s
• Chilled water and steam heat exchangers located at various locations within customer sites
• Transfer point of product for billing
• Chilled water delivered at 42F
Steam Chilled Water
• Caesars: 5 ETS’s 5 ETS’s
• Bally’s : 2 ETS’s 2 ETS’s
• Claridge: 1 ETS 1 ETS
• Trump Plaza: 2 ETS’s 2 ETS’s
• Boardwalk Hall: 2 ETS’s 2 ETS’s
• Pier Shops: 1 ETS
Profile - MTCC In Atlantic City, NJ
Project Profile
MTCC DCS Replacement Project
• Yokogawa/JCI DCS Replacement
• Viking Billing & Reporting System Replacement
Life Cycle Replacement of a Legacy Yokogawa / JCI
DCS and Viking Billing & Reporting System
Project Profile
MTCC DCS Replacement Project
• Rockwell Automation Solution Tools
• FT View SE SCADA
• FT Historian SE
• Allen Bradley PACs
• RA Transaction Manager (bridge Plant with IT Billing)
• FT VantagePoint EMI (for reporting/dashboarding)
• Remote Building Integration via Firewalled PACs
• Nexant Utility Billing & Accounting System
Life Cycle Replacement of a Legacy Yokogawa/JCI DCS
and Viking Billing & Reporting System
PES’ Business Challenges
• Proprietary
• DCS
• Billing
• Many independent systems controlled by one DCS
• Poor visibility of remote buildings
• Highly manual/inefficient billing and reporting software
Now was the time to implement a reliable control system
A global control room was a must that integrated all systems
Technical Challenges
• Lacking expertise of proprietary DCS
• Lacking expertise of proprietary Billing System
• 24/7 Plant Operation – Contractually obligated to produce chilled
water and steam
• Inconsistent connectivity to remote Thermal Plants
• Taj Mahal, Atlantic City Convention Center, Golden Nugget
A non proprietary plant control system with billing
integration was needed
Why Thermo Systems?
• Design-Build / Turnkey capabilities (Engaged as MAC)
• Ability to take project from UR through commission and life cycle
support
• Experience in application: CHP, CHW & Steam Plant
• Integrator with good quality control and documentation practices
• Thermo Systems is a RA Solution Partner
• Current PES Service Provider
DCS Replacement Project Approach
• User Requirements
– Thermo Systems knew what questions to ask..
• Phased Approach
• Design – Drawings, Software Specification
• Implementation
• Up front coordination with Plant Operations
• Transition Plan – Key to Success
– Minimize Downtime
• Client Support
DCS Replacement Project Approach
• Transition Plan – Implementation in multiple phases
• Dearator Tank and Boiler feedwater
• Boiler CCS w/ PanelView (phased install qty. 3)
• Data Concentrator – comms to 13 Customer ETS
• Chilled Water Balance of Plant (BOP)
• Remote Terminal Units (RTUs) - Golden Nugget, Taj Mahal, ACCC
• Nexant billing integration via Transaction Manger
• Steam metering upgrade and standardization
DCS Replacement Project Approach
• Leverage SCADA implemented during a previous Cogeneration
Project
• FT View SE
• FT Historian SE
DCS Replacement Solution (old)
ETS
...
ETS
1
ETS
13
PLC5 DCS
BOILER 1 CCS
BOILER 2 CCS
BOILER 3 CCS
DA TANK BFW
CHW BOP
ETS 7A
ETS 7B
ETS 5
DCS Replacement Solution (new)
ETS
...
ETS
1
ETS
13
ControlLogix
Data Concentrator
PLC
CompactLogix
PLC w/PVSCADA
FT View SE
w/Historian BOILER 2
CCS
BOILER 3
CCS
DA Tank
BFW
CHW
BOP
ETS 5
ETS 7A
ETS 7B
BOILER 1
CCS
ControlLogix
PLC
CompactLogix
PLC
CompactLogix
PLC w/PV
CompactLogix
PLC w/PV
CompactLogix
PLC
Point IO
CompactLogix
PLC
DCS Replacement Sequence
DCS Replacement Sequence
DCS Replacement Sequence
Billing Replacement Solution
- old data flow
Billing Replacement Solution
- new data flow
ETS
...
ETS
1
ETS
13
ControlLogix PLC
Data Concentrator
ETS 5
ETS 7A
ETS 7B
Transaction
Manager
Golden
Nugget
ACCC
Nexant Billing Software
MicroLogix
PLC
MicroLogix
PLC
MicroLogix
PLC
Taj Mahal
CompactLogix
PLC
Micrologix
PLC
CompactLogix
PLC
Dashboard
Dashboard
Summary of Rockwell Equipment
• Software
• Transaction Manager (billing)
• VantagePoint EMI (reporting)
• FT View SE
• FT Historian
• Hardware
• ControlLogix PAC (qty 2)
• CompactLogix PAC (qty 6)
• Point IO (qty 1)
• PanelView HMI (qty 3)
• MicroLogix RTU panel (qty 4)
Conclusions
 User Requirements & Transition Plan is key
 Phased approach for complex retrofits
 Understanding of plant operations
 FATs help minimize troubleshooting during startup
 Deploying PACs logically (separation of plants)
 PES teamed with Thermo Systems from start to finish (continuity)
 Rockwell Automation provided the tools for success
 Thermo Systems leveraged our experience in application
• Our engineers have depth and expertise in:
• Energy: Utilities / Facilities, CHP, critical HVAC, chilled water, boiler plants, power
generation, data center critical HVAC
• Consumer: Life Sciences, Food & Beverage, Consumer Packaged Goods (CPG)
Thermo Systems – Industry Expertise
• Thermo Systems LLC is more than a systems integrator. We are a design-build
control systems engineering and construction firm, managing and delivering turnkey
(MAC) Main Automation Contractor projects
• Comprehensive Services (Greenfield or Brownfield) include:
• Automation & Information Master Plan including Program/Project Management and Plant/OEM/Sub-
Contractor Coordination
• Project Specifications, Documentation and Automation Architecture Standards
• Automation & Information and I&C Design Services
• Fabrication, Assembly and Testing
• Systems Integration and Programming
• Turn key I&C Electrical and Mechanical Installation
• Start up, Commissioning and IQ/OQ
• Staff augmentation through turnkey
• 24/7/365 On-Site and Remote Support
• Life-cycle Automation support including Assessments, Modernizations/Migrations
Thermo Systems – Overview
Thermo Systems – Across America
Questions
Eastern Region Support
Eric V. Silk, CEM
609-235-7653
eric.silk@thermosystems.com
Western Region Support
Cory Notaro
609-937-5818
cory.notaro@thermosystems.com

