WORK EXPERIENCE
„Elixir Zorka-Mineralna đubriva“ is a plant for production of the different mineral fertilizers, which
capacity is 1000 t/day. It was investment worth about 40 million euros. Basic engineering and
equipement were delivered by french company CFIh, installation of equipment, pipelines, pipe bridges,
transport of energy, the construction of additional facilities etc. have been done by domestic companies.
During investment, I was a member of the project team, which has been led by director of project and
general manager. As the only person with a valid certificate of mechanical engineering, I was the
supervisory authority for all mechanical works.
As I said, basic engineering was delivered by French company CFIh, but procurement of equipment and
materials have been performing by our procurement office and technical department with the approval
of CFIh, which included frequent trips to determine the quality of equipment and materials.
Because the investment was financed by the credit and the budget was limited, we must take care about
costs and risks, apropos all parameters that could affect the cost reduction. It required strict compliance
monitor and manage the project plan, project schedule, project budget and project risks, in order to
implement the project within the deadline, to perform quality work and to avoid breaking the budget
limit.
Because there was a lot of contractors, there was and many different problems, from delays of
equipment and materials to the breakdown of the term of the plan and they had to be urgently resolved.
The investment is required daily communication with CFIh (receiving, keeping, maintaining and sending
of technical documentation etc.), with contractors (do they respect the term plan, pointing out the
failures during execution etc.) and steering committee (inform them about investment, strategic issues,
breaking the budget limit etc.). Due to scope of investment meetings with constructors, designers,
members of project team etc. were often held.
I own licenses authorized designer and contractor of thermal technique, thermal energetic, process and
gas technique, which require a minimum of 5 years of professional experience with HVAC, gas, oil, etc. I
have been working design and construction of gas installations more than 10 years, so it's one of my
most important task during the investment was supplying gas plant, which included making gas
distribution network, measuring and regulating stations and gas distribution to all consumers (infra red
heaters (IC), gas burner „OILON“-2,5 MW, gas burner „SAACKE“-11,5 MW).
Because the works related to gas as well as all other mechanical works successfully completed, the plant
was put into operation, I believe that I improve very much my professional experience.
I am still in the field of the distribution and consumption of gas, as the Manager of the boiler station for
steam production (3,5 t/h). This position includes consideration of the validity of complete gas
installation (pipelines, valves, flow meters, pressure regulators, etc.), monitoring parameters related to
gas (temperature, pressure, etc.), frequent communication with the distributor of gas "SRBIJAGAS",
reducing gas consumption while at the same time not jeopardizing the production of steam, frequent
communication with services of equipment for gas, everyday sending reports related to the consumption
of gas, steam production, etc. to Director of Production and the Managing Board.
I think that I successfully perform this tasks and on that way I significantly improve my professional
experience related to the distribution and consumption of gas, that you will use.

More Related Content

Viewers also liked

Proceso comunicativo
Proceso comunicativoProceso comunicativo
Proceso comunicativodanielamgr_
 
Deploying responsive uPortal 4.2 at UPMC - Sorbonne Universités
Deploying responsive uPortal 4.2 at UPMC - Sorbonne UniversitésDeploying responsive uPortal 4.2 at UPMC - Sorbonne Universités
Deploying responsive uPortal 4.2 at UPMC - Sorbonne UniversitésChristian Cousquer
 
46538952 analysis-of-alloys
46538952 analysis-of-alloys46538952 analysis-of-alloys
46538952 analysis-of-alloysManish Karnani
 
8 fil lm m3 (1)
8 fil lm m3 (1)8 fil lm m3 (1)
8 fil lm m3 (1)Conan1412
 
Campaign For Independence
Campaign For IndependenceCampaign For Independence
Campaign For IndependenceAkoSiGeraldo
 

Viewers also liked (6)

Proceso comunicativo
Proceso comunicativoProceso comunicativo
Proceso comunicativo
 
