EKATERINA KOCHAEVA
Project LEED Contract amount
Square
Footage
Position Description
DCPS on Call Operating
Address: 42 Schools in
Washington, DC 2011-2013
NA $1,750,000.00 NA Project Coordinator
On going small size on call projects in 42 Schools. The project scope consists of on-call maintenance and repair services for
(42) of the District of Columbia Public Schools. Such work includes electrical, mechanical, and plumbing services, fire, life safety,
as well as health and food code repairs/replacements. Upgrades include roof replacement/repair, carpentry, masonry, and
window replacement.
DCPS on Call Capital
Address: 42 Schools in
Washington, DC 2011-2013
NA $3,250,00.00 NA Project Coordinator
On going medium size on call projects in 42 Schools. The project scope consists of on-call maintenance and repair services for
(42) of the District of Columbia Public Schools. Such work includes electrical, mechanical, and plumbing services, fire, life safety,
as well as health and food code repairs/replacements. Upgrades include roof replacement/repair, carpentry, masonry, and
window replacement.
Lamond Recreation Center
Address:6400 Kansas Ave Ne,
Washington, DC June
2011-September 2011
Silver $550,000.00 10,000 sq.ft. Project Coordinator
Renovation of LEED Silver building in SW DC. The Lamond Recreation Center Rehabilitation includes the renovation of the
Gymnasium complete with a refurbished floor, repaired bleachers, installation of wall padding, freshly painted walls, installation
of new sports equipment and furniture. The renovation of the Lobby, Offices and Hallways at Lamond included the installation
of the new tile and counter tops, the installation of new directional sign, and providing new furniture and electronic devices.
Exterior repairs included the installation of a new walkway, repair flooring, fencing and gates at the playground, power-washing
the building, and repainting the parking lines, and cleaning and improving landscaping
Francis Gregory
Neighborhood Library
Address: 3660 Alabama Ave, SE,
Washington, DC August
2011-January 2012
Silver
$2,500,000.00
($12,000,000.00)
22,500 sq.ft. Project Coordinator
Ground up LEED Silver 22,500 square-foot facility. The library seats more than 200 users and allows easy access to state of the
art technology, and education materials. This is revolutionary new library construction project. I was involved in all pre-
construction and design-build services. During the construction phase, I was in the primary quality control contractor
overseeing and managing the expansive and complex exterior curtain wall system and interior finishes.
Amidon Elementary School
Phase 1 Project
Address: 401 I St, SW,
Washington, DC April
2012-September 2012
- $5,500,000.00 34,300 sq. ft. Project Coordinator
DCPS (District of Columbia Public Schools) project of an interior fit out of existing classrooms, corridors and student common
areas plus new MEP Systems. Renovation inclueded: Concrete, Masonry, Metal Fabrications, Doors, Interior Glazing, Finishes
and FF&E. These Phase 1 projects are often referred to as the “Summer Miracle”, having only eight weeks to complete almost
an entire school. My role was to coordinate the construction and pre-construction, quality control, budget control activities of
this fast track project. As a result construction was finished well ahead of the needed completion dates and within budget; so
the kids could return to school.
McKinley Tech Middle
School
Address: 151 T St, NE,
Washington, DC
November 2012-October 2013
Platinum $12,000,000.00 66,000 sq. ft.
Pre-Construction and
LEED Coordinator
Modernization of 3 levels of existing school building. Renovation include classrooms, labs, multipurpose room and offices to
be built. Scope of work contains of Demo, Testing, Concrete flooring infill, CMU masonry for elevator shaft, Structure
stabilization of existing beams, Exterior Canopy, Doors & hardware, FF&E, Millwork, Casework, Low voltage Structure cables,
Intercom and master clock system, Smart projectors, Paint, Hardwood flooring, Ceramic Tile, Rubber Flooring, Drywall, Ceiling,
Mechanical, Electrical, Sprinkler, Plumbing, Elevator, Specialties, CCTV, Intrusion system, Fire Extinguisher, Roof and Paving.
PROJECT WORK EXPERIENCE AT BROUGHTON CONSTRUCTION COMPANY, LLC
Stuart Hobson Middle
School
Address: 410 E St NE,
Washington, DC
November 2013-August 2015
Gold $22,000,000.00 80,000 sq. ft.
Pre-Construction and
LEED Coordinator
Scope of work included complete MEP upgrade to the existing systems, a gym renovation, and a Museum Program that
includes a 13,918 sf building addition. MEP upgrades will include all new heating and cooling equipment to control room
temperature and new ventilation equipment to provide improved indoor air quality. The gym renovation component will
include the demolition of two small gyms and combining them to create a modern full-sized middle school gym. The Museum
Program will include space for an Art Room, Museum Science Room, Drama/Choral Room, and a Music/Band Room.
Classrooms will also incorporate new flooring, wall finishes, acoustical ceilings, IT upgrades, furniture, and light fixtures. Other
school improvements include a renovated main entrance lobby, administration area, corridors, stairwells, and all new toilet
rooms.
Plummer Elementary School
Address: 4601 Texas Avenue, SE
Washington, DC March
2014-August 2015
Gold $15,500,000.00 35,000 sq. ft.
Pre-Construction and
LEED Coordinator
Renovation/Modernization included the following:
Replacement of mechanical, electrical and plumbing systems; enlarge 25 classrooms for Pre-K through 5th grade students;
abatement of asbestos insulation and encapsulation of HAZMAT materials; installation of new interior finishes and furniture;
new windows; new elevator, new double-story entrance lobby; upgrade of technology and IT systems.