More Related Content

What's hot

UFM Downtown San Francisco – Managing Underground Electric Assets in Densely ...
UFM Downtown San Francisco – Managing Underground Electric Assets in Densely ...UFM Downtown San Francisco – Managing Underground Electric Assets in Densely ...
UFM Downtown San Francisco – Managing Underground Electric Assets in Densely ...UDC
 
Saurabh Singh - CV.DOC
Saurabh Singh - CV.DOCSaurabh Singh - CV.DOC
Saurabh Singh - CV.DOCsaurabh singh
 
Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Nicholas Naing
 
Modernization Lessons Learned - Part 1
Modernization Lessons Learned - Part 1Modernization Lessons Learned - Part 1
Modernization Lessons Learned - Part 1Emerson Exchange
 
Raghu nambiar:industry standard benchmarks
Raghu nambiar:industry standard benchmarksRaghu nambiar:industry standard benchmarks
Raghu nambiar:industry standard benchmarkshdhappy001
 
Retrocommissioning Works
Retrocommissioning WorksRetrocommissioning Works
Retrocommissioning WorksCx Associates
 
Paul Ridenour Resume
Paul Ridenour ResumePaul Ridenour Resume
Paul Ridenour ResumePaul Ridenour
 
Randy Hogue resume 092316
Randy Hogue resume 092316Randy Hogue resume 092316
Randy Hogue resume 092316Randy Hogue
 
Erkasis company presentation
Erkasis company presentationErkasis company presentation
Erkasis company presentationTomasz Szewczyk
 
KEY ATTRIBUTES FULL TEXT
KEY ATTRIBUTES FULL TEXTKEY ATTRIBUTES FULL TEXT
KEY ATTRIBUTES FULL TEXTAled Long
 

What's hot (17)

UFM Downtown San Francisco – Managing Underground Electric Assets in Densely ...
UFM Downtown San Francisco – Managing Underground Electric Assets in Densely ...UFM Downtown San Francisco – Managing Underground Electric Assets in Densely ...
UFM Downtown San Francisco – Managing Underground Electric Assets in Densely ...
 
