Risk Assessment
During any group work there are a lot of obvious risks involved especially when
working around equipment, in this risk assessment I’ll be analyzing various risks
that could be seen as somewhat obvious however that doesn’t subtract from the
validity.

Identified risks

Location

Responsibility

Preventive
measures

All

Me/Actor

Weather

Outdoors

N/A

Common sensibility

All

Me/Actor

Problems with the
memory card

N/A

Me

Equipment

N/A

Me/Actors

Trip hazards

Outside

Me/Actors

In the event that an actor
or myself is unavailable
there will be
uncompromisable
rescheduling of the
filming and it will be
stressed that attendance
is vital to the projects
success.
The weather being
unpredictable and out of
anyone’s controller
timing will just have to
be adequate.
All will be done to make
All actors should ensure
to use their common
sense and preform their
task in a very
professional manner to
avoid any self caused or
actor caused injury.
Problems with the
memory card will be
handled by utilizing a
spare that will be carried
around at all times.
To avoid equipment
damage; it will be
stressed to the actors to
look after and properly
use equipment.
Again referring to
common sense, to avoid
tripping injuries when
working in a somewhat
unpredictable
environment such as the
outdoors. Care should be
taken when filming to

Illness/Injury
avoid tripping and
potentially causing
damage to yourself and
equipment.

More Related Content

Viewers also liked

Présentation du programme de l'atelier et des intervenants. La maîtrise du ri...
Présentation du programme de l'atelier et des intervenants. La maîtrise du ri...Présentation du programme de l'atelier et des intervenants. La maîtrise du ri...
Présentation du programme de l'atelier et des intervenants. La maîtrise du ri...Pôle Qualiméditerranée
 
An analysis of internet addiction levels of individuals according to various ...
An analysis of internet addiction levels of individuals according to various ...An analysis of internet addiction levels of individuals according to various ...
An analysis of internet addiction levels of individuals according to various ...Ida Norini Mahamad Tajudin
 
SharePoint 2013 integratie
SharePoint 2013 integratieSharePoint 2013 integratie
SharePoint 2013 integratieKjeld Punt
 
Presentatie matthijs sienot
Presentatie matthijs sienotPresentatie matthijs sienot
Presentatie matthijs sienotMandy Jolie
 
Selected funding calls 2014, tentative.
Selected funding calls 2014, tentative. Selected funding calls 2014, tentative.
Selected funding calls 2014, tentative. bgatorcom
 
Diseño de tabla de contenido con hipervínculo en word
Diseño de tabla de contenido con hipervínculo en wordDiseño de tabla de contenido con hipervínculo en word
Diseño de tabla de contenido con hipervínculo en wordmiguel vega
 
Responsive Webdesign verkaufen
Responsive Webdesign verkaufenResponsive Webdesign verkaufen
Responsive Webdesign verkaufendie.agilen GmbH
 
Présentation synthétique DUT 2015-2016
Présentation synthétique DUT 2015-2016Présentation synthétique DUT 2015-2016
Présentation synthétique DUT 2015-2016Riwal Le Faou
 
Idees capses
Idees capsesIdees capses
Idees capsesevamus
 
Recorrido 8
Recorrido 8Recorrido 8
Recorrido 8Acov89
 
Teaching teachers pk a 3ero agosto 2011
Teaching teachers pk a 3ero agosto 2011Teaching teachers pk a 3ero agosto 2011
Teaching teachers pk a 3ero agosto 2011Liceo Internacional
 
Drg 04 Proposed Site Section BB Size A4
Drg 04 Proposed Site Section BB Size A4Drg 04 Proposed Site Section BB Size A4
Drg 04 Proposed Site Section BB Size A4Martyn Colebrook
 
Stop being a glass, Become a lake
Stop being a glass, Become a lake Stop being a glass, Become a lake
Stop being a glass, Become a lake ways2capitalcsr
 

Viewers also liked (20)

Présentation du programme de l'atelier et des intervenants. La maîtrise du ri...
Présentation du programme de l'atelier et des intervenants. La maîtrise du ri...Présentation du programme de l'atelier et des intervenants. La maîtrise du ri...
Présentation du programme de l'atelier et des intervenants. La maîtrise du ri...
 
An analysis of internet addiction levels of individuals according to various ...
An analysis of internet addiction levels of individuals according to various ...An analysis of internet addiction levels of individuals according to various ...
An analysis of internet addiction levels of individuals according to various ...
 
SharePoint 2013 integratie
SharePoint 2013 integratieSharePoint 2013 integratie
SharePoint 2013 integratie
 
407 attrezzature di lavoro agricoltura
407   attrezzature di lavoro agricoltura407   attrezzature di lavoro agricoltura
407 attrezzature di lavoro agricoltura
 
Presentatie matthijs sienot
Presentatie matthijs sienotPresentatie matthijs sienot
Presentatie matthijs sienot
 
8.placenta
8.placenta8.placenta
8.placenta
 
Selected funding calls 2014, tentative.
Selected funding calls 2014, tentative. Selected funding calls 2014, tentative.
Selected funding calls 2014, tentative.
 
