SlideShare a Scribd company logo
1 of 8
Download to read offline
Robert I. Mothershed
+ 2611 Vallejo Street- Unit 11 - Los Angeles, CA 90031 USA
Phone : 310.972.0973
Email : rob@robmothershed.net
Website: www.robmothershed.net
EDUCATION LA USCAD - Revit 2009 Parametric SoftwareTraining - Certificate (2008)
Clemson University Graduate School of Design & Building (May 2002) Master of Architecture
(2001)Study Abroad Opportunity: Charles E. Daniel Center of Urban Studies in Genoa, Italy
Clemson University College of Art, Architecture, and Humanities (December 1996) BS in Design
Midland Technical College, Columbia S.C. AEC Program (1992-1994)
AWARDS Harrison and Anne Forrester Travel fellowship – One semester of all academic/ travel expenses paid at the
Charles E. Daniel Center of Urban Studies in Genoa, Italy
First Place HOK (Hellmouth, Obata, and Kassabaum) Award – Senior Exit Thesis Project (1996)
Allen Thompkin’s Scholarship Award for Outstanding Professional Leadership (Chapter President AIAS, 1996)
AIACC Interior Design Award- Merit Award- Brightleaf Cosemetic & Holistic Dental Office- Charles Bernstein
Architect- Project Design team member
SCIARC - Active Mentor / Intern Supervisor - 3 undergraduate students, Summer 2014
AIAS Chapter President / Board of Directors, AIAS South Carolina, 1994,1995, 1996
Clemson Advancement Foundation,CAF - University President’s Student Committee
The American Academy in Rome-Los Angeles Chapter membership
Cal- Poly Pomona - PHD Thesis Advisor - Regenerative Studies 2011
Anderson College - Anderson , South Carolina (Spring + Fall 2000)
--Adjunct Professor for two undergraduate courses : Art 353 (Architectural Materials and Methods)
--Art 151 (Introduction to Architectural Drawing)
Clemson University - Clemson, South Carolina (Fall 2000 + Fall/Spring 2001/2002)
--Teaching Assistant for second year design studio for Professor Maureen Zell and Dr. Jane Hurt
COMPUTER
SKILLS
ACADEMIC
U of F - Prosthetic digression- Plexus r+d
SCI-ARC-office team memember - J:PA
Submitted Entries / Proposed Projects >DAT[A] >>>Digital Atelier Terrafirmative (ANARCHITECTURE)
2014 Guggenheim Museum , Helsinki Finland
2014 Budapest , National Gallery and Ludwig Contemporary Museum
2014 Lucas Museum, Chicago
2013 Taichung Cultural Center, Libray and Fine Arts Center
2013 House of Pink Floyd, 1st place , Second design phase series
2013 Kinmen Passenger Ferry Terminal
2012 KCRW - Mobile Recording Studio, Los Angeles
2011 Dwight D. Eisenhower Memorial , Washington D.C.
2011 Hong Kong Hotel Tower - Kowloon District
2011 HSR LA - High Speed Rail, Master plan Union Station, Los Angeles
2008 eVOLO - High Rise City Skyscraper Tower - Los Angeles
2008 Taiwan Performing Arts Center - 3 Theaters
2009 MJ Forever - 9th place (230 entries)
2007 SCION- Automobile Showroom, Anywhere USA
2006 LAp Dancer - 1st place, Call for LA Times Entries, Model @ USC Annenburg C.O.C.
2005 Sun Chair - Metropolis magazine , 4th place, 1300 entries.
2004 Chicago River Stations, AIA Chicago
2004 Tittot - Museum of Glass, Taipei City
2003 Chi Chi Earthquake Memorial, Landscape Design
2002 Library of the Future - Annual Japan Architect Issue
2002 New York Highline - Top 50 ( 800 entries ) Masterplan
INTERNATIONAL
COMPETITIONS
Director and
Founder
CONSTRUCTED
INSTALLATIONS
SCI-ARC Gallery Installation - J:PA (Office team member 2004)
Digressions : University of Florida - (Plexus r + d ( spring 2004)
MOD-01- Willow Street, 200 sf Temporary gallery/ studio - Fabricator / Builder
Cafe - The Last Bookstore, Historic Spring Arts District - Fabricator / Welder / Wood work
RED -Downtown Main Street Art Gallery Showing for Painted Brain - Models and Drawings
California Architect C34114
REGISTRATION NCARB Certificate
Total Career Experience: 14 years (plus/ minus)
AutoCAD 2014 / FormZ 6.5 / Revit 2014 / Rhino 5.0 / Fryrender / Dreamweaver 3.0/
Bentley Microstation 8.1/ Various Adobe Programs
PROFESSIONAL
EXPERIENCE
LAX: Los Angeles International Airport, Tom Bradley Int’l Terminal Expansion – Los Angeles, Califor-
nia
Vertical Transportation coordinator between HNTB and Fentress Architects. IM designer for planning and
design of $1.3 billion expansion of the Tom Bradley Terminal. The one million-SF project involves two new
concourses with A380 capable gates; a five level addition to the existing terminal core providing new conces-
sions, airline lounges and expanded Customs and Border Protection facilities; and provisions for a people
mover connection to a future midfield satellite concourse.
HNTB : San Diego International Airport Terminal 2 West Building and Airside Expansion - San Diego,
California - $300 Million USD
Digital designer for the SD, DD, and CD project phases of the Terminal 2 West Building and Airside Expansion
Project. The terminal expansion will consist of 430,000-SF of new public and non-public areas, providing 10
additional contact aircraft gates, while the airside pavement expansion will incorporate an area of 1.5 million-
SF including aircraft parking, aprons, taxiways and taxi lanes. This project was delivered using the design-
build delivery method.
HNTB Architecture
2009-2012
NAC Architecture
2013- Current Long Beach High School Number 2. LBUSD, $52 Million USD
2D + 3D BIM Drawing Exterior Model Manager / Office BIM Coordinator. Project just gained DSA approval.
Construction to begin this year.
Lorcan O’Herlihy
Architects: LOHA
2012 – 2013
Santa Monica Boulevard - SMB20
http://www.loharchitects.com/work/smb20
SMB20 - $18.5 Million.Project Manager position for 1.5 years. Wrote all Contractual agreements and took the
SD project thru DD and CD’s. Coordinated all project activities for Building Permit. Negotiated consultants
fees. Worked directly with national client and local developer. Lead project team staff through schedules, cost
estimates, details, BIM collision, and material specification. Site Demolition was started. Project is placed on
indefinite hold.
HNTB Northern County Transit District, Oceanside Transit Center – Oceanside, California
Project Architect for the development of new shelters on the existing west platform. The shelters are designed
to relate to existing commuter rail shelters in other stations on the system. Researched Eco-sensitive materi-
als that were cost viable. Organic PVs and custom 3M Resin poured canopies were designed. Design went to
a local fabrication manufacturer for bid.
Watson II Programming, West Los Angeles College - Culver City, California
Design manager for development of programming documents as the basis of design for design-build procure-
ment of an 18,000-SF facility for the college’s Motion Picture and Television Production School. The facility will
