3
HISTORY OF LONDON’S SEWERS
Sewerage History of London
8 million people 62 million cubic meters Strained ecosystem
6
TUNNEL DESIGN, CONSTRUCTION AND HANDOVER
London Tideway Improvements
Riverside
Long Reach
Mogden
Crossness
Sewage Works Upgrades
Lee Tunnel
Thames Tideway Tunnel
Beckton
Tunnelling through London
Engineering challenges
• Variable ground conditions
• 120 year design life
• Dissipate energy and minimise
air entrapment
• Provide mechanical ventilation
and odour treatment
Interfaces with existing infrastructure
Bridges: 75
Victoria Embankment
Critical periods of transition and certification
Design / Construction phase
System Acceptance
Period (up to 3 years)
System
Commissioning
Commencement
System
AcceptanceHandover
Construction
Start
Licence
Award
August
2015
OCI Period TWUL maintains
MEICA elements
Pre-System (Worksite)
Commissioning Period
Planning
Ready
?
System
Commissioning
Period
TWUL Operates
Integrated CSO System
TWUL Operators begin CSO
System Training
SCCD
Criteria
Certify System
is Ready for
Commissioning
Handover
Criteria
Certify System
is Ready for
Handover
SA
Criteria
Certify System
is Ready for
Acceptance
Operational Phase Responsibilities
15
DELIVERING THE PROJECT
Tideway at a glance
Revenue collection/
operator of Sewer
Network/TWUL Works
Debt Equity
Ofwat Thames Water
100% ownership
Project Licence
Government Support
Package
TIDEWAY
DEFRA
Bazalgette Tunnel Limited: trading as Tideway
The new Infrastructure Provider is the first Wastewater only
company in the UK. It is made up of the following shareholders:
The investor group includes a significant proportion of UK pension
funds through which over 1.7 million UK pensioners will have an
indirect investment in Tideway.
West - BMB JV Central - FLO JV East - CVB JV
Who is delivering what?
London Clay London Clay/Lambeth Group/Thanet Chalk
Project wide System Integrator (SCADA)
Tideway Delivery Team, NEC Project Manager, Supervisor, System
Commissioning
20
The Role of the System Integrator
LTT SCADA purpose
LTT
SCADA
Main
Work
Sites
Pumping
Stations
CSOs
Tunnel
Ventilation
Thames
Water
Control
Sites
Secure
environment
and Tideway PS / CSO
Abbey Mills, Beckton STW,
Tideway PS and Tunnel
Greenwich – Crossness STW
Greenwich –
Deptford – Earl PS
Victoria -
Blackfriars
Albert –
Heathwall PS
Cremorne-Chelsea-
Western PS
West CSOs &
Hammersmith PS
Frogmore
Tunnel &
PS
Integrating with the existing subsystems
Interface with Thames Water SCADA
Acton Storm Tanks
Hammersmith PS
Lots Road PS
Falconbrook PS
Heathwall PS
Greenwich PSEarl PS
Abbey Mills PS
Beckton STW
Main works at TWUL sites without TWUL interface
Main works with TWUL interface
Interface with Thames Water SCADA
MWC Sites
TWUL Sites
CSO Monitoring Sites
CSO Surveys
30
OPERATING THE SYSTEM
Normal Operation
Flow from the NLL is lifted by pumps at Station F to enable gravity flow
to join the NOS and flow to Beckton for treatment.
At the moment, if the restriction of flow to the NOS requires alternative
discharge from Abbey Mills, then the river penstocks will open and the
flow diverts to the Channelsea river.
Once the Lee tunnel is operating, those river penstocks will permanently
close and the TTT penstocks will divert flow via the Lee tunnel.
When the TTT is operating and joined to the Lee tunnel to form the LTT
discharge to the Channelsea River will be possible during storm conditions
(or at high levels, -3mAOD)
Abbey Mills
Ideally flow travels down the nos, enters Beckton inlet works, gets
treated and the effluent is discharged to river
The nos flow might be combined with flow from Abbey Mills, and
Meanwhile to protect the nos there might also be flow diverting to TTT
If Beckton starts to reach capacity (there is an F5 at the inlet wks) flow
can be diverted to the storm tanks and if necessary discharged to River
(untreated).
If LTT levels at Beckton reach a certain point,, it can discharge to River
via the Tideway CSO (weir).
If Beckton has the capacity, the Tideway PS lifts the TTT flow to the nos
for treatment.
When the TTT is built, there will be discharge point lower than the
Tideway CSO (weir), so this will no longer be used to discharge in storm
conditions.
Instead the Tideway PS flow will be controlled by penstocks so that it
Beckton
Cyber Security
Trend Micro published paper in 2013 highlighting the extent to which cyber criminals
are now actively targeting Industrial Control Systems, specifically water plants.
Honey pots were created and within 18 hours attacks started. Over 28 days 39 attacks
from 14 countries were recorded of which 17 would have been catastrophic.
Secure LTT
Infrastructure
Virtual
isation Network
Segmentatio
n
Patch
Management
Recoverable
Backups
Authenticati
on
USB Control
Application
Control
Log
Monitoring
Intrusion
Detection
and
Prevention
Server and
device
hardening
Performance
Monitoring
Vulnerability
Scanning
Anti-
Malware
43
TIDEWAY LEGACY
We do things safely or not at all
Gender
Ability
Action
Cultures LGBT+
“The Great Think” is Tideway’s innovation programme
Can we find our very own 21st Century
Sir Joseph Bazalgette’s?
‘Tideway will deliver a sustainable legacy of innovation by capturing
and sharing our solutions via I3P (Infrastructure Industry Innovation
Platform) to support UK’s Construction 2025 strategic vision’
Innovation in 2017 and beyond?
The Great Think is hosted on ‘i3P’
www.thegreatthink.london
Our innovation legacy commitment:
Stream D_Sian Thomas Rachel Blundell