More Related Content

What's hot

Article - Youthbuild House
Article - Youthbuild HouseArticle - Youthbuild House
Article - Youthbuild HouseMark Gunthner
 
LEED schools are making big strides in 2018
LEED schools are making big strides in 2018LEED schools are making big strides in 2018
LEED schools are making big strides in 2018USGBC
 
KBE Laboratories 2011
KBE Laboratories 2011 KBE Laboratories 2011
KBE Laboratories 2011 charkins
 
Civil Construction and Repairing Turnkey Contractors
Civil Construction and Repairing Turnkey ContractorsCivil Construction and Repairing Turnkey Contractors
Civil Construction and Repairing Turnkey ContractorsRajesh B
 
Brick buildingremodel
Brick buildingremodelBrick buildingremodel
Brick buildingremodelLisaSnyder
 
Innovative Concrete Strengthening at Baylor Sammons Collins Cancer Center
Innovative Concrete Strengthening at Baylor Sammons Collins Cancer CenterInnovative Concrete Strengthening at Baylor Sammons Collins Cancer Center
Innovative Concrete Strengthening at Baylor Sammons Collins Cancer Centerpeter_larson
 
Master Project File
Master Project FileMaster Project File
Master Project FileStevegrund
 
NYPH_2014presentaton_13june_2014reducedAA
NYPH_2014presentaton_13june_2014reducedAANYPH_2014presentaton_13june_2014reducedAA
NYPH_2014presentaton_13june_2014reducedAABrian Kavanagh
 
Lung R X Renovation (2)
Lung  R X Renovation (2)Lung  R X Renovation (2)
Lung R X Renovation (2)JulianLeek
 
Hi-Tech Building Systems
Hi-Tech Building SystemsHi-Tech Building Systems
Hi-Tech Building SystemsDori Schmitz
 
Hencken & Gaines Portfolio of Building Projects in Maryland
Hencken & Gaines Portfolio of Building Projects in MarylandHencken & Gaines Portfolio of Building Projects in Maryland
Hencken & Gaines Portfolio of Building Projects in MarylandThomas Gaines
 

What's hot (20)

Article - Youthbuild House
Article - Youthbuild HouseArticle - Youthbuild House
Article - Youthbuild House
 
LEED schools are making big strides in 2018
LEED schools are making big strides in 2018LEED schools are making big strides in 2018
LEED schools are making big strides in 2018
 
