W a s t e w a t e r T r e a t m e n t & S e w e r a g e
Sludge Process Works departs Heathrow
Perry Oaks processing centre makes way for Terminal 5
by Andrew Gosling & Adam Hunter
Mogden Sewage Treatment Works, serving West London’s catchment, is located close to Twickenham Rugby ground
Since it was commissioned in 1936, as part of a major infrastructure project, the population equivalent has now
reached over 1.8 million. Even at the time of construction the works was in the middle of a developing urban area and
an alternative site was necessary for storage and processing sludge prior to disposal to agricultural land. The site chosen
was Perry Oaks, approximately 10 miles west of Mogden. Twin sludge mains were constructed to pump sludge to the
site. At the time this site was close to a small airfield but later this was developed into Heathrow, a rapidly expanding
major international airport as we know it to be today - with the Perry Oaks site situated between two main runways.
In 2001, agreement was reached between Thames Water and the BAA to decommission a large part of this site, allowing
the major area to be released for airport use and Terminal Five development, and to provide alternative sludge
processing facilities on the site of an existing small STW at Iver South.
Perry Oaks/Iver South: Aerial view of Iver South Sludge Dewatering works. Photo: Courtesy Thames Water.
Perry Oaks Decommissioning
Over a period of many years liquid sludge was processed at Perry
Oaks, both by air-drying and in latter years by deep lagoon storage
prior to disposal to agricultural land. Clearance of liquid sludge was
accelerated during the 1990’s and temporary centrifuges were
installed to mechanically dewater all sludge received from Mogden.
Decommissioning of the Perry Oaks site and setting up a residual
operating area on a smaller part of the site has allowed the major
area to be released for T5 development. Sludge dewatering
operations continue on a small area of Perry Oaks until the new
facilities at Iver South are complete.
This has meant that construction at Terminal 5 could be started on
the remainder of the site and sludge processing can remain in
operation during construction of replacement facilities at Iver South
and before final decommissioning.
Relocation scheme
The new works will comprise liquid sludge storage, sludge
dewatering using centrifuge plant, and a large area for sludge cake
storage.
Enabling works for the scheme are extensive. These include
uprating and extending the existing twin sludge mains from
Mogden to Iver South, transfer of Iver South STW flows, provision
of a new access to the site, together with upgrade and extension to
the sludge stream at Mogden to ensure compatibility with the
facilities at Iver South.
One of the key initial tasks was the preparation of the Iver South
site for development. This has included:
* improving access off the A4 with junction improvement and
widening the existing service road;
* construction of a bridge over the Colnebrook river and
extending the existing access road into the new site;
* diversion of all sewage flows to a new pumping station
with pipelines to an adjacent catchment;
* new power and water supplies;
* isolation of surrounding groundwater and flood water using
a bentonite/cement cut-off wall;
* satisfying all planning conditions, technical, procedural and
and environmental.
Robust solution
One of the main needs of the plant has been to provide a robust
solution, which was sufficiently flexible to receive sludge under
various operating conditions and avoid storage at the source works.
Sludge is delivered to site via twin 300mm diameter pumping
mains and is discharged into two covered storage tanks. These
provide initial storage and buffer capacity to give balanced feed to
the dewatering centrifuges. The tanks are mixed by a pumped
system, which also incorporates an air mixing process. The system
27
W a s t e w a t e r T r e a t m e n t & S e w e r a g e
has been shown to be beneficial in minimising odours in the final
cake product. In the event that these two tanks are full, the
incoming sludge is diverted to one of six buffer storage tanks which
are filled in sequence. Finally there is a storage lagoon, which
provides an emergency storage capacity but this would only be used