More Related Content

Similar to Stream D_Sian Thomas Rachel Blundell

Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15
John Grover
 
Thames Perry Oaks-Iver South 2005
Thames Perry Oaks-Iver South 2005Thames Perry Oaks-Iver South 2005
Thames Perry Oaks-Iver South 2005
Robert Sharpe
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-final
John Grover
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Charlie Reith
 
UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016
Charlie Bell
 
Paper 43 - OPT 2015_BHI 9_2_15
Paper 43 - OPT 2015_BHI 9_2_15Paper 43 - OPT 2015_BHI 9_2_15
Paper 43 - OPT 2015_BHI 9_2_15
John Grover
 

Similar to Stream D_Sian Thomas Rachel Blundell (20)

Service report
Service reportService report
Service report
 
Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15Paper 43 - Deep Water Pipeline CT 9_2_15
Paper 43 - Deep Water Pipeline CT 9_2_15
 
Lec7. Design Of Forebay-1.pdf
Lec7. Design Of Forebay-1.pdfLec7. Design Of Forebay-1.pdf
Lec7. Design Of Forebay-1.pdf
 
Thames Perry Oaks-Iver South 2005
Thames Perry Oaks-Iver South 2005Thames Perry Oaks-Iver South 2005
Thames Perry Oaks-Iver South 2005
 
Dam Breach Analysis.pptx
Dam Breach Analysis.pptxDam Breach Analysis.pptx
Dam Breach Analysis.pptx
 
E sewage
E  sewageE  sewage
E sewage
 
26-grover-john-final
26-grover-john-final26-grover-john-final
26-grover-john-final
 
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
Reliable Subsea Oil& Gas Transportation Paper - Presentation Slides 6 Novembe...
 
School Services
School ServicesSchool Services
School Services
 
DSD-INT 2019 Lake Eutrophication Modelling with Delft3D Suite, Wuhan City, Ch...
DSD-INT 2019 Lake Eutrophication Modelling with Delft3D Suite, Wuhan City, Ch...DSD-INT 2019 Lake Eutrophication Modelling with Delft3D Suite, Wuhan City, Ch...
DSD-INT 2019 Lake Eutrophication Modelling with Delft3D Suite, Wuhan City, Ch...
 