Diseño de tabla de contenido con hipervínculo en word
Diseño de tabla de contenido con hipervínculo en wordDiseño de tabla de contenido con hipervínculo en word
Diseño de tabla de contenido con hipervínculo en word
 
Responsive Webdesign verkaufen
Responsive Webdesign verkaufenResponsive Webdesign verkaufen
Responsive Webdesign verkaufen
 
Pé de pêr..
Pé de pêr..Pé de pêr..
Pé de pêr..
 
Présentation synthétique DUT 2015-2016
Présentation synthétique DUT 2015-2016Présentation synthétique DUT 2015-2016
Présentation synthétique DUT 2015-2016
 
Clima orga....
Clima orga....Clima orga....
Clima orga....
 
Idees capses
Idees capsesIdees capses
Idees capses
 
Recorrido 8
Recorrido 8Recorrido 8
Recorrido 8
 
Neuromarketing 20 años de Multimedia
Neuromarketing 20 años de MultimediaNeuromarketing 20 años de Multimedia
Neuromarketing 20 años de Multimedia
 
El Plagio
El PlagioEl Plagio
El Plagio
 
Teaching teachers pk a 3ero agosto 2011
Teaching teachers pk a 3ero agosto 2011Teaching teachers pk a 3ero agosto 2011
Teaching teachers pk a 3ero agosto 2011
 
Drg 04 Proposed Site Section BB Size A4
Drg 04 Proposed Site Section BB Size A4Drg 04 Proposed Site Section BB Size A4
Drg 04 Proposed Site Section BB Size A4
 
Stop being a glass, Become a lake
Stop being a glass, Become a lake Stop being a glass, Become a lake
Stop being a glass, Become a lake
 
Procesos de negociación
Procesos de negociaciónProcesos de negociación
Procesos de negociación
 

Similar to Risks and Preventive Measures for Group Work

Risk assesment
Risk assesmentRisk assesment
Risk assesmentRobsonBoyd
 
Risk assessment new
Risk assessment newRisk assessment new
Risk assessment newamykirbyy
 
risk assesment
risk assesmentrisk assesment
risk assesmentroydaboy
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessmentamykirbyy
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessmentamykirbyy
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessmentamykirbyy
 
Risk assessment
Risk assessmentRisk assessment
Risk assessmentShaunMoat
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessmentamykirbyy
 
Film openingtitlesequenceshootriskassessmentform
Film openingtitlesequenceshootriskassessmentformFilm openingtitlesequenceshootriskassessmentform
Film openingtitlesequenceshootriskassessmentformAdam Grundy
 
Film opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formFilm opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formAdam Grundy
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk AssessmentKonyslover
 

Similar to Risks and Preventive Measures for Group Work (20)

Risk assesment
Risk assesmentRisk assesment
Risk assesment
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk assessment new
Risk assessment newRisk assessment new
Risk assessment new
 
risk assesment
risk assesmentrisk assesment
risk assesment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Film openingtitlesequenceshootriskassessmentform
Film openingtitlesequenceshootriskassessmentformFilm openingtitlesequenceshootriskassessmentform
Film openingtitlesequenceshootriskassessmentform
 
Musicvideorisk
MusicvideoriskMusicvideorisk
Musicvideorisk
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Film opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment formFilm opening title sequence shoot risk assessment form
Film opening title sequence shoot risk assessment form
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 
Risk assessment
Risk assessmentRisk assessment
Risk assessment
 
Risk Assessment
Risk AssessmentRisk Assessment
Risk Assessment
 

Risks and Preventive Measures for Group Work

  • 1. Risk Assessment During any group work there are a lot of obvious risks involved especially when working around equipment, in this risk assessment I’ll be analyzing various risks that could be seen as somewhat obvious however that doesn’t subtract from the validity. Identified risks Location Responsibility Preventive measures All Me/Actor Weather Outdoors N/A Common sensibility All Me/Actor Problems with the memory card N/A Me Equipment N/A Me/Actors Trip hazards Outside Me/Actors In the event that an actor or myself is unavailable there will be uncompromisable rescheduling of the filming and it will be stressed that attendance is vital to the projects success. The weather being unpredictable and out of anyone’s controller timing will just have to be adequate. All will be done to make All actors should ensure to use their common sense and preform their task in a very professional manner to avoid any self caused or actor caused injury. Problems with the memory card will be handled by utilizing a spare that will be carried around at all times. To avoid equipment damage; it will be stressed to the actors to look after and properly use equipment. Again referring to common sense, to avoid tripping injuries when working in a somewhat unpredictable environment such as the outdoors. Care should be taken when filming to Illness/Injury
  • 2. avoid tripping and potentially causing damage to yourself and equipment.