Saurabh Singh - CV.DOC
Saurabh Singh - CV.DOCSaurabh Singh - CV.DOC
Saurabh Singh - CV.DOC
 
Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3
 
James Bullen CV
James Bullen CVJames Bullen CV
James Bullen CV
 
Beran APM720 Monitoring System
Beran APM720 Monitoring SystemBeran APM720 Monitoring System
Beran APM720 Monitoring System
 
Rodrigo gonzalez
Rodrigo gonzalezRodrigo gonzalez
Rodrigo gonzalez
 
Cotopaxi Presentation - India
Cotopaxi Presentation - IndiaCotopaxi Presentation - India
Cotopaxi Presentation - India
 
Modernization Lessons Learned - Part 1
Modernization Lessons Learned - Part 1Modernization Lessons Learned - Part 1
Modernization Lessons Learned - Part 1
 
Earliest days SIM reactor suite models
Earliest days SIM reactor suite modelsEarliest days SIM reactor suite models
Earliest days SIM reactor suite models
 
Project review
Project reviewProject review
Project review
 
Raghu nambiar:industry standard benchmarks
Raghu nambiar:industry standard benchmarksRaghu nambiar:industry standard benchmarks
Raghu nambiar:industry standard benchmarks
 
Retrocommissioning Works
Retrocommissioning WorksRetrocommissioning Works
Retrocommissioning Works
 
Paul Ridenour Resume
Paul Ridenour ResumePaul Ridenour Resume
Paul Ridenour Resume
 
Dcs capabilities
Dcs capabilitiesDcs capabilities
Dcs capabilities
 
Randy Hogue resume 092316
Randy Hogue resume 092316Randy Hogue resume 092316
Randy Hogue resume 092316
 
Erkasis company presentation
Erkasis company presentationErkasis company presentation
Erkasis company presentation
 
KEY ATTRIBUTES FULL TEXT
KEY ATTRIBUTES FULL TEXTKEY ATTRIBUTES FULL TEXT
KEY ATTRIBUTES FULL TEXT
 

Similar to Zero downtime upgrate for dcs migration Thermo Systems

DeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdfDeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdfbayu162365
 
Rockwell Automation TechED 2017 - AP14 - MRWPCA
Rockwell Automation TechED 2017 - AP14 - MRWPCARockwell Automation TechED 2017 - AP14 - MRWPCA
Rockwell Automation TechED 2017 - AP14 - MRWPCARockwell Automation
 
Patti Engineering Presentation: Water/Wastewater with InduSoft Web Studio and...
Patti Engineering Presentation: Water/Wastewater with InduSoft Web Studio and...Patti Engineering Presentation: Water/Wastewater with InduSoft Web Studio and...
Patti Engineering Presentation: Water/Wastewater with InduSoft Web Studio and...AVEVA
 
Controltrix- We make control solutions easier
Controltrix- We make control solutions easierControltrix- We make control solutions easier
Controltrix- We make control solutions easiercontroltrix
 
Sequencing solution with Logix Batch and Sequence Module (LBSM) & steam table...
Sequencing solution with Logix Batch and Sequence Module (LBSM) & steam table...Sequencing solution with Logix Batch and Sequence Module (LBSM) & steam table...
Sequencing solution with Logix Batch and Sequence Module (LBSM) & steam table...Brian Thomas
 
Bausch lomb leverages plant p ax_rev1
Bausch  lomb leverages plant p ax_rev1Bausch  lomb leverages plant p ax_rev1
Bausch lomb leverages plant p ax_rev1Brian Thomas
 
Session T4 - Deliverables Management - A strategic Opportunity
Session T4 - Deliverables Management - A strategic OpportunitySession T4 - Deliverables Management - A strategic Opportunity
Session T4 - Deliverables Management - A strategic OpportunityProject Controls Expo
 
Advantages of a modern DCS in coal handling
Advantages of a modern DCS in coal handlingAdvantages of a modern DCS in coal handling
Advantages of a modern DCS in coal handlingSchneider Electric
 
Current Capabilities Presentation 050416
Current Capabilities Presentation 050416Current Capabilities Presentation 050416
Current Capabilities Presentation 050416Roger Boyette
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxSchneider Electric
 
Affordably Refreshing Your Water District’s Process Control
Affordably Refreshing Your Water District’s Process ControlAffordably Refreshing Your Water District’s Process Control
Affordably Refreshing Your Water District’s Process ControlInductive Automation
 
