1. EKATERINA KOCHAEVA
Project LEED Contract amount
Square
Footage
Position Description
DCPS on Call Operating
Address: 42 Schools in
Washington, DC 2011-2013
NA $1,750,000.00 NA Project Coordinator
On going small size on call projects in 42 Schools. The project scope consists of on-call maintenance and repair services for
(42) of the District of Columbia Public Schools. Such work includes electrical, mechanical, and plumbing services, fire, life safety,
as well as health and food code repairs/replacements. Upgrades include roof replacement/repair, carpentry, masonry, and
window replacement.
DCPS on Call Capital
Address: 42 Schools in
Washington, DC 2011-2013
NA $3,250,00.00 NA Project Coordinator
On going medium size on call projects in 42 Schools. The project scope consists of on-call maintenance and repair services for
(42) of the District of Columbia Public Schools. Such work includes electrical, mechanical, and plumbing services, fire, life safety,
as well as health and food code repairs/replacements. Upgrades include roof replacement/repair, carpentry, masonry, and
window replacement.
Lamond Recreation Center
Address:6400 Kansas Ave Ne,
Washington, DC June
2011-September 2011
Silver $550,000.00 10,000 sq.ft. Project Coordinator
Renovation of LEED Silver building in SW DC. The Lamond Recreation Center Rehabilitation includes the renovation of the
Gymnasium complete with a refurbished floor, repaired bleachers, installation of wall padding, freshly painted walls, installation
of new sports equipment and furniture. The renovation of the Lobby, Offices and Hallways at Lamond included the installation
of the new tile and counter tops, the installation of new directional sign, and providing new furniture and electronic devices.
Exterior repairs included the installation of a new walkway, repair flooring, fencing and gates at the playground, power-washing
the building, and repainting the parking lines, and cleaning and improving landscaping
Francis Gregory
Neighborhood Library
Address: 3660 Alabama Ave, SE,
Washington, DC August
2011-January 2012
Silver
$2,500,000.00
($12,000,000.00)
22,500 sq.ft. Project Coordinator
Ground up LEED Silver 22,500 square-foot facility. The library seats more than 200 users and allows easy access to state of the
art technology, and education materials. This is revolutionary new library construction project. I was involved in all pre-
construction and design-build services. During the construction phase, I was in the primary quality control contractor
overseeing and managing the expansive and complex exterior curtain wall system and interior finishes.
Amidon Elementary School
Phase 1 Project
Address: 401 I St, SW,
Washington, DC April
2012-September 2012
- $5,500,000.00 34,300 sq. ft. Project Coordinator
DCPS (District of Columbia Public Schools) project of an interior fit out of existing classrooms, corridors and student common
areas plus new MEP Systems. Renovation inclueded: Concrete, Masonry, Metal Fabrications, Doors, Interior Glazing, Finishes
and FF&E. These Phase 1 projects are often referred to as the “Summer Miracle”, having only eight weeks to complete almost
an entire school. My role was to coordinate the construction and pre-construction, quality control, budget control activities of
this fast track project. As a result construction was finished well ahead of the needed completion dates and within budget; so
the kids could return to school.
McKinley Tech Middle
School
Address: 151 T St, NE,
Washington, DC
November 2012-October 2013
Platinum $12,000,000.00 66,000 sq. ft.
Pre-Construction and
LEED Coordinator
Modernization of 3 levels of existing school building. Renovation include classrooms, labs, multipurpose room and offices to
be built. Scope of work contains of Demo, Testing, Concrete flooring infill, CMU masonry for elevator shaft, Structure
stabilization of existing beams, Exterior Canopy, Doors & hardware, FF&E, Millwork, Casework, Low voltage Structure cables,
Intercom and master clock system, Smart projectors, Paint, Hardwood flooring, Ceramic Tile, Rubber Flooring, Drywall, Ceiling,
Mechanical, Electrical, Sprinkler, Plumbing, Elevator, Specialties, CCTV, Intrusion system, Fire Extinguisher, Roof and Paving.
PROJECT WORK EXPERIENCE AT BROUGHTON CONSTRUCTION COMPANY, LLC
2. Stuart Hobson Middle
School
Address: 410 E St NE,
Washington, DC
November 2013-August 2015
Gold $22,000,000.00 80,000 sq. ft.
Pre-Construction and
LEED Coordinator
Scope of work included complete MEP upgrade to the existing systems, a gym renovation, and a Museum Program that
includes a 13,918 sf building addition. MEP upgrades will include all new heating and cooling equipment to control room
temperature and new ventilation equipment to provide improved indoor air quality. The gym renovation component will
include the demolition of two small gyms and combining them to create a modern full-sized middle school gym. The Museum
Program will include space for an Art Room, Museum Science Room, Drama/Choral Room, and a Music/Band Room.
Classrooms will also incorporate new flooring, wall finishes, acoustical ceilings, IT upgrades, furniture, and light fixtures. Other
school improvements include a renovated main entrance lobby, administration area, corridors, stairwells, and all new toilet
rooms.
Plummer Elementary School
Address: 4601 Texas Avenue, SE
Washington, DC March
2014-August 2015
Gold $15,500,000.00 35,000 sq. ft.
Pre-Construction and
LEED Coordinator
Renovation/Modernization included the following:
Replacement of mechanical, electrical and plumbing systems; enlarge 25 classrooms for Pre-K through 5th grade students;
abatement of asbestos insulation and encapsulation of HAZMAT materials; installation of new interior finishes and furniture;
new windows; new elevator, new double-story entrance lobby; upgrade of technology and IT systems.