under extreme circumstance.
Sludge is drawn from the covered storage tanks to feed one of four
dewatering centrifuges, each with a capacity of 60m3
/hour. It is
dewatered to 25% DS and conveyed by covered belt conveyors to
the concrete hard standing area. A front-end loader is provided to
move sludge cake from the slab into any of the four large covered
storage bays. Each bay holds two weeks stock of sludge during
normal operation. An additional uncovered storage is provided to
cater for any restrictions on the disposal route to land. Normal duty
is provided by two centrifuges, however, a third unit can be brought
on line to deal with any backlog caused by power failures or
increased sludge production at source.
All site drainage is self contained and joins the process liquors in the
site pumping station for pumping to an adjacent sewerage network.
Process water is provided via a borehole, which taps artesian
groundwater in the underlying chalk aquifer.Whilst capital costs for
this solution are high, the saving in operating cost creates a 2 year
payback period. Potable water use is restricted to the welfare
facilities in the offices though sufficient supply volumes are
available to cover emergency situations where the borehole is
unavailable.
New power supplies have been provided and standby generation
installed to cover essential operations in the event of a power
failure.
Key partners
Thames Water Utilities Ltd entered into alliance arrangements with
contractors for delivery of this project.
Laing O’Rourke acted as Principal Contractor for decommissioning
work and development of the residual operating area.
Costain Ltd were taken on as Principal Contractor for the main
relocation scheme - including works at Iver South, Mogden and
pipelines.
Black & Veatch have been responsible for design.
Current status
All main structures are now complete. Plant and equipment has
been installed ready for commissioning with handover scheduled
for the end of 2005 - ahead of programme.
Key process parameters
Population Equivalent: 1.8 million;
Dry solids treated 85 tonnes/day;
Incoming sludge 2833m3
/day at 3% DS
Final product 340m3
/day at 25% DS
Key features
A flood and groundwater cut-off wall 1250m long and 5m deep,
was installed to contain any pollution migration and to exclude
ground water and flood water from entering the site.
Liquid sludge storage
1.5 days covered storage in two tanks, each 20m diameter.
4.5 days buffer storage in six tanks each 20m diameter.
5.5 days emergency storage in a lined lagoon.
Sludge cake storage
CTM Systems Limited
The Hayloft
Merrylees Farm
Merrylees, LEICESTER
LE9 9FE
Telephone: 01455 828816
Facsimile: 01455 828110
e-mail: sales@ctm-systems.co.uk
www.ctm-systems.co.uk
SUPPLIERS OF:
• Shafted & Shaft less screw
conveyors
• Troughed belt conveyors
• Large diameters screws
• Multi-screw live bottom
bin dischargers
• Storage and handling
systems
• Continuous Mixers
• Batch Mixers
• SPECIALISTS IN
STAINLESS STEEL
MANUFACTURING
DESIGN, MANUFACTURE & INSTALLATION OF BESPOKE
MECHANICAL HANDLING EQUIPMENT.
CTM ARE PROUD TO BE INVOLVED WITH THE SUCCESSFUL
IMPLEMENTATION OF THE SLUDGE OUTLOADING SCHEME
AT IVER SOUTH.
785A
28
W a s t e w a t e r T r e a t m e n t & S e w e r a g e
8 weeks in 4No. 2 week capacity bays - covered.
22 weeks emergency storage - uncovered.
Centrifuge sludge dewatering plant
Comprising 4No. centrifuges, each capable of treating 50% of the
design load operating as Duty, Duty, Catch-up and Standby.
Biological odour control with carbon polishing
To key process plant.
New access roads, bridge and site services; storm water storage
for 200 year event; standby power generation; development of
groumd water sources to supply all process water requirements on
site; offices for 22 personnel; landscaping and bunds at site
boundary to provide screening and wildlife habitats; planted bird
scrapes to recreate lost lagoon habitat. ■
Note on the authors: Andrew Gosling is Principal Project
Manager, Thames Water; Adam Hunter is Design Manager, Black
& Veatch.
Perry Oaks/Iver South: Covered sludge cake area. Photo: Courtesy Thames Water.
Perry Oaks/Iver South: Sludge holding tanks from odour control plant. Photo: Courtesy Thames Water.
Perry Oaks/Iver South: Centrifuge plant. Photo: Courtesy Thames Water.