Affordably Refreshing Your Water District’s Process Control
Affordably Refreshing Your Water District’s Process ControlAffordably Refreshing Your Water District’s Process Control
Affordably Refreshing Your Water District’s Process ControlInductive Automation
 
DSD-INT 2020 Simulation with RTC
DSD-INT 2020 Simulation with RTCDSD-INT 2020 Simulation with RTC
DSD-INT 2020 Simulation with RTCDeltares
 
Lecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfLecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfSmritiGarg21
 
Dynamic Simulation for HFE & Control System Design Validation
Dynamic Simulation for HFE & Control System Design ValidationDynamic Simulation for HFE & Control System Design Validation
Dynamic Simulation for HFE & Control System Design ValidationGSE Systems, Inc.
 
OCP liquid direct to chip temperature guideline.pdf
OCP liquid direct to chip temperature guideline.pdfOCP liquid direct to chip temperature guideline.pdf
OCP liquid direct to chip temperature guideline.pdfbui thequan
 

Similar to Zero downtime upgrate for dcs migration Thermo Systems (20)

DeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdfDeployingAnAdvancedDistribution.pdf
DeployingAnAdvancedDistribution.pdf
 
Rockwell Automation TechED 2017 - AP14 - MRWPCA
Rockwell Automation TechED 2017 - AP14 - MRWPCARockwell Automation TechED 2017 - AP14 - MRWPCA
Rockwell Automation TechED 2017 - AP14 - MRWPCA
 
Patti Engineering Presentation: Water/Wastewater with InduSoft Web Studio and...
Patti Engineering Presentation: Water/Wastewater with InduSoft Web Studio and...Patti Engineering Presentation: Water/Wastewater with InduSoft Web Studio and...
Patti Engineering Presentation: Water/Wastewater with InduSoft Web Studio and...
 
Controltrix- We make control solutions easier
Controltrix- We make control solutions easierControltrix- We make control solutions easier
Controltrix- We make control solutions easier
 
Sequencing solution with Logix Batch and Sequence Module (LBSM) & steam table...
Sequencing solution with Logix Batch and Sequence Module (LBSM) & steam table...Sequencing solution with Logix Batch and Sequence Module (LBSM) & steam table...
Sequencing solution with Logix Batch and Sequence Module (LBSM) & steam table...
 
Bausch lomb leverages plant p ax_rev1
Bausch  lomb leverages plant p ax_rev1Bausch  lomb leverages plant p ax_rev1
Bausch lomb leverages plant p ax_rev1
 
Session T4 - Deliverables Management - A strategic Opportunity
Session T4 - Deliverables Management - A strategic OpportunitySession T4 - Deliverables Management - A strategic Opportunity
Session T4 - Deliverables Management - A strategic Opportunity
 
Brij mohan cv
Brij mohan  cvBrij mohan  cv
Brij mohan cv
 
Advantages of a modern DCS in coal handling
Advantages of a modern DCS in coal handlingAdvantages of a modern DCS in coal handling
Advantages of a modern DCS in coal handling
 
Current Capabilities Presentation 050416
Current Capabilities Presentation 050416Current Capabilities Presentation 050416
Current Capabilities Presentation 050416
 
Aged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptxAged Data Center Infrastructure.pptx
Aged Data Center Infrastructure.pptx
 
TechComp_overview_brief
TechComp_overview_briefTechComp_overview_brief
TechComp_overview_brief
 
suresh_CV
suresh_CVsuresh_CV
suresh_CV
 
Dcs capabilities
Dcs capabilitiesDcs capabilities
Dcs capabilities
 
Affordably Refreshing Your Water District’s Process Control
Affordably Refreshing Your Water District’s Process ControlAffordably Refreshing Your Water District’s Process Control
Affordably Refreshing Your Water District’s Process Control
 
Affordably Refreshing Your Water District’s Process Control
Affordably Refreshing Your Water District’s Process ControlAffordably Refreshing Your Water District’s Process Control
Affordably Refreshing Your Water District’s Process Control
 
DSD-INT 2020 Simulation with RTC
DSD-INT 2020 Simulation with RTCDSD-INT 2020 Simulation with RTC
DSD-INT 2020 Simulation with RTC
 
Lecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdfLecture+9+-+SCADA+Systems.pdf
Lecture+9+-+SCADA+Systems.pdf
 