KBE Laboratories 2011
KBE Laboratories 2011 KBE Laboratories 2011
KBE Laboratories 2011
 
Civil Construction and Repairing Turnkey Contractors
Civil Construction and Repairing Turnkey ContractorsCivil Construction and Repairing Turnkey Contractors
Civil Construction and Repairing Turnkey Contractors
 
Michael Sackler AIA_Portfolio
Michael Sackler AIA_PortfolioMichael Sackler AIA_Portfolio
Michael Sackler AIA_Portfolio
 
Major projects
Major projectsMajor projects
Major projects
 
2014-2015
2014-20152014-2015
2014-2015
 
CV_JIAYI ZHANG
CV_JIAYI ZHANGCV_JIAYI ZHANG
CV_JIAYI ZHANG
 
Robin resume pub works
Robin resume pub worksRobin resume pub works
Robin resume pub works
 
Brick buildingremodel
Brick buildingremodelBrick buildingremodel
Brick buildingremodel
 
Renee Chow fact sheet
Renee Chow fact sheetRenee Chow fact sheet
Renee Chow fact sheet
 
Resume
ResumeResume
Resume
 
Innovative Concrete Strengthening at Baylor Sammons Collins Cancer Center
Innovative Concrete Strengthening at Baylor Sammons Collins Cancer CenterInnovative Concrete Strengthening at Baylor Sammons Collins Cancer Center
Innovative Concrete Strengthening at Baylor Sammons Collins Cancer Center
 
Campus training center is a marvel of efficiency
Campus training center is a marvel of efficiencyCampus training center is a marvel of efficiency
Campus training center is a marvel of efficiency
 
Master Project File
Master Project FileMaster Project File
Master Project File
 
NYPH_2014presentaton_13june_2014reducedAA
NYPH_2014presentaton_13june_2014reducedAANYPH_2014presentaton_13june_2014reducedAA
NYPH_2014presentaton_13june_2014reducedAA
 
Lung R X Renovation (2)
Lung  R X Renovation (2)Lung  R X Renovation (2)
Lung R X Renovation (2)
 
Hi-Tech Building Systems
Hi-Tech Building SystemsHi-Tech Building Systems
Hi-Tech Building Systems
 
Hencken & Gaines Portfolio of Building Projects in Maryland
Hencken & Gaines Portfolio of Building Projects in MarylandHencken & Gaines Portfolio of Building Projects in Maryland
Hencken & Gaines Portfolio of Building Projects in Maryland
 
Ulx June09
Ulx June09Ulx June09
Ulx June09
 

Similar to E. Kochaeva - projects (1)

CDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdfCDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdf8-koi
 
Project List
Project ListProject List
Project ListJim Ryan
 
School Presentation
School PresentationSchool Presentation
School Presentationmontorogroup
 
DJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalDJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalChris Humphries
 
LeeHanveyPortfolio2016
LeeHanveyPortfolio2016LeeHanveyPortfolio2016
LeeHanveyPortfolio2016Lee Hanvey
 
Doug's Resume 10-18-14
Doug's Resume 10-18-14Doug's Resume 10-18-14
Doug's Resume 10-18-14Douglas Rogge
 
R. A. Edwards and Partners Ltd. Company Profile
R. A. Edwards and Partners Ltd.   Company ProfileR. A. Edwards and Partners Ltd.   Company Profile
R. A. Edwards and Partners Ltd. Company Profiledownsy222
 
8315 - U of C 75 kW Array WhiteSheet
8315 - U of C 75 kW Array WhiteSheet8315 - U of C 75 kW Array WhiteSheet
8315 - U of C 75 kW Array WhiteSheetBrian Kraenzle
 
Michael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera
 
DMassey resume 2016 09 21, 17a
DMassey resume 2016 09 21, 17aDMassey resume 2016 09 21, 17a
DMassey resume 2016 09 21, 17aDaniel G. Massey
 

Similar to E. Kochaeva - projects (1) (20)

CDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdfCDE_Sustainability Performance_20240214.pdf
CDE_Sustainability Performance_20240214.pdf
 
Pj mechanical
Pj mechanicalPj mechanical
Pj mechanical
 
Long Resume
Long ResumeLong Resume
Long Resume
 
Project List
Project ListProject List
Project List
 
School Presentation
School PresentationSchool Presentation
School Presentation
 
DJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - FinalDJC Top Projects 2015 - Breathe Building Project Description - Final
DJC Top Projects 2015 - Breathe Building Project Description - Final
 
LeeHanveyPortfolio2016
LeeHanveyPortfolio2016LeeHanveyPortfolio2016
LeeHanveyPortfolio2016
 
Green leed projects
Green leed projectsGreen leed projects
Green leed projects
 
02 Chicago Teaming Presentation Part 2
02 Chicago Teaming Presentation Part 202 Chicago Teaming Presentation Part 2
02 Chicago Teaming Presentation Part 2
 
Chitnis Brochure
Chitnis BrochureChitnis Brochure
Chitnis Brochure
 
Doug's Resume 10-18-14
Doug's Resume 10-18-14Doug's Resume 10-18-14
Doug's Resume 10-18-14
 
My Resume
My ResumeMy Resume
My Resume
 
R. A. Edwards and Partners Ltd. Company Profile
R. A. Edwards and Partners Ltd.   Company ProfileR. A. Edwards and Partners Ltd.   Company Profile
R. A. Edwards and Partners Ltd. Company Profile
 
Measure A Status Report, 2010
Measure A Status Report, 2010Measure A Status Report, 2010
Measure A Status Report, 2010
 
C. Lavache Management & Consulting, Inc.
C. Lavache Management & Consulting, Inc.C. Lavache Management & Consulting, Inc.
C. Lavache Management & Consulting, Inc.
 
johnres2015
johnres2015johnres2015
johnres2015
 
8315 - U of C 75 kW Array WhiteSheet
8315 - U of C 75 kW Array WhiteSheet8315 - U of C 75 kW Array WhiteSheet
8315 - U of C 75 kW Array WhiteSheet
 
Michael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-naMichael Barbera Resume 1.6-na
Michael Barbera Resume 1.6-na
 
DMassey resume 2016 09 21, 17a
DMassey resume 2016 09 21, 17aDMassey resume 2016 09 21, 17a
DMassey resume 2016 09 21, 17a
 
NJ Projects - Anthony Pagnotta
NJ Projects - Anthony PagnottaNJ Projects - Anthony Pagnotta
NJ Projects - Anthony Pagnotta
 