include a 10,000 SF studio-grade sound stage, production /set dressing shop and a prop house. The project
will be designed to achieve a LEED Silver rating.
P.E. II Programming, West Los Angeles College - WLACC
Design manager for development of programming documents as the basis of design for design-build procure-
ment of 17,000-SF of new athletics and physical education/dance department facilities. The facilities pro-
grammed include a new dance rehearsal studio and a dance performance studio, new athletics team rooms,
locker rooms, showers and restroom facilities, as well as improvements to the baseball stadium dugouts,
spectator seating/ spectator experience and a new baseball storage/field maintenance facility. The project
will be designed to achieve a LEED Silver rating.
Facilities, Maintenance & Operations Programming -WLACC
Design manager for development of programming documents as the basis of design for design-build pro-
curement of 14,000-SF of new administrative, shop, storage and warehouse spaces for the campus facilities
department.
SR99- Seattle - HNTB
BIM/CAD Project Architect for Tunnel Operations Buildings ( North and South). Provided QAQC for project
submission. The tunnel will be the biggest in diameter ever built. The TBM tunnel has 57.5 FT diameter and
9273 mining. The interior tunnel will contain two stacked roads (North Bound and South Bound) with two
lines each: Tunnel ventilation duct and egress corridor and utilidor. Sophisticated electrical and mechanical
systems: ventilation, CO2 monitoring, drainage and pumping, fire suppression, security, communication and
SCADA. The main two operations buildings will have the following dimensions: North:78,205 SF and South:
52,339 SF
Health Sciences Education Building, Phoenix Biomedical Campus
University of Arizona, Northern Arizona University - $280 Million USD
Assisted the lead principal Architect in all 3D massing, rendering, plan, elevation, material studies. Lead the
digital BIM Model management. Worked SD and DD phases for 13 months. This was a GMP project that initi-
atly had 700,000 SF of assignable program. The building was reduced three times to fit budget. Future phases
include 2 more 12 storey lab buildings. he HSEB contains flexible classrooms, simulation laboratories, gross
anatomy facilities, pre-clinical training facilities, learning resources center, student services, faculty offices and
administrative space. Inspired by Arizona’s iconic canyon formations, the façade meets objective criteria for
thermal performance and durability, while creating an architectural expression specific to the building’s place
and time. CO Architects: Executive & Design Architect; Ayers Saint Gross: Associate Architect. Transolar was
contracted to assist in the SD phase and their data was implemented at various charettes. Jonathan Kanda
was the PM in charge.
COArchitects
2008-2009
PROFESSIONAL
EXPERIENCE
San Pedro High School, John & Muriel Olguin Campus
Los Angeles Unified School District - San Pedro, CA
Worked with lead office designer Dennis Macfadden with the Gymnasium, Library, and Multi-Purpose spaces.
I added interior options for seeing how daylight worked against glare. The assignments to coordinate spaces
was entered into the BIM model by the BIM team. My CD responsibilities were to model and render only.
Life Sciences Center
Loyola Marymount University- Los Angeles, CA
Worked on SD directly with Bob Steel ( team designer) to win this short list competition. I supported the
project team with digital content, printed 3D models, and 3D renderings to win the work. We developed over
14 schemes in the 4 months. The new building designed under the LMU Campus Master Plan, the science
center establishes new campus aesthetic standards in a modern, interdisciplinary facility for biology, chem-
istry and natural science. The science center contains teaching laboratories, lab support space, faculty of-
fices, classrooms, shared public spaces, a 300-seat auditorium serving the entire campus, and a 300-vehicle
subterranean parking structure.
HSEB HSEB
LMU
LAUSD
HSEB
Lookinglass
Architecture and
Design
2007-2008
East Valley Adult Center - Sherman Oaks, CA
Executed working CD drawings for the 17,600 SF project. LGA was the executive architect to RCHS. We
performed final exterior CD drawings and specifications. Project was $625 per SF in 2008. Emil Mertzel
was in charge of contract development. My assigned task coordinated working specs and engineering
systems. There are three main planning blocks for the site. Exterior materials were standing seam metal,
CMU, and Portland cement plaster.
Carrier Johnson Architects
Costa Mesa and San Diego, California, USA (Sept 2004-Jan 2005, July 2005-Feb. 2006)
CSU Dominguez Hill Learning Resource Addition and Renovation (DD)
Assisted with overall design development and State Board Chancellor Approval
Various task components included building physical pedestrian bridge models, electronically mapping
natural sun path movements through the primary exterior entry courtyard, material area estimate take-
offs, documenting existing site conditions, and updated campus project site plan.
Claremont University Master Plan- Graduate School Housing (DD)
Modified and updated site plan with new floor plan configurations.
VCCCD Fire / Sheriff Academy (SD)
Assisted with client power-point digital presentations
CIM Housing I-Hope Tower- Downtown LA- (DD)
Developed new rooftop penthouse/loft units (live /work style).
Newport Office Building – (DD)
Coordinated all design-build drawings for all team disciplines, building department official, construction
contractors.
Westin Hotel Study – Ontario, CA (SD)
UC-Irvine-Social and Behavioral Sciences Building (SD)
Project design assistant, printed and fabricated scaled digital study models, constructed physical site
models and program massing studies. Worked closely with manager to resolve working schemes that
provided efficient building solutions. Attended all client project kick-off user group meetings and presen-
tations. Managed current design drawings for campus director approvals.
Mariner’s Church Chapel (SD)
Prepared interior digital model renderings. Actively involved throughout the entire design charette itera-
tion process.
Oaklawn Masterplan – Chula Vista (SD)
Created with project manager’s direction, a new viable urban design solution for new non-traditional
housing neighborhood. This complex planning development framed a local vernacular of building with
modern placemaking. Finished a full schematic design package that integrated over 700 residential