Moving London Forward - Crossrail
Moving London Forward - Crossrail Moving London Forward - Crossrail
Moving London Forward - Crossrail
 
DSD-INT 2015 - Operational system for the eThekwini municipality - Angus Gowar
DSD-INT 2015 - Operational system for the eThekwini municipality - Angus GowarDSD-INT 2015 - Operational system for the eThekwini municipality - Angus Gowar
DSD-INT 2015 - Operational system for the eThekwini municipality - Angus Gowar
 
Danielle-Danielsson_FMA2015_Paper
Danielle-Danielsson_FMA2015_PaperDanielle-Danielsson_FMA2015_Paper
Danielle-Danielsson_FMA2015_Paper
 
Project 2 finallllllll
Project 2 finallllllllProject 2 finallllllll
Project 2 finallllllll
 
Project 2 final
Project 2 finalProject 2 final
Project 2 final
 
Nbc cso apwa expo july 8 t12
Nbc cso apwa expo july 8 t12Nbc cso apwa expo july 8 t12
Nbc cso apwa expo july 8 t12
 
UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016UU_Davyhulme_Modernisation_2016
UU_Davyhulme_Modernisation_2016
 
Paper 43 - OPT 2015_BHI 9_2_15
Paper 43 - OPT 2015_BHI 9_2_15Paper 43 - OPT 2015_BHI 9_2_15
Paper 43 - OPT 2015_BHI 9_2_15
 
Cv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas TulabotCv of mr.Jefferson Tomas Tulabot
Cv of mr.Jefferson Tomas Tulabot
 
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
“HYDRAULIC AND HYDROLOGICAL IMPACT ON BRIDGE”
 

More from BecarAsset

Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...
Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...
Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...
BecarAsset
 

More from BecarAsset (20)

Stream E_Peter Jay
Stream E_Peter JayStream E_Peter Jay
Stream E_Peter Jay
 
Stream E_Netherlands IAM chapter
Stream E_Netherlands IAM chapterStream E_Netherlands IAM chapter
Stream E_Netherlands IAM chapter
 
Stream E_Mike Dixon
Stream E_Mike DixonStream E_Mike Dixon
Stream E_Mike Dixon
 
Stream E_Boudewijn Neijens - IAM Canada intro
Stream E_Boudewijn Neijens - IAM Canada introStream E_Boudewijn Neijens - IAM Canada intro
Stream E_Boudewijn Neijens - IAM Canada intro
 
Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...
Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...
Stream E_Dr. Tim King - Dr. Demetrius Onoufriou - data, information + decisio...
 
Stream E_Chris Lloyd and David Ashworth
Stream E_Chris Lloyd and David AshworthStream E_Chris Lloyd and David Ashworth
Stream E_Chris Lloyd and David Ashworth
 
Stream D_Richard Longman, Chris Pickford, Mike Niblett
Stream D_Richard Longman, Chris Pickford, Mike NiblettStream D_Richard Longman, Chris Pickford, Mike Niblett
Stream D_Richard Longman, Chris Pickford, Mike Niblett
 
Stream D_Richard Hawkins, Patrick Reniers
Stream D_Richard Hawkins, Patrick ReniersStream D_Richard Hawkins, Patrick Reniers
Stream D_Richard Hawkins, Patrick Reniers
 
Stream D_Magnolia Román Cáceres
Stream D_Magnolia Román CáceresStream D_Magnolia Román Cáceres
Stream D_Magnolia Román Cáceres
 
Stream D_John Chappell
Stream D_John ChappellStream D_John Chappell
Stream D_John Chappell
 
Stream D_John Ahmet Erkoyuncu
Stream D_John Ahmet ErkoyuncuStream D_John Ahmet Erkoyuncu
Stream D_John Ahmet Erkoyuncu
 
Stream D_David Riley
Stream D_David RileyStream D_David Riley
Stream D_David Riley
 