More Related Content

What's hot

Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Jeffrey Pickett
 
Jea presentation july 2014
Jea presentation july 2014Jea presentation july 2014
Jea presentation july 2014Amanda Pasik
 
Revista en ingles miguel lugo
Revista en ingles miguel lugoRevista en ingles miguel lugo
Revista en ingles miguel lugoMiguelLugo42
 
Marina and Village Surface Water Runoff and Waste Water Management plan
 Marina and Village Surface Water Runoff and Waste Water Management plan Marina and Village Surface Water Runoff and Waste Water Management plan
Marina and Village Surface Water Runoff and Waste Water Management planFrank Costanzo Connelly
 
East Java Gas Pipeline
East Java Gas PipelineEast Java Gas Pipeline
East Java Gas PipelineBoudewijn Baan
 
Gary Merritt, Northern Star Generation LLC, “Big Yellow Taxi?…You don’t know...
Gary Merritt, Northern Star Generation LLC,  “Big Yellow Taxi?…You don’t know...Gary Merritt, Northern Star Generation LLC,  “Big Yellow Taxi?…You don’t know...
Gary Merritt, Northern Star Generation LLC, “Big Yellow Taxi?…You don’t know...Michael Hewitt, GISP
 
IPTC 16192 Manuscript
IPTC 16192 ManuscriptIPTC 16192 Manuscript
IPTC 16192 ManuscriptNghi Nguyen
 
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of Nutech
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of NutechIdentifying By-passed Pay and New Reservoirs by Jeff Bayless of Nutech
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of NutechDaniel Matranga
 
Pipeline abandonment flushing
Pipeline abandonment flushingPipeline abandonment flushing
Pipeline abandonment flushingDiggricp
 
After a decade of regulation, what have we learned about aggregate mine recla...
After a decade of regulation, what have we learned about aggregate mine recla...After a decade of regulation, what have we learned about aggregate mine recla...
After a decade of regulation, what have we learned about aggregate mine recla...Haley & Aldrich
 
Melbourne Pipeline Protection
Melbourne Pipeline ProtectionMelbourne Pipeline Protection
Melbourne Pipeline ProtectionSikko Krol
 
Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...
Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...
Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...Michael Hewitt, GISP
 

What's hot (20)

Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.Oil and Gas Undergrond Storage Keystone Project.
Oil and Gas Undergrond Storage Keystone Project.
 
Jea presentation july 2014
Jea presentation july 2014Jea presentation july 2014
Jea presentation july 2014
 
Revista en ingles miguel lugo
Revista en ingles miguel lugoRevista en ingles miguel lugo
Revista en ingles miguel lugo
 
Marina and Village Surface Water Runoff and Waste Water Management plan
 Marina and Village Surface Water Runoff and Waste Water Management plan Marina and Village Surface Water Runoff and Waste Water Management plan
Marina and Village Surface Water Runoff and Waste Water Management plan
 
East Java Gas Pipeline
East Java Gas PipelineEast Java Gas Pipeline
East Java Gas Pipeline
 
Montrose BLP
Montrose BLPMontrose BLP
Montrose BLP
 
Marginal oil fields
Marginal oil fieldsMarginal oil fields
Marginal oil fields
 
aicep Global Parques, industrial clusters the power of partnerships
aicep Global Parques, industrial clusters   the power of partnershipsaicep Global Parques, industrial clusters   the power of partnerships
aicep Global Parques, industrial clusters the power of partnerships
 
311576 DD Inserts
311576 DD Inserts311576 DD Inserts
311576 DD Inserts
 
Portfolio BlueBoy
Portfolio BlueBoyPortfolio BlueBoy
Portfolio BlueBoy
 
Praire creek
Praire creekPraire creek
Praire creek
 
Gary Merritt, Northern Star Generation LLC, “Big Yellow Taxi?…You don’t know...
Gary Merritt, Northern Star Generation LLC,  “Big Yellow Taxi?…You don’t know...Gary Merritt, Northern Star Generation LLC,  “Big Yellow Taxi?…You don’t know...
Gary Merritt, Northern Star Generation LLC, “Big Yellow Taxi?…You don’t know...
 