units. Designed six complimentary prototypical town home unit types that were flexible and feasible.
Established presentation graphics and clarified concept models with program scope.
CSUDH Mariner’s
Prepared DD documents for Private Residential Cleints - 2 different houses
Project Coordinator - Lead Project Supervisor: Gregory Hathaway, 310-467-4292, Sheldon Liber
Submitted Professional Proposals / Fee Estimates – RFQ/RFP
Aerospace Corporation Headquarters + Town of Apple Valley ( New Public Works Facility)
Santa Clarita Sports Complex- Phase 4 Gymnasium Facility + Rock-it Cargo at LAX. Lead al field docu-
mentation drawings for both active buildings and executed overall building furniture drawing.
New Gymnasium Addition at the Fiore Teen Center –Thousand oaks, CA (DD)
Updated site drawings, floor plans, sections, elevations and roof plans for client approval. Coordinated
digital model renderings with outside resources.
Beverly Hills Unified School District – Modernization school projects for Hawthorne, Horace
Mann, and El Rodeo (CD).
Job captain position. Three different urban campus locations that primarily included Auditorium and Toi-
let facility upgrades. Created all reference plan, section, elevation drawings for entire building project.
Managed all electronic file distribution, format, information for DSA review and submission. Generated
accessible sign package. Met with all educational user client groups for program scope development and
assisted with finalizing summer maintenance items.
Liberstudio Architects
2007-2008
FER Architects
2006-2007
Project Coordinator - 3D modeler
Garfield House - Single Family house in La Canada
San Marcos Housing- Hillside Development - 88 new townhomes
M.U.D. - Louisville Kentucky, Mixed Use development
Brooklyn Atlantic Yards Master Plan, New York (SD)
4 Hotel/ Residential Towers, NBA Arena, underground parking with renovated Subway station- 4.3 billion
dollar construction project. Schematic design team member responsibilities included: Maintaining cur-
rent arena floor plans with actual program scope areas. Coordinated client presentation drawings with
digital parametric model and various physical Masterplan design models. Assisted structural engineering
consultant with locating cantilevered columns with underground parking entrances, storage docks, freight
elevators, delivery stations, and utility connections. Weekly task assignments helped resolve vertical and
horizontal circulation issues with media security, private team and public area access concerns.
Lead Project Manager, Tensho Takemori
Gehry Partners, LLP
2005
Hardrock HQ - CAD architect / 2d designer
Callus- Shortridge/ MCBA
2005
Dentist office in Santa Monica - 3D designer - DD/CDs
Jones,Partners:Architects
El Segundo, California
2004
Temporarily Contracted as a Project Assistant for meeting current design/build project deadlines. Respon-
sibilities were focused on steel fabrication and material assembly. Construction projects include: SCI-
ARC Gallery Installation - LA / Jaunita Townhomes - Hermosa Beach (interior stairs, balcony screens,
metal deck ceiling, guardrails) / Spotwelder’s 4 + 6 20’ Metal Container Addition (structural joists/ beams/
girders )- Venice Beach. I reported to Doug Jackson as field fabricator.
Built digital 3D models for commissioned and competition projects. Managed construction document
drawings for building permits and pricing. Researched and specified new building materials and practices.
Assisted with institutional client presentations. Prepared project portfolios and workbooks. Coordinated
and drafted design details along with generating door, window, and finish schedules. Helped assemble
and design 2 gallery design exhibitions (1 academic /1 museum).
Various Projects include: SPSU Identity Tower, Student Lawn, and Pedestrian Plaza / SPSUCom-
petitions Laboratory / Mooreland Avenue Live/Work / Ponce de Leon Townhomes / University
of Florida Exhibition /Chi-Chi Earthquake Memorial / Memorial Street Train Depot / Little Azio’s /
Plexus r + d
Atlanta
March 2003-Sept. 2004
Lexington County Judicial and Administrative Center l Lexington, SC
Completed digital model and generated three-dimensional visualization for county government
presentation, drafted Schematic Design and Design Development Drawings for the 239 K facility and
prepared Conceptual Design Document for Press Release
ASD5
Children’s Learning Center - Worked directly with school district facility director . Modernization project
Oconee County Courthouse - Walhalla, SC
Assisted in master plan study for new 68k SF center, aided in schematic design, design development
phases and constructed 3D renderings for government client
Watkinsville High School - Oconee, GA
Built digital models and assembled illustrations for education client and team consultants
worked on CDs construction document permit/ bid set (2002)
Feasibility Survey l School District of Pickens County, SC
Analyzed, documented, and researched 12 public elementary, middle, and high schools at different
rural locations that would incorporate a new model program for various core student populations
Developed company website in August of 1999
FJCI
Frank J. Clark
1999-March 2003
Littlejohn Coliseum Renovation/Addition l Clemson University
Field verified existing facility, revised Design Development drawings, administered material research,
coordinated construction documents, and participated in SD and DD phases with Sports Group
Greenville History Museum l Greenville, SC
Assisted in Pre-schematic Programming Phase and formulated building footprint location
Medical University of South Carolina - Operating Room Expansion l Charleston, SC
Coordinated schematic interior design into a construction renovation drawing set and performed
document details for record files
*IPTAY- Avenue of Champions Project l Clemson University
Constructed scalable stadium site model for design presentation that promoted public outdoor
ceremonial for new athletic spaces
HOK Architects, Inc.
Greenville, SC
(May 1998 – June 1999 :
Arch. Dept. was closed)
REFERENCES Emil Mertzel ,AIA : Owner of Lookinglass Architecture and Design 310.766.8123
Ron Lee : Structural Engineer - Principal Saifil Bouquet Engineer 626.304.2616
Ray Varela ,AIA: Design Partner - Carrier Johnson Architects / Planners 949.939.2027
Andrew Wilson : Master Spec Writer - AWC 323.972.7800
Stephen Rhoads AIA: past Vice President of FJClark, Inc. 609.730.3880
Dr. Jane Hurt: Full Professor at Clemson University 864.656.3913
Arshia Mamoodi: past owner of Null.Lab 310.951.2986
Erik Lewitt, AIA: owner of Plexus r + d 404.519.7728
Helsinki Museum - Design by Rob Mothershed 2014

