SlideShare a Scribd company logo
1 of 1
Project Manager (contract) – Mainframe Re-Hosting, Canadian Pacific Railway (CPR)
Calgary, Alberta, Canada — February 2013 – January 2015
Mainframe Re-Hosting was a very complexproject, responsible for migrating the entire mainframe to a vBlock server
environment,running Dell UniKix. Mainframe technologies included CICS,IMS, COBOL, Assembler,PL1,Fortran,
SAS, JCL, REXX, CLIST, ISPF Panels,RACF, IMS/DB, DB2, VSAM, GDG, MQ Series,Endevor, Panvalet and
Control-M. Server technologies included vBlock,Linux, Dell UniKix, MQ Series,DB2 LUW, Java, SAS and Control-
M.
Accomplishments
• I was the overall delivery projectmanager,responsible for managing all the technical aspects ofthe project.
• At its peak, there were 200 resources working on the project,with teams in Canada,USA, India and Italy.
• Project completed successfullyin 22 months,within the 2-year expectation stated by Mainframe re-hosting
experts.
• 76 business critical applications,2,100 batch jobs,5,200 VSAM/GDG/Sequential files,700 DB2 tables,
1,750 IMS/DB databases were converted to run in a Dell UniKix environmenton vBlock.
• The PROD cut-over in December was completed in 10 hours and as itwas performed on Christmas
Eve/Day, there was no outage to the business.
• The cut-over was very successful and there were so few issues postcut-over that we were able to reduce
the warranty period by one month.
• Total budgetwas $32M.

More Related Content

Viewers also liked

PRIMERA GUERRA MUNDIAL (1914-1918)
PRIMERA GUERRA MUNDIAL (1914-1918)PRIMERA GUERRA MUNDIAL (1914-1918)
PRIMERA GUERRA MUNDIAL (1914-1918)josefermin
 
Angle modulation: FM & PM & Spectrum of Angle modulation wave
Angle modulation: FM & PM & Spectrum of Angle modulation waveAngle modulation: FM & PM & Spectrum of Angle modulation wave
Angle modulation: FM & PM & Spectrum of Angle modulation waveJaafer Saeed
 
Inforatica und 3
Inforatica und 3Inforatica und 3
Inforatica und 3angy melo
 
Resume_Document Management.ai
Resume_Document Management.aiResume_Document Management.ai
Resume_Document Management.aiUsama A. Qureshi
 
Edgardo Reyes 2016 Resume
Edgardo Reyes 2016 ResumeEdgardo Reyes 2016 Resume
Edgardo Reyes 2016 Resumeereyes94
 

Viewers also liked (11)

PRIMERA GUERRA MUNDIAL (1914-1918)
PRIMERA GUERRA MUNDIAL (1914-1918)PRIMERA GUERRA MUNDIAL (1914-1918)
PRIMERA GUERRA MUNDIAL (1914-1918)
 
Angle modulation: FM & PM & Spectrum of Angle modulation wave
Angle modulation: FM & PM & Spectrum of Angle modulation waveAngle modulation: FM & PM & Spectrum of Angle modulation wave
Angle modulation: FM & PM & Spectrum of Angle modulation wave
 
Inforatica und 3
Inforatica und 3Inforatica und 3
Inforatica und 3
 
SridharPS _New
SridharPS _NewSridharPS _New
SridharPS _New
 
RESUME
RESUMERESUME
RESUME
 
Michael Trager Resume
Michael Trager ResumeMichael Trager Resume
Michael Trager Resume
 
2016 Resume
2016 Resume2016 Resume
2016 Resume
 
Resume_Document Management.ai
Resume_Document Management.aiResume_Document Management.ai
Resume_Document Management.ai
 
Dominique Torres Resume
Dominique Torres ResumeDominique Torres Resume
Dominique Torres Resume
 
Edgardo Reyes 2016 Resume
Edgardo Reyes 2016 ResumeEdgardo Reyes 2016 Resume
Edgardo Reyes 2016 Resume
 