E. Kochaeva - projects (1)

  • 1. EKATERINA KOCHAEVA Project LEED Contract amount Square Footage Position Description DCPS on Call Operating Address: 42 Schools in Washington, DC 2011-2013 NA $1,750,000.00 NA Project Coordinator On going small size on call projects in 42 Schools. The project scope consists of on-call maintenance and repair services for (42) of the District of Columbia Public Schools. Such work includes electrical, mechanical, and plumbing services, fire, life safety, as well as health and food code repairs/replacements. Upgrades include roof replacement/repair, carpentry, masonry, and window replacement. DCPS on Call Capital Address: 42 Schools in Washington, DC 2011-2013 NA $3,250,00.00 NA Project Coordinator On going medium size on call projects in 42 Schools. The project scope consists of on-call maintenance and repair services for (42) of the District of Columbia Public Schools. Such work includes electrical, mechanical, and plumbing services, fire, life safety, as well as health and food code repairs/replacements. Upgrades include roof replacement/repair, carpentry, masonry, and window replacement. Lamond Recreation Center Address:6400 Kansas Ave Ne, Washington, DC June 2011-September 2011 Silver $550,000.00 10,000 sq.ft. Project Coordinator Renovation of LEED Silver building in SW DC. The Lamond Recreation Center Rehabilitation includes the renovation of the Gymnasium complete with a refurbished floor, repaired bleachers, installation of wall padding, freshly painted walls, installation of new sports equipment and furniture. The renovation of the Lobby, Offices and Hallways at Lamond included the installation of the new tile and counter tops, the installation of new directional sign, and providing new furniture and electronic devices. Exterior repairs included the installation of a new walkway, repair flooring, fencing and gates at the playground, power-washing the building, and repainting the parking lines, and cleaning and improving landscaping Francis Gregory Neighborhood Library Address: 3660 Alabama Ave, SE, Washington, DC August 2011-January 2012 Silver $2,500,000.00 ($12,000,000.00) 22,500 sq.ft. Project Coordinator Ground up LEED Silver 22,500 square-foot facility. The library seats more than 200 users and allows easy access to state of the art technology, and education materials. This is revolutionary new library construction project. I was involved in all pre- construction and design-build services. During the construction phase, I was in the primary quality control contractor overseeing and managing the expansive and complex exterior curtain wall system and interior finishes. Amidon Elementary School Phase 1 Project Address: 401 I St, SW, Washington, DC April 2012-September 2012 - $5,500,000.00 34,300 sq. ft. Project Coordinator DCPS (District of Columbia Public Schools) project of an interior fit out of existing classrooms, corridors and student common areas plus new MEP Systems. Renovation inclueded: Concrete, Masonry, Metal Fabrications, Doors, Interior Glazing, Finishes and FF&E. These Phase 1 projects are often referred to as the “Summer Miracle”, having only eight weeks to complete almost an entire school. My role was to coordinate the construction and pre-construction, quality control, budget control activities of this fast track project. As a result construction was finished well ahead of the needed completion dates and within budget; so the kids could return to school. McKinley Tech Middle School Address: 151 T St, NE, Washington, DC November 2012-October 2013 Platinum $12,000,000.00 66,000 sq. ft. Pre-Construction and LEED Coordinator Modernization of 3 levels of existing school building. Renovation include classrooms, labs, multipurpose room and offices to be built. Scope of work contains of Demo, Testing, Concrete flooring infill, CMU masonry for elevator shaft, Structure stabilization of existing beams, Exterior Canopy, Doors & hardware, FF&E, Millwork, Casework, Low voltage Structure cables, Intercom and master clock system, Smart projectors, Paint, Hardwood flooring, Ceramic Tile, Rubber Flooring, Drywall, Ceiling, Mechanical, Electrical, Sprinkler, Plumbing, Elevator, Specialties, CCTV, Intrusion system, Fire Extinguisher, Roof and Paving. PROJECT WORK EXPERIENCE AT BROUGHTON CONSTRUCTION COMPANY, LLC
  • 2. Stuart Hobson Middle School Address: 410 E St NE, Washington, DC November 2013-August 2015 Gold $22,000,000.00 80,000 sq. ft. Pre-Construction and LEED Coordinator Scope of work included complete MEP upgrade to the existing systems, a gym renovation, and a Museum Program that includes a 13,918 sf building addition. MEP upgrades will include all new heating and cooling equipment to control room temperature and new ventilation equipment to provide improved indoor air quality. The gym renovation component will include the demolition of two small gyms and combining them to create a modern full-sized middle school gym. The Museum Program will include space for an Art Room, Museum Science Room, Drama/Choral Room, and a Music/Band Room. Classrooms will also incorporate new flooring, wall finishes, acoustical ceilings, IT upgrades, furniture, and light fixtures. Other school improvements include a renovated main entrance lobby, administration area, corridors, stairwells, and all new toilet rooms. Plummer Elementary School Address: 4601 Texas Avenue, SE Washington, DC March 2014-August 2015 Gold $15,500,000.00 35,000 sq. ft. Pre-Construction and LEED Coordinator Renovation/Modernization included the following: Replacement of mechanical, electrical and plumbing systems; enlarge 25 classrooms for Pre-K through 5th grade students; abatement of asbestos insulation and encapsulation of HAZMAT materials; installation of new interior finishes and furniture; new windows; new elevator, new double-story entrance lobby; upgrade of technology and IT systems.