More Related Content

Similar to Rob Mothershed Architect 310-972-0973.pdf

RESUME FOR STEVE RIMNAC ARCHITECT 2017
RESUME FOR STEVE RIMNAC ARCHITECT 2017RESUME FOR STEVE RIMNAC ARCHITECT 2017
RESUME FOR STEVE RIMNAC ARCHITECT 2017Stephen P. Rimnac
 
Stan Shipley Resume, Projects 11mr18
Stan Shipley   Resume, Projects 11mr18Stan Shipley   Resume, Projects 11mr18
Stan Shipley Resume, Projects 11mr18stan_shipley
 
Doug's Resume 10-18-14
Doug's Resume 10-18-14Doug's Resume 10-18-14
Doug's Resume 10-18-14Douglas Rogge
 
Francisco Farias_CV 2016
Francisco Farias_CV 2016Francisco Farias_CV 2016
Francisco Farias_CV 2016Francisco Far
 
Long Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramLong Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramCordoba Corp
 
Mai gabica cv 2020
Mai gabica cv 2020Mai gabica cv 2020
Mai gabica cv 2020maigabica
 
Matthew Vinten Resume2
Matthew Vinten Resume2Matthew Vinten Resume2
Matthew Vinten Resume2guest70408e
 
Design portfolio 2014 - Deepal Kilewala
Design portfolio 2014 - Deepal Kilewala Design portfolio 2014 - Deepal Kilewala
Design portfolio 2014 - Deepal Kilewala Deepal Kilewala
 
Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig
 
I-3 Correctional Work
I-3 Correctional WorkI-3 Correctional Work
I-3 Correctional Workbuckostuco
 
Brian Hauff Resume - 2015
Brian Hauff Resume - 2015Brian Hauff Resume - 2015
Brian Hauff Resume - 2015Brian Hauff
 
2010 Li Portfolio
2010 Li Portfolio2010 Li Portfolio
2010 Li Portfolioberlyfish
 

Similar to Rob Mothershed Architect 310-972-0973.pdf (20)

RESUME FOR STEVE RIMNAC ARCHITECT 2017
RESUME FOR STEVE RIMNAC ARCHITECT 2017RESUME FOR STEVE RIMNAC ARCHITECT 2017
RESUME FOR STEVE RIMNAC ARCHITECT 2017
 
Stan Shipley Resume, Projects 11mr18
Stan Shipley   Resume, Projects 11mr18Stan Shipley   Resume, Projects 11mr18
Stan Shipley Resume, Projects 11mr18
 
Leslie Lopena_CV
Leslie Lopena_CVLeslie Lopena_CV
Leslie Lopena_CV
 
Doug's Resume 10-18-14
Doug's Resume 10-18-14Doug's Resume 10-18-14
Doug's Resume 10-18-14
 
Francisco Farias_CV 2016
Francisco Farias_CV 2016Francisco Farias_CV 2016
Francisco Farias_CV 2016
 
Long Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramLong Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction Program
 
M walker resume_current
M walker resume_currentM walker resume_current
M walker resume_current
 
Mai gabica cv 2020
Mai gabica cv 2020Mai gabica cv 2020
Mai gabica cv 2020
 
Logan McDowell Resume
Logan McDowell ResumeLogan McDowell Resume
Logan McDowell Resume
 
CV & examples of work
CV & examples of workCV & examples of work
CV & examples of work
 
Kenneth_Meding_Resume
Kenneth_Meding_ResumeKenneth_Meding_Resume
Kenneth_Meding_Resume
 
Work_HMichaelFletcher
Work_HMichaelFletcherWork_HMichaelFletcher
Work_HMichaelFletcher
 
Matthew Vinten Resume2
Matthew Vinten Resume2Matthew Vinten Resume2
Matthew Vinten Resume2
 
Design portfolio 2014 - Deepal Kilewala
Design portfolio 2014 - Deepal Kilewala Design portfolio 2014 - Deepal Kilewala
Design portfolio 2014 - Deepal Kilewala
 