Dynamic Simulation for HFE & Control System Design Validation
Dynamic Simulation for HFE & Control System Design ValidationDynamic Simulation for HFE & Control System Design Validation
Dynamic Simulation for HFE & Control System Design Validation
 
OCP liquid direct to chip temperature guideline.pdf
OCP liquid direct to chip temperature guideline.pdfOCP liquid direct to chip temperature guideline.pdf
OCP liquid direct to chip temperature guideline.pdf
 

More from Brian Thomas

Justifying Migration of legacy process control systems
Justifying Migration of legacy process control systemsJustifying Migration of legacy process control systems
Justifying Migration of legacy process control systemsBrian Thomas
 
Central Process Utility Plant controls upgrade required 100% uptime
Central Process Utility Plant controls upgrade required 100% uptimeCentral Process Utility Plant controls upgrade required 100% uptime
Central Process Utility Plant controls upgrade required 100% uptimeBrian Thomas
 
OnTrack CIP Validation
OnTrack CIP ValidationOnTrack CIP Validation
OnTrack CIP ValidationBrian Thomas
 
Produced Water Handling System Upgrade
Produced Water Handling System UpgradeProduced Water Handling System Upgrade
Produced Water Handling System UpgradeBrian Thomas
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Brian Thomas
 
Food Safety Modernization Act (FSMA) regulatory requirements by FDA
Food Safety Modernization Act (FSMA) regulatory requirements by FDAFood Safety Modernization Act (FSMA) regulatory requirements by FDA
Food Safety Modernization Act (FSMA) regulatory requirements by FDABrian Thomas
 
DCS migration - zero downtime upgrade
DCS migration - zero downtime upgradeDCS migration - zero downtime upgrade
DCS migration - zero downtime upgradeBrian Thomas
 

More from Brian Thomas (7)

Justifying Migration of legacy process control systems
Justifying Migration of legacy process control systemsJustifying Migration of legacy process control systems
Justifying Migration of legacy process control systems
 
Central Process Utility Plant controls upgrade required 100% uptime
Central Process Utility Plant controls upgrade required 100% uptimeCentral Process Utility Plant controls upgrade required 100% uptime
Central Process Utility Plant controls upgrade required 100% uptime
 
OnTrack CIP Validation
OnTrack CIP ValidationOnTrack CIP Validation
OnTrack CIP Validation
 
Produced Water Handling System Upgrade
Produced Water Handling System UpgradeProduced Water Handling System Upgrade
Produced Water Handling System Upgrade
 
Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)Production Line OEE (Overall Equipment Effectiveness)
Production Line OEE (Overall Equipment Effectiveness)
 
Food Safety Modernization Act (FSMA) regulatory requirements by FDA
Food Safety Modernization Act (FSMA) regulatory requirements by FDAFood Safety Modernization Act (FSMA) regulatory requirements by FDA
Food Safety Modernization Act (FSMA) regulatory requirements by FDA
 
DCS migration - zero downtime upgrade
DCS migration - zero downtime upgradeDCS migration - zero downtime upgrade
DCS migration - zero downtime upgrade
 

Recently uploaded

Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxnull - The Open Security Community
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):comworks
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentationphoebematthew05
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsPrecisely
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsRizwan Syed
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubKalema Edgar
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024BookNet Canada
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfjimielynbastida
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDGMarianaLemus7
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Scott Keck-Warren
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Alan Dix
 

Recently uploaded (20)

Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptxMaking_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
Making_way_through_DLL_hollowing_inspite_of_CFG_by_Debjeet Banerjee.pptx
 
CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):CloudStudio User manual (basic edition):
CloudStudio User manual (basic edition):
 
costume and set research powerpoint presentation
costume and set research powerpoint presentationcostume and set research powerpoint presentation
costume and set research powerpoint presentation
 
Unlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power SystemsUnlocking the Potential of the Cloud for IBM Power Systems
Unlocking the Potential of the Cloud for IBM Power Systems
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
Transcript: New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Scanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL CertsScanning the Internet for External Cloud Exposures via SSL Certs
Scanning the Internet for External Cloud Exposures via SSL Certs
 
The transition to renewables in India.pdf
The transition to renewables in India.pdfThe transition to renewables in India.pdf
The transition to renewables in India.pdf
 
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptxVulnerability_Management_GRC_by Sohang Sengupta.pptx
Vulnerability_Management_GRC_by Sohang Sengupta.pptx
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Unleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding ClubUnleash Your Potential - Namagunga Girls Coding Club
Unleash Your Potential - Namagunga Girls Coding Club
 