Deploying responsive uPortal 4.2 at UPMC - Sorbonne Universités
Deploying responsive uPortal 4.2 at UPMC - Sorbonne UniversitésDeploying responsive uPortal 4.2 at UPMC - Sorbonne Universités
Deploying responsive uPortal 4.2 at UPMC - Sorbonne Universités
 
46538952 analysis-of-alloys
46538952 analysis-of-alloys46538952 analysis-of-alloys
46538952 analysis-of-alloys
 
8 fil lm m3 (1)
8 fil lm m3 (1)8 fil lm m3 (1)
8 fil lm m3 (1)
 
Campaign For Independence
Campaign For IndependenceCampaign For Independence
Campaign For Independence
 
Mobile Payment Security Trends for the Future
Mobile Payment Security Trends for the FutureMobile Payment Security Trends for the Future
Mobile Payment Security Trends for the Future
 

Similar to Work experience

Similar to Work experience (20)

Tony_Van_Grembergen
Tony_Van_GrembergenTony_Van_Grembergen
Tony_Van_Grembergen
 
Mostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cvMostafa omar el beh 2015 cv
Mostafa omar el beh 2015 cv
 
Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, ResumeAntonio MartinezArano B. Ch. E, MBA, PMP, Resume
Antonio MartinezArano B. Ch. E, MBA, PMP, Resume
 
CURRICULUM VITAE Walid Alhaddad Drilling Supervisor
CURRICULUM VITAE Walid Alhaddad Drilling SupervisorCURRICULUM VITAE Walid Alhaddad Drilling Supervisor
CURRICULUM VITAE Walid Alhaddad Drilling Supervisor
 
CV-rev5
CV-rev5CV-rev5
CV-rev5
 
CV -mosleh
CV -moslehCV -mosleh
CV -mosleh
 
new 5 tanmay_CV
new 5 tanmay_CV new 5 tanmay_CV
new 5 tanmay_CV
 
CV Alberto Uribe English
CV Alberto Uribe EnglishCV Alberto Uribe English
CV Alberto Uribe English
 
CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016CE1 - Final Reviewed - 10 Feb 2016
CE1 - Final Reviewed - 10 Feb 2016
 
Presentation1
Presentation1Presentation1
Presentation1
 
vijay cv
vijay cvvijay cv
vijay cv
 
Fabio_CV 2014n
Fabio_CV 2014nFabio_CV 2014n
Fabio_CV 2014n
 
Case study 1 effective and efficient communication
Case study 1 effective and efficient communicationCase study 1 effective and efficient communication
Case study 1 effective and efficient communication
 
Civil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter lastCivil eng.m.sayed c.v & cover letter last
Civil eng.m.sayed c.v & cover letter last
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
Akshay Updated CV
Akshay Updated CVAkshay Updated CV
Akshay Updated CV
 
EPPMPresentationOMOct22 (1).pptx
EPPMPresentationOMOct22 (1).pptxEPPMPresentationOMOct22 (1).pptx
EPPMPresentationOMOct22 (1).pptx
 
CV Elmar (1)
CV Elmar (1)CV Elmar (1)
CV Elmar (1)
 
CV Sigve Hamilton Aspelund 042019
CV Sigve Hamilton Aspelund 042019 CV Sigve Hamilton Aspelund 042019
CV Sigve Hamilton Aspelund 042019
 
my_cv_WP
my_cv_WPmy_cv_WP
my_cv_WP
 

More from Branko Gajić

Projektantska licenca
Projektantska licencaProjektantska licenca
Projektantska licencaBranko Gajić
 
Europass-CV-ESP-20150525-Gajić-EN
Europass-CV-ESP-20150525-Gajić-ENEuropass-CV-ESP-20150525-Gajić-EN
Europass-CV-ESP-20150525-Gajić-ENBranko Gajić
 
Branko Gajić_ CV_Srpski
Branko Gajić_ CV_SrpskiBranko Gajić_ CV_Srpski
Branko Gajić_ CV_SrpskiBranko Gajić
 