IPTC 16192 Manuscript
IPTC 16192 ManuscriptIPTC 16192 Manuscript
IPTC 16192 Manuscript
 
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of Nutech
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of NutechIdentifying By-passed Pay and New Reservoirs by Jeff Bayless of Nutech
Identifying By-passed Pay and New Reservoirs by Jeff Bayless of Nutech
 
Pipeline abandonment flushing
Pipeline abandonment flushingPipeline abandonment flushing
Pipeline abandonment flushing
 
Hydro International - What is HX
Hydro International - What is HXHydro International - What is HX
Hydro International - What is HX
 
After a decade of regulation, what have we learned about aggregate mine recla...
After a decade of regulation, what have we learned about aggregate mine recla...After a decade of regulation, what have we learned about aggregate mine recla...
After a decade of regulation, what have we learned about aggregate mine recla...
 
Lick Creek Wastewater Treatment Plant
Lick Creek Wastewater Treatment PlantLick Creek Wastewater Treatment Plant
Lick Creek Wastewater Treatment Plant
 
Melbourne Pipeline Protection
Melbourne Pipeline ProtectionMelbourne Pipeline Protection
Melbourne Pipeline Protection
 
Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...
Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...
Ryan A. McCampbell, Bloomsburg University, "A Cost-Benefit Analysis of AMD Re...
 

Viewers also liked

Manfaat Jaringan
Manfaat JaringanManfaat Jaringan
Manfaat Jaringansmk malaka
 
FULL BROCHURE 22 June LR proof
FULL BROCHURE 22 June LR proofFULL BROCHURE 22 June LR proof
FULL BROCHURE 22 June LR proofMalu Machado
 
Cremation of IBM Stock Certificates
Cremation of IBM Stock CertificatesCremation of IBM Stock Certificates
Cremation of IBM Stock CertificatesDaniel Stumpf
 
Rodriguez silvestri 11am_socialmediacampaign
Rodriguez silvestri 11am_socialmediacampaignRodriguez silvestri 11am_socialmediacampaign
Rodriguez silvestri 11am_socialmediacampaignDana Marie
 
Year 8 history medieval
Year 8 history medievalYear 8 history medieval
Year 8 history medievalterracelibrary
 
The American Legion - National Emergency Fund Responds to Disasters
The American Legion - National Emergency Fund Responds to DisastersThe American Legion - National Emergency Fund Responds to Disasters
The American Legion - National Emergency Fund Responds to DisastersArthur Godsell
 
Rev. John Grueal and Exodus 1947: Aspirations of Concentration Camp Survivors
Rev. John Grueal and Exodus 1947: Aspirations of Concentration Camp SurvivorsRev. John Grueal and Exodus 1947: Aspirations of Concentration Camp Survivors
Rev. John Grueal and Exodus 1947: Aspirations of Concentration Camp SurvivorsArthur L. Finkle
 
Motivating change chapter 9 (word version)
Motivating change   chapter 9 (word version)Motivating change   chapter 9 (word version)
Motivating change chapter 9 (word version)Usm Major
 

Viewers also liked (15)

Wanda Clarke-Morin - resume
Wanda Clarke-Morin - resumeWanda Clarke-Morin - resume
Wanda Clarke-Morin - resume
 
Manfaat Jaringan
Manfaat JaringanManfaat Jaringan
Manfaat Jaringan
 
FULL BROCHURE 22 June LR proof
FULL BROCHURE 22 June LR proofFULL BROCHURE 22 June LR proof
FULL BROCHURE 22 June LR proof
 
Cremation of IBM Stock Certificates
Cremation of IBM Stock CertificatesCremation of IBM Stock Certificates
Cremation of IBM Stock Certificates
 
DrKnows Healthy Eating 7-18-2015
DrKnows Healthy Eating 7-18-2015DrKnows Healthy Eating 7-18-2015
DrKnows Healthy Eating 7-18-2015
 
pranav kumar
pranav kumarpranav kumar
pranav kumar
 
Rodriguez silvestri 11am_socialmediacampaign
Rodriguez silvestri 11am_socialmediacampaignRodriguez silvestri 11am_socialmediacampaign
Rodriguez silvestri 11am_socialmediacampaign
 