Christopher Buehler portfolio
Christopher Buehler portfolioChristopher Buehler portfolio
Christopher Buehler portfolio
 
Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16Mark Koenig Resume 8_16_16
Mark Koenig Resume 8_16_16
 
I-3 Correctional Work
I-3 Correctional WorkI-3 Correctional Work
I-3 Correctional Work
 
KLupdate 2015
KLupdate 2015KLupdate 2015
KLupdate 2015
 
Brian Hauff Resume - 2015
Brian Hauff Resume - 2015Brian Hauff Resume - 2015
Brian Hauff Resume - 2015
 
2010 Li Portfolio
2010 Li Portfolio2010 Li Portfolio
2010 Li Portfolio
 

Recently uploaded

Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...ankitnayak356677
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfParomita Roy
 
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...Suhani Kapoor
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonDelhi Call girls
 
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...Pooja Nehwal
 
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Servicejennyeacort
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Yantram Animation Studio Corporation
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝soniya singh
 
NATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detailNATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detailDesigntroIntroducing
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Delhi Call girls
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130Suhani Kapoor
 
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...Suhani Kapoor
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Roomdivyansh0kumar0
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiSuhani Kapoor
 
A level Digipak development Presentation
A level Digipak development PresentationA level Digipak development Presentation
A level Digipak development Presentationamedia6
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentationamedia6
 
如何办理(UVa毕业证书)弗吉尼亚大学毕业证毕业证(文凭)成绩单原版一比一定制
如何办理(UVa毕业证书)弗吉尼亚大学毕业证毕业证(文凭)成绩单原版一比一定制如何办理(UVa毕业证书)弗吉尼亚大学毕业证毕业证(文凭)成绩单原版一比一定制
如何办理(UVa毕业证书)弗吉尼亚大学毕业证毕业证(文凭)成绩单原版一比一定制didi bibo
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...Call Girls in Nagpur High Profile
 
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 

Recently uploaded (20)

Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
Raj Nagar Extension Call Girls 9711199012 WhatsApp No, Delhi Escorts in Raj N...
 
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdfChapter 19_DDA_TOD Policy_First Draft 2012.pdf
Chapter 19_DDA_TOD Policy_First Draft 2012.pdf
 
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
VIP Russian Call Girls in Gorakhpur Deepika 8250192130 Independent Escort Ser...
 
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk GurgaonCheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
Cheap Rate ➥8448380779 ▻Call Girls In Iffco Chowk Gurgaon
 
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...Kurla Call Girls Pooja Nehwal📞 9892124323 ✅  Vashi Call Service Available Nea...
Kurla Call Girls Pooja Nehwal📞 9892124323 ✅ Vashi Call Service Available Nea...
 
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts ServiceCall Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
Call Girls In Safdarjung Enclave 24/7✡️9711147426✡️ Escorts Service
 
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
Captivating Charm: Exploring Marseille's Hillside Villas with Our 3D Architec...
 
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
Call Girls in Okhla Delhi 💯Call Us 🔝8264348440🔝
 
NATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detailNATA 2024 SYLLABUS, full syllabus explained in detail
NATA 2024 SYLLABUS, full syllabus explained in detail
 
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
Best VIP Call Girls Noida Sector 44 Call Me: 8448380779
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
 
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
VIP Russian Call Girls in Saharanpur Deepika 8250192130 Independent Escort Se...
 
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130  Available With RoomVIP Kolkata Call Girl Gariahat 👉 8250192130  Available With Room
VIP Kolkata Call Girl Gariahat 👉 8250192130 Available With Room
 
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service AmravatiVIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
VIP Call Girl Amravati Aashi 8250192130 Independent Escort Service Amravati
 
A level Digipak development Presentation
A level Digipak development PresentationA level Digipak development Presentation
A level Digipak development Presentation
 
The history of music videos a level presentation
The history of music videos a level presentationThe history of music videos a level presentation
The history of music videos a level presentation
 
如何办理(UVa毕业证书)弗吉尼亚大学毕业证毕业证(文凭)成绩单原版一比一定制
如何办理(UVa毕业证书)弗吉尼亚大学毕业证毕业证(文凭)成绩单原版一比一定制如何办理(UVa毕业证书)弗吉尼亚大学毕业证毕业证(文凭)成绩单原版一比一定制
如何办理(UVa毕业证书)弗吉尼亚大学毕业证毕业证(文凭)成绩单原版一比一定制
 
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
VVIP Pune Call Girls Hadapsar (7001035870) Pune Escorts Nearby with Complete ...
 
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Harsh Vihar (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 