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
New from BookNet Canada for 2024: BNC BiblioShare - Tech Forum 2024
 
Science&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdfScience&tech:THE INFORMATION AGE STS.pdf
Science&tech:THE INFORMATION AGE STS.pdf
 
APIForce Zurich 5 April Automation LPDG
APIForce Zurich 5 April  Automation LPDGAPIForce Zurich 5 April  Automation LPDG
APIForce Zurich 5 April Automation LPDG
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024Advanced Test Driven-Development @ php[tek] 2024
Advanced Test Driven-Development @ php[tek] 2024
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...Swan(sea) Song – personal research during my six years at Swansea ... and bey...
Swan(sea) Song – personal research during my six years at Swansea ... and bey...
 

Zero downtime upgrate for dcs migration Thermo Systems

  • 1. Eric V. Silk, CEM October 14, 2015
  • 2. Agenda Q & A Conclusions Design and Implementation Strategies Project Challenges Project Introduction
  • 3. Pepco Energy Services (customer) partnered with Thermo Systems, a Rockwell Automation Solution Partner, to design, build, deploy and commission a turnkey replacement of its aging DCS system serving the district energy system in Midtown Atlantic City. The successful migration included zero customer downtime, ease of service, increased operational efficiency, billing accuracy, and expansion possibilities moving forward. DCS Replacement in a 24/7 Critical District Energy Facility
  • 4. Site Profile PES In Atlantic City, NJ • Fourteen (14) Chillers – 16,000 ton capacity • Three (3) Saturated Steam Boilers – 210,000 Lb/hr capacity • Combined Heat and Power – 5.5MW w/ 50,000 Lb/hr waste heat recovery (2011 Project) • Thirteen (13) Customers on District Energy Loop • Energy Transfer Stations with dedicated metering PACs Midtown Thermal Control Center (MTCC)
  • 5. Profile - PES In Atlantic City, NJ • Remote Locations • Golden Nugget Plant • Convention Center Thermal Plant • Convention Center Solar System • Wilmington, DE Loop MTCC ACCC 2.4Mw PV GN • MTCC Overview • Cogen Plant • Boiler Plant • Chiller Plant • District Customers
  • 6. Energy Distribution System • 4 miles of steam & chilled water piping • Fiber optic controls throughout system • Steam Header leaving the plant – 20” • Chilled water header leaving the plant – 42” Energy Transfer Stations – ETS’s • Chilled water and steam heat exchangers located at various locations within customer sites • Transfer point of product for billing • Chilled water delivered at 42F Steam Chilled Water • Caesars: 5 ETS’s 5 ETS’s • Bally’s : 2 ETS’s 2 ETS’s • Claridge: 1 ETS 1 ETS • Trump Plaza: 2 ETS’s 2 ETS’s • Boardwalk Hall: 2 ETS’s 2 ETS’s • Pier Shops: 1 ETS Profile - MTCC In Atlantic City, NJ
  • 7. Project Profile MTCC DCS Replacement Project • Yokogawa/JCI DCS Replacement • Viking Billing & Reporting System Replacement Life Cycle Replacement of a Legacy Yokogawa / JCI DCS and Viking Billing & Reporting System
  • 8. Project Profile MTCC DCS Replacement Project • Rockwell Automation Solution Tools • FT View SE SCADA • FT Historian SE • Allen Bradley PACs • RA Transaction Manager (bridge Plant with IT Billing) • FT VantagePoint EMI (for reporting/dashboarding) • Remote Building Integration via Firewalled PACs • Nexant Utility Billing & Accounting System Life Cycle Replacement of a Legacy Yokogawa/JCI DCS and Viking Billing & Reporting System
  • 9. PES’ Business Challenges • Proprietary • DCS • Billing • Many independent systems controlled by one DCS • Poor visibility of remote buildings • Highly manual/inefficient billing and reporting software Now was the time to implement a reliable control system A global control room was a must that integrated all systems
  • 10. Technical Challenges • Lacking expertise of proprietary DCS • Lacking expertise of proprietary Billing System • 24/7 Plant Operation – Contractually obligated to produce chilled water and steam • Inconsistent connectivity to remote Thermal Plants • Taj Mahal, Atlantic City Convention Center, Golden Nugget A non proprietary plant control system with billing integration was needed