Branko Gajić_CV_Engleski
Branko Gajić_CV_EngleskiBranko Gajić_CV_Engleski
Branko Gajić_CV_EngleskiBranko Gajić
 

More from Branko Gajić (6)

Radno iskustvo
Radno iskustvoRadno iskustvo
Radno iskustvo
 
Projektantska licenca
Projektantska licencaProjektantska licenca
Projektantska licenca
 
Izvođačka licenca
Izvođačka licencaIzvođačka licenca
Izvođačka licenca
 
Europass-CV-ESP-20150525-Gajić-EN
Europass-CV-ESP-20150525-Gajić-ENEuropass-CV-ESP-20150525-Gajić-EN
Europass-CV-ESP-20150525-Gajić-EN
 
Branko Gajić_ CV_Srpski
Branko Gajić_ CV_SrpskiBranko Gajić_ CV_Srpski
Branko Gajić_ CV_Srpski
 
Branko Gajić_CV_Engleski
Branko Gajić_CV_EngleskiBranko Gajić_CV_Engleski
Branko Gajić_CV_Engleski
 

Work experience

  • 1. WORK EXPERIENCE „Elixir Zorka-Mineralna đubriva“ is a plant for production of the different mineral fertilizers, which capacity is 1000 t/day. It was investment worth about 40 million euros. Basic engineering and equipement were delivered by french company CFIh, installation of equipment, pipelines, pipe bridges, transport of energy, the construction of additional facilities etc. have been done by domestic companies. During investment, I was a member of the project team, which has been led by director of project and general manager. As the only person with a valid certificate of mechanical engineering, I was the supervisory authority for all mechanical works. As I said, basic engineering was delivered by French company CFIh, but procurement of equipment and materials have been performing by our procurement office and technical department with the approval of CFIh, which included frequent trips to determine the quality of equipment and materials. Because the investment was financed by the credit and the budget was limited, we must take care about costs and risks, apropos all parameters that could affect the cost reduction. It required strict compliance monitor and manage the project plan, project schedule, project budget and project risks, in order to implement the project within the deadline, to perform quality work and to avoid breaking the budget limit. Because there was a lot of contractors, there was and many different problems, from delays of equipment and materials to the breakdown of the term of the plan and they had to be urgently resolved. The investment is required daily communication with CFIh (receiving, keeping, maintaining and sending of technical documentation etc.), with contractors (do they respect the term plan, pointing out the failures during execution etc.) and steering committee (inform them about investment, strategic issues, breaking the budget limit etc.). Due to scope of investment meetings with constructors, designers, members of project team etc. were often held. I own licenses authorized designer and contractor of thermal technique, thermal energetic, process and gas technique, which require a minimum of 5 years of professional experience with HVAC, gas, oil, etc. I have been working design and construction of gas installations more than 10 years, so it's one of my most important task during the investment was supplying gas plant, which included making gas distribution network, measuring and regulating stations and gas distribution to all consumers (infra red heaters (IC), gas burner „OILON“-2,5 MW, gas burner „SAACKE“-11,5 MW). Because the works related to gas as well as all other mechanical works successfully completed, the plant was put into operation, I believe that I improve very much my professional experience. I am still in the field of the distribution and consumption of gas, as the Manager of the boiler station for steam production (3,5 t/h). This position includes consideration of the validity of complete gas installation (pipelines, valves, flow meters, pressure regulators, etc.), monitoring parameters related to gas (temperature, pressure, etc.), frequent communication with the distributor of gas "SRBIJAGAS", reducing gas consumption while at the same time not jeopardizing the production of steam, frequent communication with services of equipment for gas, everyday sending reports related to the consumption of gas, steam production, etc. to Director of Production and the Managing Board. I think that I successfully perform this tasks and on that way I significantly improve my professional experience related to the distribution and consumption of gas, that you will use.