Rob Mothershed Architect 310-972-0973.pdf

  • 1. Robert I. Mothershed + 2611 Vallejo Street- Unit 11 - Los Angeles, CA 90031 USA Phone : 310.972.0973 Email : rob@robmothershed.net Website: www.robmothershed.net EDUCATION LA USCAD - Revit 2009 Parametric SoftwareTraining - Certificate (2008) Clemson University Graduate School of Design & Building (May 2002) Master of Architecture (2001)Study Abroad Opportunity: Charles E. Daniel Center of Urban Studies in Genoa, Italy Clemson University College of Art, Architecture, and Humanities (December 1996) BS in Design Midland Technical College, Columbia S.C. AEC Program (1992-1994) AWARDS Harrison and Anne Forrester Travel fellowship – One semester of all academic/ travel expenses paid at the Charles E. Daniel Center of Urban Studies in Genoa, Italy First Place HOK (Hellmouth, Obata, and Kassabaum) Award – Senior Exit Thesis Project (1996) Allen Thompkin’s Scholarship Award for Outstanding Professional Leadership (Chapter President AIAS, 1996) AIACC Interior Design Award- Merit Award- Brightleaf Cosemetic & Holistic Dental Office- Charles Bernstein Architect- Project Design team member SCIARC - Active Mentor / Intern Supervisor - 3 undergraduate students, Summer 2014 AIAS Chapter President / Board of Directors, AIAS South Carolina, 1994,1995, 1996 Clemson Advancement Foundation,CAF - University President’s Student Committee The American Academy in Rome-Los Angeles Chapter membership Cal- Poly Pomona - PHD Thesis Advisor - Regenerative Studies 2011 Anderson College - Anderson , South Carolina (Spring + Fall 2000) --Adjunct Professor for two undergraduate courses : Art 353 (Architectural Materials and Methods) --Art 151 (Introduction to Architectural Drawing) Clemson University - Clemson, South Carolina (Fall 2000 + Fall/Spring 2001/2002) --Teaching Assistant for second year design studio for Professor Maureen Zell and Dr. Jane Hurt COMPUTER SKILLS ACADEMIC U of F - Prosthetic digression- Plexus r+d SCI-ARC-office team memember - J:PA Submitted Entries / Proposed Projects >DAT[A] >>>Digital Atelier Terrafirmative (ANARCHITECTURE) 2014 Guggenheim Museum , Helsinki Finland 2014 Budapest , National Gallery and Ludwig Contemporary Museum 2014 Lucas Museum, Chicago 2013 Taichung Cultural Center, Libray and Fine Arts Center 2013 House of Pink Floyd, 1st place , Second design phase series 2013 Kinmen Passenger Ferry Terminal 2012 KCRW - Mobile Recording Studio, Los Angeles 2011 Dwight D. Eisenhower Memorial , Washington D.C. 2011 Hong Kong Hotel Tower - Kowloon District 2011 HSR LA - High Speed Rail, Master plan Union Station, Los Angeles 2008 eVOLO - High Rise City Skyscraper Tower - Los Angeles 2008 Taiwan Performing Arts Center - 3 Theaters 2009 MJ Forever - 9th place (230 entries) 2007 SCION- Automobile Showroom, Anywhere USA 2006 LAp Dancer - 1st place, Call for LA Times Entries, Model @ USC Annenburg C.O.C. 2005 Sun Chair - Metropolis magazine , 4th place, 1300 entries. 2004 Chicago River Stations, AIA Chicago 2004 Tittot - Museum of Glass, Taipei City 2003 Chi Chi Earthquake Memorial, Landscape Design 2002 Library of the Future - Annual Japan Architect Issue 2002 New York Highline - Top 50 ( 800 entries ) Masterplan INTERNATIONAL COMPETITIONS Director and Founder CONSTRUCTED INSTALLATIONS SCI-ARC Gallery Installation - J:PA (Office team member 2004) Digressions : University of Florida - (Plexus r + d ( spring 2004) MOD-01- Willow Street, 200 sf Temporary gallery/ studio - Fabricator / Builder Cafe - The Last Bookstore, Historic Spring Arts District - Fabricator / Welder / Wood work RED -Downtown Main Street Art Gallery Showing for Painted Brain - Models and Drawings California Architect C34114 REGISTRATION NCARB Certificate Total Career Experience: 14 years (plus/ minus) AutoCAD 2014 / FormZ 6.5 / Revit 2014 / Rhino 5.0 / Fryrender / Dreamweaver 3.0/ Bentley Microstation 8.1/ Various Adobe Programs
  • 2. PROFESSIONAL EXPERIENCE LAX: Los Angeles International Airport, Tom Bradley Int’l Terminal Expansion – Los Angeles, Califor- nia Vertical Transportation coordinator between HNTB and Fentress Architects. IM designer for planning and design of $1.3 billion expansion of the Tom Bradley Terminal. The one million-SF project involves two new concourses with A380 capable gates; a five level addition to the existing terminal core providing new conces- sions, airline lounges and expanded Customs and Border Protection facilities; and provisions for a people mover connection to a future midfield satellite concourse. HNTB : San Diego International Airport Terminal 2 West Building and Airside Expansion - San Diego, California - $300 Million USD Digital designer for the SD, DD, and CD project phases of the Terminal 2 West Building and Airside Expansion Project. The terminal expansion will consist of 430,000-SF of new public and non-public areas, providing 10 additional contact aircraft gates, while the airside pavement expansion will incorporate an area of 1.5 million- SF including aircraft parking, aprons, taxiways and taxi lanes. This project was delivered using the design- build delivery method. HNTB Architecture 2009-2012 NAC Architecture 2013- Current Long Beach High School Number 2. LBUSD, $52 Million USD 2D + 3D BIM Drawing Exterior Model Manager / Office BIM Coordinator. Project just gained DSA approval. Construction to begin this year. Lorcan O’Herlihy Architects: LOHA 2012 – 2013 Santa Monica Boulevard - SMB20 http://www.loharchitects.com/work/smb20 SMB20 - $18.5 Million.Project Manager position for 1.5 years. Wrote all Contractual agreements and took the SD project thru DD and CD’s. Coordinated all project activities for Building Permit. Negotiated consultants fees. Worked directly with national client and local developer. Lead project team staff through schedules, cost estimates, details, BIM collision, and material specification. Site Demolition was started. Project is placed on indefinite hold. HNTB Northern County Transit District, Oceanside Transit Center – Oceanside, California Project Architect for the development of new shelters on the existing west platform. The shelters are designed to relate to existing commuter rail shelters in other stations on the system. Researched Eco-sensitive materi- als that were cost viable. Organic PVs and custom 3M Resin poured canopies were designed. Design went to a local fabrication manufacturer for bid. Watson II Programming, West Los Angeles College - Culver City, California Design manager for development of programming documents as the basis of design for design-build procure- ment of an 18,000-SF facility for the college’s Motion Picture and Television Production