Resume
ResumeResume
Resume
 

Similar to Project Manager (contract) – Mainframe Re-Hosting

Lieto, Robert - Resume
Lieto, Robert - ResumeLieto, Robert - Resume
Lieto, Robert - ResumeRobert Lieto
 
Steve cummings cv_2019_c
Steve cummings cv_2019_cSteve cummings cv_2019_c
Steve cummings cv_2019_cSteveCummings20
 
CV - ken wood on 12th feb 2016 2 pages
CV - ken wood  on  12th feb 2016   2 pagesCV - ken wood  on  12th feb 2016   2 pages
CV - ken wood on 12th feb 2016 2 pagesKen Wood
 
Resume_Achhar_Kalia
Resume_Achhar_KaliaResume_Achhar_Kalia
Resume_Achhar_KaliaAchhar Kalia
 
Delma Hagen 2010 Resume
Delma Hagen 2010 ResumeDelma Hagen 2010 Resume
Delma Hagen 2010 Resumedelhagen
 
Introducing AIS BusinessCloud1
Introducing AIS BusinessCloud1Introducing AIS BusinessCloud1
Introducing AIS BusinessCloud1AISDC
 
Notes from the Field - Cloud Solutions with VMware vCloud Director
Notes from the Field - Cloud Solutions with VMware vCloud DirectorNotes from the Field - Cloud Solutions with VMware vCloud Director
Notes from the Field - Cloud Solutions with VMware vCloud DirectorJames Charter
 
Gaurav Singh-resume
Gaurav Singh-resumeGaurav Singh-resume
Gaurav Singh-resumegaurav singh
 
d2iq, d2iq konvoy, day 2 operations, lifecycle management, mayadata, mayadata...
d2iq, d2iq konvoy, day 2 operations, lifecycle management, mayadata, mayadata...d2iq, d2iq konvoy, day 2 operations, lifecycle management, mayadata, mayadata...
d2iq, d2iq konvoy, day 2 operations, lifecycle management, mayadata, mayadata...MayaData Inc
 
NILIP_DUTTA_18th_January_2016
NILIP_DUTTA_18th_January_2016NILIP_DUTTA_18th_January_2016
NILIP_DUTTA_18th_January_2016Nilip Dutta
 
WeLab Reaps Advantages of Multi-Cloud Capabilities. You Can Too.
WeLab Reaps Advantages of Multi-Cloud Capabilities. You Can Too.WeLab Reaps Advantages of Multi-Cloud Capabilities. You Can Too.
WeLab Reaps Advantages of Multi-Cloud Capabilities. You Can Too.NuoDB
 
Abhishek_Resume_Latest
Abhishek_Resume_LatestAbhishek_Resume_Latest
Abhishek_Resume_LatestAbhishek Singh
 

Similar to Project Manager (contract) – Mainframe Re-Hosting (20)

ravindra_resume.doc
ravindra_resume.docravindra_resume.doc
ravindra_resume.doc
 
Resume gunasundari dba
Resume gunasundari dbaResume gunasundari dba
Resume gunasundari dba
 
Resume gunasundari dba
Resume gunasundari dbaResume gunasundari dba
Resume gunasundari dba
 
Senthilnadhan K_Resume
Senthilnadhan K_ResumeSenthilnadhan K_Resume
Senthilnadhan K_Resume
 
Lieto, Robert - Resume
Lieto, Robert - ResumeLieto, Robert - Resume
Lieto, Robert - Resume
 
Steve cummings cv_2019_c
Steve cummings cv_2019_cSteve cummings cv_2019_c
Steve cummings cv_2019_c
 
CV - ken wood on 12th feb 2016 2 pages
CV - ken wood  on  12th feb 2016   2 pagesCV - ken wood  on  12th feb 2016   2 pages
CV - ken wood on 12th feb 2016 2 pages
 