Year 8 history medieval
Year 8 history medievalYear 8 history medieval
Year 8 history medieval
 
Mi historieta
Mi historietaMi historieta
Mi historieta
 
The American Legion - National Emergency Fund Responds to Disasters
The American Legion - National Emergency Fund Responds to DisastersThe American Legion - National Emergency Fund Responds to Disasters
The American Legion - National Emergency Fund Responds to Disasters
 
Rev. John Grueal and Exodus 1947: Aspirations of Concentration Camp Survivors
Rev. John Grueal and Exodus 1947: Aspirations of Concentration Camp SurvivorsRev. John Grueal and Exodus 1947: Aspirations of Concentration Camp Survivors
Rev. John Grueal and Exodus 1947: Aspirations of Concentration Camp Survivors
 
Motivating change chapter 9 (word version)
Motivating change   chapter 9 (word version)Motivating change   chapter 9 (word version)
Motivating change chapter 9 (word version)
 
Ahmad_CV
Ahmad_CVAhmad_CV
Ahmad_CV
 
15 cifor an overview of cifor works related to gfsf
15 cifor an overview of cifor works related to gfsf15 cifor an overview of cifor works related to gfsf
15 cifor an overview of cifor works related to gfsf
 
faiz
faizfaiz
faiz
 

Similar to Thames Perry Oaks-Iver South 2005

Thames_Beckton_Crossness_THPs_2014
Thames_Beckton_Crossness_THPs_2014Thames_Beckton_Crossness_THPs_2014
Thames_Beckton_Crossness_THPs_2014Jason Adams
 
Climax Nomination for 2014 Hardrock Mining Reclamation Awards
Climax Nomination for 2014 Hardrock Mining Reclamation AwardsClimax Nomination for 2014 Hardrock Mining Reclamation Awards
Climax Nomination for 2014 Hardrock Mining Reclamation AwardsKathy Remias
 
Prayas Session: Rain Water Harvesting by Soumalya Nandi
Prayas Session: Rain Water Harvesting by Soumalya NandiPrayas Session: Rain Water Harvesting by Soumalya Nandi
Prayas Session: Rain Water Harvesting by Soumalya NandiTenet Systems Pvt Ltd
 
PIA Magazine May - June 2014 (lift-out)
PIA Magazine May - June 2014 (lift-out)PIA Magazine May - June 2014 (lift-out)
PIA Magazine May - June 2014 (lift-out)Matt Kirkbride
 
UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15ADAM DUKE
 
Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 John M Riggs
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description detailsAonghus Murray
 
Rosslyn Brewery SAIMechEng Projects&Systems Award 1987
Rosslyn Brewery SAIMechEng Projects&Systems Award 1987 Rosslyn Brewery SAIMechEng Projects&Systems Award 1987
Rosslyn Brewery SAIMechEng Projects&Systems Award 1987 John Cluett
 
Three Valleys Chertsey WTW 2005
Three Valleys Chertsey WTW 2005Three Valleys Chertsey WTW 2005
Three Valleys Chertsey WTW 2005Niall Pembroke
 
Suez Victorian Desalination Project
Suez Victorian Desalination ProjectSuez Victorian Desalination Project
Suez Victorian Desalination ProjectRick Nabett
 
focus-on-major-new-lp-gas-facilities-around-the-globe
focus-on-major-new-lp-gas-facilities-around-the-globefocus-on-major-new-lp-gas-facilities-around-the-globe
focus-on-major-new-lp-gas-facilities-around-the-globeKlaus Gohra
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyAndrew White
 
Marine_Brochure_For_Web
Marine_Brochure_For_WebMarine_Brochure_For_Web
Marine_Brochure_For_WebMike Bisland
 
Pipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & CatchpitsPipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & Catchpitseddiebradbrook
 