School. The facility will include a 10,000 SF studio-grade sound stage, production /set dressing shop and a prop house. The project will be designed to achieve a LEED Silver rating. P.E. II Programming, West Los Angeles College - WLACC Design manager for development of programming documents as the basis of design for design-build procure- ment of 17,000-SF of new athletics and physical education/dance department facilities. The facilities pro- grammed include a new dance rehearsal studio and a dance performance studio, new athletics team rooms, locker rooms, showers and restroom facilities, as well as improvements to the baseball stadium dugouts, spectator seating/ spectator experience and a new baseball storage/field maintenance facility. The project will be designed to achieve a LEED Silver rating. Facilities, Maintenance & Operations Programming -WLACC Design manager for development of programming documents as the basis of design for design-build pro- curement of 14,000-SF of new administrative, shop, storage and warehouse spaces for the campus facilities department. SR99- Seattle - HNTB BIM/CAD Project Architect for Tunnel Operations Buildings ( North and South). Provided QAQC for project submission. The tunnel will be the biggest in diameter ever built. The TBM tunnel has 57.5 FT diameter and 9273 mining. The interior tunnel will contain two stacked roads (North Bound and South Bound) with two lines each: Tunnel ventilation duct and egress corridor and utilidor. Sophisticated electrical and mechanical systems: ventilation, CO2 monitoring, drainage and pumping, fire suppression, security, communication and SCADA. The main two operations buildings will have the following dimensions: North:78,205 SF and South: 52,339 SF
  • 3. Health Sciences Education Building, Phoenix Biomedical Campus University of Arizona, Northern Arizona University - $280 Million USD Assisted the lead principal Architect in all 3D massing, rendering, plan, elevation, material studies. Lead the digital BIM Model management. Worked SD and DD phases for 13 months. This was a GMP project that initi- atly had 700,000 SF of assignable program. The building was reduced three times to fit budget. Future phases include 2 more 12 storey lab buildings. he HSEB contains flexible classrooms, simulation laboratories, gross anatomy facilities, pre-clinical training facilities, learning resources center, student services, faculty offices and administrative space. Inspired by Arizona’s iconic canyon formations, the façade meets objective criteria for thermal performance and durability, while creating an architectural expression specific to the building’s place and time. CO Architects: Executive & Design Architect; Ayers Saint Gross: Associate Architect. Transolar was contracted to assist in the SD phase and their data was implemented at various charettes. Jonathan Kanda was the PM in charge. COArchitects 2008-2009 PROFESSIONAL EXPERIENCE San Pedro High School, John & Muriel Olguin Campus Los Angeles Unified School District - San Pedro, CA Worked with lead office designer Dennis Macfadden with the Gymnasium, Library, and Multi-Purpose spaces. I added interior options for seeing how daylight worked against glare. The assignments to coordinate spaces was entered into the BIM model by the BIM team. My CD responsibilities were to model and render only. Life Sciences Center Loyola Marymount University- Los Angeles, CA Worked on SD directly with Bob Steel ( team designer) to win this short list competition. I supported the project team with digital content, printed 3D models, and 3D renderings to win the work. We developed over 14 schemes in the 4 months. The new building designed under the LMU Campus Master Plan, the science center establishes new campus aesthetic standards in a modern, interdisciplinary facility for biology, chem- istry and natural science. The science center contains teaching laboratories, lab support space, faculty of- fices, classrooms, shared public spaces, a 300-seat auditorium serving the entire campus, and a 300-vehicle subterranean parking structure. HSEB HSEB LMU LAUSD HSEB
  • 4. Lookinglass Architecture and Design 2007-2008 East Valley Adult Center - Sherman Oaks, CA Executed working CD drawings for the 17,600 SF project. LGA was the executive architect to RCHS. We performed final exterior CD drawings and specifications. Project was $625 per SF in 2008. Emil Mertzel was in charge of contract development. My assigned task coordinated working specs and engineering systems. There are three main planning blocks for the site. Exterior materials were standing seam metal, CMU, and Portland cement plaster. Carrier Johnson Architects Costa Mesa and San Diego, California, USA (Sept 2004-Jan 2005, July 2005-Feb. 2006) CSU Dominguez Hill Learning Resource Addition and Renovation (DD) Assisted with overall design development and State Board Chancellor Approval Various task components included building physical pedestrian bridge models, electronically mapping natural sun path movements through the primary exterior entry courtyard, material area estimate take- offs, documenting existing site conditions, and updated campus project site plan. Claremont University Master Plan- Graduate School Housing (DD) Modified and updated site plan with new floor plan configurations. VCCCD Fire / Sheriff Academy (SD) Assisted with client power-point digital presentations CIM Housing I-Hope Tower- Downtown LA- (DD) Developed new rooftop penthouse/loft units (live /work style). Newport Office Building – (DD) Coordinated all design-build drawings for all team disciplines, building department official, construction contractors. Westin Hotel Study – Ontario, CA (SD) UC-Irvine-Social and Behavioral Sciences Building (SD) Project design assistant, printed and fabricated scaled digital study models, constructed physical site models and program massing studies. Worked closely with manager to resolve working schemes that provided efficient building solutions. Attended all client project kick-off user group meetings and presen- tations. Managed current design drawings for campus director approvals. Mariner’s Church Chapel (SD) Prepared interior digital model renderings. Actively involved throughout the entire design charette itera- tion process. Oaklawn Masterplan – Chula Vista (SD) Created with project manager’s direction, a new viable urban design solution for new non-traditional housing neighborhood. This complex planning development framed a local vernacular of building with modern placemaking. Finished a full schematic design package that integrated over 700 residential units. Designed six complimentary prototypical town home unit types that were flexible and feasible. Established presentation graphics and clarified concept models with program scope. CSUDH Mariner’s Prepared DD documents for Private Residential Cleints - 2 different houses