Stream D_Julian Schwarzenbach Andy Watts and Wayne Reed
Stream D_Julian Schwarzenbach Andy Watts and Wayne ReedStream D_Julian Schwarzenbach Andy Watts and Wayne Reed
Stream D_Julian Schwarzenbach Andy Watts and Wayne Reed
 
Stream C_Ross Agnew Ursula Bryan
Stream C_Ross Agnew Ursula BryanStream C_Ross Agnew Ursula Bryan
Stream C_Ross Agnew Ursula Bryan
 
Stream C_Luke Body
Stream C_Luke BodyStream C_Luke Body
Stream C_Luke Body
 
Stream C_Javier Serrano
Stream C_Javier SerranoStream C_Javier Serrano
Stream C_Javier Serrano
 
Stream C_David Tyler
Stream C_David TylerStream C_David Tyler
Stream C_David Tyler
 
Stream C_Cristian Augusto Eemolina Alvarez
Stream C_Cristian Augusto Eemolina AlvarezStream C_Cristian Augusto Eemolina Alvarez
Stream C_Cristian Augusto Eemolina Alvarez
 
Stream C_Bill Emery
Stream C_Bill EmeryStream C_Bill Emery
Stream C_Bill Emery
 
Stream C_Christian Schmidt Berthelsen
Stream C_Christian Schmidt BerthelsenStream C_Christian Schmidt Berthelsen
Stream C_Christian Schmidt Berthelsen
 

Recently uploaded

Call girls In Rana Pratap Bagh {Delhi ↫8447779280↬Escort Service (Delhi)
Call girls In Rana Pratap Bagh {Delhi ↫8447779280↬Escort Service (Delhi)Call girls In Rana Pratap Bagh {Delhi ↫8447779280↬Escort Service (Delhi)
Call girls In Rana Pratap Bagh {Delhi ↫8447779280↬Escort Service (Delhi)
asmaqueen5
 
Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...
Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...
Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...
asmaqueen5
 
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
asmaqueen5
 
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
ApartmentWala1
 
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
asmaqueen5
 
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
ApartmentWala1
 
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
ApartmentWala1
 

Recently uploaded (20)

Parksville 96 Surrey Floor Plans May 2024
Parksville 96 Surrey Floor Plans May 2024Parksville 96 Surrey Floor Plans May 2024
Parksville 96 Surrey Floor Plans May 2024
 
Kalpataru Exquisite Wakad Pune E-Brochure.pdf
Kalpataru Exquisite Wakad Pune  E-Brochure.pdfKalpataru Exquisite Wakad Pune  E-Brochure.pdf
Kalpataru Exquisite Wakad Pune E-Brochure.pdf
 
Call girls In Rana Pratap Bagh {Delhi ↫8447779280↬Escort Service (Delhi)
Call girls In Rana Pratap Bagh {Delhi ↫8447779280↬Escort Service (Delhi)Call girls In Rana Pratap Bagh {Delhi ↫8447779280↬Escort Service (Delhi)
Call girls In Rana Pratap Bagh {Delhi ↫8447779280↬Escort Service (Delhi)
 
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & RequirementsExplore Dual Citizenship in Africa | Citizenship Benefits & Requirements
Explore Dual Citizenship in Africa | Citizenship Benefits & Requirements
 
construction material procurement in India
construction material procurement in Indiaconstruction material procurement in India
construction material procurement in India
 
Kohinoor Teiko Hinjewadi Phase 2 Pune E-Brochure.pdf
Kohinoor Teiko Hinjewadi Phase 2 Pune  E-Brochure.pdfKohinoor Teiko Hinjewadi Phase 2 Pune  E-Brochure.pdf
Kohinoor Teiko Hinjewadi Phase 2 Pune E-Brochure.pdf
 
Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...
Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...
Call Girls In Sarai Rohilla ☎️8447779280{Sarai Rohilla Escort Service In Delh...
 