Cronulla wastewater treatment plant
Cronulla wastewater treatment plantCronulla wastewater treatment plant
Cronulla wastewater treatment plantRick Nabett
 
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...DOE Office of River Protection
 
Sealing cables over land and sea - Panel Building & Systems Integration Magaz...
Sealing cables over land and sea - Panel Building & Systems Integration Magaz...Sealing cables over land and sea - Panel Building & Systems Integration Magaz...
Sealing cables over land and sea - Panel Building & Systems Integration Magaz...Roxtec UK & Ireland
 
Supplemental Services for Water Treatment Needs
Supplemental Services for Water Treatment NeedsSupplemental Services for Water Treatment Needs
Supplemental Services for Water Treatment NeedsDustin Powell, MBA
 

Similar to Thames Perry Oaks-Iver South 2005 (20)

Thames_Beckton_Crossness_THPs_2014
Thames_Beckton_Crossness_THPs_2014Thames_Beckton_Crossness_THPs_2014
Thames_Beckton_Crossness_THPs_2014
 
Climax Nomination for 2014 Hardrock Mining Reclamation Awards
Climax Nomination for 2014 Hardrock Mining Reclamation AwardsClimax Nomination for 2014 Hardrock Mining Reclamation Awards
Climax Nomination for 2014 Hardrock Mining Reclamation Awards
 
Prayas Session: Rain Water Harvesting by Soumalya Nandi
Prayas Session: Rain Water Harvesting by Soumalya NandiPrayas Session: Rain Water Harvesting by Soumalya Nandi
Prayas Session: Rain Water Harvesting by Soumalya Nandi
 
PIA Magazine May - June 2014 (lift-out)
PIA Magazine May - June 2014 (lift-out)PIA Magazine May - June 2014 (lift-out)
PIA Magazine May - June 2014 (lift-out)
 
UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15UKWP Case study - Mauchline Final copy 23 06 15
UKWP Case study - Mauchline Final copy 23 06 15
 
Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606 Elgin Country Estate Project Summary as on 20160606
Elgin Country Estate Project Summary as on 20160606
 
cross-green1
cross-green1cross-green1
cross-green1
 
19-07-06 Scheme Description details
19-07-06 Scheme Description details19-07-06 Scheme Description details
19-07-06 Scheme Description details
 
Rosslyn Brewery SAIMechEng Projects&Systems Award 1987
Rosslyn Brewery SAIMechEng Projects&Systems Award 1987 Rosslyn Brewery SAIMechEng Projects&Systems Award 1987
Rosslyn Brewery SAIMechEng Projects&Systems Award 1987
 
Three Valleys Chertsey WTW 2005
Three Valleys Chertsey WTW 2005Three Valleys Chertsey WTW 2005
Three Valleys Chertsey WTW 2005
 
Suez Victorian Desalination Project
Suez Victorian Desalination ProjectSuez Victorian Desalination Project
Suez Victorian Desalination Project
 
focus-on-major-new-lp-gas-facilities-around-the-globe
focus-on-major-new-lp-gas-facilities-around-the-globefocus-on-major-new-lp-gas-facilities-around-the-globe
focus-on-major-new-lp-gas-facilities-around-the-globe
 
Whitescape Civil Engineering Case Study
Whitescape Civil Engineering Case StudyWhitescape Civil Engineering Case Study
Whitescape Civil Engineering Case Study
 
Marine_Brochure_For_Web
Marine_Brochure_For_WebMarine_Brochure_For_Web
Marine_Brochure_For_Web
 
Pipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & CatchpitsPipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & Catchpits
 
Cronulla wastewater treatment plant
Cronulla wastewater treatment plantCronulla wastewater treatment plant
Cronulla wastewater treatment plant
 
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
Office of River Protection Manager Scott Samuelson’s tank waste cleanup updat...
 
Sealing cables over land and sea - Panel Building & Systems Integration Magaz...
Sealing cables over land and sea - Panel Building & Systems Integration Magaz...Sealing cables over land and sea - Panel Building & Systems Integration Magaz...
Sealing cables over land and sea - Panel Building & Systems Integration Magaz...
 