Resume_Achhar_Kalia
Resume_Achhar_KaliaResume_Achhar_Kalia
Resume_Achhar_Kalia
 
Delma Hagen 2010 Resume
Delma Hagen 2010 ResumeDelma Hagen 2010 Resume
Delma Hagen 2010 Resume
 
Introducing AIS BusinessCloud1
Introducing AIS BusinessCloud1Introducing AIS BusinessCloud1
Introducing AIS BusinessCloud1
 
Notes from the Field - Cloud Solutions with VMware vCloud Director
Notes from the Field - Cloud Solutions with VMware vCloud DirectorNotes from the Field - Cloud Solutions with VMware vCloud Director
Notes from the Field - Cloud Solutions with VMware vCloud Director
 
Mohideen Khader-122316
Mohideen Khader-122316Mohideen Khader-122316
Mohideen Khader-122316
 
Gaurav Singh-resume
Gaurav Singh-resumeGaurav Singh-resume
Gaurav Singh-resume
 
Neil-Leslie-CV
Neil-Leslie-CVNeil-Leslie-CV
Neil-Leslie-CV
 
d2iq, d2iq konvoy, day 2 operations, lifecycle management, mayadata, mayadata...
d2iq, d2iq konvoy, day 2 operations, lifecycle management, mayadata, mayadata...d2iq, d2iq konvoy, day 2 operations, lifecycle management, mayadata, mayadata...
d2iq, d2iq konvoy, day 2 operations, lifecycle management, mayadata, mayadata...
 
Billmresume3-2015
Billmresume3-2015Billmresume3-2015
Billmresume3-2015
 
Stephen miller resume
Stephen miller resumeStephen miller resume
Stephen miller resume
 
NILIP_DUTTA_18th_January_2016
NILIP_DUTTA_18th_January_2016NILIP_DUTTA_18th_January_2016
NILIP_DUTTA_18th_January_2016
 
WeLab Reaps Advantages of Multi-Cloud Capabilities. You Can Too.
WeLab Reaps Advantages of Multi-Cloud Capabilities. You Can Too.WeLab Reaps Advantages of Multi-Cloud Capabilities. You Can Too.
WeLab Reaps Advantages of Multi-Cloud Capabilities. You Can Too.
 
Abhishek_Resume_Latest
Abhishek_Resume_LatestAbhishek_Resume_Latest
Abhishek_Resume_Latest
 

Project Manager (contract) – Mainframe Re-Hosting

  • 1. Project Manager (contract) – Mainframe Re-Hosting, Canadian Pacific Railway (CPR) Calgary, Alberta, Canada — February 2013 – January 2015 Mainframe Re-Hosting was a very complexproject, responsible for migrating the entire mainframe to a vBlock server environment,running Dell UniKix. Mainframe technologies included CICS,IMS, COBOL, Assembler,PL1,Fortran, SAS, JCL, REXX, CLIST, ISPF Panels,RACF, IMS/DB, DB2, VSAM, GDG, MQ Series,Endevor, Panvalet and Control-M. Server technologies included vBlock,Linux, Dell UniKix, MQ Series,DB2 LUW, Java, SAS and Control- M. Accomplishments • I was the overall delivery projectmanager,responsible for managing all the technical aspects ofthe project. • At its peak, there were 200 resources working on the project,with teams in Canada,USA, India and Italy. • Project completed successfullyin 22 months,within the 2-year expectation stated by Mainframe re-hosting experts. • 76 business critical applications,2,100 batch jobs,5,200 VSAM/GDG/Sequential files,700 DB2 tables, 1,750 IMS/DB databases were converted to run in a Dell UniKix environmenton vBlock. • The PROD cut-over in December was completed in 10 hours and as itwas performed on Christmas Eve/Day, there was no outage to the business. • The cut-over was very successful and there were so few issues postcut-over that we were able to reduce the warranty period by one month. • Total budgetwas $32M.