  • 5. Project Coordinator - Lead Project Supervisor: Gregory Hathaway, 310-467-4292, Sheldon Liber Submitted Professional Proposals / Fee Estimates – RFQ/RFP Aerospace Corporation Headquarters + Town of Apple Valley ( New Public Works Facility) Santa Clarita Sports Complex- Phase 4 Gymnasium Facility + Rock-it Cargo at LAX. Lead al field docu- mentation drawings for both active buildings and executed overall building furniture drawing. New Gymnasium Addition at the Fiore Teen Center –Thousand oaks, CA (DD) Updated site drawings, floor plans, sections, elevations and roof plans for client approval. Coordinated digital model renderings with outside resources. Beverly Hills Unified School District – Modernization school projects for Hawthorne, Horace Mann, and El Rodeo (CD). Job captain position. Three different urban campus locations that primarily included Auditorium and Toi- let facility upgrades. Created all reference plan, section, elevation drawings for entire building project. Managed all electronic file distribution, format, information for DSA review and submission. Generated accessible sign package. Met with all educational user client groups for program scope development and assisted with finalizing summer maintenance items. Liberstudio Architects 2007-2008 FER Architects 2006-2007 Project Coordinator - 3D modeler Garfield House - Single Family house in La Canada San Marcos Housing- Hillside Development - 88 new townhomes M.U.D. - Louisville Kentucky, Mixed Use development
  • 6. Brooklyn Atlantic Yards Master Plan, New York (SD) 4 Hotel/ Residential Towers, NBA Arena, underground parking with renovated Subway station- 4.3 billion dollar construction project. Schematic design team member responsibilities included: Maintaining cur- rent arena floor plans with actual program scope areas. Coordinated client presentation drawings with digital parametric model and various physical Masterplan design models. Assisted structural engineering consultant with locating cantilevered columns with underground parking entrances, storage docks, freight elevators, delivery stations, and utility connections. Weekly task assignments helped resolve vertical and horizontal circulation issues with media security, private team and public area access concerns. Lead Project Manager, Tensho Takemori Gehry Partners, LLP 2005
  • 7. Hardrock HQ - CAD architect / 2d designer Callus- Shortridge/ MCBA 2005 Dentist office in Santa Monica - 3D designer - DD/CDs Jones,Partners:Architects El Segundo, California 2004 Temporarily Contracted as a Project Assistant for meeting current design/build project deadlines. Respon- sibilities were focused on steel fabrication and material assembly. Construction projects include: SCI- ARC Gallery Installation - LA / Jaunita Townhomes - Hermosa Beach (interior stairs, balcony screens, metal deck ceiling, guardrails) / Spotwelder’s 4 + 6 20’ Metal Container Addition (structural joists/ beams/ girders )- Venice Beach. I reported to Doug Jackson as field fabricator. Built digital 3D models for commissioned and competition projects. Managed construction document drawings for building permits and pricing. Researched and specified new building materials and practices. Assisted with institutional client presentations. Prepared project portfolios and workbooks. Coordinated and drafted design details along with generating door, window, and finish schedules. Helped assemble and design 2 gallery design exhibitions (1 academic /1 museum). Various Projects include: SPSU Identity Tower, Student Lawn, and Pedestrian Plaza / SPSUCom- petitions Laboratory / Mooreland Avenue Live/Work / Ponce de Leon Townhomes / University of Florida Exhibition /Chi-Chi Earthquake Memorial / Memorial Street Train Depot / Little Azio’s / Plexus r + d Atlanta March 2003-Sept. 2004 Lexington County Judicial and Administrative Center l Lexington, SC Completed digital model and generated three-dimensional visualization for county government presentation, drafted Schematic Design and Design Development Drawings for the 239 K facility and prepared Conceptual Design Document for Press Release ASD5 Children’s Learning Center - Worked directly with school district facility director . Modernization project Oconee County Courthouse - Walhalla, SC Assisted in master plan study for new 68k SF center, aided in schematic design, design development phases and constructed 3D renderings for government client Watkinsville High School - Oconee, GA Built digital models and assembled illustrations for education client and team consultants worked on CDs construction document permit/ bid set (2002) Feasibility Survey l School District of Pickens County, SC Analyzed, documented, and researched 12 public elementary, middle, and high schools at different rural locations that would incorporate a new model program for various core student populations Developed company website in August of 1999 FJCI Frank J. Clark 1999-March 2003
  • 8. Littlejohn Coliseum Renovation/Addition l Clemson University Field verified existing facility, revised Design Development drawings, administered material research, coordinated construction documents, and participated in SD and DD phases with Sports Group Greenville History Museum l Greenville, SC Assisted in Pre-schematic Programming Phase and formulated building footprint location Medical University of South Carolina - Operating Room Expansion l Charleston, SC Coordinated schematic interior design into a construction renovation drawing set and performed document details for record files *IPTAY- Avenue of Champions Project l Clemson University Constructed scalable stadium site model for design presentation that promoted public outdoor ceremonial for new athletic spaces HOK Architects, Inc. Greenville, SC (May 1998 – June 1999 : Arch. Dept. was closed) REFERENCES Emil Mertzel ,AIA : Owner of Lookinglass Architecture and Design 310.766.8123 Ron Lee : Structural Engineer - Principal Saifil Bouquet Engineer 626.304.2616 Ray Varela ,AIA: Design Partner - Carrier Johnson Architects / Planners 949.939.2027 Andrew Wilson : Master Spec Writer - AWC 323.972.7800 Stephen Rhoads AIA: past Vice President of FJClark, Inc. 609.730.3880 Dr. Jane Hurt: Full Professor at Clemson University 864.656.3913 Arshia Mamoodi: past owner of Null.Lab 310.951.2986 Erik Lewitt, AIA: owner of Plexus r + d 404.519.7728 Helsinki Museum - Design by Rob Mothershed 2014