Desalination
DesalinationDesalination
Desalination
 
Supplemental Services for Water Treatment Needs
Supplemental Services for Water Treatment NeedsSupplemental Services for Water Treatment Needs
Supplemental Services for Water Treatment Needs
 

Thames Perry Oaks-Iver South 2005

  • 1. 25 W a s t e w a t e r T r e a t m e n t & S e w e r a g e Sludge Process Works departs Heathrow Perry Oaks processing centre makes way for Terminal 5 by Andrew Gosling & Adam Hunter Mogden Sewage Treatment Works, serving West London’s catchment, is located close to Twickenham Rugby ground Since it was commissioned in 1936, as part of a major infrastructure project, the population equivalent has now reached over 1.8 million. Even at the time of construction the works was in the middle of a developing urban area and an alternative site was necessary for storage and processing sludge prior to disposal to agricultural land. The site chosen was Perry Oaks, approximately 10 miles west of Mogden. Twin sludge mains were constructed to pump sludge to the site. At the time this site was close to a small airfield but later this was developed into Heathrow, a rapidly expanding major international airport as we know it to be today - with the Perry Oaks site situated between two main runways. In 2001, agreement was reached between Thames Water and the BAA to decommission a large part of this site, allowing the major area to be released for airport use and Terminal Five development, and to provide alternative sludge processing facilities on the site of an existing small STW at Iver South. Perry Oaks/Iver South: Aerial view of Iver South Sludge Dewatering works. Photo: Courtesy Thames Water. Perry Oaks Decommissioning Over a period of many years liquid sludge was processed at Perry Oaks, both by air-drying and in latter years by deep lagoon storage prior to disposal to agricultural land. Clearance of liquid sludge was accelerated during the 1990’s and temporary centrifuges were installed to mechanically dewater all sludge received from Mogden. Decommissioning of the Perry Oaks site and setting up a residual operating area on a smaller part of the site has allowed the major area to be released for T5 development. Sludge dewatering operations continue on a small area of Perry Oaks until the new facilities at Iver South are complete. This has meant that construction at Terminal 5 could be started on the remainder of the site and sludge processing can remain in operation during construction of replacement facilities at Iver South and before final decommissioning. Relocation scheme The new works will comprise liquid sludge storage, sludge dewatering using centrifuge plant, and a large area for sludge cake storage. Enabling works for the scheme are extensive. These include uprating and extending the existing twin sludge mains from Mogden to Iver South, transfer of Iver South STW flows, provision of a new access to the site, together with upgrade and extension to the sludge stream at Mogden to ensure compatibility with the facilities at Iver South. One of the key initial tasks was the preparation of the Iver South site for development. This has included: * improving access off the A4 with junction improvement and widening the existing service road; * construction of a bridge over the Colnebrook river and extending the existing access road into the new site; * diversion of all sewage flows to a new pumping station with pipelines to an adjacent catchment; * new power and water supplies; * isolation of surrounding groundwater and flood water using a bentonite/cement cut-off wall; * satisfying all planning conditions, technical, procedural and and environmental. Robust solution One of the main needs of the plant has been to provide a robust solution, which was sufficiently flexible to receive sludge under various operating conditions and avoid storage at the source works. Sludge is delivered to site via twin 300mm diameter pumping mains and is discharged into two covered storage tanks. These provide initial storage and buffer capacity to give balanced feed to the dewatering centrifuges. The tanks are mixed by a pumped system, which also incorporates an air mixing process. The system