  • 11. Why Thermo Systems? • Design-Build / Turnkey capabilities (Engaged as MAC) • Ability to take project from UR through commission and life cycle support • Experience in application: CHP, CHW & Steam Plant • Integrator with good quality control and documentation practices • Thermo Systems is a RA Solution Partner • Current PES Service Provider
  • 12. DCS Replacement Project Approach • User Requirements – Thermo Systems knew what questions to ask.. • Phased Approach • Design – Drawings, Software Specification • Implementation • Up front coordination with Plant Operations • Transition Plan – Key to Success – Minimize Downtime • Client Support
  • 13. DCS Replacement Project Approach • Transition Plan – Implementation in multiple phases • Dearator Tank and Boiler feedwater • Boiler CCS w/ PanelView (phased install qty. 3) • Data Concentrator – comms to 13 Customer ETS • Chilled Water Balance of Plant (BOP) • Remote Terminal Units (RTUs) - Golden Nugget, Taj Mahal, ACCC • Nexant billing integration via Transaction Manger • Steam metering upgrade and standardization
  • 14. DCS Replacement Project Approach • Leverage SCADA implemented during a previous Cogeneration Project • FT View SE • FT Historian SE
  • 15. DCS Replacement Solution (old) ETS ... ETS 1 ETS 13 PLC5 DCS BOILER 1 CCS BOILER 2 CCS BOILER 3 CCS DA TANK BFW CHW BOP ETS 7A ETS 7B ETS 5
  • 16. DCS Replacement Solution (new) ETS ... ETS 1 ETS 13 ControlLogix Data Concentrator PLC CompactLogix PLC w/PVSCADA FT View SE w/Historian BOILER 2 CCS BOILER 3 CCS DA Tank BFW CHW BOP ETS 5 ETS 7A ETS 7B BOILER 1 CCS ControlLogix PLC CompactLogix PLC CompactLogix PLC w/PV CompactLogix PLC w/PV CompactLogix PLC Point IO CompactLogix PLC
  • 21. Billing Replacement Solution - new data flow ETS ... ETS 1 ETS 13 ControlLogix PLC Data Concentrator ETS 5 ETS 7A ETS 7B Transaction Manager Golden Nugget ACCC Nexant Billing Software MicroLogix PLC MicroLogix PLC MicroLogix PLC Taj Mahal CompactLogix PLC Micrologix PLC CompactLogix PLC
  • 24. Summary of Rockwell Equipment • Software • Transaction Manager (billing) • VantagePoint EMI (reporting) • FT View SE • FT Historian • Hardware • ControlLogix PAC (qty 2) • CompactLogix PAC (qty 6) • Point IO (qty 1) • PanelView HMI (qty 3) • MicroLogix RTU panel (qty 4)
  • 25. Conclusions  User Requirements & Transition Plan is key  Phased approach for complex retrofits  Understanding of plant operations  FATs help minimize troubleshooting during startup  Deploying PACs logically (separation of plants)  PES teamed with Thermo Systems from start to finish (continuity)  Rockwell Automation provided the tools for success  Thermo Systems leveraged our experience in application
  • 26. • Our engineers have depth and expertise in: • Energy: Utilities / Facilities, CHP, critical HVAC, chilled water, boiler plants, power generation, data center critical HVAC • Consumer: Life Sciences, Food & Beverage, Consumer Packaged Goods (CPG) Thermo Systems – Industry Expertise
  • 27. • Thermo Systems LLC is more than a systems integrator. We are a design-build control systems engineering and construction firm, managing and delivering turnkey (MAC) Main Automation Contractor projects • Comprehensive Services (Greenfield or Brownfield) include: • Automation & Information Master Plan including Program/Project Management and Plant/OEM/Sub- Contractor Coordination • Project Specifications, Documentation and Automation Architecture Standards • Automation & Information and I&C Design Services • Fabrication, Assembly and Testing • Systems Integration and Programming • Turn key I&C Electrical and Mechanical Installation • Start up, Commissioning and IQ/OQ • Staff augmentation through turnkey • 24/7/365 On-Site and Remote Support • Life-cycle Automation support including Assessments, Modernizations/Migrations Thermo Systems – Overview
  • 28. Thermo Systems – Across America
  • 29. Questions Eastern Region Support Eric V. Silk, CEM 609-235-7653 eric.silk@thermosystems.com Western Region Support Cory Notaro 609-937-5818 cory.notaro@thermosystems.com