Yedi Mavi TOBB Zeytinburnu - Listing Turkey
Yedi Mavi TOBB Zeytinburnu - Listing TurkeyYedi Mavi TOBB Zeytinburnu - Listing Turkey
Yedi Mavi TOBB Zeytinburnu - Listing Turkey
 
Prestige Sancoale Goa Residneces Brochure.pdf
Prestige Sancoale Goa Residneces Brochure.pdfPrestige Sancoale Goa Residneces Brochure.pdf
Prestige Sancoale Goa Residneces Brochure.pdf
 
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
Low rate ↬Call girls in Sabzi Mandi Delhi | 8447779280}Escort Service In All ...
 
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...Bptp The Amaario Launch  Luxury Project  Sector 37D Gurgaon Dwarka Expressway...
Bptp The Amaario Launch Luxury Project Sector 37D Gurgaon Dwarka Expressway...
 
Eldeco Dwarka Project In Delhi-brochure.pdf.pdf
Eldeco Dwarka Project In Delhi-brochure.pdf.pdfEldeco Dwarka Project In Delhi-brochure.pdf.pdf
Eldeco Dwarka Project In Delhi-brochure.pdf.pdf
 
Bridge & Elliot Ladner Floor Plans May 2024.pdf
Bridge & Elliot Ladner Floor Plans May 2024.pdfBridge & Elliot Ladner Floor Plans May 2024.pdf
Bridge & Elliot Ladner Floor Plans May 2024.pdf
 
Rohan Harita Tathawade Pune Brochure.pdf
Rohan Harita Tathawade Pune Brochure.pdfRohan Harita Tathawade Pune Brochure.pdf
Rohan Harita Tathawade Pune Brochure.pdf
 
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
Call Girls in Maurice Nagar (Delhi) ꧁8447779280꧂ Female Escorts Service in De...
 
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
BPTP THE AMAARIO Luxury Project Invest Like Royalty in Sector 37D Gurgaon Dwa...
 
Best Interior Design Services in Haldwani
Best Interior Design Services in HaldwaniBest Interior Design Services in Haldwani
Best Interior Design Services in Haldwani
 
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
BPTP THE AMAARIO For The Royals Of Tomorrow in Sector 37D Gurgaon Dwarka Expr...
 
Kohinoor Courtyard One Wakad Pune | Elegant Living Spaces
Kohinoor Courtyard One Wakad Pune | Elegant Living SpacesKohinoor Courtyard One Wakad Pune | Elegant Living Spaces
Kohinoor Courtyard One Wakad Pune | Elegant Living Spaces
 
Housing Price Regulation Thesis Defense by Slidesgo.pptx
Housing Price Regulation Thesis Defense by Slidesgo.pptxHousing Price Regulation Thesis Defense by Slidesgo.pptx
Housing Price Regulation Thesis Defense by Slidesgo.pptx
 