  • 2. 27 W a s t e w a t e r T r e a t m e n t & S e w e r a g e has been shown to be beneficial in minimising odours in the final cake product. In the event that these two tanks are full, the incoming sludge is diverted to one of six buffer storage tanks which are filled in sequence. Finally there is a storage lagoon, which provides an emergency storage capacity but this would only be used under extreme circumstance. Sludge is drawn from the covered storage tanks to feed one of four dewatering centrifuges, each with a capacity of 60m3 /hour. It is dewatered to 25% DS and conveyed by covered belt conveyors to the concrete hard standing area. A front-end loader is provided to move sludge cake from the slab into any of the four large covered storage bays. Each bay holds two weeks stock of sludge during normal operation. An additional uncovered storage is provided to cater for any restrictions on the disposal route to land. Normal duty is provided by two centrifuges, however, a third unit can be brought on line to deal with any backlog caused by power failures or increased sludge production at source. All site drainage is self contained and joins the process liquors in the site pumping station for pumping to an adjacent sewerage network. Process water is provided via a borehole, which taps artesian groundwater in the underlying chalk aquifer.Whilst capital costs for this solution are high, the saving in operating cost creates a 2 year payback period. Potable water use is restricted to the welfare facilities in the offices though sufficient supply volumes are available to cover emergency situations where the borehole is unavailable. New power supplies have been provided and standby generation installed to cover essential operations in the event of a power failure. Key partners Thames Water Utilities Ltd entered into alliance arrangements with contractors for delivery of this project. Laing O’Rourke acted as Principal Contractor for decommissioning work and development of the residual operating area. Costain Ltd were taken on as Principal Contractor for the main relocation scheme - including works at Iver South, Mogden and pipelines. Black & Veatch have been responsible for design. Current status All main structures are now complete. Plant and equipment has been installed ready for commissioning with handover scheduled for the end of 2005 - ahead of programme. Key process parameters Population Equivalent: 1.8 million; Dry solids treated 85 tonnes/day; Incoming sludge 2833m3 /day at 3% DS Final product 340m3 /day at 25% DS Key features A flood and groundwater cut-off wall 1250m long and 5m deep, was installed to contain any pollution migration and to exclude ground water and flood water from entering the site. Liquid sludge storage 1.5 days covered storage in two tanks, each 20m diameter. 4.5 days buffer storage in six tanks each 20m diameter. 5.5 days emergency storage in a lined lagoon. Sludge cake storage CTM Systems Limited The Hayloft Merrylees Farm Merrylees, LEICESTER LE9 9FE Telephone: 01455 828816 Facsimile: 01455 828110 e-mail: sales@ctm-systems.co.uk www.ctm-systems.co.uk SUPPLIERS OF: • Shafted & Shaft less screw conveyors • Troughed belt conveyors • Large diameters screws • Multi-screw live bottom bin dischargers • Storage and handling systems • Continuous Mixers • Batch Mixers • SPECIALISTS IN STAINLESS STEEL MANUFACTURING DESIGN, MANUFACTURE & INSTALLATION OF BESPOKE MECHANICAL HANDLING EQUIPMENT. CTM ARE PROUD TO BE INVOLVED WITH THE SUCCESSFUL IMPLEMENTATION OF THE SLUDGE OUTLOADING SCHEME AT IVER SOUTH. 785A
  • 3. 28 W a s t e w a t e r T r e a t m e n t & S e w e r a g e 8 weeks in 4No. 2 week capacity bays - covered. 22 weeks emergency storage - uncovered. Centrifuge sludge dewatering plant Comprising 4No. centrifuges, each capable of treating 50% of the design load operating as Duty, Duty, Catch-up and Standby. Biological odour control with carbon polishing To key process plant. New access roads, bridge and site services; storm water storage for 200 year event; standby power generation; development of groumd water sources to supply all process water requirements on site; offices for 22 personnel; landscaping and bunds at site boundary to provide screening and wildlife habitats; planted bird scrapes to recreate lost lagoon habitat. ■ Note on the authors: Andrew Gosling is Principal Project Manager, Thames Water; Adam Hunter is Design Manager, Black & Veatch. Perry Oaks/Iver South: Covered sludge cake area. Photo: Courtesy Thames Water. Perry Oaks/Iver South: Sludge holding tanks from odour control plant. Photo: Courtesy Thames Water.
  • 4. Perry Oaks/Iver South: Centrifuge plant. Photo: Courtesy Thames Water.