Stream D_Sian Thomas Rachel Blundell

  • 1. BUILDING FOR 22ND CENTURY LONDON IAM CONFERENCE JUNE 2017
  • 2.
  • 5. 8 million people 62 million cubic meters Strained ecosystem
  • 7. London Tideway Improvements Riverside Long Reach Mogden Crossness Sewage Works Upgrades Lee Tunnel Thames Tideway Tunnel Beckton
  • 9. Engineering challenges • Variable ground conditions • 120 year design life • Dissipate energy and minimise air entrapment • Provide mechanical ventilation and odour treatment
  • 10. Interfaces with existing infrastructure Bridges: 75
  • 12.
  • 13. Critical periods of transition and certification Design / Construction phase System Acceptance Period (up to 3 years) System Commissioning Commencement System AcceptanceHandover Construction Start Licence Award August 2015 OCI Period TWUL maintains MEICA elements Pre-System (Worksite) Commissioning Period Planning Ready ? System Commissioning Period TWUL Operates Integrated CSO System TWUL Operators begin CSO System Training SCCD Criteria Certify System is Ready for Commissioning Handover Criteria Certify System is Ready for Handover SA Criteria Certify System is Ready for Acceptance
  • 16. Tideway at a glance Revenue collection/ operator of Sewer Network/TWUL Works Debt Equity Ofwat Thames Water 100% ownership Project Licence Government Support Package TIDEWAY DEFRA
  • 17. Bazalgette Tunnel Limited: trading as Tideway The new Infrastructure Provider is the first Wastewater only company in the UK. It is made up of the following shareholders: The investor group includes a significant proportion of UK pension funds through which over 1.7 million UK pensioners will have an indirect investment in Tideway.
  • 18. West - BMB JV Central - FLO JV East - CVB JV Who is delivering what? London Clay London Clay/Lambeth Group/Thanet Chalk Project wide System Integrator (SCADA) Tideway Delivery Team, NEC Project Manager, Supervisor, System Commissioning
  • 19.
  • 20. 20 The Role of the System Integrator
  • 21.
  • 23. and Tideway PS / CSO Abbey Mills, Beckton STW, Tideway PS and Tunnel Greenwich – Crossness STW Greenwich – Deptford – Earl PS Victoria - Blackfriars Albert – Heathwall PS Cremorne-Chelsea- Western PS West CSOs & Hammersmith PS Frogmore Tunnel & PS Integrating with the existing subsystems
  • 24. Interface with Thames Water SCADA Acton Storm Tanks Hammersmith PS Lots Road PS Falconbrook PS Heathwall PS Greenwich PSEarl PS Abbey Mills PS Beckton STW Main works at TWUL sites without TWUL interface Main works with TWUL interface
  • 25. Interface with Thames Water SCADA
  • 31.
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39. Normal Operation Flow from the NLL is lifted by pumps at Station F to enable gravity flow to join the NOS and flow to Beckton for treatment. At the moment, if the restriction of flow to the NOS requires alternative discharge from Abbey Mills, then the river penstocks will open and the flow diverts to the Channelsea river. Once the Lee tunnel is operating, those river penstocks will permanently close and the TTT penstocks will divert flow via the Lee tunnel. When the TTT is operating and joined to the Lee tunnel to form the LTT discharge to the Channelsea River will be possible during storm conditions (or at high levels, -3mAOD) Abbey Mills
  • 40. Ideally flow travels down the nos, enters Beckton inlet works, gets treated and the effluent is discharged to river The nos flow might be combined with flow from Abbey Mills, and Meanwhile to protect the nos there might also be flow diverting to TTT If Beckton starts to reach capacity (there is an F5 at the inlet wks) flow can be diverted to the storm tanks and if necessary discharged to River (untreated). If LTT levels at Beckton reach a certain point,, it can discharge to River via the Tideway CSO (weir). If Beckton has the capacity, the Tideway PS lifts the TTT flow to the nos for treatment. When the TTT is built, there will be discharge point lower than the Tideway CSO (weir), so this will no longer be used to discharge in storm conditions. Instead the Tideway PS flow will be controlled by penstocks so that it Beckton
  • 41. Cyber Security Trend Micro published paper in 2013 highlighting the extent to which cyber criminals are now actively targeting Industrial Control Systems, specifically water plants. Honey pots were created and within 18 hours attacks started. Over 28 days 39 attacks from 14 countries were recorded of which 17 would have been catastrophic.
  • 42. Secure LTT Infrastructure Virtual isation Network Segmentatio n Patch Management Recoverable Backups Authenticati on USB Control Application Control Log Monitoring Intrusion Detection and Prevention Server and device hardening Performance Monitoring Vulnerability Scanning Anti- Malware
  • 44. We do things safely or not at all
  • 45.
  • 47.
  • 48.
  • 49.
  • 50. “The Great Think” is Tideway’s innovation programme Can we find our very own 21st Century Sir Joseph Bazalgette’s? ‘Tideway will deliver a sustainable legacy of innovation by capturing and sharing our solutions via I3P (Infrastructure Industry Innovation Platform) to support UK’s Construction 2025 strategic vision’ Innovation in 2017 and beyond? The Great Think is hosted on ‘i3P’ www.thegreatthink.london Our innovation legacy commitment: